CDRLs.pdf
PDF 2 MB Posted
- Attached to
- Radar Array Servicing System RFP
- Solicitation number
- FA8217-13-R-7000
About this file
CDRLs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOWRev19Dec.pdf | ||
| FA821713R7000_______0001.pdf | ||
| SOW_Rev_19_Dec.pdf | ||
| FA821713R7000RFP.pdf | ||
| CDRLs.pdf | ||
| PackagingRequirements.pdf | ||
| PackagingInstructions.pdf | ||
| SOWAtch.pdf | ||
| SOWFinal.pdf | ||
| SOWAtchNEASSealiftPackagingGuide.pdf | ||
| SOWAtch.pdf | ||
| DraftRFP.pdf | ||
| SOW.pdf | ||
| Synopsis.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved
(1 Data Item) OMB No. 0704·0188 n,t publie reportinll burden for this collection of information is estimated to avetagoe 110 hours per response, including the time fa. reviewing instruc:tions, s•••.ening uisling data $ourees, gath •.•.ing and maintaining the data needed, and completing and reviewing the collection 01 information. Send comments regarding this burden estimate or any other aspect 01 this collection 01 information, including suggestions lor reducing the burden, to the Department of Oefenu, Executive Services Directorate {0704-01881. Rtospon~n1S should be aware that notwithstanding any other provision of lew, no petson sh.1l be subject to any penalty for failinS! to eomply wi'lh • collection of information if it does nol displilY ;I currently valid OMB control numbel'. Pl ••••• do not r.turn your form to the above organization. Send c:ompleted form to th.
Goyernment Issuing Contr.c:ling Off"Ie" for the Contrac:tJPR No. listed in Bloc:k E.
A. CONTRACTLINEITEMNO. B. EXHIBIT C. CATEGORY,
CUN 0005 A TOP TM OTHER
D. SYSTEM/ITEM IE. CONTRACTIPRNO. F. CONTRACTOR
AN/FPS-117 FA8217-13-R-7000
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTiTlE
AOOI Contractor's Progress. Status, and Management Report
4. AUTHORITY (D.ra Ac:quisition Doc:umenr No.1 15. CONTRACT REFERENCE G. REQUIRING OFFICE
DI-MGMT-80227rr SOW Para 3.7.1 AFLCMClHBZIA
7. DO 250 REQ 9. DIST STATEMENT '0. FREQUENCY '2. DATE OF FIRST SUBMISSION '4. DISTRIBUTION
REQUIRED QTRLY SEE BLK 16LT b. COPlES
8. APP CODE ".AS OF DATE '3. DATE OF SUBSEQUENT a. ADDRESSEE Fin.1
A D SU8MISSION Dr.ft SEEBLK 16 SEE BLK 16 R" Repro
,G. REMARI(S AFLCMOHBZIA I I
Block 4, DID tailored to change 10.2 format to be Microsoft Word or Adobe Acrobat pdf file formated to fit on a 81/2 inch by 11 inch page. DID tailored to delete IO.3.g. 10.3.h. and 10.3.i.
Block 9, I
DISTRIBUTION STATEMENT 0: Distribution authorized to 000 and U.S. DoD contractors only; Administrative/Operational Use; 26 Sep 2012. Other requests shall be referred to AFLCMC/HBZIA. 6029 Wardleigh Road (Bldg 1207). Hill AFB UT 84056
DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Blocks II. 12. 13:
Government will be allowed 10 calendar days after receipt of data item to review/approve/disapprove. Contractor shall deliver re-submittal to incorporate Government comments, if required, NL T 10 calendar days after receipt of Government comments. Final Contractor's Progress, Status and Management Report shall be submitted at completion of contract.
