Wage_Determinations_UT140007.pdf

PDF 15 KB Posted

Attached to
Paint Booth Inserts for Hill AFB Federal contract opportunity
Solicitation number
FA8224-14-R-PAINT
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Wage Determinations UT410007

View the file

Other files for this federal contract opportunity

Other files attached to Paint Booth Inserts for Hill AFB, newest first.
File Type Posted
Section_L_(BLDG_674_3_Paint_Booth_Inserts)_10_Jun_2012.pdf PDF
FA8224-14-R-3001-0001.pdf PDF
Paint_Booth_SOW-_REV_1.pdf PDF
Questions_and_Answers_Part_2.pdf PDF
IMG_9739.JPG JPG image
IMG_9725.JPG JPG image
IMG_9747.JPG JPG image
IMG_9727.JPG JPG image
IMG_9756.JPG JPG image
IMG_9734.JPG JPG image
IMG_9745.JPG JPG image
IMG_9723.JPG JPG image
IMG_9726.JPG JPG image
IMG_9754.JPG JPG image
IMG_9750.JPG JPG image
IMG_9751.JPG JPG image
IMG_9729.JPG JPG image
IMG_9735.JPG JPG image
IMG_9736.JPG JPG image
IMG_9755.JPG JPG image
IMG_9722.JPG JPG image
IMG_9744.JPG JPG image
IMG_9731.JPG JPG image
IMG_9748.JPG JPG image
IMG_9733.JPG JPG image
IMG_9752.JPG JPG image
IMG_9730.JPG JPG image
Site_Visit_Attendees.pdf PDF
IMG_9746.JPG JPG image
IMG_9737.JPG JPG image
Questions_and_Answers_Part_1.pdf PDF
Section_L_(BLDG_674_3_Paint_Booth_Inserts)_v1.pdf PDF
Section_M_(B674_3Paint_Booth_Inserts).pdf PDF
Paint_Booth_SOW.pdf PDF
Attachment_3_(As-Built_Drawings_B674_Phase_1).pdf PDF
FA8224-14-R-3001.pdf PDF
Attachment_11_(Asbestos_and_LBP_Survey).pdf PDF
Attachment_4_(General_Conditions_Specifications).pdf PDF
Attachment_10_(Hydrant_Flow_Test).pdf PDF
Attachment_1_(As-Built_Drawings_1).pdf PDF
Attachment_9_(DoD_Manual_5200.01_Vol3).pdf PDF
Attachment_7_(AF_ETLs).pdf PDF
Registration_Form.xlsx XLSX spreadsheet
Attachment_6_(Base_Architectural_Compatibility_Standard).pdf PDF
Attachment_12_(CDRL).pdf PDF
Official_Paint_Booth_Inserts_Synopsis_of_Proposed_Contract_Action.pdf PDF
Section_L_(Draft_Industry).pdf PDF
RFI_-_2_Paint_Booth.doc DOC document
Registration_Form.xlsx XLSX spreadsheet
Paint_Booth_SOW_(Sources_Sought).docx DOCX document
Show all 50

Paint Booth Inserts for Hill AFB has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: UT140007 01/03/2014 UT7

Superseded General Decision Number: UT20130007

State: Utah

Construction Type: Building

County: Davis County in Utah.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 01/03/2014

* BRUT0001-002 06/01/2013

Rates Fringes

BRICKLAYER.......................$ 22.23 7.07

CARP0140-001 11/01/2007

Rates Fringes

CARPENTER (Form Work Only).......$ 20.19 6.74

* ELEC0354-008 06/01/2013

Rates Fringes

ELECTRICIAN, Excludes Low Voltage Wiring and Installation of HVAC/Temperature Controls........$ 29.34 10.61

ENGI9993-011 09/01/2011

Rates Fringes

OPERATOR: Power Equipment

(CRANES & ATTACHMENTS)

(1) Up to 35 tons...........$ 25.50 14.41

(2) Over 35 tons to 100 tons........................$ 26.79 14.41

(3) Over 100 tons...........$ 28.13 14.41 OPERATOR: Power Equipment

(1) Mechanic................$ 27.35 14.41 (2a) Grader/Blade...........$ 25.69 14.41

(3) Front End loader (over 5 cu. yds)...........$ 25.17 14.41

(4) Bulldozer, Front End Loader (2 to 5 cu. yds.)....$ 24.17 14.41

(5) Asphalt Roller, Front End Loader (Under 2 cu.

