Attachment_7_(AF_ETLs).pdf

PDF 107 KB Posted

Attached to
Paint Booth Inserts for Hill AFB Federal contract opportunity
Solicitation number
FA8224-14-R-PAINT
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 7 (AF FTLs)

View the file

Other files for this federal contract opportunity

Other files attached to Paint Booth Inserts for Hill AFB, newest first.
File Type Posted
Paint_Booth_Inserts_BLDG_674_Brand_Name_Justification_Redacted.pdf PDF
FA8224-14-R-3001-0001.pdf PDF
Paint_Booth_SOW-_REV_1.pdf PDF
Questions_and_Answers_Part_2.pdf PDF
IMG_9749.JPG JPG image
IMG_9721.JPG JPG image
IMG_9742.JPG JPG image
IMG_9732.JPG JPG image
IMG_9740.JPG JPG image
IMG_9758.JPG JPG image
IMG_9738.JPG JPG image
IMG_9743.JPG JPG image
IMG_9726.JPG JPG image
IMG_9754.JPG JPG image
IMG_9750.JPG JPG image
IMG_9751.JPG JPG image
IMG_9729.JPG JPG image
IMG_9735.JPG JPG image
IMG_9736.JPG JPG image
IMG_9755.JPG JPG image
IMG_9722.JPG JPG image
IMG_9744.JPG JPG image
IMG_9731.JPG JPG image
IMG_9748.JPG JPG image
IMG_9733.JPG JPG image
IMG_9752.JPG JPG image
IMG_9730.JPG JPG image
Site_Visit_Attendees.pdf PDF
IMG_9746.JPG JPG image
IMG_9737.JPG JPG image
Questions_and_Answers_Part_1.pdf PDF
Section_L_(BLDG_674_3_Paint_Booth_Inserts)_v1.pdf PDF
Section_M_(B674_3Paint_Booth_Inserts).pdf PDF
Attachment_2_(As-Built_Drawings_2).pdf PDF
Attachment_5_(Base_Facility_Design_Standard).pdf PDF
Attachment_8_(AF_UFCs).pdf PDF
Attachment_9_(DoD_Manual_5200.01_Vol3).pdf PDF
Registration_Form.xlsx XLSX spreadsheet
Attachment_6_(Base_Architectural_Compatibility_Standard).pdf PDF
Attachment_12_(CDRL).pdf PDF
Official_Paint_Booth_Inserts_Synopsis_of_Proposed_Contract_Action.pdf PDF
Section_M_(Draft_Industry).pdf PDF
Section_L_(Draft_Industry).pdf PDF
Three_Paint_Booth_Inserts_-_Industry_Day_24_Feb_14.docx DOCX document
Industry_Day_Appt_Assignment_and_RSVP_Consolidated_-_Paint_Booth.xls XLS spreadsheet
RFI_-_2_Paint_Booth.doc DOC document
Industry_Day_Agenda.docx DOCX document
Hill_Aerospace_Museum_Directions.pdf PDF
Notice_of_Industry_Day_Paint_Booth_Inserts.pdf PDF
Registration_Form.xlsx XLSX spreadsheet
Show all 50

Paint Booth Inserts for Hill AFB has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B674, THREE PAINT BOOTH INSERTS

Attachment 7 Air Force

Engineering Technical Letters

Appendix Engineering Technical Letters (ETL)

Number Title Status Date

82-1 Energy Budget Figures Superseded by ETLs 83-10, 86- 1, 87-4 10 Nov 82

82-2 Energy Efficient Equipment Superseded by AFEPPM 88-10 10 Nov 82

82-3 Computer Energy Analyses – New Facilities Superseded by ETLs 83-5, 84-2 10 Nov 82

82-4 Energy Conservation Investment Program (ECIP) Superseded by ETL 84-7 10 Nov 82

82-5 Solar Applications Superseded by ETLs 84-1, 86- 13, 86-14 10 Nov 82

82-6 Normal Passive Solar Applications Canceled 30 Dec 82

82-7 Unique Passive Solar Applications Canceled 30 Nov 82

83-1 Design of Control Systems for HVAC Superseded by ETL 83-1 (Change 1) 16 Feb 83

83-1 (Chg 1)

U.S. Air Force Standardized Heating, Ventilating & Air Conditioning (HVAC) Control Systems

Superseded by UFC 3-410-02 22 Jul 87

83-2 Supplemental Design Guidance to AF Standards – Pressurized Hydrant Fueling Systems