Block 14:
One electronic softcopy will be delivered to:
Agustin.Prosper@Hill.af.mil
Agustin Prosper Configuration Manager
AFLCMC/HBZIA
6029 Ward leigh Rd Bldg 1207 Hill AFB. UT 84056·5838
15. TOTAL I I 0 I
G. PREPAREDBY~ H.DATE I. APPROVED BY ~' J. DATE
David P. Parke Q,f tlfJoI {z. Janan Can acari ~ at\\. 5N6lJ,'P AN/FPS-117 Mechanical Engineer AN/FPS-117 Pro am Manager r.';;7~.•PR~'~C<E;;G~R~DU;;;:P'
~'~8~.~Es~n~M::':A~TE~o~-1
TOTAL PRICE
DO FORM 1423·1. FEB 2001 PREVIOUSEDITIONMAY BE USED. Page of Pages Adobe Professional 7.0 mailto:Agustin.Prosper@Hill.af.mil t'~8".~E~ST~I~M~A;;TE;;D;;-;
TOTAL PRICE
"~7".;;P;;RI~C"E~G;;R~OU""P"
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OM8 No. 0704-0188
Th. public reponing burden for this collection of information is estimated to average 110 nours p.r ,esponse, including the time to' r~i.wing instructions, n.ching .)lining dau sources, gllthefing MKI m.intaining the data needed, and compteting end reviewing the collection of information. Send comments regarding this burden estimate 01' any olh ••. i1Spect of this collection of information, inckJding suggestions for reducing the burden, to Ihe Department of Defens.e, Executiye Services DirectOfate 10704-0188). Respondents should b. ",war. that notwi1hstanding any other provision of raw, no p.rson shall be subteet to any ~"alty for hIlling to comply with. collection of information jf it does not di:;play a currently valid OMS control number. P1•• se do not return your form to the above organization. Send completed form to the Govammtnt I•.•uing Contra-c:ting Offic:.r lor the ContractlPR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY,
CLiN 0005 A TOP TM OTHER
D. SYSTEM/ITEM IE. CONTRACTIPR NO. F.CONTRACTOR
AN/FPS-117 FA8217-13-R-7000
1. DATA ITEM NO. 2. Tine OF DATA ITEM 3.SUBTTTLE
A002 Conference Minutes
4. AUTHORITY tOafllAcquisitionDocu~t No.} 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-ADMN-81250A SOW Para 3.7.2 AFLCMCIHBZIA
7.00250 REQ .. DIST STATEMENT 10. fREQUENCY 12. DATE Of FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
SEE BLK 16 SEE BLK 16LT b. COPlES
8. APP CODE 11. AS Of DATE 13. DATE Of SUBSEQUENT a. ADDRESSEE Final
A D SUBMISSION Draft SEE BLK 16 SEE BLK 16 R., Repro
to. REMARKS AFLCMClHBZIA I I
Block 4, Delivery shall be in Microsoft Office Word (.doc) or Adobe Acrobat (.pdt).
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to DoD and U.S. DoD contractors only; Administrative/Operational Use; 26 Sep 2012. Other requests for this Idocument shall be refereed to AFLCMC/HBZIA, 6029 Wardleigh Road (Bldg. 1207). Hill
IAFB UT 84056
DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Blocks 10. II. 12, 13:
Contractor shall submit Conference Meeting Minutes NLT 7 calendar days after any meeting held between the Government and the Contractor. Government will be allowed 5 business days after receipt of data item to review/approve/disapprove. Contractor shall deliver re-submittal to incorporate Government comments, if required. LT 5 business days after receipt ofGovemment comments.
Block 14, One electronic softcopy will be delivered to:
Agustin. Prosper@Hill.afmil
Agustin Prosper Configuration Manager AFLCMClHBZIA 6029 Ward leigh Rd Bldg 1207 Hill AFB. UT 84056-5838 I:
I:
15. TOTAL I 0 I
G. PREPARED BY H.DATE I. APPROVED BY ~' J. DATE
David P. Parker@&~ O~f{O'f Iv
Janan Canacari ~ a;u.. .5 /lbV, I/::z IANIFPS-117 Mechanical Engineer ANIFPS-117 Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages mailto:Prosper@Hill.afmil
(1 Data Item) OM8 No. 0704-0188
Th. public: reporting bwden for this c:ollec:tion 01 informatIOn is estimated to ~&r'ag<'! 110 hours plr r.sponse. ineluding the tn.. wr reviewing instruc:tions. seare:hing 'KiSling dati sourees, gathering ~ m••ntlinnll m. dau. nuded •• nd c:omp'-ting and reviewing tlw collection of ,nformation. Send comments regarding lh;s burden estimate or any other iIlSpKl of this collection 01 inlorm.tion, including sU9geStlons for reduc: •.•g the burden. 10 m. o.partr'Mnt of Deflffisl, Execvtrve 5enIic:.:;: Directorate (0704-0188). Re$pOndenu should be .w .... that notwithstanding any atMr provision of l.w, no p•.•.son snail be subject to "'1' penalty for failing 10 comply with. collection of information if it does not di$pl.y • currently valid OMB control number. PI.ase do not return your form 10 the .bove organization. Send completed form to the Government Issuing Contracting Officet for the Contr.c:tJPR No. listed in BJoc.k E.
