PMEL Services
PERFORMANCE-BASED WORK STATEMENT
FOR
PRECISION MEASUREMENT EQUIPMENT LABORATORY
(PMEL)
SERVICES
DATE
Table of Contents
1. Scope
2. Description of Services
2.1. Scheduling and Production Control
2.2. Calibration and Repair of Test, Measurement, and Diagnostic Equipment
2.3. Workload Management
2.4. Supply Support and Property Control
2.5. Quality Control
2.6. Reports
2.7. Personnel
2.8. Program Management
2.9. Travel
3. General Requirements
3.1. Training
3.2. Security
3.3. Installation-Specific Safety and Health Standards
3.4. Contractor Furnished Items
3.5. Publication Responsibilities
3.6. Hours of Operation
3.7. Government Closures
3.8. Performance of Services During Crisis
3.9. Conservation of Utilities
3.10. Transition
3.11. Partnering
4. Service Summary
5. Government Surveillance
5.1. Contracting Officer’s Representative (COR)
5.2. Quality Assurance Surveillance Plan
6. Government Furnished Property
6.1. Government Furnished Facilities
6.2. Government Furnished Equipment(GFE)/Government Furnished Property(GFP)
6.3. Government Furnished Materials
6.4. Government Furnished Records, Files, Documents, and Work Papers
6.5. Government Furnished Services ……………………………………………..……………………………………………19
APPENDIX A – Acronyms and Abbreviations List
1. SCOPE
The Type IIA Precision Measurement Equipment Laboratory (PMEL) at Hill AFB supports all common portable Test Measurement and Diagnostic Equipment (TMDE) for
OO-ALC and surrounding geographical area.
2. DESCRIPTION OF SERVICES
The Contractor shall provide all personnel, equipment, materials, management, and services necessary to perform traceable calibration and related maintenance and repair capabilities to operate the Type IIA PMEL at Hill AFB, Utah. Working standards are used along with PMEL-owned TMDE. All work shall be performed In Accordance With
(IAW) the requirements of this Performance-Based Work Statement (PWS) and all publications cited herein. The Contractor shall comply with this PWS in its entirety.
2.1 Assessments, Certifications, and Inspections: The Contractor shall comply with and participate in local, base-wide, Air Force, and any other assessments, certifications and/or inspections that involve/require PMEL participation . During any assessment, certification or inspection, the Contractor shall provide all information and access necessary to demonstrate compliance. The Contractor shall take prompt action to resolve all Contractor related deficiencies and recommendations identified during assessments, certifications, and inspections.
2.1.1 Air Force Metrology and Calibration (AFMETCAL) certification:
Immediately upon award, the Contractor shall obtain AFMETCAL certification
IAW T.O. 00-20-14 Section 7.
2.1.1.1 AFMETCAL pre-assessment, onsite assessment, and certification review shall be completed within approximately seven months after contract award. Following the initial certification, AFMETCAL assessments will occur approximately every 2 years for the life of the contract. AFMETCAL certification shall be maintained for the life of the contract.
2.1.2 Inter-PMEL Comparisons and Proficiency Testing: The Contractor shall participate in Inter-PMEL comparisons and proficiency testing IAW T.O. 00-
20-14, Section 11.
2.1.3 Logistics Compliance Assessment Program (LCAP): As required, the
Contractor shall participate in LCAP inspections. The purpose of the LCAP is to provide leadership at all levels with an evaluation of a unit’s ability to perform key logistics processes in a safe, standardized, repeatable, and technically compliant manner. LCAP evaluations are conducted IAWAFI 20-
111.
2.2 Calibration and Repair of Test, Measurement, and Diagnostic Equipments
(TMDE):
2.2.1 TMDE calibration and repair shall be accomplished IAW T.O. 00-20-14
Section 3, Weapon System Calibration Measurement Summaries (CMS), T.O.
33K-1-100-1, T.O. 33K-1-100-2, applicable 33K Series T.O.’s, applicable commercial data, and AFMETCAL approved local calibration procedures.