yds.), Oil Distributor......$ 23.17 14.41

(6) Screed..................$ 22.21 14.41

(7) Roller (Dirt and Grade

5/6/2014http://www.wdol.gov/wdol/scafiles/davisbacon/UT7.dvb?v=0

Compaction).................$ 21.30 14.41

* IRON0027-013 07/01/2013

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 26.18 15.60

* IRON0847-001 08/01/2013

Rates Fringes

IRONWORKER, REINFORCING..........$ 26.61 11.60

* LABO0295-007 07/01/2012

Rates Fringes

Laborer: Mason Tender (Brick, Cement/Concrete).................$ 18.63 6.35

PAIN0077-001 08/06/2012

Rates Fringes

PAINTER: Brush, Roller and Spray............................$ 18.75 5.70

PLUM0140-008 08/01/2013

Rates Fringes

PIPEFITTER, Excludes HVAC Pipe Installation................$ 30.05 12.93

PLUM0140-009 08/01/2013

Rates Fringes

PLUMBER (Including HVAC Pipe Installation)....................$ 30.05 12.93

SFUT0669-001 07/01/2013

Rates Fringes

SPRINKLER FITTER.................$ 29.93 16.87

SHEE0312-006 07/01/2012

Rates Fringes

SHEETMETAL WORKER (HVAC Duct Installation)....................$ 30.71 11.67

TEAM0222-011 07/01/2013

Rates Fringes

TRUCK DRIVER (Articulated).......$ 22.18 11.33

TRUCK DRIVER (Flat Rack, Bulk Cement, Semi-trailers, Mud/Banding and Paint) Less than 10 tons...........$ 19.51 11.33 10 tons to less than 15 tons........................$ 19.66 11.33 15 tons and less than 20 tons........................$ 19.76 11.33 20 tons and over............$ 19.91 11.33 Pickup Truck................$ 19.44 11.33 TRUCK DRIVER (Oil Spreader)......$ 20.31 11.33 TRUCK DRIVER (Transit Mix) 0 cu. yds. to 8 cu. yds.....$ 19.94 11.33 Over 8 cu. yds. to 14 cu.

yds.........................$ 19.84 11.33 TRUCK DRIVER (Water, Fuel & Oil Tank) 0 to less than 1,200 gal....$ 19.49 11.33 1,200 gal. to less than 2,500 gal...................$ 19.61 11.33 2,500 gal. to less than 4,000 gal...................$ 19.76 11.33 4,000 gal. to less than 6,000 gal...................$ 20.06 11.33 6,000 gal. to less than 10,000 gal..................$ 20.31 11.33 10,000 gal. to less than 15,000 gal..................$ 20.56 11.33 15,000 gal. to less than 20,000 gal..................$ 20.81 11.33 20,000 gal. to less than 25,000 gal..................$ 21.16 11.33 Over 25,000 gal.............$ 21.31 11.33 TRUCK DRIVER, Includes Dump Truck (Includes Bottom-end or side) Less than 8 cu. yds.........$ 19.61 11.33 8 cu. yds. and less than 14 cu. yds..................$ 19.76 11.33 14 cu. yds. and less than 35 cu. yds..................$ 19.91 11.33 35 cu. yds. and less than 55 cu. yds..................$ 20.11 11.33 55 cu. yds. and less than 75 cu. yds..................$ 20.31 11.33 75 cu. yds. and less than 95 cu. yds..................$ 20.51 11.33 95 cu. yds. and less than 105 cu. yds.................$ 20.71 11.33 105 cu. yds. and less than 130 cu. yds.................$ 20.83 11.33 TRUCK DRIVER: Lowboy Truck......$ 22.68 11.33

SUUT2008-002 07/14/2008

Rates Fringes

CARPENTER, Includes Acoustical Ceiling Installation, and Foam

Insulation (Excludes Drywall Hanging, Metal Stud Installation, and Form Work).....$ 16.47 4.14

CEMENT MASON/CONCRETE FINISHER...$ 15.33 2.19

DRYWALL HANGER, Includes Metal Stud Installation..........$ 15.45 0.00

ELECTRICIAN (HVAC

Electrical/Temperature Controls and Wiring Installation)....................$ 21.00 4.61

HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)............................$ 32.79 7.31

IRONWORKER, STRUCTURAL...........$ 26.13 2.40

LABORER: Common or General......$ 12.06 3.14

LABORER: Landscape..............$ 10.52 0.00

LABORER: Power Tool Operator (Hand Drill, Jackhammer and Power Saw Only)..................$ 11.70 0.00

OPERATOR: Backhoe/Excavator.....$ 16.28 6.55

ROOFER...........................$ 13.70 1.17

SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 23.61 5.45

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .