DESIGN-BUILD MACC III
PROJECT TITLE: Construct Blast Booth Enclosure on East Side of Bldg. 507
KRSM 162064
DATE: 12 May 2017
MACC III
Project # KRSM162064, W/O # 59163
| CONSTRUCT | BLAST | BOOTH | ENCLOSURE | ON | EAST | SIDE |
| OF | BLDG | 507 | | | | |
STATEMENT
OF
WORK
Rev d
1. SCOPE
This Project Statement of Work (SOW) defines the scope for the building 507 project
| KRSM162064. This SOW | includes | the | construction | requirements | that | the | MACC | III | | | | | | |
| contractor | shall | implement | in | the | design | and | construction | of | a | new | facility | enclosure | that | |
| shall | be | constructed | and | attached | to | the | east | side | of | building | 507. | This | new | building |
| enclosure | shall | be | constructed | for | the | purpose | of | housing | 2 | new | blast | booths | and | |
| appurtenance | equipment | that | shall | be | purchased | and | installed | under | a | separate | contract | | | |
| once | the | building | 507 | MACC | III | construction | enclosure | project | is | completed. | The | | | |
| approximate | building | layout | is | provided | in | the | attached | drawings. | These | drawings | show | the | | |
| desired | layout | with | approximate | dimensions | and | these | drawings | shall | be | used | as | guidance | | |
| in | the | design. | | The | contractor | shall | coordinate | all | design | information | with | the | project | |
| manager | and | also | with | the | building | 507 | process | engineer | to | verify | that | the | new | building |
| design | and | layout | meets | all | requirements. | | | | | | | | | |
| Note: | CLIN | 0002 | | EQUIPMENT | (also | see | paragraph | 3.0 | below): | The | contractor | shall | | |
| provide | a | proposal | for | a | complete | Dual | Overhead | Bridge | Girder | Crane | system | described | in | |
| paragraph | 3.0. | The | CLIN | 0002 | proposal | shall | include | the | system’s | equipment | and | | | |
| installation. | This | crane | system | proposal | shall | also | include | all | materials | and | labor | for | the | |
| installation | of | any | utilities | required | for | the | complete | crane | system | operation. | The | cost | of | the |
| reinforced | concrete | footings | for | the | crane | system | support | columns | shall | not | be | included | in | |
| the | crane | system | equipment | and | installation | cost. | The | concrete | footings | cost | shall | be | part | of |
| the | general | construction | scope | and | not | part | of | the | crane | equipment | installation. | The | | |
| government | reserves | the | right | not | to | include | CLIN | 0002 | Dual | Overhead | Bridge | Girder | Crane | |
| system | purchase | and | installation | as | part | of | the | contract. | The | government | may | decide | to | |
| purchase | the | crane | and | installation | under | a | separate | contract | and | contractor | at | a | later | date. |
All design services furnished by the Design Build MACC III contractor shall be performed under the direct supervision of licensed Professional Engineers (PE) and licensed Architects. The Professional Engineers and Architects shall be licensed in the state of Utah. The contractor, through his or her designer, is responsible for the accuracy, adequacy, timeliness, and professionalism of the design solutions and design documents. The contractor shall ensure that all designs and solutions meet the requirements of the contract documents for this building 507 project.
1.1. Efficient project management shall include accurate on-time submittals for successful project execution. Contractor requirements include early involvement in the planning and design process to insure a successful project outcome. The contractor shall provide a superior design along with cost-effective and technically-sound solutions. The contractor shall perform all work in accordance with (IAW) federal, state, and local statutes and regulations.
| 2. EQUIPMENT | ENCLOSURE | REQUIREMENTS: | The | Enclosure | shall | be | designed | and | | | | |
| constructed | as | a | weather‐tight | enclosure | design | to | house | two | blast | booths | with | structurally |
| boxed | out | areas | for | two | exhaust | ducts | and | the | associated | blast | media | recovery | system | that | |
| will | penetrate | the | south | facing | wall. | These | two | blast | booths, | exhaust | ducts | and | media | | |
| recover | will | be | installed | under | a | different | contract | once | this | building | enclosure | is | | | |
| completed. | The | MACC | III | contractor | for | this | building | 507 | new | construction | enclosure | | | | |
| project | shall | structurally | box | out | the | south | wall | areas | in | the | locations | where | the | two | blast |
| media | exhaust | ducting | will | penetrate | the | wall | at | a | later | date. | | | | | |
| The | contractor | shall | design, | provide, | and | install | the | HVAC | system | equipment, | dual | | | | | | |
| bridge | overhead | cranes | system, | and | all | associated | material | or | footings | requirements | for | the | | | | | |
| crane | support | columns | and | installation, | fire | suppression, | hand | guard | rails | to | keep | | | | | | |
| employees | on | the | higher | level | dock | area | safe | from | falling | to | the | lower | floor | area, | stairs | to | go |
| from | the | higher | dock | area | to | the | lower | floor | area | at | the | locations | shown | on | the | attached | |
| drawings, | compressed | air | piping | and | breathing | air | piping, | and | any | other | equipment | | | | | | |
| appurtenances | listed | or | explained | in | this | SOW. | | | | | | | | | | | |
| The | contractor | shall | provide | and | install | two | 18’ | wide | x | 15’ | high | roll | up | doors | on | the | | |
| east | wall | of | the | enclosure | and | there | shall | be | two | man | doors | (one | on | the | north | side | wall | and |
| one | on | the | south | side | wall) | of | the | new | building | enclosure. | | | | | | | | |
| 2.1 | | | | | | | EQUIPMENT | BUILDING | ENCLOSURE | DESIGN: | | (Refer | to | concept | floor | plan | drawings) | The |
| new | building | enclosure | shall | structurally | and | architecturally | be | designed | and | constructed | to | | | | | | | |
| connect | with | building | 507 | on | the | east | wall | side | of | the | present | building | 507. | The | enclosure | | | |
| shall | connect | at | the | north | side | of | the | exterior | process | door | opening | that | is | currently | sealed | | | |
| closed | with | temporary | siding | material. | The | present | door | is | presently | covered | with | siding | | | | | | |
| materials, | other | materials, | some | utilities | and | they | shall | be | removed | from | where | this | | | | | | |
| opening | will | be, | to | provide | the | entrance | path | into | the | new | enclosure | area | from | the | main | | | |
| building | 507 | process | area. | Any | utilities | (electrical, | air, | water, | etc.) | that | are | removed | shall | be | | | | |
| re‐routed | and | replaced. | | | | | | | | | | | | | | | | |
| The | door | opening | entrance | size | from | the | main | building | 507 | into | the | new | blast | booth | | |
| building | area | shall | be | 22’ | wide | X | 13’ | high. | This | entrance | door | opening | shall | be | framed | and |
| flashed | with | heavy | gauge | sheet | metal | and | painted | to | provide | a | nice | appearance | and | also | to | |
| provide | protection | from | rust | and | the | process | carts | which | may | bump | into | the | entrance | | | |
| corners. | This | is | where | the | north | wall | of | the | new | building | enclosure | shall | tie | into | the | existing |
| building | 507 | wall | as | shown | on | the | concept | floor | plan | drawings. | | | | | | |
| The | existing | building | 507 | east | wall | will | be | used | as | the | west | wall | of | the | new | enclosure | |
| area. | The | south | wall | shall | be | located | approximately | 104 | feet | to | the | south | of | the | north | new | |
| building | wall | tie | in | point | per | the | concept | floor | plan | drawings. | This | south | wall | will | run | in | the |
| east | direction | and | shall | be | approximately | 57 | feet | long | (refer | to | layout | drawings). | The | north | | | |