Superseded by ETL 84-3 16 Feb 83

83-3 Interior Wiring Systems, AFM 88-15, Para 7-3 Canceled 2 Mar 83

83-4 EMCS Data Transmission Media Considerations Canceled 3 Apr 83

83-5 Computer Energy Analyses Superseded by ETL 84-2 5 May 83

83-6 Solar Applications in Medical Facilities Canceled 24 May 83

83-7 Plumbing – AFM 83-8, Chapter 4 Canceled 30 Aug 83

83-8 Use of Air-to-Air Unitary Heat Pumps Canceled 15 Sep 83

83-9 Insulation Superseded by ETL 94-4 14 Nov 83

83-10 Energy Budget Figure (EBF) Superseded by ETL 86-1 28 Nov 83

84-1 Solar Applications Superseded by ETL 86-14 18 Jan 84

84-2 Computer Energy Analysis Superseded by ETL 94-4 27 Mar 84

84-3 AF Petroleum Fuel Facility Criteria and Standards Canceled 21 Mar 84

84-4 Meters in New Facilities Superseded by ETLs 86-7, 86- 15, 87-5 10 Apr 84

84-5 Heat Distribution Systems Outside of Buildings

Superseded by ETLs 84-8, 86- 11, 86-18, 88-6 7 May 84

84-7 MCP Energy Conservation Investment Program (ECIP) Superseded by AFEPPM 96-4 13 Jun 84

84-8 Heat Distribution Systems Outside of Buildings Superseded by ETL 86-11 19 Jun 84

Number Title Status Date

84-9 EMPEST/EMP Shielding for Facilities Superseded by ETL 88-7 5 Jul 84

84-10 AF Building Construction and the Use of Termiticides Canceled 1 Aug 84

86-1 Energy Budget Figures (EBFs) for Facilities in the Military Construction Program Superseded by ETL 87-7 3 Feb 86

86-2 Energy Management and Control Systems (EMCS) Canceled 5 Feb 86

86-3 Paints and Protective Coatings Superseded by ETL 86-4 21 Feb 86

86-4 Coating Systems and Specifications for Exterior and Interior of Steel Tanks Canceled 12 May 86

86-5 Fuels Use Criteria for Air Force Construction Canceled 22 May 86

86-6 Heat Distribution Systems Outside of Buildings

Superseded by ETLs 86-11, 86- 18, 88-6 3 Jun 86

86-7 Utility Meters in New and Renovated Facilities Superseded by ETL 86-15 3 Jun 86

86-8 Aqueous Film Forming Foam Waste Discharge Retention and Disposal 4 Jun 86

86-9 Lodging Facility Design Guide Superseded by AFCEE Temporary Lodging Facilities Design Guide

4 Jun 86

86-10 Antiterrorism Planning and Design Guidance

Superseded by AFCEE Design Guide, Installation Force Protection Guide

13 Jun 86

86-11 Heat Distribution Systems Outside of Buildings Superseded by ETL 88-6 3 Jul 86

86-12 Prewired Workstations and Systems Furniture Superseded by ETL 90-2 3 Jul 86

86-13 Solar Applications Superseded by ETL 86-14 18 Aug 86

86-14 Solar Applications Canceled 15 Oct 86

86-15 Utility Meters in New and Renovated Facilities Superseded by ETL 87-5 13 Nov 86

86-16 Direct Digital Control of Heating, Ventilation, and Air Conditioning Systems Superseded by UFC 3-410-02 9 Dec 86

86-17 Power Conditioning and Continuation Interfacing Equipment (PCCIE) Superseded by ETL 89-6 17 Dec 86

86-18 Heat Distribution Systems Outside of Buildings Superseded by ETL 88-6 18 Dec 86

87-1 Lead Ban Requirements of Drinking Water Superseded by AFI 32-1067 15 Jan 87

87-2 Volatile Organic Compounds Canceled 4 Mar 87

Number Title Status Date

87-3 Cathodic Protection Superseded by ETLs 87-6, 88-5 12 Mar 87

87-4 Energy Budget Figures (EBFs) for Facilities in the Military Construction Program Superseded by ETL 94-4 13 Mar 87

87-5 Utility Meters in New and Renovated Facilities Superseded by ETL 94-2 13 Jul 87

87-6 Cathodic Protection Superseded by ETL 88-5 21 Aug 87

87-7 1987 Energy Prices and Discount Factors for Life-Cycle Cost Analysis Superseded by ETL 89-1 14 Oct 87