A. CONTRACTLINEITEMNO. B. EXHIBIT C. CATEGORY:
CLIN 0005 A TOP TM OTHER
D. SYSTEMIITEM I E. CONTRACTIPRNO. F.CONTRACTOR
ANIFPS-117 FA8217-I3-R- 7000
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTiTlE
A003 Technical Report
4. AUTHORITY (DataAcqvisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFfiCE
D1-MISC-80508B SOW Para 3.1.2 AFLCMC/HBZIA
7. DO 250 REO 9. OIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUSMISSION 14. DISTRIBUTION
REQUIRED SEE BLK 16 SEE BLK 16LT b. COPIES
8. APP CODE ".AS Of DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Fin,l
A D SUBMISSION Draft SEE BLK 16 SEE BLK 16 R•• Repro
16. REMARKS AfLCMCJHBZIA 1 1
Block 4:
Delivery shall be in Microsoft Office Word (.doc) or Adobe Acrobat (.pdt).
Block 9:
DISTRIBUTION STATEMENT 0: Distribution authorized to DoD and U.S. ODD contractors only; Administrative/Operational Use: 26 Sep 2012. Other requests for this document shall be referred to AFLCMC/HBZIA, 6029 Wardleigh Road (Bldg. 1207). Hill
AFB UT 84056
DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Blocks 10. 11. 12. 13:
Contractor shall submit Technical Report NLT 30 calendar days ARO. Government will be allowed 15 calendar days after receipt of data item to review/approve/disapprove.
Contractor shall deliver re·subminal to incorporate Government comments, if required.
NL T 15 calendar days after receipt of Government comments.
Block 14:
One electronic softcopy will be delivered to:
Agustin. Prosper@Hill.af.mil
Agustin Prosper Configuration Manager
AFLCMCIHBZIA
6029 Wardleigh Rd Bldg 1207 Hill AFB. UT 84056-5838
15. TOTAL I 1 0 I
G. PREPAREDBY~~ H.DATE I. APPROVEDBY ~ J. DATE
David P. Parke (J> t.wl /;U Janan Can acari ~\.~u... 55 t1JcnJ, I(;)..
AN/FPS-117 Mechanical Engineer AN/FPS-117 Pro ram Manager
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DO FORM 1423-1, FEB 2001 PREVIOUSEDITIONMAY BEUSED. Page of Pages mailto:Prosper@Hill.af.mil
(1 Data Item) OMB No. 0704-0188
Th. publIC reporting burden lor this collection of information is estimated 10 avenlge 110 hours per f,spann, including the time for reviewing instruo;tions, s•• ching uisti"'il dall sources, glltheri"1l ~d m.ime:r-.inSi the dau, .,..ded, and comp1e11n9 Wld reviewing the collectIOn 01 infOfmation. Send comments regarding this burden .:uim". or eny 011'1••. ,s~et of thi$ col\eoc:tion of I/'lform.tion, inc;ludil'lg suggoestoon$ to< reducing the burden, to the o.p~ment of Oefenu, executIVe Services Directorate (0704-01881. Respondents should be aware that notwithstanding any other provision ollllW, no petson sh,lI b. subject to any pen.fly lor f~lj"'il to comply with a collection of information it it does no1 display 11currently .••;>lidOMS control numb ••. Please do not retum yout form to the .bove organU;uion. Send com~tOJd form to the Go..-mment Issuing Contr_~ Off;.:.. for the Contrac:tIPR No. listed in Block E.
