Vandenberg MW RFI-002.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Microwave Radio Link System Replacement Federal contract opportunity
- Solicitation number
- FA822824R0003
About this file
This document contains a request for information and clarification regarding a solicitation for a Microwave Radio Link System Replacement. The government seeks to replace four existing Alcatel/Lucent MDR-8000 Line of Sight microwave radio links with new Internet Protocol-based systems. Respondents are requested to provide company information including name, address, point of contact, NAICS code, DUNS number, CAGE code and socio-economic status. Quotes must be valid for a minimum of 30 days from January 18, 2024. Questions and responses regarding the statement of work and contract data requirements lists must be submitted in writing to the specified contracting specialist by that date. Additional details are requested on cutover requirements, function configuration audits, product warranties and the reuse of an existing clock for synchronization.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 6 March Industry Questions - Vandenberg MRL RFI-003.xlsx | XLSX spreadsheet | |
| Vandenberg MW RFI-001.xlsx | XLSX spreadsheet | |
| 10375 - Combined Solicitation-Synopsis 20230816.docx | DOCX document | |
| Solicitation - FA822824R0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Request for Information and Clarification - 2-11-2024 | |||
| Microwave Radio Link System Replacement: FA822824R0003 | |||
| Site | Question/Request from ITL | Government Response | |
| General | Requesting clarification on the cutover requirements, specifically the max downtime per hop. | ||
| a. | The proposed implementation is a parallel installation, reusing existing antennas and lines. | ||
| i. | Assumes the DoD can acquire additional frequencies. (Note: This is all base path, site survey verification, and NTIA coordination results) | ||
| ii. | Assuming the existing waveguide sweeps will meet passing specifications for the new design. | i. Government is not acquiring additional frequencies. |
ii. Government does not assume waveguides will pass specifications.
| General | 2. | Requesting clarification on section 2.3.5 of the SOW, for the Function Configuration Audit (FCA) and Physical Configuration Audit (PCA). | |
| a. | Provide additional technical specifications requirements for this proposal. As an alternative, standard field testing and acceptance procedures can be provided. | FCA/PCA is an audit that ensures that all drawings are correct, all labels (cable and equipment) are placed and accurate, and all equipment and softwrae and liscences are accounted for. | |
| General | Please detail warranty on routers. Manufacturers versus system life as described in RFP. | Manufacture warranty is adequate, needs to extend at least 1 year from the date of delivery- however all routers (and firmware/software) should not be within 5 years of product end of life/end of support. | |
| General | Confirm clock for syncronizing routers is existing and is to be reused | Clock exists, is in use, and should be reused | |
| General | Please provide official request for extension process. | CO to provide answer. |
File details come from the government source that posted it. Updated .