87-8 Built-Up Roof Repair/Replacement Guide Specifications Superseded by ETL 90-1 19 Oct 87

87-9 Prewiring Superseded by ETL 02-12 21 Oct 87

88-1 Standard Guidelines for Submission of Facility Operating and Maintenance Manuals

Superseded by ETL 89-2 5 Jan 88

88-2 Photovoltaic Applications

Superseded by AFCESA Tech Data Bulletin, Photovoltaic Concept, Design, and Application

21 Jan 88

88-3 Design Standards for Critical Facilities Superseded by AFMAN 32- 1146(I) 15 Jun 88

88-4 Reliability & Maintainability (R&M) Design Checklist Superseded by ETL 01-1 24 Jun 88

88-5 Cathodic Protection Superseded by ETL 91-6 2 Aug 88

88-6 Heat Distribution Systems Outside of Buildings Superseded by AFI 32-1068 1 Aug 88

88-7 TEMPEST and High-Altitude Electromagnetic Pulse (HEMP) Protection for Facilities

Superseded by ETLs 90-3, 91-2 24 Aug 88

88-8 Chlorofluorocarbon (CFC) Limitation in Heating, Ventilating, and Air-Conditioning (HVAC) Systems

Superseded by ETL 91-7 4 Oct 88

88-9 Radon Reduction in New Facility Construction Canceled 7 Oct 88

88-10 Prewired Work Station Guide Specifications Canceled 29 Dec 88

89-1 1988 Energy Prices and Discount Factors for Life-Cycle Cost Analysis Superseded by ETL 90-4 6 Feb 89

89-2 Standard Guidelines for Submission of Facility Operating and Maintenance Manuals

23 May 89

89-3 Fire Protection Engineering Criteria for Electronic Equipment Installations Superseded by ETL 93-5 9 Jun 89

Number Title Status Date

89-4 Systems Furniture Guide Specification Canceled 6 Jul 89

89-6 Power Conditioning and Continuation Interfacing Equipment (PCCIE) in the Military Construction Program (MCP)

Canceled 7 Sep 89

89-7 Design of Air Force Courtrooms Superseded by Air Force Base Legal Facilities Design Guide 29 Sep 89

90-1 Built-Up Roof (BUR) Repair/Replacement Guide Specification

Superseded by UFGS 07 51 13, Built-up Asphalt Roofing 23 Jan 90

90-2 General Policy for Prewired Workstations and Systems Furniture Canceled 26 Jan 90

90-3 TEMPEST Protection for Facilities Canceled

90-4 1990 Energy Prices and Discount Factors for Life-Cycle Cost Analysis Canceled 24 May 90

90-5 Fuel and Lube Oil Bulk Storage Capacity for Emergency Generators

Superseded by AFI 32-1062, Electrical Power Plants and Generators

26 Jul 90

90-6 Electrical System Grounding, Static Grounding and Lightning Protection Canceled 3 Oct 90

90-7 Air Force Interior Design Policy Canceled 12 Oct 90

90-8 Guide Specifications for Ethylene Propylene Diene Monomer (EPDM) Roofing

Superseded by UFGS 07 53 23, Ethylene Propylene Diene Monomer Roofing

17 Oct 90

90-9 Fire Protection Engineering Criteria for Aircraft Maintenance, Servicing, and Storage Facilities

Superseded by ETL 96-1 2 Nov 90

90-10 Commissioning of Heating, Ventilating, and Air Conditioning (HVAC) Systems Guide Specification

Canceled 17 Oct 90

91-1 Fire Protection Engineering Criteria - Testing Halon Fire Suppression Systems 2 Jan 91

91-2 High Altitude Electromagnetic Pulse (HEMP) Hardening in Facilities Canceled 4 Mar 91

91-3 Water Supply for Fire Protection Superseded by MIL-HDBK- 1008B, Jan 94 14 Jun 91

91-4 Site Selection Criteria for Fire Protection Training Areas 14 Jun 91

91-5 Fire Protection Engineering Criteria – Emergency Lighting and Marking of Exits Superseded by ETL 94-5

91-6 Cathodic Protection

Superseded by MIL-HDBK- 1136 (now UFC 3-570-06) and MIL-HDBK-1004/10 (now UFC 3-570-02N)

3 Jul 91

Number Title Status Date

91-7 Chlorofluorocarbon (CFC) Limitation in Heating, Ventilating, and Air-Conditioning (HVAC) Systems

Canceled 21 Aug 91

91-8 Facility Electrical Power for Aircraft Ground Support Equipment (Hangars, Aprons, and Ramps)