Calibration authority shall be selected according to the order of precedence outlined in T.O. 00-20-14 Section 3.1.2.
2.2.2 Forms: The Contractor shall complete and attach the appropriate AFTO Forms and/or DD condition tags to all TMDE IAW with T.O. 00-20-14 Section 5, AFMAN 23-110Volume 2 Part 13 and TO 00-20-3 Section 3.
2.2.3 The Contractor shall enter required traceability and Maintenance Data
Collection (MDC) information into the Electronic Facility Equipment
Maintenance System (E-FEMS) IAW T.O. 00-20-14 Section 3 and T.O. 33K-
1-100-1 Section 2.
2.2.4 The Contractor shall verify TMDE against E-FEMS and notify the PMEL scheduling function of any discrepancies for correction.
2.2.5 Acceptance: The Contractor shall submit completed TMDE to the Contracting
Officer Representative (COR) for acceptance on a daily basis. After acceptance the Contractor shall deliver the TMDE to the PMEL scheduling function.
2.2.6 TMDE Returns: TMDE that fails within 30 days of receipt by the customer due to improper servicing, as determined by the COR, shall be reworked with the same priority as Mission Essential TMDE as defined in TO 00-20-14 paragraph 3.7 Input Priority System. The Contractor shall rework the item at no additional cost to the Government. Disputes regarding the COR determination will be resolved by the ACO.
2.2.7 Technical Assistance: The Contractor shall provide metrology related technical assistance to TMDE owners/users.
2.2.8 Limited Certifications: The Contractor shall document limited certifications
IAW T.O. 00-20-14 Section 3 and record in E-FEMS, limited certifications, required user notification, as well as approvals and denials. At a minimum the
Contractor records shall include the date/time, name of user contacted and approval or denial of limited certification, prior to submitting the item to the
COR for acceptance and/or evaluation.
2.2.9 TMDE Repair: The Contractor shall troubleshoot and repair TMDE to the lowest level possible. The Contractor shall not remove parts (cannibalize) from other TMDE to repair like TMDE unless directed by COR.
2.2.10 Beyond Economical Repair: If the estimated cost of materials and labor for repair exceeds 75 percent of the replacement cost, the Contractor shall request approval from the COR before proceeding with the repair action.
2.2.11 Not Repairable This Station (NRTS): When an item is determined to be
NRTS, the Contractor shall record in E-FEMS, the reason for the NRTS action, enter the appropriate status code in E-FEMS, and submit the item with the required supporting documentation for COR approval.
2.2.12 Return to Owner (RTO): TMDE is considered RTO when contractor determines work cannot progress due to lack of owner supplied data or accessories. When TMDE is determined to be RTO, the Contractor shall enter the appropriate status code in E-FEMS, and submit the item with supporting documentation to the COR for approval.
2.3 Workload Management
2.3.1 Throughput Time: The Contractor shall accomplish all TMDE workload within a 20 calendar day throughput time, excluding authorized delay time.
Overall, the Contractor shall maintain a 10-calendar day average throughput time. The Contractor shall perform a root cause analysis on each item of
TMDE that exceeds the 20-day throughput time to determine what is responsible for the delay. The Contractor shall report the results of the root cause analysis to the COR and shall actively participate in the development of corrective actions.
2.3.1.1 Throughput Time Calculation: E-FEMS will track each equipment item's throughput time after the PMEL schedulers have entered it as
Received by PMEL (RBP). Day number zero (0) is the day the item is scheduled. Day number one (1) is a day to allow PMEL personnel to move the item to the Contractor's designated location/shelf. Day number two (2) is the first day the item counts against throughput time. Throughput time stops when an item is entered as
AWAITCLOSE. Time accumulated in a Government approved deferred status is not counted against throughput time.