A. CONTRACTLINEITEMNO. B. EXHIBIT C. CATEGORY:
CUN 0005 A TOP TM OTHER
D. SYSTEMliTEM I E. CONTRACTIPRNO. F. CONTRACTOR
AN/FPS-117 FA8217- J 3-R-7000
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
AOO4 Engineering Change Proposal (ECP)
4. AUTHORITY (0"'" Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-CMAN-80639CIT SOW Para 3.1.2 AFLCMC/HBZIA
7.00250 REO 9. OIST STATEMENT '0. FREQUENCY 12. DATE OF FIRST SUBMISSION '4. DISTRIBUTION
REQUIRED ASREQ SEE BLK 16LT b. COPIES
8. APP CODE ".AS OF DATE '3. DATE OF SUBSEQUENT •. ADDRESSEE Fin.1
A D SUBMISSION Draft SEE BLK 16 SEE BLK 16 R., R,pro
".REMARkS AFLCMClHBZIA 1 1
Block 4:
Contractor shall follow format using DO Form 1692.
Block 9:
DISTRIBUTION STATEMENT 0: Distribution authorized to ODD and U.S. OeD contractors only; Administrative/Operational Use: 26 Sep 2012. Other requests for this document shall be referred to AFLCMCIHBZIA. 6029 Wardleigh Road (Bldg. 1207). Hill
AFB UT 84056
DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Blocks II. t 2. 13:
Contractor shall submit ECP as the need arises. Government will be allowed 5 business days after receipt of data item to review/approve/disapprove. Contractor shall deliver re-submittal to incorporate Government comments, if required, LT 5 business days after receipt ofGovemment comments.
Block 14:
One electronic softcopy will be delivered to:
Agustin. Prosper@Hill.af.mil
Agustin Prosper Configuration Manager
AFLCMCIHBZIA
6029 Wardleigh Rd Bldg 1207 Hill AFB. VT 84056-5838
15. TOTAL I J 0 1
G. PREPAREOBY H. DATE I. APPROVEDBY - J. DATE
David P. Parke~~ (/i rfql I').. lanan Canacari ~~ 5/Jov,' (:A..AN/FPS-117 Mechanical Engineer AN/FPS-117 Program Manager r'~7~.~P~R~IC~E~G~R~0~U~P"
~,~,~.~es~T~IM::-:A~TE~D:--1
TOTAL PRICE
DD FORM 1423-1. FEB 2001 PREVIOUSEDITIONMAYBE USED. Page of Pages
Ttw PUblic:r~ ,bos~ to< thos~~ of informatIOn .s fttim8'led to awl'age , 10 hours PM r.~s., ro;Iuding ~ t_ tor ,••••_'"~tNc~~ ." ••tIng
~s~·o~a~T;'c:':o.c~-:r~~M-=-~~~~'7Jd:.,~~~~~~~~~~"~·~rJ:"Kt-:=.'j'J lrlfof_ ae-atIOnS r.cl ~ ~' 1881. 15 ;Jell •.••••• 0 •••• l1ojjt:1w.y. Suite 1 • At~on. VA 2220~2. ~ ~ " __ tN1 notwl'lhat-.dong IIny '""* P'~1Oft of ~son ~ to. sub,.e;t to..., ~ to.' f~!:'&tto comoly w • collec1•••• of •.•format •••••,t" does,not •••• ...,. c~ ••~~ t,or's::k~.Ple_ NOT 'fOUl'fol'm to thI ___ Idckess. send eomp ed lDfm to the G-..--.I llSUW'IQICorrt•.•c:tJngOff., •• for rhi Cantr No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT c. CATEGORY:
CLINOOO5 A TO' )C TM OTHER
o.SYSTEM~TEM I E. CONTRACTIPR NO. F. CONTRACTOR ANtFPS-117 FA8217-I3-R-70oo
,. DATA l'TEMNO. 2. TtTl.E Of DATA ITEM 3. SUBTlTLE
A005 Product Drawings and Associated Lists
4. AUTHORITY (Ollto Acqulsirlon Oocumefll /Yo.} 15. CONTRACT REfERENCE 6. REQUIRINGOFFICE
DI-SESS-8 10000 SOW Para 3.1.2 and 3.3 AFLCMCIHBZIA
7.00 250 REO. 9. OIST STATEMENT 10. FR;fQlfENCY 12. DATE Of FIRST SUBMISSION ,.. OlSTR18VTION
LT REQVlREO see blk 16 see blk 16 b. COPIES
8. APPCOOE 0 11. AS OFDATE 13. DATE OF SU8SfQUENT 11_ ADDRESSEE F ••
A see blk 16 SUBMISSION Oril~ see blk 16 ••• ••••••
111.REMARKS AFLCMClEZGEM I I Stephanie Willis
