1. FT3 PWS_Production Follow-On Final_17 Nov 26.pdf
PDF 399 KB Posted
- Solicitation number
- FA821426RB004
About this file
This is a Performance Work Statement (PWS) for the Flight Test, Telemetry, and Termination (FT3) Program Production Follow-On contract, issued by the Air Force Nuclear Weapons Center (AFNWC) for the Minuteman III Intercontinental Ballistic Missile system. The contract covers an estimated period of performance of up to seven years (October 2027 to September 2034) for the base contract to produce 25 flight test kit replenishment spares.
The contractor shall manufacture, assemble, test, and deliver flight test kits consisting of a Flight Destruct System (FDS) and Integrated Instrumentation System (IIS) to support Operational Test Launches (OTLs). Key deliverables include delivery of the first production kit to Vandenberg Space Force Base (VSFB) in August 2032, 120 calendar days prior to each scheduled OTL launch. The contractor must procure all parts and materials, perform assembly and acceptance testing at Boeing-Heath, manage parts inventory and supply chain risk, conduct requalification efforts as needed, and provide comprehensive program management including subcontract oversight, risk management, and cost/software data reporting. For the first five flight test kits, the contractor shall ship kits just-in-time to VSFB for final certification by I-LAB personnel; remaining 20 IIS subkits shall be acceptance tested and stored at Heath pending shipment notification by Air Force Global Strike Command. The contract includes four Production CLINs: 001 Materials/Build/Assemble (Firm-Fixed-Price), 002 Data (FFP), 003 Travel (Cost Reimbursable No Fee), and 004 Requalification (Cost-Plus arrangement). Specific compliance requirements include adherence to Range Commanders Council standards RCC 319-14(T) and RCC 324-11(T), Parts/Materials/Processes management per document D2-28994-1, quality assurance per D2-28843-1, corrosion prevention and control per applicable standards, and safety assessments under FAR and military specifications. The contractor must submit numerous Contract Data Requirements List (CDRL) deliverables including manufacturing plans, test reports, acceptance test reports, failure analysis reports, and cost/labor reports to the Cost Assessment Data Enterprise (CADE) system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FT3 Production Follow-On Request for Proposal Memo_17 Nov 26.pdf | ||
| 3. FT3 Production Follow-On CDRL Package 4 Nov 2026.docx | DOCX document | |
| 5. Solicitation - FA821426RB004 Rev 17 Nov 2026.pdf | ||
| 4. FT3 Production Follow-On CLIN Structure.xlsx | XLSX spreadsheet | |
| 4. FT3 Production Follow-On CLIN Structure_Draft May 26.xlsx | XLSX spreadsheet | |
| 6. AFNWC-NIMS OPSEC Addendum.docx | DOCX document | |
| 2. FT3 Production Follow-On GRID.docx | DOCX document | |
| 3. FT3 Production Follow-On CDRL Package 24 Apr 2026.docx | DOCX document | |
| FT3 Production Follow-On Request for Proposal Memo_updated 7 July 26.docx | DOCX document | |
| 5. Solicitation - FA821426RB004.pdf | ||
| 1. FT3 PWS_Production Follow-On_1 Jun 26v1.docx | DOCX document | |
| 7. FT3_VSFB_locations for shipping Attachment.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FT3 Production Follow-On Performance Work Statement – 17 November 2026
PERFORMANCE WORK STATEMENT
for
FLIGHT TEST, TELEMETRY, AND
TERMINATION (FT3) PROGRAM
OPERATIONS AND SUPPORT PHASE
FT3 Production Follow-On
17 November 2026
AIR FORCE NUCLEAR WEAPONS CENTER (AFNWC)
INTERCONTINENTAL BALLISTIC MISSILE (ICBMSD)
SYSTEMS DIRECTORATE (AFNWC/NI)
MMIII Systems Program Office (AFNWC/NIM)
Guidance Branch (AFNWC/NIMG)
Hill Air Force Base, Utah
Distribution Statement A:
Distribution authorized to Department of War and U.S. DoD contractors only (public release), 8 April 26. Other requests must be referred to MMIII SPO (AFNWC/NIM), 6014 Dogwood Ave, Hill AFB UT 84056.