| side | wall | of | the | enclosure | angles | across | the | dock | at | the | down | ramp | area | and | towards | the | |
| natural | gas | meter | area | as | shown | on | the | Government | supplied | concept | drawing | plan. | | | | | |
| The | government | drawings | attached | are | approximate | and | it | is | the | responsibility | of | | | | | | | |
| the | contractor | to | field | measure | and | verify | all | government | supplied | drawings | information | | | | | | | |
| for | accuracy | and | the | contractor | shall | only | use | these | drawings | as | guidance. | For | bidding | | | | | |
| purposes | this | enclosure | area | is | approximately | 4,700 | square | feet. | The | roof | height | of | the | new | | | | |
| enclosure | shall | be | the | same | elevation | as | the | existing | main | building | 507 | east | wall | roof | | | | |
| height. | The | new | blast | booth | building | enclosure | roof | and | the | existing | building | 507 | roof | shall | | | | |
| connect | at | this | point | on | the | east | side | of | building | 507. | This | height | of | the | new | enclosure | at | the |
| main | building | roof | connection | point | is | approximately | 25 | feet | +/‐ | a | few | inches | as | measured | | | | |
| from | the | top | of | the | asphalt | elevation. | | | | | | | | | | | | |
| The | contractor | shall | take | all | required | field | measurements | of | the | existing | building | | | |
| 507 | for | use | in | the | design | drawings | that | the | contractor | shall | provide. | The | interior | clear |
| height | measured | from | the | dock | floor | to | the | underside | of | the | ceiling | in | the | new |
| building | enclosure | shall | be | designed | to | provide | the | maximum | possible | height | to | allow | head | | |
| space | for | the | new | blast | booth | and | dual | bridge | crane | installation. | The | dual | bridge | crane | shall |
| be | designed | to | provide | the | maximum | hook | heights | that | are | possible | for | crane | travel | without | |
| obstructions | and | never | shall | the | crane | maximum | hook | heights | be | less | than | 12 | feet. | | |
| The | new | building | enclosure | shall | also | have | the | same | type | of | fascia | as | the | fascia | | |
| that | is | on | the | overhang | area | located | to | the | north | of | the | gas | meter | equipment | area. | The |
| existing | building | 507 | windows | that | are | located | below | the | roof | line | fascia | on | the | existing | | |
| east | building | 507 | wall | shall | remain | in | place. | | | | | | | | | |
| 2.2 | | | | | | | BUILDING | ENCLOSURE | WALLS: | | The | contractor | shall | provide | a | 2’ | high | and | a |
| minimum | of | 8” | thick | reinforced | concrete | stem | wall | on | top | of | the | south | dock. | The | stem | wall | | | | |
| shall | continue | to | the | end | of | the | dock | and | down | to | the | ground | level | elevation | (present | | | | | |
| asphalt | elevation) | and | at | ground | level | it | shall | be | 5’ | (+/‐) | high | measured | from | the | ground. | | | | | |
| The | dock | elevation | measured | from | the | ground | is | about | 3’ | (+/‐). | The | stem | wall | design | shall | | | | | |
| make | sure | that | the | top | of | both | the | 2’ | high | dock | stem | wall | and | the | 5’ | high | ground | wall | are | at |
| the | same | elevation | at | the | top | of | the | two | walls | and | they | shall | be | level | all | the | way | around | the | |
| stem | wall | perimeter. | Note: | There | shall | not | be | a | stem | wall | in | the | design | of | the | top | of | the | | |
| north | dock | side | wall. | This | is | the | side | wall | that | is | located | over | the | top | of | the | equipment | room | | |
| (see | layout | concept | drawing | and | pictures) | and | will | be | at | an | angle. | There | is | no | requirement | | | | | |
| for | a | stem | wall | on | top | of | this | north | dock | side. | The | reason | for | omitting | a | stem | wall | at | the | |
| north | dock | is | to | reduce | the | load | over | the | concrete | dock | floor | that | is | on | top | of | the | equipment | | |
| room | below. | This | north | side | metal | wall | shall | have | a | heavy | duty | guard | rail | designed | and | | | | | |
| installed | on | the | interior | side | of | the | wall | to | protect | this | wall | from | any | process | material | | | | | |
| handling | and | cart | traffic. | This | north | dock | side | wall | shall | be | designed | of | metal | framing | and | | | | | |
| siding | without | a | concrete | stem | wall. | The | north | wall | portion | that | is | located | at | ground | level | | | | | |
| below | the | dock | (presently | the | asphalt | elevation) | shall | have | a | stem | wall | 5’ | (+/‐) | high | and | a | | | | |
| minimum | of | 8” | thick | reinforced | concrete | and | the | top | of | this | stem | wall | shall | be | level | with | the | | | |
| top | elevation | of | the | east | and | south | stem | walls. | These | stem | walls | shall | go | around | the | | | | | |
| perimeter | of | the | new | enclosure | except | for | the | north | wall | located | on | top | of | the | dock. | The | | | | |
| stem | walls | shall | have | openings | where | the | enclosure | doors | will | be | located. | The | concept | is | | | | | | |
| that | the | top | of | the | dock | stem | walls | and | the | top | of | the | ground | level | stem | walls | will | be | level | |
| with | each | other | around | the | entire | perimeter | of | the | new | enclosure | addition. | The | dock | area | is | | | | | |
| approximately | 3’ | high | from | ground | level | and | this | is | why | the | stem | wall | will | be | taller | at | the | | | |
| ground | level | area | than | the | stem | wall | will | be | at | the | south | dock | wall | area. | The | top | of | all | the | |
| stem | walls | will | be | level | with | each | other | around | the | entire | perimeter. | The | concrete | stem | | | | | | |
| walls | shall | be | scored | or | embossed | on | the | exterior | face | to | match | the | profile | and | look | of | the | | | |
| existing | serrated | building | 507 | wall | panels. | | | | | | | | | | | | | | | |
| The | building | enclosure | upper | portion | of | the | walls | shall | be | 22 | gauge | corrugated | metal | | |
| panels | on | the | exterior | with | 22 | gauge | full | height | metal | interior | liner | panel. | New | metal | wall |
| panels | shall | extend | down | over | the | concrete | curb | and | concrete | stem | wall | a | minimum | of | 2” |
| and | be | properly | flashed. | The | new | exterior | metal | panels | shall | match | as | close | as | possible | to |
| the | wall | profile | and | color | of | building | 507. | The | contractor | shall | provide | submittals | for | the | |
| proposed | wall | design. | This | wall | design | and | material | submittal | shall | be | reviewed | by | the | | |
| government | and | government | approval | is | required | before | the | contractor | is | to | purchase | the | | | |
| materials | for | the | walls. | The | contractor | submittal | shall | at | the | minimum | include | materials, | | | |
| profile | drawing | details, | and | colors | proposed. | | | | | | | | | | |
| The contractor shall provide a minimum wall R-value of R-17 at all walls that | extend | | | | | | | | | | | | | |
| above | the | concrete | knee | wall. | The | entire | new | enclosure | building | shall | be | designed | and | |
| constructed | to | meet | all | snow | loads, | wind | loads, | and | seismic | requirements | for | this | northern | |
| Utah | geographical | location | per | UFC | 3‐301‐01. | The | colors | of | all | materials | shall | meet | Hill | AFB |
| Architectural | compatibility | requirements | and | they | shall | be | submitted | to | the | Hill | AFB | project | | |
| manager | for | approval | before | using | them | for | construction. | Provide | a roof metal fascia to | | | | | |
extend down the face of the metal wall panels of the same length and profile to match the fascia
| height on the existing adjoining canopy just to the north of the project site. Provide | roof | gutters | | | | | | | | | |
| and | downspouts | designed | in | accordance | with | SMACNA | standards | (also | see | description | of |