Drawings shall be IAW ASME Y 14.100-2004 (including Appendices B.CD,E) 6020 Gum Ln ASME YI4.3. ASME Y14.24, ASME YI4.34. ASME Y14.35 and ASME Y14.5. Bldg.1218 Tailoring to these documents as indicated on this DD1423. Legibility and Hill AFB, UT 8405 Reproducibility: All documents prepared or submitted shall meet the legibility and reproducibility requirements of the specification or standard controlling the AFLCMC!HBZISA 1 I media in which the data is delivered. As a minimum, all lines, symbols, letters, Agustin Prosper and numerals shall be readable as per ASME Y 14.2-2008, para. 4.6. 6029 Wardlei.h
BLK 4: Dl-SESS-81000D and Technical Data Package Optional Worksheet Bldg. 1207 Hill AFB, UT(defined in MIL-STD-31 000) are applicable. Tailoring to DID per TDP option 84056Selection Worksheet.
Contractor may select the type of drawings. however the contractor shall prepare Source Control Drawings and/or Vendor Item Control Drawings fOT existing Commercial-off-the-shelf (COTS) items or vendor developed items, with the exception of bulk items. Two or more sources shall be identified.
Contract number: All drawings and associated list shall have the contract number identified on sheet one of each document.
BLK 9: Distribution Statement D: Distribution authorized to DoD and U.S. DoD contractors only Administrative/Operational Use; (26 Sep 2012). Other requests for this document shall be referred to AFLCMClHBZIA, 6029 Wardleigh Road (Bldg. 1207), Hill AFB UT 84056.
Export Control Statement and Destruction Notice lAW DoD Directive 5230.24.
BLK's: 10.11,12,13: Date and Frequency Shipping List:
A shipping list shall be provided with each shipment of engineering data delivery.
Each shipping list shall identify each and every document being furnished in the TOP in alphanumeric order. Media shall be in paper copies and via e-mail to
AFLCMCIEZGEM SO-HILL.
Preliminaries:
Contractor shall submit "D" size preliminary paper copies to Blk 14 addressees N'l.T 30 days prior to CDR and FAT. The Government requires 30 days to review drawings and provide comments back to the contractor via Government engineer.
Contractor shall respond with corrections/comments via Government engineer within 30 days.
15. TOTAL I 2 2 0
G. PREPARBlBY(i _ H. DATE I. APPROVEDBY~,,-+\~- J. DATE
Stepbonie Wi' ~ 1a-W-<./I.L 4/,; 10 OCT. 2012 Janan Canacari ANIFPS-117 Program ~ S N--v '(2.
./ I
DO FORM 1423· • FE8 200f' PREVIOUS EDITION MAY BE USED. Page _1- of_2_ Pages r.,1'l,'"1. ",=rnc:;,c;.;;.;:;ou~,;"'1
11. EsnMATED TOTAl PRICE
A. CONTRACT LINE ITEM NO.
CLlN 0005
o. SYSTEMnTEM
ANfFPS-117
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) lB. EXHIBIT IC, CATEGORY:
A TOP )( TN! OTHER
I
E. CONTRACTIPR NO. IF. CONTRACTOR
FA8217-13-R-7000
16. REMARKS (Continued)
Prior to final delivery a digital data sample, including metadata file, for drawings and associated lists, will be submined no later than 30 days before final drawing review. The government requires 30 days for inspection and acceptance of sample Metadata.
AFLCMCIEZGEM SO-HILL will provide sample metadata file and instructions when final delivery media has been determined. The Metadata shall be prepared using option 2 from the 9579776 (Rev K) document. This document may be located in the Jedmics Repository or shall be furnished upon request.
