Attachment_11___Awardable Task Order PWS.pdf

PDF 211 KB Posted

Attached to
Pre-Solicitation: Full and Open CLS Sustainment services for the AEWS AN/FPS-117 Radar System
Solicitation number
FA8217-25-AEWS_Open_CLS
Issued by

About this file

This Performance Work Statement (PWS) details contractor logistics support (CLS) services for the Atmospheric Early Warning System (AEWS) AN/FPS-117 Long Range Radar, supporting 27 operational sites in Alaska, Canada, and Hawaii, plus an Engineering Facility at Hill AFB, Utah. The task order is part of an Indefinite Delivery, Indefinite Quantity (IDIQ) contract with a base year and four option years, plus an additional six-month option, issued by the Air Force Life Cycle Management Center (AFLCMC).

Key service requirements include program management, engineering support, depot and field-level maintenance, repairs, hardware/software procurement, Diminishing Manufacturing Sources and Material Shortages (DMSMS) management, technical refreshes, emergency services, and travel/shipping support. The contractor will provide up to 200 hours of technical engineering support and must deliver multiple reports and plans, including a Program Management Plan, Monthly Status Report, Contract Funds Status Report, and DMSMS Report. The contract references the base IDIQ contract number FA8217-25-R-B006 and involves multiple Contract Line Item Numbers (CLINs) covering data, program management, engineering support, emergency services, and other critical logistics functions.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

CUI Page 1 of 5

Performance Work Statement (PWS)

Atmospheric Early Warning System (AEWS) AN/FPS-117 (V) 1/4 Long Range Radar

Lockheed Martin Contractor Logistics Support (CLS)

Contract#: FA8217-25-R-B004 Task Order#: FA8217-XX-X-XXXX

Prepared By:

AFLCMC/HBDIA

Program Management Office (PMO) Hill AFB, Utah

Version: 1.0 14 May 2025

Controlled by: USAF AFLCMC/HBDIA Controlled by: Atmospheric Early Warning System Program Office CUI Category: Controlled Technical Information Distribution/Dissemination Controls: CTI

POC: USAF AFLCMC/HBDIA

Table 1 Post Award Changes

CUI Page 2 of 5

Initiator Rev# Date Change Summary

CUI Page 3 of 5

1.0 Overview

1.1 Purpose

1.2 Scope

1.3 Period Of Performance

1.3.1 Workload Agreements

1.3.2 Technical Orders

1.4 Reference to Base Contract ………………………………………………………………………………

2.0 Task Order General Requirements

LIST OF TABLES

TABLE 1 POST AWARD CHANGES

CUI Page 4 of 5

1.0 Overview

This Performance Work Statement (PWS) outlines the tasks and duties required of the Contractor to support task order FA8217-XX-X-XXXX under Indefinite Delivery, Indefinite Quantity (IDIQ) contract number FA8217-25-R- B004 for AFLCMC/HBDIA, Atmospheric Early Warning System (AEWS), AN/FPS-117V(1)/V(4), Program Management Office (PMO).

1.1 Purpose

This task order invokes Contracting Line Item Numbers (CLINs) for Data, Program Management, Engineering Technical Support Services, Emergency Services, Shipping, Travel, Diminishing Manufacturing Sources and Material Shortages (DMSMS). These services will be provided in accordance with the terms and conditions of the base contract, including any subsequent modifications.

1.2 Scope

This PWS defines the Government's requirements for exercising option years and invoking annual service requirements under Contract Order # FA8217-XX-X-XXXX. The specific scope of work for each year is detailed in this PWS, the base contract, and any subsequent modifications.

1.3 Period Of Performance

The Period of Performance for this Task Order contains Base year with four (4) option years, and one (1) additional six (6) month option.

1.3.1 Workload Agreements

IAW Paragraph 2.19 of the Basic PWS and sub-paragraphs

1.3.2 Technical Orders and Guidance Documents

IAW Paragraph 1.9, Table 2, and 1.10 of the Basic PWS

1.4 Reference to Base Contract

This PWS is issued under and governed by IDIQ Basic Contract # FA8217-25-R-B006. Where applicable, the terms of the basic contract apply

2.0 Task Order General Requirements

Work performed shall be IAW the following Basic contract paragraphs and associated sub-paragraphs as listed below:

Basic PWS Reference Task

2.0 IAW Basic General Contractor Requirements, and all sub-paragraphs

3.1 IAW Basic Program Management, and all sub-paragraphs (CLINs 0002 through 5002)

3.4 IAW Basic Emergency Depot Level Maintenance (CLINs 0007 through 5007 and 0009 through

5009)

3.2 IAW Basic DMSMS Management, and all sub-paragraphs (CLINs 0026 through 5026) 3.24, 3.25 IAW Basic Freight and Special Freight Shipping in support of DMSMS Management (CLIN 0024 through 5024)

3.3 The Contractor shall provide up to 200 hours of technical engineering support to the Government.

This support shall include, but not be limited to, facilitating communication (phone and email) with contractor engineers regarding technical issues for the items listed in 3.3 of the basic PWS, as encountered by the PMO. The Contractor shall act as a liaison, clarifying technical requirements and troubleshooting issues, and documenting communication between the Government and Contractor. Hours shall be documented within the monthly Contract Funds Status Report (CFSR).

(CLIN 0004 through 5004)

4.0 IAW Basic Data Deliverables (CLINs 0001 through 5001)

• Program Management Plan, CDRL-A001

CUI Page 5 of 5

• Meeting Agenda, CDRL- A/B/C/D/E/F002

• Presentation Material, CDRL-A/B/C/D/E/F003

• Meeting Minutes, CDRL-A/B/C/D/E/F004

• OPSEC Plan, CDRL-A005

• Counterfeit Prevention Plan, CDRL-A006

• Quality Plan, CDRL-A007

• Monthly Status Report (MSR), CDRL-A/B/C/D/E/F008

• Contract Funds Status Report (CFSR), CDRL-A/B/C/D/E/F009

• Data Accession List (DAL), CDRL-A/B/C/D/E/F010

• Phase-In Transition Plan, A070

• Government Property (GP) Inventory Report, CDRL-A/B/C/D/E/F012

• Diminishing Manufacturing Sources and Material Shortages (DMSMS) Report CDRL-

A/B/C/D/E/F017

1.0 Overview
1.1 Purpose
1.2 Scope
1.3 Period Of Performance
1.3.1 Workload Agreements
1.3.2 Technical Orders and Guidance Documents

1.4 Reference to Base Contract

2.0 Task Order General Requirements