AGE_RFP_Questions_1_(24Dec14).pdf

PDF 21 KB Posted

Attached to
Aerospace Ground Equipment (AGE) Federal contract opportunity
Solicitation number
FA8224-15-R-0010
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Responses to RFP Questions 1

View the file

Other files for this federal contract opportunity

Other files attached to Aerospace Ground Equipment (AGE), newest first.
File Type Posted
FA8224-15-R-0010_0003.pdf PDF
Attachment_2_Section_L.pdf PDF
AGE_Q A.pdf PDF
Attachment_2_Section_L.pdf PDF
Site_Visit_Attendance_Record_-_AGE.pdf PDF
AGE_Site_Visit_Notes_Q A_(ALL_13Jan15).pdf PDF
Attachment_3_Section_M.pdf PDF
Attachment_1_AGE_PWS.pdf PDF
FA8224-15-R-0010_0002.pdf PDF
AGE_Site_Visit(FBO2).pdf PDF
Attachment_4_TEP_Worksheet.xlsx XLSX spreadsheet
Attachment_1_AGE_PWS.pdf PDF
Attachment_3_Section_M.pdf PDF
Attachment_2_Section_L.pdf PDF
CDRL_A031_VPP_A032_Paint_Report.pdf PDF
FA8224-15-R-0010_0001.pdf PDF
AGE_Site_Visit.pdf PDF
SiteVisitContractorInfoRequest_.docx DOCX document
Attachment_6_Utah_AGE_PMI_and_Unscheduled_Maintenance_History.pdf PDF
Attachment_4_TEP_Worksheet.pdf PDF
FA8224-15-R-0010.pdf PDF
Attachment_1_AGE_PWS.pdf PDF
Attachment_7_AGE_Over_and_Above_One_Year_History.pdf PDF
Attachment_12_AMARG_AGE_Facilities.pdf PDF
Attachment_11_Arizona_Wage_Determination.pdf PDF
Attachment_13_DD_254.pdf PDF
Attachment_2_Section_L.pdf PDF
Attachment_8_Utah_Collective_Bargaining_Agreement_(CBA)_Wage_Determination_(WD).pdf PDF
Exhibit_1_CDRL's.pdf PDF
Attachment_5_AGE_Workload_History.pdf PDF
Attachment_10_Arizona_AGE_PMI_and_Unscheduled_Maintenance_History.pdf PDF
Attachment_3_Section_M.pdf PDF
Attachment_9_Utah_Wage_Determination.pdf PDF
ppi_tool.accdb —
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Air Force Response to Comments/Questions from Industry

Aerospace Ground Equipment (AGE) Last Updated: 24 December 2014

Below is a list of questions/comments the Air Force has received from industry regarding the FA8224-15- R-0010 RFP posting on FedBizOpps and the Air Force responses to the questions/comments. Air Force responses are based on the best information available at this time and are subject to change in the event the requirement is amended. Only the RFP and RFP Amendments, if issued, should be relied upon while preparing proposals.

1. Reference: Standard Form 33, Section 9

Industry Question: Proposal due date indicates 4:00 pm local time on 15 Jan 2014. Should this be 15 Jan 2015?

Air Force Response: An updated Page 1 of solicitation FA8224-15-R-0010 has been uploaded to reflect the correct date of 15 January 2015.

2. Reference: Section L, 5.4.1.1.

Question: Section L, 5.4.1.1. states the proposal shall reflect the applicable PWS section; thus, Section 1.1 of the offeror’s proposal shall address requirements set forth in Section 1.1 of the PWS, etc. This seems to contradict the mandatory layout in L.5.3., L.5.4.1.2. and L.5.4.2. with required PWS elements. Should the proposal paragraphs reference the applicable PWS paragraph (PWS x.x), rather than be numbered identically to the PWS?

Air Force Response: Section L, paragraph 5.4.1.1 has been amended.

3. Reference: PWS 2.6.3, Equipment Abuse

Question: This paragraph also contains the Over & Above (O&A) paragraph. Should Over and Above (O&A) be numbered 2.6.4 and all subsequent paragraphs renumbered?

Air Force Response: The PWS paragraphs have been renumbered.

4. Reference: PWS 4.1, Tool Requirements and Appendix B, Listing of Publications

Question: AFMCI 21-107 and AFMCI 21-122 both have been superseded and are not in Appendix B. Have these requirements been rolled-up into AFI 21-101 or is there another publication?

Air Force Response: PWS paragraph 4.1 has been amended to reference AFI 21-101.

5. Reference: Section L, 4.2.1.1.

Question: Referenced section requires the offeror to submit a copy of the completed TEP worksheet in the Price Volume in Microsoft Excel format (non-PDF format). The solicitation included the TEP only in the PDF format. Will the Government provide or should the contractor develop the TEP in Excel format?

Air Force Response: A Microsoft Excel version of Attachment 4 – TEP Worksheet will be uploaded.

6. Reference: PWS Appendix D, Attachment 6a and 6b

Question: The types of vehicles and specifications for Contractor Furnished Vehicles are provided. Will the government provide the quantity for each type of vehicle required?

Air Force Response: No, the quantity and types of vehicles is up to the contractor to determine based on ability to successfully fulfill contract requirements.

7. Reference: Section I – Contract Clauses

Question: Will the government allow the use of GSA Leasing to obtain the Contractor Furnished Vehicles?

Air Force Response: The government will not dictate how Contractor Furnished Vehicles are obtained.

8. Reference: Attachment 8, Utah Collective Bargaining Agreement (CBA) Wage Determination WD), Appendix A, Wage Rates

Question: Are the Health & Welfare rates only applicable up to a maximum of 40 hours per week?

Air Force Response: Please refer all questions to the Local Lodge 568 International Association of Machinist and Aerospace Workers, AFL-CIO.

9. Reference: Attachment 8 Utah Collective Bargaining Agreement (CBA) Wage Determination (WD), Attachment 9 Utah Wage Determination & Attachment 11 Arizona Wage Determination

Question: Will the government provide the seniority list for the current employees at both the Hill AFB and DMAFB locations?

Air Force Response: Please refer all questions to the Local Lodge 568 International Association of Machinist and Aerospace Workers, AFL-CIO.

10. Reference: Section L, 3.4, references Block 11 of the Standard Form (SF) 1447 Model Contract Solicitation and 7.3 references Block 12 of the SF33.

Question: Should 3.4 reference SF33?

Air Force Response: Section L has been amended to reflect the correct reference of the SF33.

11. Reference: PWS 2.7, Contractor Reporting

Question: Will the government require the contractor to complete a CDRL for each location (e.g.

two A001) if applicable to both or will the information from the two locations be combined onto one CDRL for submission?

Air Force Response: Only one CDRL is required if applicable to both locations.