| roof | and | roof | gutter | scope | in | paragraph | 2.3 | Roofing). | | | |
| The | blast | booth | exhaust/blast | media | recovery | system | ducting | will | penetrate | the | | | | | |
| south | wall | in | two | locations | after | this | enclosure | project | is | completed. | This | MACC | III | | |
| contractor | is | responsible | for | structurally | boxing | in | these | two | penetration | locations | at | the | | | |
| areas | shown | on | the | attached | layout | drawings. | The | two | exhaust/media | recovery | ducts | will | | | |
| penetrate | the | south | wall | and | be | attached | to | these | boxed | and | reinforced | structure | locations | | |
| at | a | later | time. | The | design | of | these | structurally | boxed | areas | shall | be | coordinated | with | the |
| government | project | manager | to | assure | the | boxed | in | locations | are | correct | and | to | prevent | | |
| any | re‐work | later. | These | boxed | areas | shall | prevent | the | need | to | disturb | or | re‐locate | any | |
| building | structural | steel | beams | or | purlins | later | when | it | comes | time | to | install | the | blast | booth |
| exhaust | ducting | or | media | recovery | ducting. | The | exhaust | duct | and | media | recovery | duct | size | | |
| is | 24” | and | the | penetration | hole | diameter | size | and | structural | boxed | area | sizes | required | shall | |
| allow | for | correct | anchoring | and | flashing | at | these | locations. | These | duct | sizes | and | locations | | |
| are | shown | on | the | attached | drawings. | | | | | | | | | | |
| 2.3 | | | | FOUNDATION: | The | design | of | the | new | building | enclosure | foundation | and | footings | shall | | |
| make | sure | that | the | new | foundation | and | footings | do | not | interfere | with | the | existing | | | | |
| equipment | that | is | in | place | inside | the | equipment | room. | The | equipment | room | is | located | under | | | |
| the | existing | dock | concrete | floor. | The | new | foundations | and | footings | shall | also | not | interfere | | | | |
| with | the | new | overhead | dual | bridge | crane | that | will | be | installed | on | top | of | the | dock | floor | and |
| also | not | interfere | with | the | new | blast | booths | and | media | recovery | systems | that | will | be | | | |
| installed | at | a | later | time. | | | | | | | | | | | | | |
| If | the | structural | footings | are | above | the | floor | elevation | in | the | equipment | room | or | | | | | |
| inside | any | portion | of | the | new | building | enclosure, | then | the | structural | footings | shall | not | | | | | |
| protrude | more | than | 24” | into | the | enclosure | room | area | measuring | from | the | inside | wall | | | | | |
| perimeter | of | the | new | building | enclosure | room. | This | is | necessary | so | that | the | structural | | | | | |
| footings | or | columns | do | not | interfere | with | the | existing | equipment | or | the | new | process | | | | | |
| equipment | or | operations | procedures | of | the | two | new | blast | booths | and | associated | equipment | | | | | | |
| appurtenances | that | will | be | installed | after | the | enclosure | project | is | completed. | Note: | All | | | | | | |
| excavation | work | within | 15 | feet | of | a | Questar | high | pressure | natural | gas | distribution | line | will | | | | |
| require | Questar | Gas | technicians | to | be | on‐site | during | the | excavation. | | Contractor | shall | | | | | | |
| coordinate | this | through | Blue | Stakes. | | | | | | | | | | | | | | |
| 2.4 | | | ROOFING: | | The | roof | shall | be | a | standing | seam | metal | roof | (double | lock | – | machine | seamed) |
| and | shall | be | from | a | continuous | roll | sheet | from | ridge | to | eave. | At | a | minimum | the | roof | R‐value | |
| shall | be | R‐30. | Provide | a | roof | fascia | to | extend | down | the | face | of | the | metal | wall | panels | of | |
| length | and | profile | to | match | fascia | height | on | the | existing | adjoining | canopy | just | to | the | north | of | | |
| the | project | site. | Comply | with | NRCA | (National | Roofing | Contractors | Association) | standard | | | | | | | | |
| details | for | the | metal | roof | and | fascia. | The | roof | shall | slope | away | from | building | 507 | towards | | | |
| the | east. | The | roof | slope | shall | never | be | less | than | 1:12 | slope. | The | new | roof | color | shall | match |
| the | existing | canopy | roof | color | and | fascia | color. | | | | | | | | | | |
| The | complete | structure | shall | be | designed | to | meet | or | exceed | all | Utah | State | seismic | | | | |
| zone | codes | requirements | and | the | roof | shall | be | designed | for | all | roof | loads | including | all | snow | | |
| loads, | wind | loads, | and | any | roof | equipment | loads | for | this | geographical | area | per | all | applicable | | | |
| codes | and | requirements. | (Also | see | UFC | 3‐301‐01). | Provide | roof | snow/ice | dams | and | a | roof | | | | |
| gutter | drain | system | including | heat | tape | for | the | complete | gutter | system | to | insure | proper | | | | |
| drainage | for | all | areas | and | for | the | down | spouts | to | flow | freely | from | the | roof | gutter | system. | |
| The | contractor | shall | provide | and | install | a | heat | tape | temperature | controller | inside | of | the | | | | |
| building | for | proper | heat | tape | auto | temperature | adjustment | and | also | install | a | fault | indicator | | | | |
| that | clearly | indicates | when | the | heat | tape | is | operating | and | when | there | is | a | fault | in | the | heat |
| tape | system. | | Any | roof | or | wall | penetrations | and | connections | including | to | the | main | building | | | |
| shall | be | completely | sealed | from | any | infiltration | or | leakage. | This | roof | system | shall | meet | all | | | |
| NFPA | and | UFC | requirements | and | the | complete | roof | system | shall | be | water | proof. | This | new | | | |
| roof | shall | also | provide | full | protection | against | all | weather | conditions. | All | roof | flashing | | | | | |
| designs | shall | be | submitted | for | approval | by | the | Hill | AFB | Architects | and | project | manager. | The | | | |
| colors | of | all | materials | shall | be | submitted | to | the | Hill | AFB | project | manager | for | approval | | | |
| before | purchase | and | installation. | | Design | and | install | ice | and | snow | protection | for | the | existing | | | |
| gas | meter | equipment | that | is | located | at | the | north | east | corner | area | of | the | elevated | dock | area. | |
| The gas | meter | location | is | shown | on | the | attached | layout | drawings. | The | protection | of | | | | |
| this | gas | meter | can | be | a | metal | lean | to | type | design | that | is | structurally | designed | to | withstand |
| all | inclement | weather | conditions | and | keep | roof | ice | from | falling | onto | the | gas | meter. | This | gas | |
| meter | protection | structure | shall | also | be | architecturally | compatible | with | Hill | AFB | | | | | | |
| requirements | and | allow | for | easy | maintenance | of | the | natural | gas | meter | and | piping. | A | | | |
| submittal | of | the | proposed | design | shall | be | provided | to | the | government | project | manager | for | | | |
| review | and | approval. | | | | | | | | | | | | | | |
| 2.5 | | | EQUIPMENT | ACCESS | DOORS: | | The | blast | booth | enclosure | shall | be | equipped | with | two |
| electric | type | opening | heavy | metal | 18 | gauge | powder | coat | painted | steel | roll | up | doors. | These | | |
| roll | up | doors | are | required | to | facilitate | equipment | maintenance | and | blast | media | removal | | | | |
| from | the | area. | The | contractor | shall | evaluate | NFPA | and | UL | requirements | for | these | two | roll | | |
| up | doors | and | also | requirements | for | the | two | man | egress | doors. | The | contractor | shall | provide | | |
| and | install | doors | that | meet | all | code | requirements. | The | contractor | shall | provide | and | install | | | |