Canceled 24 Sep 91

93-1 Construction Signs Superseded by ETL 02-9 11 Mar 93

93-2 Dormitory Criteria for Humid Areas Superseded by ETL 03-2 13 Jul 93

93-3 Inventory, Screening, Prioritization, and Evaluation of Existing Buildings for Seismic Risk

Canceled 18 Aug 93

93-4 Fire Protection Engineering Criteria - Automatic Sprinkler Systems in Military Family Housing (MFH)

Superseded by UFC 3-600-01 11 Aug 93

93-5 Fire Protection Engineering Criteria - Electronic Equipment Installations Superseded by ETL 01-18

94-1 Standard Airfield Pavement Marking Schemes Superseded by ETL 04-2 5 Apr 94

94-2 Utility Meters in New and Renovated Facilities Superseded by UFC 3-400-01 10 Jun 94

94-3 Air Force Carpet Standard Superseded by ETL 00-6 10 Jun 94

94-4 Energy Usage Criteria for Facilities in the Military Construction Program Superseded by UFC 3-400-01 19 Aug 94

94-5 Fire Protection Engineering Criteria and Technical Guidance Superseded by ETL 99-4 8 Nov 94

94-6

Fire Protection Engineering Criteria and Technical Guidance - Removal of Halogenated Agent Fire Suppression Systems

5 Dec 94

94-7 EPA Guideline Items in Construction and Other Civil Engineering Specifications Superseded by ETL 00-1 14 Dec 94

94-8 Design in Metric Canceled 14 Dec 94

94-9 Silicone Joint Sealants for Pavements Superseded by ETL 96-4 14 Dec 94

95-1 Halon 1301 Management Planning Guidance 12 May 95

95-2

Preparation of Requirements and Management Plan (RAMP) Packages for Military Construction (MILCON) Program Projects

Superseded by AFCEE Project Managers Guide For Design And Construction

26 Oct 95

Number Title Status Date

95-3

Planning Guide for Installation of Ultra-High- Molecular-Weight (UHMW) Polyethylene Panels Under Aircraft Arresting System Cables (CONUS Installations)

Superseded by AFI 32-1043 26 Oct 95

95-4 Mandatory Energy/Water Performance Standards for Replaced or Modified Equipment

Superseded by UFC 3-400-01 31 Oct 95

96-1 Fire Protection Engineering Criteria - New Aircraft Facilities Superseded by ETL 98-7 22 Jan 96

96-2 Elimination of Liquid Polychlorinated Biphenyls (PCBs) Prioritization Guidance Canceled 2 May 96

96-3 Typical Statement of Work for Airfield Pavement Condition Survey Canceled 26 Jun 96

96-4 Temporary Joint Sealing Details and Procedures for Pavements 9 Jul 96

96-5 Hangar Concrete Floor Reflective Coating Criteria 26 Aug 96

97-1

National Primary Drinking Water Regulations: Lead and Copper Rule (LCR) Corrosion Control Desk-Top Report Statement of Work (SOW)

Canceled 29 Jan 97

97-2 Maintenance and Repair of Rigid Airfield Pavement Surfaces, Joints, and Cracks 28 Jul 97

97-3 Base Course Proof Rolling Requirements 25 Mar 97

97-4 Expedient Trim Pad Anchoring Superseded by ETL 06-4 2 Jun 97

97-5 Proportioning Concrete Mixtures with Graded Aggregates for Rigid Airfield Pavements

25 Apr 97

97-8 Building Manager Energy Conservation Handbook Superseded by ETL 98-4 9 Jun 97

97-9 Criteria and Guidance for C-17 Contingency Operations on Semi-Prepared Airfields 25 Nov 97

97-10 Structural Evaluation of Existing Buildings for Seismic and Wind Loads Superseded by ETL 00-5 30 Oct 97

97-11 Mitigation of Non-Structural Seismic and High Wind Deficiencies for Existing Buildings

Superseded by ETL 00-5 30 Oct 97

97-12 Mitigation of Existing Building Structural Deficiencies for Seismic and High Wind Loads

Superseded by ETL 00-5 30 Oct 97

97-13 Dormitory Ventilation and Exhaust System Design Criteria Superseded by ETL 03-2 7 Aug 97

