Vendor Questions and Government Responses - Revised.docx

DOCX document 14 KB Posted

Attached to
Procurement of 37 each Link-16 Mobile Racks - Amendment 6 Federal contract opportunity
Solicitation number
FA8224-20-Q-RCK2
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This combined synopsis and solicitation requests quotes for the procurement of 37 mobile racks to support Link 16 terminals. The Air Force Sustainment Center is seeking fixed price quotes by September 15th for transit case mounted UPS systems with a minimum 2,400 watt capacity and 10 minute backup time. The UPS units must meet MIL-STD specifications and include six 120V AC outlets and one L5-30R outlet. Quotes will be evaluated on technical compliance, price, and past performance. Award is expected within 52 weeks of order receipt by the responsible offeror providing the best value to the government.

View the file

Other files for this federal contract opportunity

Other files attached to Procurement of 37 each Link-16 Mobile Racks - Amendment 6, newest first.
File Type Posted
Vendor Questions and Government Responses 5.docx DOCX document
Vendor Questions and Government Responses 4.docx DOCX document
Vendor Questions and Government Responses 3.docx DOCX document
Combined Synopsis Solicitation - Link-16 Mobile Racks - FA8224-20-R-RCK2 Amendment 2.docx DOCX document
Vendor Questions and Government Responses 2.docx DOCX document
Vendor Questions and Government Responses.docx DOCX document
PURCHASE DESCRIPTION -Link 16 Mobile Rack.doc DOC document
Combined Synopsis Solicitation - Link-16 Mobile Racks - FA8224-20-R-RCK2.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. What devices and/or systems are being powered? All devices supported by the UPS requires 120VAC, 60Hz, Single Phase

1. What will the UPS be powered by (generator, grid, vehicle etc.)? Military Prime power and commercial source.

1. Where will the UPS be deployed? (office, shelter, shipboard, transit case, factory etc.) TRANSIT CASE

1. Is there a height and or mechanical size requirements for the UPS? Comply with MIL-STD-1472, 19” Rack, 2U high x 24” deep (max)

1. How much power (in Watts) does your system require? 120V * 20A = 2,400 W minimum

e. Do you have a specific run-time requirement? AT LEAST 10 MINUTES BACKUP TIME

2. Are there any MIL-STD specifications and/or certification(s) the unit needs to meet or be tested to?

Safety Test Standard EN 60950-1 Compliant, Type III Mobility per SAE-AS8090, MIL-STD-1472 compliant

3. What is the Input Voltage level? Into the UPS is 120V +-10% with 60Hz +- 5%. 20A, Single Phase What is the Output Voltage level? 120V AC, 60Hz, Single Phase, Sinewave Grounding Lug on case.

4. How many AC Outputs are required? Six each: 5-20R receptacles, One each: L5-30R receptacle How many DC Outputs are required? None

5. When do they need the UPS’s in hand? Need to come as a KIT to support the MIDS JTRS terminal How many do you need? 37ea.

6. Are any rack mounting hardware required? yes If so, how deep are the transit cases? 6in depth for the covers. Rack is 24in Does the customer required fixed or sliding rail kits? fixed

7. Are any cables required? (If so please specify) All supporting cables, (Input Power cable with L5-30P Connector)

8. What battery type is required? LFP battery type required

9. Is SNMP required? YES

10. Are there any other special requirements? FUNGUS RESISTANT; NSTISSAM Operating Temperature Range: +32 to +104 degrees Fahrenheit (0 to +40 degrees Celsius) Storage Temperature Range: +5 to +122 degrees Fahrenheit (-15 to +50 degrees Celsius) Relative Humidity 0 to 95%, non-condensing AC Mode BTU/Hr. (Full Load)): 44 Ac Mode Efficiency Rating (100% Load): 96% Audible Noise: 45dBA maximum (measured 1m from front side)