2.3.2 TMDE Categories: TMDE will be categorized by the Government COR as follows:
Category 1: Calibrations estimated to take up to 1 hour
Category 2: Calibrations estimated to take between 1 to 2 hours
Category 3: Calibrations estimated to take between 2 and 3 hours
Category 4: Calibrations estimated to take between 3 and 6 hours
Category 5: Calibrations estimated to take more than 6 hours
2.3.3 Status Changes: The Contractor shall enter historical data, all status changes, and other pertinent data into E-FEMS, while TMDE is in their possession. All
Status changes shall be updated within four hours. Any problems shall be reported to the COR for correction.
2.3.4 Maintenance Priorities: The Contractor shall accomplish TMDE on a First In
First Out (FIFO) basis according to the maintenance priority identified by the customer (routine, mission essential, or emergency). The maintenance priorities are defined in T.O. 00-20-14, Section 3.7.
2.3.4.1 The Contractor shall ensure that requests for mission essential or emergency maintenance are received in writing from the
Government. The Contractor shall notify the COR, and provide a copy of each request for mission essential and emergency maintenance the day it is received, or by 0730 the next duty day if received during other than normal duty hours.
2.3.5 Workload Records and Data: The Contractor shall allow the Government unlimited access to all workload records and data.
2.4 Supply Support and Property Control: The Contractor shall accomplish effective and economical supply support and property control. The Contractor shall manage, control, and safeguard all supplies and equipment.
2.4.1 Procurement of Materials and Assets: As required, the Contractor shall order
PMEL related materials and assets through Standard Base Supply System
(SBSS) and/or commercial suppliers.
2.4.2 Requisition of Replacement Equipment: The Contractor shall promptly notify the COR of Non-Equipment Authorized In-Use Detail (Non-EAID)
(Tables, Chairs, etc.) and Equipment Authorized-In Use Detail (EAID) items that need to be requisitioned.
2.4.3 Management of Hazardous Waste: The Contractor shall be the Hazardous
Waste Site Manager for the 527 th
EMXS Hazardous waste site IAW XXX.
This will include all waste streams and waste generated by government and contractor personnel.
2.5 Quality Control: The Contractor shall develop, implement, and maintain a comprehensive management system that assures compliance with all requirements of this PWS. As a minimum the Management System shall implement a Quality
Program IAW with T.O. 00-20-14 Section 9 and include a quality manual IAW T.O.
00-20-14, Section 10.2. The Contractor shall make changes as necessary and submit changes to the COR. (CDRL XXXX)
2.6 Reports: The Contractor shall provide a summary of Production and Quality
Metrics to the COR by the 10th calendar day of each month. (CDRL XXXX)
2.7 Personnel: The Contractor shall employ and utilize qualified personnel with appropriate combinations of education, experience, knowledge, training, and skills necessary to complete the services described in this PWS. The Contractor shall be responsible for determining the size and makeup of the Type IIA PMEL workforce with the following minimum requirements:
2.7.1 Program Manager: The Contractor shall provide a full time on-site Program
Manager who shall be responsible for the performance of all work required by this contract. Prior to the performance start date and as changes occur, the
Contractor shall provide in writing to the ACO, telephone numbers of the
Program Manager and alternate where they can be contacted during and outside of normal duty hours. The Program Manager shall have sufficient knowledge to understand, communicate, and manage the terms of this contract, have full authority to obligate the Contractor on all matters relating to the execution of this contract and be available during normal duty hours to meet the Government Program Office or ACO to discuss contract issues.
2.7.2 PMEL Manager: The Contractor shall provide a PMEL Manager who shall be responsible for the daily performance of work required by this contract. The
PMEL Manager shall have knowledge of electronic and physical/dimensional principals; troubleshooting techniques, calibration traceability, metrology techniques and Air Force PMEL laboratory practices, policies, and procedures.
The PMEL Manager or designated alternate shall be available on site at the
Hill AFB PMEL facility during normal duty hours.