| automatic | door | closers | on | the | man | doors. | The | contractor | shall | provide | all | materials | and | | | |
| labor | for | the | complete | doors | installations | including | all | of | the | required | electrical | work | (460 | | | |
| V/3PH/60HZ) | for | these | roll | up | doors. | The | electric | opening | steel | roll | up | doors | shall | be | heavy | |
| duty | storm | tight | doors | (example: | Cookson | Thermiser | style | storm | tight | insulated | roll | up | | | | |
| doors | or | equal) | and | the | roll | up | door | slats | shall | be | insulated | with | closed | cell | high | density |
| polyurethane | foam | insulation. | | | | | | | | | | | | | | |
| The | roll | up | doors | shall | also | be | constructed | of | 18 | gauge | steel | that | is | galvanized, | | | | |
| phosphatized, | and | polyester | powder | coat | painted | on | the | outdoors | side | and | 24 | gauge | steel | | | | | |
| that | is | galvanized, | phosphatized, | and | polyester | powder | coat | painted | on | the | interior | side. | | | | | | |
| These | doors | shall | be | designed | for | an | inside | fit | and | the | roll | up | doors | shall | be | installed | on | the |
| inside | of | the | building | to | keep | the | door | hood, | motor, | and | barrel | out | of | the | inclement | weather | | |
| conditions. | The | hood | for | these | doors | shall | also | be | steel | that | is | galvanized, | phosphatized, | and | | | | |
| polyester | powder | coat | painted. | The | guides | shall | be | structural | steel, | phosphatized, | and | | | | | | | |
| polyester | powder | coat | painted. | These | roll | up | doors | shall | also | have | a | manual | override | chain | | | | |
| hoist | system | on | each | door | for | opening | and | closing | the | doors | in | case | of | power | failure. | The | | |
| two | roll | up | doors | will | be | located | on | the | East | side | of | the | enclosure | as | | | | |
| shown | on | the | layout | drawings. | | The | size | of | each | of | the | roll | up | doors | shall | be | 18’ | wide | and |
| 15’ | tall. | | There | shall | be | 2 | personnel | egress | doors | (man | doors) | located | at | the | lower | level | of | | |
| the | enclosure | to | exit | to | the | outside | as | shown | on | the | concept | layout | drawings. | All | doors | shall | | | |
| be | metal, | powder | coat | painted | and | insulated. | | | | | | | | | | | | | |
| 2.6 | | | | PAD | MOUNTED | OVERHEAD | CRANE: | The | contractor | shall | design, | provide, | and | install | an | | | |
| overhead | dual | bridge | crane | system | that | includes | reinforced | concrete | footings | for | all | of | the | | | | | |
| crane | structural | columns | and | their | respective | mounting | locations. | The | overhead | dual | bridge | | | | | | | |
| crane | system | shall | be | primed | and | painted | safety | yellow | in | color. | The | dual | bridge | crane | | | | |
| system | shall | be | designed | and | installed | so | that | there | are | two | bridge | cranes | installed | on | the | | | |
| same | structural | railway | travel | system. | Each | bridge | crane | shall | be | operated | independently | of | | | | | | |
| the | each | other | and | they | may | both | be | operated | at | the | same | time | if | the | operator | choses | to | do |
| so. | The | dual | bridge | crane | system | shall | be | installed | on | the | existing | dock | area | to | assist | the | | |
| building | 507 | customers | in | material | handling | operations | or | parts | staging. | Each | bridge | crane | | | | | | |
| shall | be | rated | at | a | minimum | of | one | ton | capacity. | The | two | bridge | cranes | shall | each | have | two | |
| speeds | or | more | capability | and | they | shall | be | provided | with | remote | control | operation. | The | | | | | |
| contractor | shall | provide | the | remote | control | crane | operator | pendants | for | each | bridge | crane | | | | | | |
| and | the | contractor | shall | also | provide | crane | operator | training. | The | crane | operator | training | | | | | | |
| shall | be | provided | by | a | certified | crane | manufacture | trainer. | These | two | bridge | cranes | shall | | | | | |
| have | pendant | controls | for | each | bridge. | The | two | bridge | cranes | shall | each | have | a | minimum | | | | |
| hook | height | of | 12 | feet | as | measured | from | the | dock | floor | elevation | on | up | to | the | crane | hook | |
| elevation. | Maximum | available | hook | height | is | desired. | | | | | | | | | | | | |
| The | crane | and | building | enclosure | shall | be | designed | to | provide | maximum | available | | | | | | | |
| crane | hook | height | without | any | interference | of | obstacles. | Bridge | crane | stop | locations | shall | | | | | | |
| be | coordinated | with | the | Hill | AFB | project | manager | and | the | process | engineer. | This | overhead | | | | | |
| crane | system | shall | be | designed | to | span | entire | length | and | width | of | the | new | enclosure | dock | | | |
| area, | and | this | crane | system | shall | to | be | able | to | lift | from | any | point | within | this | dock | area | span. |
| The | dock | area | span | is | approximately | 70’ | by | 24’, | but | the | contractor | shall | field | measure | and | | | |
| verify | the | exact | measurements | of | the | full | dock | area | room | span | (see | concept | layout | plan). | | | | |
| The | contractor | is | required | to | load | test | the | dual | bridge | crane | system | and | provide | | | | | |
| written | certification | documenting | that | the | crane | system | meets | all | safety | requirements | and | | | | | | | |
| that | the | crane | system | passed | all | of | the | required | load | tests. | This | load | test | shall | be | done | by | a |
| third | party | crane | load | testing | company | that | is | certified | to | inspect | and | load | test | cranes. | | | | |
| Bridge | stop | locations | shall | be | coordinated | with | the | Hill | AFB | project | manager | and | the | | | | | |
| process | engineer. | | | | | | | | | | | | | | | | | |
| | | | | | | | | 2.7 | | | | FLOORING: | The | contractor | shall | remove | all | of | the | existing | asphalt | in | this | new | building |
| enclosure | site | area | below | the | dock | so | that | the | new | concrete | floor | and | perimeter | footings | | | | | | | | | | | | |
| can | be | installed. | The | contractor | shall | remove | as | much | of | the | existing | asphalt, | gravel | and | | | | | | | | | | | | |
| dirt | required | to | prepare | the | site | for | the | new | installation. | The | removed | material | that | will | | | | | | | | | | | | |
| not | be | reused | (asphalt, | dirt, | gravel) | shall | be | hauled | away | by | the | contractor | and | taken | off | | | | | | | | | | | |
| Hill | AFB | property. | | | | | | | | | | | | | | | | | | | | | | | | |
| This | waste | material | that | is | hauled | away | shall | be | disposed | of | at | a | government | | | |
| approved | land | fill | site. | The | area | where | the | asphalt | was | removed | shall | be | filled | with | the | |
| new | civil | engineer | designed | material | and | then | compacted | as | designed | and | required | for | | | | |
| the | new | 6”‐ | 7” | thick | reinforced | 5,000 | psi | rating | concrete | floor. | This | new | concrete | floor | | |
| shall | match | the | elevation | of | the | asphalt | floor | area | elevation | before | removal, | and | it | is | | |
| critical | that | the | new | concrete | floor | be | level. | The | concrete | floor | is | required | to | be | level | for |
| the | installation | of | the | two | blast | booths | per | the | blast | booths | manufactures’ | | | | | |
| specifications. | These | two | blast | booths | will | be | installed | under | a | different | contract | once | the |
| enclosure | is | completed. | | | | | | | | | | | |
| There | is | an | oil | water | separator | located | underground | in | this | area | and | it | has | a | round |
| metal | cover | that | can | be | seen. | The | underground | oil | water | separator | and | metal | cover | that | is |
| visible | at | the | ground | floor | elevation | shall | remain | in | place. | The | finished | concrete | floor | | |
| elevation | shall | be | at | the | same | elevation | as | the | top | of | the | oil | water | separator | elevation. |