Tailoring to ASME's as follows:
ASME YI4.IOO-2004
Application Data para 4.6 .
Drawing notes para. 4.26 Drawing notes shall be on first sheet of drawings.
ASME Y14.35
Redrawn drawings shall be lAW para 4.3 sub-para 4.3.2 Revision column shall be lAW para 6.1 sub-para 6.1; 6.1.3 Adding sheets shall be lAW para 7.5 sub-para 7.5. I(a) Deleting sheets shall be lAW para 7.5 sub-para 7.5.2(a)
ASME Y14.5
Dimensions and Tolerances shall be lAW para 1.6 and shall be decimal inch.
ASME Y14.3
Angle of projection shall be lAW para 1.6.1 third angle projection.
ASME Y14.IOO-2004 iNVOKED APPENDICES:
Appendix B- Non Commercial Drawing Practices Appendix B- for para 85 see TDP option selection Worksheet (continuation sheet) Appendix C- Drawing Titles Appendix D- Numbering, Coding, and Identification Appendix E- Markings on Engineering Drawings
DO FORM 1423-1, FEB 2001 Page_2_ of_2__ Pages
(1 Data /tern) OMS No. 0704-0188
The p •••.blic reporting burden for this collection of iI'lformatJOn is estimated to 've.•.•i" 110 nours per ruponn, ineluclmQ the time for reviewing instructions, searching existing data $OUren, liI;rth•••.ing .rn:l ma.ntaining the data ,..ded, and completing and teviewinool the eollt<:bon of inform.tion. Send comments •• " ••.ding thn: burden estimate or •.• y other upeet of this eolleetion of information, ineluding S"'ii"'stJOns for r.dueing the burden, to the Department of Delense. executIVe Sentiee:; Director.te (0704.Q1881. Respondents should be ;lwara!ha! notwithstanding ••••y othM provision of law, no ptlfson sh.1I b. subjM:t to any penalty for failing to comply with;l collection of inform~ion if it does not display. currently va{id OMB control numbl!f. "'ease do not return your form III the aoove organization. Send completed form 10 the GovemmeM lasuing Contracting Officer for the Contrae:tlPR No. listed in Block E.
A. CONTRACT LINEITEM NO. B. EXHIBIT C. CATEGORY:
CUN 0005 A TOP 1M OTHER
D.SYSTEMnTEM IE. CONTRACTIPR NO. F. CONTRACTOR
ANIFPS-117 FA8217-I3-R-7000
1. DATA ITEM NO. 2. TiTlE OF DATA ITEM 3. SUBTlnE
A006 Technical Report I
4. AUTHORITY (Data Acqui!lirion Docvmenl No.1 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
IOJ-MISC-80508B SOW Para 3.1.3 AFLCMC/HBZIA
7. 00250 REa 9. OIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION ,.. OISTRIBUTlON
REQUIREO SEE BLK 16 SEE BLK 16LT b. COPlES
8. APP CODe 11. AS OF DATE ".DATE OF SUBSEQUENT ••. ADDRESSEE Firu,1
A D SUBMISSION Draft SEE BLK 16 SEE BLK 16 •••• Repro
1•. REMARKS AFLCMClHBZIA I I
Block 4:
Delivery shall be in Microsoft Office Word (.doc) or Adobe Acrobat (.pdt).
Block 9:
DISTRIBUTION STATEMENT 0: Distribution authorized to DoD and U.S. DaD contractors only; Administrative/Operational Use; 26 Sep 2012. Other requests for this
Idocument shall be referred to AFLCMC/HBZIA, 6029 Wardleigh Road (Bldg. 1207), Hill
I
AFB UT 84056
DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Blocks 10. II. 12. 13:
Contractor shall submit Technical Report NLT 30 calendar days prior to installation.
Government will be allowed 5 business days after receipt of data item to review/approve/disapprove. Contractor shall deliver fe-submittal to incorporate Government comments. if required, NLT 5 business days after receipt of Government comments.