2.7.2.1 As a minimum, the PMEL Manager shall have experience in the following areas: planning, directing, and supervising employees in functions such as inspecting, troubleshooting, repairing, modifying, overhauling, aligning, and calibrating (automatic and manual calibration) complex and intricate TMDE and laboratory measurement standards; developing policies, instructions, procedures and operational guidance for PMEL operations; establishing daily and long range plans for various projects and work operations;
advising management on and coordinating training programs and requirements, manpower and personnel, facility, and budget requirements; safety, quality control and assurance programs;
reimbursement procedures; equipment scheduling, production, and materiel control; submitting maintenance data; support equipment management.
2.7.3 Quality Manager: The Quality Manager shall have knowledge and experience in Air Force PMEL quality management concepts and practices outlined in
T.O. 00-20-14 Section 9, and shall have overall responsibility for the
Management system and its implementation.
2.7.4 Training Manager: Training Manager shall be responsible for overseeing training, and coordinating joint curriculum development and documentation with the Government PMEL Training Manager.
2.7.5 Additional Personnel Requirements:
2.7.5.1 The Contractor shall maintain a current listing of all personnel assigned to the contract. The list shall include the employee's name, duty section, PMEL discipline(s), skill level, and "K" stamp number, if applicable. A copy of the list will be provided to the COR monthly or when personnel changes occur. (CDRL XXXX)
2.7.5.2 Personnel shall at all times, wear some form of visible identification showing their status as a Contractor Employee. Contractor identification shall include conversations, mail, email, teleconferences, video teleconferences, faxes, and/or other electronic communication when their status as Contractor employees might not otherwise be apparent or where they might be mistaken for civil service employees.
2.8 Program Management Reviews (PMRs): The Contractor shall conduct formal
PMRs, which at a minimum will address Training, Quality, Throughput, Backlog, Deferred Status, Contractor Deficiency Reports (CDRs), and partnering updates.
PMRs shall be conducted with the Government on a quarterly basis unless otherwise directed by the ACO.
2.9 Travel: The Contractor may be required to travel in support of the performance of this PWS. All travel shall be IAW FAR 31.205-46. The Contractor shall be responsible for making travel and lodging arrangements. The number of trips and personnel shall be limited to the minimum required to accomplish the work. The
Contractor shall obtain prior written approval from the ACO for all travel.
2.9.1 The Contractor may be required to attend project meetings, technical conferences, trainings, etc, at offsite locations in the local area.
3. GENERAL REQUIREMENTS
3.1 Training
3.1.1 Training Responsibility: On the performance start date, the Contractor shall provide trained personnel to meet the requirements of the PWS. The
Government may provide technical training for new Government equipment requirements, as determined by the ACO.
3.1.2 Government Provided Training: The Contractor shall ensure all employees complete training required for base access, network access, safety, etc.
Appendix G lists the training that will be given through the Center Training
Office (CTO) at HAFB at no expense to the Contractor. The training list is not all-inclusive and additional training may be required. Course numbers may change as training courses are updated.
3.1.3 Training Records: The Contractor shall maintain records on file in the
Contractor PMEL office or electronically for each employee on the relevant qualifications, training, skills, and experience of technical personnel. These records shall be of sufficient detail to provide confidence in the task competence of assigned personnel. The Contractor shall provide the
Government access to these records upon request.
3.2 Security
3.2.1 General Security Requirements:
3.2.1.1 The Contractor shall complete a DD 1172-2 to obtain a Base
Common Access Card (CAC) card for all of their employees and submit to the appropriate security manager. The Contractor shall obtain a Building ID and access card from the appropriate Building
Security Manager for all of their employees.
3.2.1.2 The Contractor shall complete an Unescorted Entry Authorization
Certificate (AF Form 2586) for each employee requiring entry into controlled areas. The request shall be submitted to the HAFB Pass and ID Office. The Government will provide an AF Form1199, Air
Force Entry Control Card. The credentials shall be properly displayed while in an authorized controlled area and surrendered as directed when access to controlled areas is no longer required.
3.2.2 Computer Security: Contractor personnel shall comply with the current Air
Force requirements for access to Air Force computer resources and network access, to include completing the current on-line Air Force computer security training. This training must be completed in order for an employee to receive an account on the system.