| There | shall | be | a | smooth | elevation | transition | from | the | new | building | enclosure | area | out | to | |
| the | street | area, | so | that | fork | lifts | entering | and | leaving | the | enclosure | through | the | roll | up |
| doors | will | have | a | smooth | easy | transition | into | and | out | of | the | enclosure. | The | enclosure | |
| concrete | slab | shall | meet | or | exceed | 5,000 | psi | compression | tests | requirements. | The | | | | |
| contractor | shall | have | this | concrete | tested | by | a | third | party | certified | concrete | lab | testing | | |
| company | and | the | written | concrete | test | results | shall | be | signed | and | dated | by | the | lab | and |
| submitted | to | the | government | project | engineer. | | | | | | | | | | |
| The | contractor | shall | provide | an | industrial/manufacturing | grade | (heavy | duty) | epoxy | | | | | | |
| floor | coating | for | all | concrete | floor | areas | of | this | new | enclosure | building | (dock | floor | area | and |
| lower | new | concrete | floor | area). | The | contractor | shall | provide | a | submittal | for | the | heavy | duty | |
| epoxy | coating | they | propose | to | use | for | this | project | and | government | approval | is | required | | |
| prior | to | purchase | or | installation | of | this | epoxy | floor | coating | system. | | | | | |
| The | repair | or | replacement | of | the | upper | dock | concrete | area | shall | be | evaluated | by | the | | | |
| contractor | and | the | contractor | shall | provide | two | design | options | of | how | this | area | can | best | be | | |
| repaired | or | replaced. | It | may | be | possible | to | grind | and | resurface | this | dock | area | so | that | all | of |
| the | expansion | joint | concrete | sections | and | transitions | are | level | and | at | the | same | elevation. | It | | | |
| is | also | possible | that | these | concrete | areas | need | to | be | removed | and | replaced. | The | contractor | | | |
| shall | evaluate | the | dock | area | and | provide | two | options | of | how | correct | this | problem. | The | | | |
| existing | dock | area | expansion | joint | filler | material | shall | be | removed | and | the | expansion | joint | | | | |
| shall | be | cleaned | per | the | recommendations | of | the | filler | material | manufacture. | Proper | | | | | | |
| cleaning | of | the | joints | is | critical | for | long | lasting | joint | filler | adhesion | and | for | proper | | | |
| installation | and | wear. | | | | | | | | | | | | | | | |
| The | new | epoxy | floor | installation | shall | be | compatible | with | the | expansion | joint | | | | | | | |
| material. | If | this | is | not | the | best | way | to | correct | this | joint | sealing | problem, | then | the | contractor | | |
| shall | give | his | or | her | recommendation | of | how | to | accomplish | the | best | results | and | design | the | | | |
| solution. | There | are | large | holes | in | the | existing | dock | floor | and | also | at | the | drop | off | end | of | dock |
| side | wall. | These | holes/voids | are | where | machinery | used | to | be | located | and | this | machinery | | | | | |
| has | been | removed | leaving | large | hole | areas | that | need | to | be | filled. | The | filler | material | shall | be | | |
| compacted | per | the | contractors | engineering | design, | and | then | poured | and | filled | with | new | | | | | | |
| 5000 | psi | rated | reinforced | concrete. | The | largest | dock | area | hole | is | approximately | 13’ | X | 8’ | X | | | |
| 3’. | These | holes/voids | shall | be | filled | and | finished | to | match | the | rest | of | the | top | dock | floor | | |
| elevation. | The | top | elevation | of | the | new | enclosure | dock | floor | area | shall | be | leveled | to | match | | | |
| the | building | 507 | floor | elevation. | | | | | | | | | | | | | | |
| The | complete | dock | floor | area | needs | to | be | designed | and | repaired | or | replaced | using | | | |
| the | best | available | self‐leveling | concrete | filling | material | to | level | all | areas | that | need | filler | and | | |
| then | a | heavy | duty | epoxy | floor | system | shall | be | applied | over | the | top | of | the | dock | area |
| concrete | floor | as | mentioned | above. | The | end | result | shall | be | a | finished | concrete | floor | surface | | |
| with | an | epoxy | coating | covering | the | entirety | of | the | upper | dock | level | area. | The | contractor | | |
| shall | propose | the | two | best | repair | or | replacement | methods | and | the | best | materials | to | | | |
| accomplish | the | dock | floor | leveling | work. | The | contractor | shall | provide | the | best | leveling | | | | |
| filler | material | available | so | that | the | floor | will | not | fracture, | crumble, | or | sustain | any | damage | | |
| under | heavy | moving | equipment | point | loads | applied | by | process | operators | pushing | | | | | | |
| materials | handling | equipment | carts, | forklifts, | and | by | the | loading | and | unloading | of | parts | and | | | |
| parts | staging | on | the | concrete | floor. | | | | | | | | | | | |
There will also
| be | parts | beings | off | loaded | and | loaded | into | and | out | of | the | blast | booths. | The | contractor | shall |
| also | provide | the | warranty | information | for | the | proposed | floor | repair | or | replacement | | | | | |
| construction | and | the | government | will | prefer | the | method | with | the | longest | warranty | period. | | | | |
| Note: | There | is | a | mechanical | equipment | room | below | the | dock | floor | level | at | the | north | end | of |
| the | dock | and | this | concrete | floor | area | repair | will | require | the | best | available | engineering | | | |
| solution | also. | The | contractor | shall | provide | submittals | for | review | and | approval | by | the | | | | |
| Government | project | manager | and | the | process | engineer | before | this | concrete | work | is | | | | | |
| started. | Note: | All | excavation | work | within | 15 | feet | of | a | Questar | high | pressure | natural | gas | | |
| distribution | line | will | require | Questar | Gas | technicians | to | be | on‐site | during | the | excavation. | | | | |
| Contractor | shall | coordinate | this | through | Blue | Stakes. | | | | | | | | | | |
| 2.8 | | | | ELECTRICAL | POWER | SYSTEM: | The | contractor | is | responsible | for | all | electrical | materials, | | |
| labor, | and | electrical | installation. | There | is | a | main | electrical | buss | duct | system | overhead | inside | | | |
| the | building | 507 | process | area. | This | buss | duct | is | approximately | 90 | feet | away | from | the | new | |
| enclosure | entrance | opening | which | leads | to | the | new | blast | booth | enclosure | area. | The | | | | |
| contractor | shall | tap | into | this | buss | duct | to | obtain | the | electrical | power | requirements | of | the | | |
| new | blast | booth | enclosure | area. | The | contractor | shall | provide | and | install | an | electrical | safety | | | |
| disconnect | switch | at | the | buss | duct | and | run | all | conduit | and | wires | required | for | the | power | of |
| the | new | enclosure | area. | | | | | | | | | | | | | |
| The | contractor | shall | first | evaluate | and | verify | that | there | is | sufficient | electrical | | | | |
| capacity | at | this | overhead | electrical | buss | duct | location | to | supply | all | of | the | electrical | | |
| requirements | of | the | new | blast | booth | enclosure. | If | the | contractor | determines | that | the | power | | |
| available | at | the | buss | duct | location | is | not | sufficient | to | feed | the | power | requirements | of | the |
| new | blast | booth | enclosure, | then | the | contractor | shall | obtain | the | power | from | the | southeast | | |
| electrical | vault | location. | | | | | | | | | | | | | |
| The | Contractor | shall | provide | and | install | 1 | each | 400 | amp | underwriters | Lab | (UL) | | | | |
| listed | and | labeled | electrical | power | panel | for | the | 277/480 | V, | 3ph | electrical | power | required | | | |