Number Title Status Date

97-14 Procedures for Airfield Pavement Condition Index Surveys

Superseded by UFCs 3-270- 05/06 15 Sep 97

97-16 Pavement Marking Systems for Low Temperature Applications 25 Nov 97

97-17 Paint and Rubber Removal from Roadway and Airfield Pavements 1 Dec 97

97-18 Guide Specification for Airfield and Roadway Marking 5 Dec 97

97-22 Competing Facility Keying Systems 5 Dec 97

98-1 Design Criteria for Aggregate Surfaced Helicopter Slide Areas and Heliports 14 Jan 98

98-2 Clean Air Act Amendments Requirements for Electric Generators and Power Plants Canceled 1 Jun 98

98-4 Building Manager Energy Conservation Handbook 16 Jan 98

98-5 C-130 and C-17 Contingency and Training Airfield Dimensional Criteria Superseded by ETL 04-7 19 Oct 98

98-7 Fire Protection Engineering Criteria - New Aircraft Facilities Superseded by ETL 01-2 29 Apr 98

98-8 Fire Protection Engineering Criteria – Existing Aircraft Facilities 25 Jun 98

98-10 Installation and Operation Guide for the Stanley Hydraulic Power Unit (HPU) (M (MAAS) Upgrade)

5 Nov 98

99-1 Treatment and Disposal of Aircraft Washwater Effluent 7 Jan 99

99-4 Fire Protection Engineering Criteria - Emergency Lighting and Marking of Exits 9 Nov 99

99-6 Programming Fuels Projects Superseded by ETL 01-15 10 Dec 99

99-7 Airfield Pavement Condition Index Survey Superseded by ETL 02-13 27 Sep 99

00-1 EPA Guideline Items in Construction and Other Engineering Specifications 5 Jan 00

00-2 Inspection and Testing of Trim Pad Anchoring Systems 1 Feb 00

00-4 Small Arms Range Design and Construction Superseded by ETL 01-13

00-5 Seismic Design for Buildings and Other Structures Canceled 5 Jun 00

00-6 Air Force Carpet Standard Superseded by ETL 03-3 11 May 00

00-7 Fire Protection Engineering Criteria — Correlation of US and Host Nation Codes and Criteria

10 May 00

Number Title Status Date

00-8 Airfield Pavement Design Criteria Superseded by UFC 3-260-02 28 Apr 00

00-9 Airblast Protection Retrofit for Unreinforced Concrete Masonry Walls 8 Aug 00

00-12 Fire Protection Engineering Criteria — Conversion of Fire Alarm Radio Systems to Narrowband Technology

Superseded by ETL 03-5 19 Dec 00

01-1 Reliability and Maintainability (R&M) Design Checklist 11 Oct 01

01-2 Fire Protection Engineering Criteria - New Aircraft Facilities Superseded by ETL 02-15 1 Apr 01

01-4 Fire Protection Engineering Criteria - Protective and Hardened Aircraft Shelters 31 Dec 01

01-5 Jet Engine Thrust Standoff Requirements for Airfield Asphalt Edge Pavements Superseded by ETL 07-3 24 May 01

01-6 Contingency Airfield Pavement Specifications Superseded by ETL 09-2 12 Jun 01

01-7 Large Aggregate Asphalt Mixtures 5 Jun 01

01-8 Resin Modified Pavement Design and Application Criteria 25 Sep 01

01-9 Procedures to Retard Reflective Cracking 17 Jul 01

01-10 Design and Construction of High-Capacity Trim Pad Anchoring Systems 24 Jul 02

01-13 Small Arms Range Design and Construction Superseded by ETL 02-11 31 Dec 01

01-15 Programming Fuels Projects Canceled 5 Jun 01

01-18 Fire Protection Engineering Criteria – Electronic Equipment Installations 24 Oct 01

01-20 Guidelines for Airfield Frangibility Zones Superseded by UFC 3-260-01 17 Nov 08

02-1 Design of Drainage Structures for Heavy Aircraft Loading Superseded by UFC 3-260-01 1 Aug 02

02-4 Airblast Protection Polymer Retrofit of Unreinforced Concrete Masonry Walls 12 Jun 02

02-5 Guidance for Energy Savings Performance Contracts Superseded by ETL 04-12 31 Oct 02

02-7 Preventing Concrete Deterioration Under B- 1 Aircraft 7 Aug 02

02-8 Silicone Joint Sealant Specification for Airfield Pavements 5 Sep 02

02-9 Construction Signs 15 May 02

02-10 Airblast Protection Retrofit of Lightweight Manufactured Structures 12 Jun 02

Number Title Status Date

02-11 Small Arms Range Design and Construction Superseded by ETL 05-5 22 Nov 02

02-12 Communications and Information System Criteria for Air Force Facilities 27 Jun 02