Block 14:
One electronic softcopy will be delivered to:
I
Agustin. Prosper@Hill.af.mil
Agustin Prosper Configuration Manager AFLCMClHBZIA 6029 Wardleigh Rd Bldg 1207 Hill AFB. UT 84056-5838
15. TOTAL I I 0 I
G. PREPAREDBY H.DATE I. APPROVED BY~ _ J. DATE I
David P. parke~~ rfi fib" /2-lanan Canacari tt'r\.~a.cQA..\ 5tJIJV· '/2- AN/FPS-117 Mechanical ngineer AN/FPS- I 17 Pro am Manager I
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1. FEB 2001 PREVIOUS EDITIONMAY BE USED. Page of Pages Adobe PfOfessional7.0
The public: teportil"l9 b •••.den lor thiS collotction of information is es1imat.d to lIVenlge .110 hours pet ruponu. including the time lor r.v;'wing instructions, se •••.ching existing dllt. sources, gllth ••.ing •••d m'MllaininSl the dati' needed, and compl.tlng and reviewing the collection 01 information. Send comm.nts regarding this burden estimate or ••.•y 01~ aspect of thi$ collel;tion of irlform.tion. inl;luding suggestIOns 101' reducing the b •••.den. to the Depart.,...nt 01 Defenn, EJi.cvt"". $«vices Directorate (0704-0188). Rupondents snould bot 'WiN' thai notwithsunding iIflY other provision of law, no pef$on shall be subject 10 •• y penalty 101'f~linlil to comply with a collection of inform.tion if It does not display a currently valid OMS control numb... Pleue do not return 'four form to the above otganiz.tion. S.....:! complet.d form to the Govemmem luuing Contracting otf"lCer for lhe Contr.lctJPR No. li.ted in Bloelt E.
A. CONTRACT LINEITEMNO. B. EXHIBIT C. CATEGORY:
CLIN 0005 A TOP TM OTHER
D. SYSTEM/ITEM IE. CONTRACT/PRNO. F. CONTRACTOR
ANIFPS-117 FA8217-I3-R-7000
1. DATA ITEM NO. 2. TiTlE Of DATA ITEM 3. SUBTITlE
A007 Commercial Off the Shelf Manuals and Associated Suoolemental Data
4. AUTHORITY /Dara Acqui.sition Documenr No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
01-TMSS-80527C SOW Para 3.\.2 and 3.3 AFLCMCIHBZIA
7. 00250 REQ g. DtST STATEMENT '0. FREQUENCY 12. DATE OF FIRST SUBMISSION '4. DISTRIBUTION
REQUIRED SEE BLK 16 SEE BLK 16LT b. COPIES
B. APP COOE ".AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE FirJal
A D SUBMISSION Draft SEE BLK 16 SEE BLK 16 R., R.pro
16. REMARKS AFLCMCJHBZIA I I
Block 4:
Delivery shall be in Microsoft Office Word (.doc) or Adobe Acrobat (.pdf).
Block 9:
DISTRIBUTION STATEMENT D: Distribution authorized to DoD and U.S. 000 contractors only; Administrative/Operational Use; 26 Dec 2012. Other requests for this document shall be referred to AFLCMCIHBZIA. 6029 Ward leigh Road (Bldg 1207), Hill
AFB UT 84056.
DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Blocks 10. 11. 12. 13:
Contractor shall submit Commercial-Off- The-Shelf (COTS) Manuals and Associated Supplemental Data NLT 15 calendar days prior to acceptance testing Government will be allowed 5 business days after receipt of data item to review/approve/disapprove. Contracto shall deliver re·subminal to incorporate Government comments, if required. NLT 5 business days after receipt of Government comments.
Block 14:
One electronic softcopy will be delivered to:
Agustin. Prosper@Hill.afmil
Agustin Prosper Configuration Manager
AFLCMCIHBZIA
6029 Wardleigh Rd Bldg 1207 Hill AFB. UT 84056-5838
15. TOTAL I I 0 I
G. PREPAREDBY ~ H. DATE I. APPROVEDBY ~ J. DATE
David P. Parke~ 0> /'to 1/ I,?-./ Janan canacar~ 54v. ~:2-- ANIFPS-117 Mechanical Engineer ANIFPS-l 17 Pr gram Manager r.'~7~.~PR~'~C~E~G~R~O~U~P"
18. ESTIMATEO
TOTAL PRICE
DD FORM 1423-1. FEB 2001 PREVIOUSEDITIONMAY BE USED. Page of Pages Adobe Professional 7,0 mailto:Prosper@Hill.afmil