| for | the | new | building | enclosure. | The | power | panel | shall | be | UL | listed | and | labeled | and | it | shall |
| have | a | minimum | of | 42 | circuit | breaker | spaces | and | all | of | the | necessary | circuit | breakers. | The | |
| circuit | breakers | shall | also | be | UL | listed | and | labeled. | The | new | installed | electrical | panel | shall | | |
| be | located | inside | the | new | blast | booth | building | enclosure | at | a | central | location | that | is | easily | |
| accessible | and | out | of | the | way | of | material | handling | equipment. | | | | | | | |
| The | contractor | shall | coordinate | the | electrical | panel | location | with | the | government | | | | | | | |
| project | manager. | The | contractor | shall | also | provide | and | install | 1 | each | 100 | amp | rated | | | | |
| electrical | power | panel | that | is | UL | listed | and | labeled | for | the | 120/208 | V, | 3ph | power | | | |
| requirements | in | or | at | the | new | building | enclosure. | The | power | panel | shall | have | at | a | minimum | | |
| 42 | circuit | breaker | spaces | and | all | of | the | necessary | circuit | breakers | to | provide | the | power | | | |
| requirements | of | the | new | building | enclosure. | All | circuit | breakers | shall | be | UL | listed | and | | | | |
| labeled. | The | contractor | shall | calculate, | provide, | and | install | a | UL | listed | and | labeled | | | | | |
| transformer | to | step | down | the | power | from | 480 | V | to | 120 | V | for | the | power | requirements | to | the |
| 120 | V | panel. | This | step | down | transformer | shall | have | all | copper | windings. | Aluminum | | | | | |
| windings | shall | not | be | allowed. | All | electrical | wiring | for | any | and | all | power | requirements | shall | | | |
| also | be | copper | wire. | Aluminum | wire | shall | not | be | allowed. | All | buss | connections | and | electrical | | | |
| busses | provided | in | any | electrical | equipment | or | panels | shall | be | copper | only. | Aluminum | shall | | | | |
| not | be | allowed | for | any | electrical | busses | or | any | portion | of | the | electrical | work | in | this | project. | |
| The | Contractor | shall | provide | the | electrical | design | proposals | for | review. | The | |
| contractor | shall | schedule | and | submit | outage | documents | for | any | required | utilities | outages |
| (electrical, | excavation, | water, | compressed | air, | breathing | air, | etc.) | The | enclosure | shall | be |
| equipped | with | electrical | surge | | | | | | | | |
| suppression | protection | inside | the | new | building | enclosure | and | it | shall | be | UL | listed | and |
| labeled | and | meet | underwriters | Lab | (UL) | certification | requirements. | All | of | the | electrical | | |
| materials | supplied, | electrical | engineering | design, | and | installation | work | shall | be | in | | | |
| compliance | with | latest | National | Electrical | Code | (NEC), | UFC’s, | UL, | and | Hill | AFB | facility | design |
requirements.
| 2.9 | | | LIGHTING: | Shall | be | ceiling‐mounted | light‐emitting | diode | (LED) | light | fixtures. | The | light | | | | | | | |
| fixtures | and | LED | lights | shall | be | rated | 100 | foot‐candles | at | a | minimum | with | a | color | | | | | | |
| temperature | rating | of | 5100k | at | the | work | surface. | The | lighting | layout | shall | be | designed | for | | | | | | |
| the | correct | number | of | light | fixtures | and | the | light | fixtures | shall | be | optimized | and | located | to | | | | | |
| provide | required | lighting | for | the | complete | blast | booth | enclosure | process | area. | The | light | | | | | | | | |
| switch | system | shall | be | designed | to | allow | for | all | of | the | lights | to | be | on | or | for | half | of | the | lights |
| to | be | turned | on | or | off | at | any | time. | | | | | | | | | | | | |
| The | design | shall | strategically | place | the | half | banks | of | lights | evenly | around | the | ceiling | | | | | | |
| enclosure | area | so | that | if | only | half | of | the | lights | are | on | the | entire | area | still | has | even | lighting. | |
| There | shall | also | be | emergency | lighting | with | battery | backup | provided | and | this | shall | be | | | | | | |
| designed | to | meet | all | code | and | specification | requirements. | The | contractor | shall | use | the | | | | | | | |
| existing | lighting | electrical | power | panel | for | the | light | power | requirements | in | the | new | | | | | | | |
| building | enclosure. | This | electrical | panel | is | located | inside | the | main | building | 507 | process | | | | | | | |
| area | near | the | entrance | door | to | the | new | enclosure. | This | electrical | panel | has | spare | breaker | | | | | |
| spaces | and | the | customer | wants | this | electrical | panel | used | for | the | lighting | because | they | use | | | | | |
| an | automated | maintenance | program | for | all | of | the | building | lighting. | | There | shall | be | light | | | | | |
| switches | at | the | entrance | to | the | enclosure | to | turn | all | of | the | lights | off | or | half | of | the | lights | off |
| as | stated | above. | | Note: | The | contractor | shall | verify | that | there | is | enough | capacity | available | in | | | | |
| this | existing | lighting | electrical | panel. | If | there | is | not | enough | capacity | in | the | existing | electrical | | | | | |
| panel, | then | the | contractor | shall | be | required | to | tie | into | the | overhead | electrical | buss | system | | | | | |
| and | install | a | safety | disconnect | switch | and | any | and | all | other | required | electrical | parts | for | a | | | | |
| full | and | complete | lighting | system. | | | | | | | | | | | | | | | |
| There | shall | also | be | lighting | outside | of | the | building | to | illuminate | the | roll | up | door | area |
| and | man | door | areas | at | night | and | the | outside | door | lighting | shall | have | their | own | dedicated |
| electrical | switches | located | inside | near | the | doors. | | | | | | | | | |
| 2.10 | | FIRE | ALARM | SYSTEM: | Fire | alarm | and | mass | notification | systems | shall | connect | with | the |
| existing | fire | alarm | system | and | operate | according | to | the | National | Fire | Protection | | | | |
| Association | (NFPA) | 72 | and | UFC | requirements. | | Any | modifications | to | the | system | need | to | be | |
| approved | by | the | Base | Fire | Department | and | base | alarm | shop. | The | fire | alarm | system | shall | be |
| interlinked | with | the | blast | media | system | equipment | and | the | HVAC | system. | | | | | |
| In | the | event | that | there | is | a | fire | alarm | activated | the | fire | alarm | interlink | shall | shut |
| down | all | of | the | blast | media | systems | equipment | and | also | the | HVAC | equipment. | The | | |
| contractor | shall | design | and | provide | a | fire | suppression | and | alarm | system | that | meets | ETL | 02‐ | |
| 15, | UFC | 3‐600‐01, | NFPA 72, | and | all | other | the | applicable | requirements, | including | Air | Force | | | |
| Civil | Engineering | Center | (AFCEC) | Interim | Guidance | that | is | given | precedence | for | the | | | | |
| operation | of | the | building | 507 | new | enclosure. | | | | | | | | | |
| 2.11 | | | FIRE | SUPPRESSION: | The | contractor | shall | design | and | provide | a | fire | suppression | and | |
| alarm | system | that | meets | UFC | 3‐600‐01 | and | all | other | the | applicable | requirements, | including | | | |
| Air | Force | Civil | Engineering | Center | (AFCEC) | Interim | Guidance | that | is | given | precedence | for | | | |
| the | operation | of | the | building | 507 | new | enclosure. | | | | | | | | |
NOTE: NFPA Chapter 13 Section 10.4.3.1 prohibits fire service mains that run further than 10 feet under a building. Currently a section of high pressure fire suppression line does run between the PIV and the interior fire riser on the east wall. The contractor shall insure that the design and construction for this project is in compliance with NFPA Chapter 13 Section 10.4.3.1 and all other UFC and NFPA codes as required for underground fire suppression piping.