3.2.3 Operations Security (OPSEC): Contractor personnel shall observe OPSEC
IAW DoD 5205.02.m, AFI 10-701 and the attached DD Form 254.
3.2.4 Force Protection Conditions (FPC): The Contractor shall respond to all FPCs mandated by the United States Air Force, the 75ABW Commander and the th
MXW, IAW AFI 31-101 Hill AFB Sup. The Contractor shall support all
Force Protection awareness exercise scenarios. The Contractor will support other Force Protection Conditions, as directed by the ACO.
3.3 Installation-Specific Safety and Health Standards
3.3.1 Voluntary Protection Program
3.3.1.1 The Air Force, has adopted the Voluntary Protection Program (VPP) as recognized by Occupation Safety Health Association (OSHA).
Consequently, VPP impacts all “applicable Contractors” operating on Air Force Installations. It is the Contractor’s responsibility to ensure its employees and managers have a comprehensive understanding of VPP as well as full compliance with OSHA requirements. Detailed information on VPP is available on the
OSHA website (http://www.osha.gov/dcsp/vpp/index.html).
Contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of the installation or VPP site.
http://www.osha.gov/dcsp/vpp/index.html
3.3.1.2 VPP requirements apply to Contractors whose employees work more than 1,000 hours per quarter. The Contractor shall flow down these requirements to applicable Subcontractors.
3.3.1.3 Contractors are required to provide from their OSHA 300 information the Total Case Incident Rate/Days Away Restricted or
Transferred (TCIR/DART) rates. Submit to the CO as part of the installation’s annual OSHA VPP self evaluation report.
(CDRL XXXX)
3.3.2 Safety Program
3.3.2.1 The Contractor shall implement a safety program that ensures protection of Government personnel and property. (Appendix C)
3.3.2.2 As part of the Safety Program the Contractor shall establish a Safety
Plan and checklist IAW Appendix C of this PWS. The Contractor shall submit the Safety Plan with the contract proposal. (CDRL
XXXX)
3.3.2.3 In the event of an accident/mishap, the Contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence. A written or email copy of the mishap / incident notification shall be sent within three calendar days to the Government Representative, who will forward it to 309 MXW safety.(CDRL XXXX)
3.4 Contractor Furnished Items: The Contractor shall furnish everything required to perform this contract, except items listed in the GFE/GFP/GFM section and
Appendix E of this PWS. At a minimum the Contractor shall furnish the following items:
3.4.1 Office supplies (paper, ribbons, tape, pens, pencils, stamps, etc.) as required for its own operations.
3.4.2 Office equipment not specifically listed as GFE, such as copy machine(s), FAX machine, or personal computer equipment as required for its own operations. The Government will provide computers and equipment needed to interface with Government systems.
3.4.3 Computer supplies (paper, printer cartridges, mouse pads, etc.) to be utilized on Government provided computers and equipment as required for its own operations.
3.4.4 Janitorial supplies as required to maintain a clean, safe, and sanitary environment. Chemicals purchased to meet this requirement shall be managed
IAW AFI 32-7086 Hazardous Materials Management.
3.5 Publication Responsibilities
3.5.1 T.O. Deficiency Reporting: The Contractor shall complete AFTO Form 22s, Technical Manual (TM) Change Recommendation and Reply, IAW T.O. 00-
20-14 paragraph 3.1.8 and T.O. 00-5-1 Chapter 9.
3.5.2 T.O. Verifications: The Contractor shall perform Calibration Technical Order
Verifications (TOV) as requested by AFMETCAL and IAW T.O. 00-20-14
Paragraph 3.1.7.3. TOVs shall be completed by the suspense date except for
AFMETCAL approved extensions.
3.6 Hours Of Operation: The Contractor shall maintain the following minimum customer service hours: 6:00 a.m. through 3:30 p.m. local Monday through Friday, excluding Federal holidays. Additional shifts may be utilized at the discretion of the
Contractor to meet the requirements of this PWS. The Contractor shall observe recognized federal holidays.
