Questions_and_Answers_Part_2.pdf

PDF 45 KB Posted

Attached to
Paint Booth Inserts for Hill AFB Federal contract opportunity
Solicitation number
FA8224-14-R-PAINT
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Part 2 Questions

View the file

Other files for this federal contract opportunity

Other files attached to Paint Booth Inserts for Hill AFB, newest first.
File Type Posted
Section_L_(BLDG_674_3_Paint_Booth_Inserts)_10_Jun_2012.pdf PDF
FA8224-14-R-3001-0001.pdf PDF
Paint_Booth_SOW-_REV_1.pdf PDF
IMG_9726.JPG JPG image
IMG_9754.JPG JPG image
IMG_9750.JPG JPG image
IMG_9751.JPG JPG image
IMG_9729.JPG JPG image
IMG_9735.JPG JPG image
IMG_9736.JPG JPG image
IMG_9755.JPG JPG image
IMG_9722.JPG JPG image
IMG_9744.JPG JPG image
IMG_9731.JPG JPG image
IMG_9748.JPG JPG image
IMG_9739.JPG JPG image
IMG_9725.JPG JPG image
IMG_9747.JPG JPG image
IMG_9727.JPG JPG image
IMG_9756.JPG JPG image
IMG_9734.JPG JPG image
IMG_9745.JPG JPG image
IMG_9723.JPG JPG image
IMG_9733.JPG JPG image
IMG_9752.JPG JPG image
IMG_9730.JPG JPG image
Site_Visit_Attendees.pdf PDF
IMG_9746.JPG JPG image
IMG_9737.JPG JPG image
Questions_and_Answers_Part_1.pdf PDF
Section_L_(BLDG_674_3_Paint_Booth_Inserts)_v1.pdf PDF
Section_M_(B674_3Paint_Booth_Inserts).pdf PDF
Attachment_9_(DoD_Manual_5200.01_Vol3).pdf PDF
Attachment_7_(AF_ETLs).pdf PDF
Wage_Determinations_UT140007.pdf PDF
Paint_Booth_SOW.pdf PDF
Attachment_3_(As-Built_Drawings_B674_Phase_1).pdf PDF
FA8224-14-R-3001.pdf PDF
Attachment_11_(Asbestos_and_LBP_Survey).pdf PDF
Attachment_4_(General_Conditions_Specifications).pdf PDF
Attachment_10_(Hydrant_Flow_Test).pdf PDF
Attachment_1_(As-Built_Drawings_1).pdf PDF
Registration_Form.xlsx XLSX spreadsheet
Attachment_6_(Base_Architectural_Compatibility_Standard).pdf PDF
Attachment_12_(CDRL).pdf PDF
Official_Paint_Booth_Inserts_Synopsis_of_Proposed_Contract_Action.pdf PDF
Section_L_(Draft_Industry).pdf PDF
RFI_-_2_Paint_Booth.doc DOC document
Registration_Form.xlsx XLSX spreadsheet
Paint_Booth_SOW_(Sources_Sought).docx DOCX document
Show all 50

Paint Booth Inserts for Hill AFB has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Answer Spec Question Answer

3.2 How realistic is an extended period of Weekend Work? The work schedule will be as outlined in SOW paragraph

5.3

Can we use a PVC/Vinyl coated galvanized panels versus the white pre-coated metal in the spec? The alternative coating resists scratching and damage better than the white pre-coat?

PVC/Vinyl coated galvanized panels are acceptable. See change to SOW paragraph 5.3.

Is there a color requirement for the exterior structures of the booth?

Paint booth structure shall be white. See added SOW paragraph 3.32

Can we supply the conversions? Or is that limited to conversion using GFS parts?

The OEM shall preform the work as outlined in SOW paragraph 6.2. The Contractor may perform the remainder of the conversion work. Heater conversion parts are commercially available. The Government will not mandate that GFS parts are used. Part manufacturers shall be determined during the design by the Designer/OEM with input from the Contractor and the Government.

5.5.5.2 Indicates a Storage Mode temperature set point of 70°F.

Is this a minimum temperature or is cooling required for summer conditions as well.

This is a minimum temperature. No cooling is required.

See change to SOW paragraph 5.5.5.2.

5.21.1 Is vibration monitoring of the exhaust fans also required? Or similar to 6.11.1, 2 per AMU

Vibration monitoring equipment is only required on supply fans.

5.21 & 6.11

Per the specified manufacturer of the vibration monitoring equipment, the specified model is obsolete.

Will an equivalent model from the specified manufacturer be acceptable?

Yes, existing vibration analysis computer is obsolete.

New accelerometers shall be compatible to new Azima/DLI TRIO CX10 data collector or Government approved equal to be provided as part of this project.

See changes to SOW paragraphs 5.21 and 6.11.

UFC 4-211-

02/ 5.17.3

UFC design required a "No Loss" type exhaust stack.

Section 5.17.3 references an automatic roof ventilator with dampers which is consistent with the existing booth equipment. Please confirm which is required.

Exhaust stacks shall be "No Loss" type. See change to SOW paragraph 5.17.3.

Base Facility Design

Standard

Is sub-metering of utilities required for each individual paint booth?

No. Individual paint booths will not have utility meters.

Base Facility Design

Standard

7.7.6- Similar to item 4 above, also referring to a "No Loss" exhaust stack design. Please clarify.

Exhaust stacks shall be "No Loss" type. See modified SOW paragraph 5.17.3.

NAICS Code doesn't reflect the codes of the companies submitting proposals. Will this cause rejection of proposal?

The NAICS code is used to determine a company size standard. The NAICS for this acquisition is 336413. The small business size standard is 1,000 employees. If the company's size standard is less than 1,000 employees, your company is considered a small business. If your company's size standard is more than a 1,000 employees, then your company is considered a large business. This solicitation is a full and open competition.

This will not cause rejection of proposal as long as the requirements are met in accordance with the RFP and Sections L and M.