TDP OPTION SELECTION WORKSHEET
P R O D U C T D R A W I N G S A N D A S S O C I A T E D L I S T S
A. CONTRACT NO.
FA8217-13-R-7000
B. EXHIBIT/ATTACHMENT NO.
A
C. CLIN
D. CDRL DATA ITEM NO.
A005
1. DELIVERABLE PRODUCT (X and complete as applicable.)
a. ORIGINALS (Specify current design activity's full size reproducible drawing or digital data file(s) on which is kept the revision record recognized as official) (Identify specification, type, grade and class, etc.)
b. REPRODUCTIONS (Identify specifications, type, grade and class, etc., and quantity of each)
X
c. DIGITAL DATA (Identify specification, exchange media, etc. and specify original (master) or copy) see continuation sheet
2. CAGE CODE AND DOCUMENT NUMBERS (X one)
X a. CONTRACTOR
b. GOVERNMENT Complete (1) and (2) or (3)
(1) Use CAGE Code
(2) Use Document Numbers
(3) To Be Assigned By:
3. DRAWING FORMATS AND DRAWING FORMS (X one and complete as applicable)
X a. CONTRACTOR FORMATS. Forms to be supplied by contractor.
b. GOVERNMENT FORMATS. Forms to be supplied by contractor.
Samples supplied by (Specify)
c. GOVERNMENT FORMATS. Forms to be supplied as Government Furnished Material by (Specify)
4. TYPES OF DRAWINGS SELECTION (X one) x a. CONTRACTOR SELECTS b. GOVERNMENT SELECTS (Specify in Item 9)
5. ASSOCIATED LISTS (X and complete as applicable) X a. PARTS LISTS (X one) X (1) Integral (2) Separate
b. DATA LISTS (X one) (1) Not Required (2) Required (Specify levels of assembly)
c. INDEX LISTS (X one) (1) Not Required (2) Required (Specify levels of assembly)
X d. WIRING LISTS (X one) (1) Not Required X (2) Required (Specify levels of assembly) LRU level
e. INDENTURED DATA LISTS (X
ne) (1) Not Required (2) Required (Specify levels of assembly) x f. APPLICATION LISTS (X one) (1) Not Required X (2) Required (Specify levels of assembly) LRU level
6. DETAILS (X one) x a. MULTIDETAIL DRAWINGS PERMITTED
b. b. MONODETAIL DRAWINGS MANDATORY
7. VENDOR SUBSTANTIATION DATA (X one) x a. NOT REQUIRED b. REQUIRED
8. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable) x
a. ASME Y14.100M
ENGINEERING
DRAWING PRACTICES
(COMMERCIAL)
X
ASME Y14,100
With Appendices B,C,D,E X
c. ASME Y14.34M, ASSOCIATED
LISTS
d. EXISTING STANDARDS
DO NOT APPLY
9. OTHER TAILORING (Attach additional sheets as necessary)
See option selection worksheet continuation
TDP Option Selection Worksheet (continuation sheet)
Product Drawings and Associated Lists AN/FPS-117 Array Servicing System Project
Technical Data Package
Authority: Data Item Description (DID): DI-SESS-81000D
PR #FA8217-13-R-7000
1. Delivery preliminaries shall be D-size paper copies.
ASME Y14.100-2004 Appendix B para B5 is tailored as follows:
a. Contractor shall deliver engineering drawings and associated lists media in AutoCAD (NX), and PDF. Metadata file shall be delivered in Microsoft Access 2007.
b. Government will provide Metadata file instruction and a sample file. This metadata file will be in Microsoft Access 2007.
2. Format must meet the requirements of ASME Y14.1.
3. Government Formats- providing types of drawings prepared shall include, but are not limited to: (See CDRL A005, paragraph 3).
(A) Parts List- Contractor shall select separate or integral.
(B) Wire List- Top level assembly
(C) Application list shall be on sheet one of each drawing.
| Signed CDRLS |
| 2 |
| 3 |
| signed |
| Signed CDRLS 2 |
| Signed CDRLS 3 |
File details come from the government source that posted it. Updated .