3.7 Government Closures: Unless required under the terms of the contract or authorized by the CO, the Contractor shall not work at any Government facility, nor should any deliveries under this contract be made to any Government facility, on any of the following holidays:
New Year’s Day – 1 January
Martin Luther King, Jr.’s Birthday – 3rd Monday in January
President’s Day – 3rd Monday in February
Memorial Day – Last Monday in May
Independence Day – 4 July
Labor Day – 1st Monday in September
Columbus Day – 2nd Monday in October
Veteran’s Day – 11 November
Thanksgiving Day – 4th Thursday in November
Christmas Day – 25 December
Any other day designated by Federal Statute, Executive Order or
Presidential proclamation.
3.8 Continuation of Essential Contractor Services: The Contractor shall be prepared to continue providing services designated as essential in accordance with the requirements listed in Appendix H, during periods of crisis.
3.9 Conservation of Utilities: The Contractor shall be responsible for operating under conditions which prevent the waste of utilities. Government telephones shall be used only for official Government business.
3.10 Transition: The Contractor shall fully cooperate with incoming and outgoing personnel for assumption of and relinquishing contractual responsibilities to permit an orderly and timely changeover.
3.10.1 Phase-In: The Contractor shall interface with Government and incumbent
Contractor personnel to assume responsibility for contract performance. The phase in period shall include transition of all necessary transition tasks including inventories, personnel turnover, and transfer of documentation, supplies and equipment. The Contractor shall assume responsibility for all workload and PMEL operations on the contract performance start date. The phase in period shall be a maximum of 30 days, but may be less at the incoming contractor’s discretion.
3.10.2 Phase-Out: The Contractor shall interface with the government and incoming contractor to relinquish contractual responsibilities. During the phase-out period the contractor shall be responsible for all transition tasks including inventories, personnel turnover, and transfer of documentation, supplies and equipment in order to relinquish responsibility for contract performance. The
Contractor shall maintain responsibility for all workload and PMEL operations until the contract performance end date. The phase out period shall be a maximum of 30 days, but may be less at the incoming contractor’s discretion.
4. SERVICE SUMMARY
Task Performance Objective Performance
Threshold
PWS
Reference
1 TMDE Calibration and Repair
Condition of all completed
TMDE is correctly identified and documented. Certified
TMDE meets accuracy, traceability, and safety requirements.
95% of
Completed TMDE
2.2
2 Management
System Compliance
Establish and maintain a
Management System IAW T.O.
00-20-14, Section 10.
95% of the time the Contractor shall adhere to
Management
System
2.7.3
5. GOVERNMENT SURVEILLANCE
5.1 Contracting Officer’s Representative (COR): The COR is the authorized
Government representative(s) who will assess the Contractor’s performance.
Subsequent to contract award, the identity of all CORs, along with their duties and authority, will be provided in the Quality Assurance Surveillance Plan.
5.1.1 Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the ACO and Not to the COR.
5.2 Quality Assurance Surveillance Plan (QASP): The QASP is the key Government-developed surveillance process document that is applied to Performance-Based
Service Contracting (PBSC) and is used to manage Contractor performance assessments by ensuring that systematic quality assurance methods are utilized to
3 AFMETCAL
Certification
Obtain and maintain certification IAW T.O.
00- 20-14, Section 7
100% of the time
2.1.1
4 LCAP Inspections Comply with LCAP performance requirements
95% of the time
(See LCAP
Checklists)
2.1.3
5 Throughput Time Accomplish TMDE workload within 20-calendar days and maintain a 10-calendar day average excluding authorized delays
99.5% of completed items shall have fewer than 20 calendar days excluding authorized delay time. 10 Day
Average will be maintained 100% of the time
2.3.1
6 Status Code
Accuracy
Proper use of status codes 98% of the time
2.3.3
7 Contractor
Identification
Contractor employees shall be easily identified as such when viewed from a distance
100% of the time from a minimum of 25 feet.
2.7.5.3 validate the Contractor's quality control efforts are timely, effective, and are delivering the results specified in the contract. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS) and details how, when and by whom the
Government will survey, observe, test, sample, evaluate, and document Contractor performance results, to determine whether the Contractor has met the required standards for each objective in the PWS.