02-13 Pavement Engineering Assessment Standards Superseded by ETL 04-9 5 Sep 02

02-14 Determining the Need for Runway Rubber Removal Superseded by ETL 04-10 4 Sep 02

02-15 Fire Protection Engineering Criteria – New Aircraft Facilities 3 Dec 02

02-16

Design, Construction, Maintenance, and Evaluation of the Pegasus Glacial Ice Runway for Heavy Wheeled Aircraft Operations

16 Oct 02

02-17 Use of Non-Potable Water to Replace Potable Water Superseded by ETL 08-10 25 Oct 02

02-19 Airfield Pavement Evaluation Standards and Procedures 12 Nov 02

03-1 Storm Water Construction Standards 24 Mar 03

03-2 Design Criteria for Prevention of Mold in Air Force Facilities Superseded by ETL 04-3 12 Aug 03

03-3 Air Force Carpet Standard Superseded by ETL 07-4 16 Apr 03

03-4 Alternate Fuels E85 and B20 21 Oct 03

03-5 Converting Civil Engineering Radio Frequency Devices to Narrowband Technology

21 Oct 03

03-8 Rejuvenation of Hot-Mix Asphalt (HMA) Pavements Superseded by UFGS 32 01 22 19 Dec 03

04-2 Standard Airfield Pavement Marking Schemes 19 Jul 04

04-3 Design Criteria for Prevention of Mold in Air Force Facilities 6 Apr 04

04-4 Trenchless Technology (TT) for Crossing Air Force Pavements 31 Mar 04

04-5 Design Recommendations for Potable Water System Security (FOUO) 20 Aug 04

04-6 Inspection of Drainage Systems 8 Jan 04

04-7 C-130 and C-17 Landing Zone (LZ) Dimensional, Marking, and Lighting Criteria Superseded by ETL 09-6 29 Mar 04

04-8 Stone Matrix Asphalt (SMA) for Air Force Pavements Superseded by UFGS 32 13 17 9 Jan 04

Number Title Status Date

04-9 Pavement Engineering Assessment (EA) Standards 29 Apr 04

04-10 Determining the Need for Runway Rubber Removal 12 May 04

04-11 Recommendations for Incorporating Water System Emergency Response Plan (ERP) Requirements (FOUO)

Superseded by ETL 12-1 18 Oct 04

04-12 Energy Savings Performance Contracts (ESPC) Superseded by ETL 06-8 13 Oct 04

04-15 Electrical Safety Guidance Superseded by UFC 3-560-01 30 Sep 04

05-1 Use of Acrylic Diffusers with Metal Halide Fixtures 5 Feb 05

05-2

Design, Construction, Maintenance, and Evaluation of the McMurdo Sound Sea Ice Runway for Heavy Wheeled Aircraft Operations

Superseded by ETL 06-7 6 Jun 05

05-5 Small Arms Range Design and Construction Superseded by ETL 06-11 8 Nov 05

05-8 Use of Off-the-Shelf Concrete Admixtures as Cold Weather Admixture Systems

(CWAS)

4 Nov 05

06-1

Arc Flash Personal Protective Equipment (PPE) Requirements for High-Voltage Overhead Line Work at 69 kV (nominal) or Less

Superseded by ETL 06-9 5 Jan 06

06-2 Alkali-Aggregate Reaction in Portland Cement Concrete (PCC) Airfield Pavements 9 Feb 06

06-4 Expedient Trim Pad Anchoring Systems 8 May 06

06-6 Interim Swaged End Inspection Criteria for Aircraft Arresting System (AAS) Pendants 16 Jun 06

06-7

Design, Construction, Maintenance, and Evaluation of the McMurdo Sound Sea Ice Runway for Heavy Wheeled Aircraft Operations

Superseded by ETL 07-12 19 Jul 06

06-8 Energy Savings Performance Contracts (ESPC) Superseded by ETL 08-5 19 Sep 06

06-9

Arc Flash Personal Protective Equipment (PPE) Requirements for High-Voltage Overhead Line Work at 69 kV (nominal) or Less

Superseded by UFC 3-560-01 15 Aug 06

06-11 Small Arms Range Design and Construction Superseded by ETL 08-11 28 Nov 06

Number Title Status Date

07-1

Design Criteria for Underground Electrical Distribution Systems Using Directional Boring (DB) Installation Methods for Installing High Density Polyethylene Electrical (HDPE) Conduit