1523148610C Highlight
1523148610C Highlight
The contractor shall survey and evaluate the existing available Hill AFB fire protection water distribution system and conduct water flow tests, water volume test, and pressure tests as necessary to determine that there is enough water capacity to be able to provide a design that meets all of the requirements. The contractor shall submit detailed building sprinkler shop drawings and calculations to the base fire department and to the Government project manager prior to beginning the construction of the building enclosure for the two blast booths. The shop drawings submittals shall include all water testing results and calculations, etc. Note: All ferrous materials and water lines that are in contact with the earth shall have cathodic protection. The fire protection water piping system shall have cathodic protection installed by the contractor. See cathodic protection in the Hill AFB Facility Design Standard. The drawings shall be signed and stamped by a professional fire protection design engineer (FPDE).
Plans and calculations for new systems or modified systems, construction (shop) drawings and calculations must be prepared by an individual that has obtained National Institute for Certification in Engineering Technologies, Automatic Sprinkler Systems, Level III certification, or Special Hazards Suppression Systems, Level IV certification, in accordance with the applicable NFPA code. A registered professional engineer licensed to practice fire protection engineering in Utah must stamp the shop drawings prior to submitting the fire extinguishing system shop drawings to the appropriate contractor’s designated Fire Protection Engineer.
System working plans and calculations must be prepared and submitted for approval by a registered professional fire protection engineer or an individual that has obtained National Institute for Certification in Engineering Technologies, Fire Alarm Systems, level III certification (minimum) in accordance with NFPA 72 and UFC requirements. Submit the fire alarm reporting system, fire alarm evacuation system, and automatic fire detection system construction (shop) drawings to the appropriate components designated Fire Protection Engineer. A registered PE licensed to practice fire protection engineering in Utah must stamp the shop drawings prior to submitting them. The final fire suppression system installation shall be tested in coordination with the Hill AFB Fire Department and a report of the results shall be submitted to the Hill AFB Fire Department and the Government project manager.
The Qualified FPDE shall have a Bachelor of Science or higher level of education in fire protection engineering with curriculum accredited by the Accreditation Board for Engineering and Technology (ABET) as a professional engineering curriculum at a university or school of engineering. The FPDE shall have as a minimum 5 years of work experience in fire protection engineering or a Professional Engineer (PE) license by examination, National Council of Examiners for Engineering and Surveys (NCEE) fire protection engineering written examination, or a PE license in a related discipline with a minimum of 5 years work experience in fire protection engineering. The AE firm that the MACC III contractor hires shall confirm that the FPDE’s credentials and education comply with the definition of a qualified FPDE. The FPDE shall have the required experience in the design and construction of Hill AFB buildings fire protection systems of similar complexity, drawings, and specifications.
Note: There shall be a Final Inspection of the complete fire suppression and alarm system that is installed for this new building blast booth enclosure area.
| 2.12 | HEATING | AND | VENTILATION: | | The | equipment | enclosure | addition | shall | be | equipped | with | | | |
| an | HVAC | system. | There | shall | be | heating | for | winter | conditions | and | cooling | systems | for | the | |
| summer | along | with | any | and | all | required | make‐up | and | ventilation | air. | | Summer | controlled | | |
| temperature | requirements | shall | be | 78 | +/‐ | 4 | degrees | Fahrenheit | (F). | Winter | controlled | | | | |
| temperatures | requirements | shall | be | 68 | +/‐ | 4 | degrees | F. | The | HVAC | design | shall | take | into | |
| account | the | volume | of | make‐up | air | required | for | the | two | blast | booths | while | in | operation | and |
| also | for | the | new | building | enclosure | materials | handling | operation. | The | future | blast | booths | | | |
| air | recirculation | and | media | recovery | system | requirements | shall | be | included | in | the | | | | | |
| evaluation | of | the | HVAC | system | design | to | make | sure | the | HVAC | system | will | meet | all | | |
| requirements. | Air | requirements | include | that | proper | make‐up | air | supply | volumes | shall | be | | | | | |
| provided | for | any | exhausted | air | and | for | the | required | room | air | changes | per | hour | in | this | new |
| building | enclosure. | | | | | | | | | | | | | | | |
| The | new | HVAC | system | equipment | shall | all | be | energy | star | rated | and | be | of | the | high | | | |
| energy | efficient | type. | The | contractor | shall | design | all | HVAC | requirement | solutions | and | | | | | | | |
| provide | direct/indirect | (dir/ind) | evaporative | cooling | and | the | dir/ind | unit | or | units | shall | be | | | | | | |
| of | stainless | steel | material | fabrication. | The | new | air | handler | and | or | air | handlers | and | the | dir/ | | | |
| ind | units | shall | be | located | on | the | roof | of | the | existing | building | 507. | This | roof | area | is | located | a |
| few | feet | west | of | where | the | new | building | enclosure | will | tie | into | the | building | 507 | roof | area. | | |
| There | is | a | curb | on | the | roof | of | where | an | old | unit | was | removed | and | this | curb | can | be |
| used | if | it | meet | requirements. | The | structural | engineer | shall | verify | that | the | roof | can | sustain | | | | |
| all | loading | and | design | extra | roof | bracing | as | required | for | seismic, | wind, | weight, | and | any | | | | |
| other | required | load | calculations. | The | contractor | shall | make | sure | the | installation | is | safe | and | | | | | |
| meets | all | requirements. | | | | | | | | | | | | | | | | |
| The | heating | system | shall | use | natural | gas | as | the | fuel | for | the | equipment | considered | in | | | | |
| the | heating | design. | If | an | air | handler | with | both | heating | and | cooling | is | considered | in | the | | | |
| design, | then | the | air | intake | of | the | dir/ind | cooler | and | also | the | air | intake | of | the | heater | filter | |
| bank | must | be | protected | from | inclement | weather. | The | equipment | shall | have | a | large | | | | | | |
| protective | shroud | and | this | shall | be | a | proven | design | that | shall | protect | and | keep | the | air | | | |
| intake | filters | dry | in | all | weather | conditions | (rain, | snow, | sleet, | fog, | etc). | The | air | intake | shall | be | | |
| the | proper | distance | from | any | exhausts | or | contaminants | and | the | design | shall | provide | preheat | of | the | | | |
| entering | air | at | the | air | intake | filter | bank | to | keep | the | filters | dry | so | moist | air | outside | air | does |
| not | freeze | or | collect | on | the | filters | and | reduce | air | flow. | Any | HVAC | equipment | that | is | | | |
| installed | outside | shall | have | an | 18” | high | structural | curb | that | the | equipment | will | be | bolted | or | | | |
| welded | to | and | the | equipment | shall | be | anchored | correctly | to | meet | seismic | requirements | for | | | | | |
| this | geographical | part | of | the | State | of | Utah. | | | | | | | | | | | |
| Another | heating | option | that | will | be | considered | is | to | locate | gas | heaters | inside | the | | | | |
| new | enclosure | area, | but | they | would | have | to | be | located | out | of | the | way | of | any | interference | of |
| processes | or | process | equipment | access | areas. | They | shall | be | located | where | they | can | be | | | | |
| easily | serviced. | If | they | are | located | up | high | and | can’t | be | serviced | from | floor | level, | then | OSHA | |
| approved | catwalks | and | ladders | shall | be | required | to | access | them. | The | equipment | and | | | | | |
| installed | locations | also | have | to | meet | all | fire | code | requirements. | | All | of | the | HVAC | equipment | | |
| and | ducting | shall | be | located | out | of | the | way | of | the | two | bridge | cranes | and | crane | travel | paths |
| for | the | two | bridge | cranes. | These | bridge | cranes | will | be | installed | and | located | overhead | inside | | | |
| of | the | enclosure | dock | area. | | | | | | | | | | | | | |
| These | two | blast | booths | will | be | installed | after | this | construction | enclosure | project | is | | | |
| complete. | | The | contractor | shall | provide | direct | digital | controls | (DDC’s) | for | the | complete | | | |
| HVAC | system. | The | contractor | shall | also | provide | all | of | the | programming | for | the | DDC’s | | |
| system | and | connect | the | DDC’s | system | to | the | Hill | AFB | EMCS | office. | The | contractor | shall | |
| coordinate | the | DDC’s | connection | to | the | EMCS | system | with | the | Hill | AFB | project | manager. | | |
| The | contractor | shall | also | provide | and | install | any | and | all | required | equipment, | wiring, | | | |
| sensors, | etc. | and | the | installation | required | for | the | complete | DDC’s | and | EMCS | system | and | | |
| connection. | The | contractor | shall | also | supply | an | independent | third | party | company | to | | | | |
| commission | the | complete | HVAC | system | for | this | new | building | enclosure. | The | contractor | | | | |
| shall | provide | a | copy | of | the | commissioning | plan, | the | commissioning | agents | name | and | | | |
| qualifying | certifications | for | government | approval | prior | to | the | start | of | the | commissioning | | | | |
| process. | The | contractor | shall | also | provide | test | and | balance | of | the | equipment | and | a | test | and |
| balance | report | along | with | a | commissioning | report | to | the | Hill | AFB | project | manager. | The | | |
| new | enclosure | addition | air | pressure | needs | to | remain | slightly | negative | compared | to | the |
| main | building | 507. | | | | | | | | | | |
| The | contractor | shall | design | the | HVAC | system | so | that | it | generates | enough | make | up | | | | |
| air | for | this | enclosure | area | and | the | system | shall | have | proper | controls | to | make | sure | the | new | |
| enclosure | are | is | kept | at | the | proper | pressure | at | all | times. | The | contractor | shall | make | sure | | |
| that | the | HVAC | design | and | installation | does | not | allow | air | from | the | enclosure | area | to | migrate | | |
| into | the | main | building | 507 | process | area. | The | blast | media | and | the | paint | that | is | removed | | |
| from | parts | during | the | bead | blast | process | is | considered | hazardous | and | the | contractor | needs | | | | |
| to | design | the | HVAC | system | so | that | the | enclosed | area | is | always | at | a | negative | pressure | | |
| compared | to | the | main | building | 507 | so | that | the | contaminants | do | not | migrate | into | the | main | | |
| building | 507 | process | area. | The | two | blast | media | booths | will | exhaust | 45,000 | CFM | each | for | a | | |
| total | of | 90,000 | CFM. | There | are | three | make | up | air | units | in | the | main | building | 507 | area | near |
| this | new | enclosure | and | they | provide | 35,000 | CFM | each | of | makeup | air | for | a | total | of | 105,000 | |
| CFM | to | the | main | building | area. | The | contractor | shall | evaluate | and | verify | the | correct | exhaust | | | |
| rates, | ventilation | rates, | and | the | required | make‐up | air | for | the | enclosure | area | for | the | design. | | | |
| The | contractor | is | ultimately | responsible | for | the | correct | amount | of | make | air | that | is | | |
| provided | to | this | area | when | two | blast | booths | are | operating, | when | only | one | blast | booth | is |
| operating, | or | when | the | two | blast | booths | are | shut | down. | This | design | requires | an | electrical | |
| interlink | and | a | variable | speed | make‐up | air | adjustment | (Variable | Frequency | Drive, | VFD) | | | | |
| provided | to | ensure | this | enclosure | area | remains | at | a | negative | pressure | under | all | conditions. | | |
| The | contractor | shall | provide | and | install | an | accurate | pressure | measuring | and | | | | | | | |
| monitoring | device | that | verifies | that | the | enclosure | area | remains | at | a | negative | pressure | and | | | | |
| the | contractor | shall | provide | and | install | a | room | pressure | display | on | the | wall | that | shall | show | | |
| the | room | pressure | at | all | times. | The | contractor | shall | also | install | this | same | type | of | measuring | | |
| and | monitoring | device | on | the | wall | of | the | main | building | 507 | process | area | near | the | opening | | |
| into | the | enclosure | area | so | that | the | pressures | in | both | areas | can | be | read | and | so | that | negative |
| pressure | in | the | new | enclosure | area | can | be | verified | at | all | times. | The | amount | of | negative | | |
| pressure | shall | not | be | so | great | that | it | impleads | or | interferes | with | the | blast | booth | exhaust | | |
| equipment | operation, | any | portion | of | the | HVAC, | or | cause | trouble | with | the | opening | or | closing | | | |
| of | any | room | doors. | There | shall | be | a | manual | emergency | mushroom | style | HVAC | stop | (shut | | | |
| off) | switch | of | the | complete | HVAC | system | in | case | of | fire | or | air | contamination | located | in | an | |
| easily | accessible | location | that | shall | be | approved | by | the | Hill | AFB | Fire | Department. | The | | | | |
| contractor | shall | supply | and | install | the | HVAC | shut | off | switch | and | a | protective | clear | plastic | | | |
| enclosure | for | the | switch. | The | emergency | shut | off | switch | cover | shall | be | hinged | so | that | the | | |
| cover | can | be | easily | opened | to | allow | access | to | the | HVAC | emergency | stop | switch. | The | | | |
| complete | new | HVAC | system | shall | comply | with | UFC | 4‐010‐01, | Department | of | Defense | | | | | | |
| (DOD) | minimum | antiterrorism | standards | for | buildings. | | | | | | | | | | | | |
| 2.13 | | ENTRY | INTO | THE | ENCLOSURE: | The | existing | doorway | from | the | main | building | shall | be | | | |
| widened | and | expanded. | The | contractor | shall | remove | the | present | existing | temporary | wall | | | | | | |
| sections | being | used | to | cover | the | opening. | The | new | opening | shall | be | approximately | 22 | feet | | | |
| wide | by | 13 | feet | tall, | to | allow | easy | entry | of | the | material | handling | carts | which | roll | on | wheels |
| and | will | be | manually | pushed | into | and | out | of | the | blast | booth | enclosure | area. | Note: | There | are | |
| electrical | conduits | and | wiring | that | may | need | to | be | relocated | to | increase | the | door | opening | | | |
| height | and | to | frame | and | flash | the | opening. | The | entryway | elevation | of | the | existing | building | | | |
| 507 | floor | shall | be | continued | into | the | new | enclosure | area | without | any | elevation | changes | or | | | |
| floor | elevation | obstacles. | This | is | required | to | provide | smooth | and | easy | transition | of | the | | | | |
| material | handling | carts | that | are | manually | pushed | into | and | out | of | the | new | building | | | | |
| enclosure | and | blast | booth | area. | The | door | way | opening | shall | be | structurally | framed | and | |
| flashed | to | provide | a | nice | looking | transition | from | the | main | building | area | into | the | new |
| building | enclosure | area. | | | | | | | | | | | | |
| 2.14 | PROCESS | COMPRESSED | AIR | PIPING: | The | contractor | shall | be | responsible | for | all | materials | | | | | | |