6. GOVERNMENT FURNISHED PROPERTY AND SERVICES
6.1 Government Furnished Facilities
6.1.1 The Government will furnish the facilities required to perform the services of this PWS. The Government furnished facility shall be used for this contract effort only. The Contractor shall be responsible for day-to-day operation of the assigned facilities to include identifying problem areas to the COR. All repairs shall be accomplished through the Civil Engineering Squadron (CES) or Plant
Services unless otherwise directed by the CO.
No alteration to the facilities shall be made without specific written permission from CE or Plant Services and authorization from the ACO.
6.1.2 Environmental Control: The Contractor shall monitor all environmental recorders within the Type IIA Facilities IAW T.O. 00-20-14 Section 8.2. When the environmental conditions are "Out-of-Tolerance", the Contractor shall adjust and/or curtail performance IAW T.O. 00-20-14 applicable TMDE technical orders, and commercial data. The Contractor shall notify the COR and the facility manager within 30 minutes of an out-of-tolerance condition as defined in T.O. 00-20-14, Section 8.2.
6.1.3 Housekeeping and Custodial Service: The Contractor shall be responsible for cleaning all items and work areas in its assigned laboratory, office, and storage areas IAW T.O. 00-20-14, Section 3.10.2.s.
6.2 Government Furnished Equipment (GFE)/Government Furnished Property
(GFP):
6.2.1 The Government will provide the Contractor with the GFE and GFP listed in the appendices. The Contractor shall maintain and calibrate, all GFE/GFP as required to perform the requirements of this PWS.
6.2.2 Property Control: The Contractor shall establish and maintain acceptable property management plans and systems IAW applicable contract clauses.
Failure to maintain an acceptable property management system, as defined, may result in disapproval of the system by the Contracting Officer and/or withholding of payments.
6.2.3 Equipment Inventory: The Contractor and a Government representative
(identified by the ACO) shall conduct a joint incoming inventory of all items listed in PWS Appendix E no later than five (5) calendar days before full performance and within 10 calendar days of the start of any option periods.
Upon inventory completion, the Contractor shall sign a receipt for all equipment provided by the Government.
6.2.4 Baseline Calibration Limitation (BCL) Listing: The BCL Listing shall establish a baseline for GFE limitations and shall be maintained throughout the life of the contract. During the inventory, the Contractor and Government representative shall prepare a BCL Listing, in electronic format, identifying all
GFE with calibration limitations as reflected on AFTO Forms 99 or 398. As a minimum, the BCL Listing shall include the equipment model/part number, serial number, ID number, and a description of the calibration limitation exactly as it appears on the AFTO Form 99 or 398. Any changes to the BCL
Listing shall be approved by the ACO.
6.2.4.1 At the end of the contract period GFE that is missing or found with calibration limitations that were not identified on the BCL Listing or directed by Air Force technical order shall be replaced and/or repaired/calibrated at no additional cost to the Government.
6.2.5 Custodian Authorization/Custody Receipt Listing (CA/CRL) and
Equipment Authorization Inventory Data (EAID): The Contractor shall furnish a primary and an alternate equipment custodian to act as the focal point for all equipment identified in Appendix E in accordance with AFMAN 23-
110, USAF Supply Manual. The Contractor shall acknowledge receipt for equipment inventoried and applicable to the EAID records on the CA/CRL.
The Contractor shall conduct and document the CA/CRL inventory as required
IAW AFMAN 23-110, Volume 2, Part 13. The Contractor shall justify and submit requirements to the CFM for additional equipment and/or turn-in of
EAID equipment on AF Form 2005, Issue/Turn-In Request and/or AF Form
601, Equipment Action Request.