9 Feb 07

07-2 Anchoring a Fiberglass Mat Assembly in Asphalt Concrete (AC) Pavement 19 Dec 07

07-3 Jet Engine Thrust Standoff Requirements for Airfield Asphalt Edge Pavements 14 Feb 07

07-4 Air Force Carpet Standard 28 Mar 07

07-5 Bridge Inspections Superseded by UFC 3-310-08 18 Apr 07

07-6

Risk Assessment Procedure for Recycling Portland Cement Concrete (PCC) Suffering from Alkali-Silica Reaction (ASR) in Airfield Pavement Structures

14 Aug 07

07-7 Compact Fluorescent Lamp (CFL) Applications (FOUO) 6 Nov 07

07-8 Spall Repair of Portland Cement Concrete (PCC) Airfield Pavements in Expeditionary Environments

27 Jul 07

07-10 Evaluation and Restoration of Folded Fiberglass Mats (FFM) 19 Dec 07

07-11 Evaluation of Aged Asphalt Concrete Surfaces Superseded by ETL 08-1 25 Sep 07

07-12

Design, Construction, Maintenance, and Evaluation of the McMurdo Sound Sea Ice Runway for Heavy Wheeled Aircraft Operations

24 Sep 07

08-1 Evaluation Criteria for Aged Asphalt Concrete (AC) Surfaces 8 Feb 08

08-2 Testing Protocol for Rigid Spall Repair Materials 30 Jan 08

08-3 Crater Repair Methods Using Rapid-Setting (RS) Materials (FOUO) 4 Apr 08

08-4 Testing Protocol for Polymeric Spall Repair Materials 10 Apr 08

08-5 Energy Savings Performance Contracts (ESPC) Superseded by ETL 11-24 14 Apr 08

08-6 Design of Surface Drainage Facilities 5 Feb 08

08-10 Alternative Water Sources - Use of Non- Potable Water 10 Jul 08

08-11 Small Arms Range Design and Construction Superseded by ETL 11-18 20 Oct 08

Number Title Status Date

08-13

Incorporating Sustainable Design and Development (SDD) and Facility Energy Attributes in the Air Force Construction Program

14 Sep 08

08-14 Structural Evaluation Procedure for Stabilized Soil-Surfaced Airfields 28 Aug 08

08-15 Utilities Privatization (UP) Service Contract Post-Award Management

Superseded by Air Force Utilities Privatization Playbook 14 Sep 08

09-1 Airfield Planning and Design Criteria for Unmanned Aircraft Systems (UAS) 28 Sep 09

09-2 Contingency Airfield Pavement Specifications 11 Mar 09

09-3 Chemical Dust Control for Contingency Roads, Base Camps, Helipads, and Airfields

3 Mar 09

09-4 Fire Protection Engineering Criteria – Expeditionary and Force Projection Operational Theaters

9 Feb 09

09-6 C-130 and C-17 Landing Zone (LZ) Dimensional, Marking, and Lighting Criteria

(FOUO)

17 Aug 09

09-8 Resource Efficiency Manager (REM) Tracking and Results Verification Canceled 3 Mar 09

09-9 Connection Methods For Standby Generators - 600 Volts or Less Superseded by ETL 10-7 18 May 09

09-10 Aurora Electrical System Vulnerability Assessment and Mitigation Actions (FOUO) 16 Apr 09

09-11 Civil Engineering Industrial Control System Information Assurance Compliance Superseded by ETL 11-1 26 Oct 09

09-12 Use of Light-Emitting Diode (LED) Fixtures in Airfield Lighting Systems on Air Force Installations and Expeditionary Locations

Superseded by ETL 10-15 18 Aug 09

09-13 Irrigation of Installation Turfgrass and Landscaping 23 Oct 09

09-15 External Foam Insulation of Temporary Structures Superseded by ETL 09-18 19 Oct 09

09-18 External Foam Insulation of Temporary Structures Superseded by ETL 10-6 18 Nov 09

10-2 Light-Emitting Diode (LED) Fixture Design and Installation Criteria for Interior and Exterior Lighting Applications

Superseded by ETL 10-18 18 Mar 10

Number Title Status Date

10-3 Procedures and Acceptance Criteria for Protective Materials Resistant to 155 mm and Smaller Fragmenting Munitions

1 Mar 10

10-4 Joint Strike Fighter (JSF) F-35B Vertical Landing (VL) Pad Design (FOUO) Canceled 8 Jul 10

10-5 Self-Help Pest and Vegetation Management Program 30 Aug 10

10-6 External Foam Insulation of Temporary Structures 22 Feb 10

10-7 Connection Methods For Standby Generators - 600 Volts or Less 3 Mar 10

10-15 Use of Light-Emitting Diode (LED) Fixtures in Airfield Lighting Systems on Air Force Installations and Expeditionary Locations

Superseded by ETL 11-13 24 Sep 10

10-18 Light-Emitting Diode (LED) Fixture Design and Installation Criteria for Interior and Exterior Lighting Applications

Superseded by ETL 12-4 13 Dec 10

11-1 Civil Engineer Industrial Control System Information Assurance Compliance 30 Mar 11

11-3 Warm Mix Asphalt (WMA) 8 Aug 11

11-4 Airfield Pavement Drainage Layers 13 Dec 11

11-6 Utilities Reporting for Air Force Facilities 21 Jun 11

11-7 Nuclear Weapons-Capable Maintenance and Storage Facilities 1 Sep 11

11-8 Decision Criteria for Installing Vegetative Green Roofs at CONUS Installations 13 Jan 11

11-9 Electrical Manhole Entry and Work Procedures 19 Jan 11

11-10 Electrical Manhole Design Considerations 19 Jan 11

11-12 Grounding, Bonding, Testing, and Recordkeeping for Communications Facilities

24 Feb 11

11-13 Use of Light-Emitting Diode (LED) Fixtures in Airfield Lighting Systems on Air Force Installations and Expeditionary Locations

Superseded by ETL 11-29 14 Apr 11

11-15 Repairing and Backfilling Earthen Structures with Flowable Fill 1 Aug 11

11-18 Small Arms Range Design and Construction 19 Apr 11

11-21 Emergency and Standby Generator Design, Maintenance, and Testing Criteria

Superseded by ETL 11-21 (Chg

1) 31 Oct 11

Number Title Status Date

11-21 (Chg 1)

Emergency and Standby Generator Design, Maintenance, and Testing Criteria

Superseded by ETL 11-21 (Chg

2) 16 Feb 12

11-21 (Chg 2)

Emergency and Standby Generator Design, Maintenance, and Testing Criteria 16 Mar 12

11-22 Water Distribution Lines Leak Detection 21 Jun 11

11-24 Energy Savings Performance Contracts (ESPC) 18 Jul 11

11-25

Implementation of Major and Area Source Rules as Applied to Boiler Tune-ups and Energy Assessments for the Boiler MACT Rule

8 Aug 11

11-26 Using Asphalt Surface Treatments as Preventive Maintenance on Asphalt Airfield Pavements

21 Dec 11

11-27 Solar Lighting for Airfields 7 Dec 11

11-28

Mandatory Review and Update of Record Drawings for Nuclear-Capable Weapons and Munitions Storage and Maintenance Facilities

7 Dec 11

11-29

Use of Light-Emitting Diode (LED) Fixtures in Airfield Lighting Systems on Air Force Installations and Enduring/Contingency Locations

22 Dec 11

12-1 Recommendations for Incorporating Water System Emergency Response Plan Requirements (FOUO)

13 Jan 12

12-4 LED Fixture Design and Installation Criteria for Interior and Exterior Lighting Applications

Superseded by ETL 12-4 (Chg

1) 9 Jan 12

12-4 (Chg 1)

LED Fixture Design and Installation Criteria for Interior and Exterior Lighting Applications

Superseded by ETL 12-15 17 Feb 12

12-7 Repair of Cement-Stabilized Soil (CSS) Surfaces 7 Feb 12

12-8 Contingency Aircraft Mooring Points in Portland Cement Concrete Pavements 18 Jan 12

12-9

Personnel Certification Requirements for Inspection of Lightning Protection Systems (LPS) on Nuclear Weapons Maintenance, Handling, and Storage Facilities

13 Apr 12

12-10 Utility Energy Service Contracts (UESC) 3 Apr 12

Number Title Status Date

12-12

Solar-Powered Light-Emitting Diode (LED) Fixture Design and Installation Criteria for Exterior Lighting Applications in Contingency Environments

27 Jul 12

12-15 LED Fixture Design and Installation Criteria for Interior and Exterior Lighting Applications

Superseded by ETL 12-15 (Chg

1) 22 Aug 12

12-15 (Chg 1)

LED Fixture Design and Installation Criteria for Interior and Exterior Lighting Applications

22 Oct 12

Attachment 7 Cover Page
Attachment 7 (AF ETLs)

File details come from the government source that posted it. Updated .