6.2.6 Working Measurement Standards: The Contractor shall repair, calibrate, and perform preventive maintenance on all working measurement standards
IAW T.O. 00-20-14 Section 3, except for those working measurement standards designated in T.O. 33K-1-100-1 or -2 to go to Air Force Primary
Standards Laboratory (AFPSL), AFMETCAL approved vendor/contract, or other servicing agency. The Contractor shall turn these items over to the PMEL scheduling function for proper disposition.
6.2.7 Shared Equipment: As workload permits, the Contractor shall allow
Government personnel the use of the equipment listed in PWS Appendix E.
The Contractor shall implement a process to track the loaned equipment.
6.2.8 Certification Stamps ("K Stamps"): The Government will provide certification stamps ("K Stamps") to the Contractor. The Contractor shall manage these stamps as a controlled item and shall be responsible for issuance, inventory, and control. All certification stamps ("K stamps") shall be accounted for and returned to the Government upon contract completion.
6.2.9 Hand Tools: The Government will furnish to the Contractor all hand tools required to perform the services of this PWS IAW AFI 21-101 AFMC
Supplement I Chapter10 and local tool policies.
6.2.9.1 The Contractor shall control all tools, accessories and fixtures IAW
AFI 21-101 AFMC Supplement I Chapters 10.11 through 10.13 and local tool control policies.
6.3 Government Furnished Materials
6.3.1 The Government will pay for materials used by the Contractor in performance of the PMEL services for the duration of the contract unless otherwise specified. The initial stock of materials shall be inventoried by the Contractor and a Government PMEL representative no later than five (5) working days before the contract performance start date. Any missing items shall be annotated and the ACO immediately notified. Any disagreements between the
Contractor and the Government PMEL representative on the materials inventoried shall be resolved by the ACO. The Contractor shall be responsible for keeping enough materials on hand for the performance of the contract IAW its terms. If additional materials are required, the Contractor shall request such additional materials by providing a written request to the ACO. Upon approval by the ACO, said additional materials will be provided at Government expense.
At the conclusion of the contract period the Contractor shall return all residual materials to the Government IAW the applicable clauses cited in the basic contract. A closing inventory will be conducted by the Contractor and a
Government PMEL representative, and the report will be given to the ACO prior to contract completion date.
6.4 Government Furnished Records, Files, Documents, And Work Papers
6.4.1 All records, files, documents, and work papers, including all electronic records, files and communications, provided or generated in support of this contract are
Government property and shall be maintained and disposed of IAW Air Force
Records Information Management System (AFRIMS). At the time of disposition the Contractor shall box, label, and deliver all records, files, documents, and work papers to the COR.
6.4.2 The Government will provide all forms and publications required to perform the work outlined in this PWS.
APPENDIX A
ACRONYMS AND ABBREVIATIONS LIST
ACO Administrative Contracting Officer
AFMETCAL Air Force Metrology and Calibration
AFPSL Air Force Primary Standards Laboratory
AFRIMS Air Force Records Information Management System
BCL Baseline Calibration Limitation
CAC Common Access Card
CA/CRL Custodian Authorization/Custody Receipt Listing
CDRL Contract Data Requirements List (DD Form 1423)
CO Contracting Officer
COR Contracting Officers Representative
CTO Center Training Office
DART Days Away Restricted
DOD Department of Defense
EAID Equipment Authorized-In Use Detail
E-FEMS Electronic Facility Equipment Maintenance System
FAR Federal Acquisition Regulation
FPC Force Protection Conditions
GFE Government Furnished Equipment
GFM Government Furnished Property
GFS Government Furnished Services
IAW In Accordance With
IMP Integrated Master Plan
IMS Integrated Master Schedule
LAN Local Area Network
LCAP Logistics Compliance Assessment Program
NRTS Not Repairable This Station
OPSEC Operations Security
OSHA Occupational Safety and Health Administration
PMEL Precision Measurement Equipment Laboratory
PMR Program Management Review
PWS Performance-Based Work Statement
QASP Quality Assurance Surveillance Plan
RTO Return To Owner
TCIR Total Case Incident Rate
TMDE Test, Measurement, and Diagnostic Equipments
T.O. Technical Order
VPP Voluntary Protection Program