Table of Contents
1 SECTION I. DESCRIPTION OF SERVICES/SCOPE
1.1 Introduction
1.2 Description of Services
1.3 Scope and Period of Performance
2 SECTION II. PRODUCTION DESCRIPTION OF TASKS
2.1 Flight Test Kit Production
2.1.1 Program Objectives
2.1.2 Contract Objectives
2.1.3 Aerospace Vehicle Equipment Integration, Assembly, Test and Checkout
2.1.4 Parts Management Working Group and Parts, Materials, and Processes (PMP) Management Plan
2.1.5 Production Readiness Review and Audits
2.1.6 Manufacturing Practices and Materiel Fielding
2.1.7 Packaging, Handling, Storage and Transportation (PHS&T)
2.1.8 Program Management
3 SECTION III. GENERAL REQUIREMENTS
3.1 Contractor Travel
3.2 Scientific Technical Information (STINFO) and Controlled Unclassified Information (CUI)
3.3 Applicable Documents
3.4 Base or Area Badges for Access to Government Facilities
3.5 Common Access Card (CAC)
3.6 Continuation of Mission-Essential Services During a Crisis
3.7 Mission-Essential Contractor Services Plan
3.8 Days and Hours of Operation
3.9 Conservation of Utilities
3.10 Standards of Conduct
3.11 Identification of Contractor Personnel
3.12 Direct and Immediate Removal of Contractor Personnel
3.13 Qualified Workforce
APPENDIX A: ACRONYMS
APPENDIX B. REFERENCE DOCUMENTS
APPENDIX C: CONTRACT DATA REQUIREMENTS LISTING (CDRL)
APPENDIX D. SPACE LAUNCH DELTA 30 SAFETY OFFICE
1 SECTION I. DESCRIPTION OF SERVICES/SCOPE
1.1 Introduction
The flight test kit consists of the Flight Destruct System (FDS) and an Integrated Instrumentation System (IIS), and is expected to meet Space Launch Delta (SLD) 30 Range Safety and Air Force Global Strike Command (AFGSC) requirements and resolve obsolescence concerns. Flight test kit replenishment spares are necessary to sustain future Operational Test Launches (OTL). The OTLs are critical to validating the continued accuracy and reliability of the Minuteman (MM) III Intercontinental Ballistic Missile (ICBM) Weapons System and providing valuable data to ensure a safe, secure, and effective nuclear deterrent. The FT3 flight test kit is expected to perform the same function as the existing flight test kits and comply with Range Commanders Council (RCC) 319, Flight Termination Systems Commonality Standard, and RCC-324, Global Positioning and Inertial Measurements Range Safety Tracking Systems’ Commonality Standard as tailored for the FT3 Program.
1.2 Description of Services
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to produce flight test kits to include flight spares to support OTLs except for those items specified in the FT3 Government Furnished Property (GFP) Listing as defined in this Performance Work Statement (PWS). The contractor shall perform to the standards in this contract.
1.3 Scope and Period of Performance
The Government estimates an overall contract period of performance (PoP) of up to 7 years (October 2027 to September 2034) for the base contract to buy 25 flight test kits. The Production CLINs include 001 Materials, Build, Assemble; 002 Data; 003 Travel; 004 Requalification.
2 SECTION II. Production Description of Tasks
2.1 Flight Test Kit Production
2.1.1 Program Objectives
2.1.1.1 As part of the FT3 Program Production Follow-On Contract (Operations & Support Phase), the contractor shall manufacture, produce and deliver, using FT3 approved technical data, specifications and drawings for 25 flight test kit replenishment spares.
2.1.1.1.1 The contractor shall review and analyze acceptance test data to determine if there are adverse trends.
2.1.1.2 The contractor shall implement corrective action with Government approval to resolve findings, negative trends, deficiencies, and nonconformities as identified.
2.1.2 Contract Objectives
2.1.2.1 The Government expects delivery of the first production flight test kit (spare) at Vandenberg Space Force Base (VSFB) in August 2032 to support launch GT 275 in November 2032. Once acceptance testing has been performed and the assets have been accepted by the Government, Range verification checks will be required prior to final configuration for flight, as outlined in the FT3 tailored versions of RCC 319-14 and RCC 324-11.
2.1.2.2 The contractor shall provide a delivery schedule upon contract award, detailing activities/tasks planned to deliver flight test kits 120 calendar days prior to scheduled OTLs per the current AFGSC MMIII OTL 5-year schedule.
2.1.2.3 The FT3 Production contractor will procure parts and materials to produce 25 FT3 flight test kits with expected delivery to VSFB 120 calendar days prior to OTL.
2.1.2.4 The contractor shall ensure timely and accurate delivery of all data deliverables IAW contract requirements and shall ensure data is marked with the appropriate STINFO (i.e., Distribution Statement, Export Control Warning statement, and Destruction Notice), Controlled Unclassified Information (CUI) and classification markings.
2.1.3 Aerospace Vehicle Equipment Integration, Assembly, Test and Checkout
2.1.3.1 The contractor shall procure all equipment, parts and materials required to support production for 25 flight test kits prior to contract PoP end.
2.1.3.2 The contractor shall assemble, check out and test flight test kits, then ship kits to VSFB just-in-time (120 days prior to flight for the primary and 90 days prior to flight for the spare) for acceptance testing and certification for flight by I-LAB personnel. These actions will pertain to the first five (5) flight test kits produced provided this requirement does not extend beyond the contract PoP. [CDRL A064, DI-QCIC-81891, Acceptance Test Reports]
2.1.3.3 For the remaining 20 IIS subkits, the contractor shall assemble, check out and conduct acceptance testing at Boeing-Heath for sell-off once IIS and FDS components are received from the manufacturers [CDRL A064, DI-QCIC-81891, Acceptance Test Reports (ATR)]. Upon completion of acceptance testing, the IIS and completed set of FDS components will be stored at Heath in appropriate shipping containers. The IIS will be stored on a Test and Transportation (TAT) or equivalent storage fixture. FDS components will be stored in an I-lab or Missile Processing Facility (MPF) crate ready for shipment. Shipment of these kits is determined by the
AFGSC MMIII OTL 5-year schedule. Flight test kits stored beyond the Production Follow-On contract POP end will be billed to the sustainment contract.
2.1.3.4 For the Ordnance subkit, the contractor shall direct shipment from the manufacturer to the VSFB Munitions Facility.
2.1.3.5 The contractor shall manage parts inventory and supply chain risk, including the procurement of spare components, to ensure zero schedule slippage due to component failures or anomalies.
2.1.3.6 The contractor shall provide management and engineering support to ensure test activities meet latest FT3 tailored revision of RCC-319-14(T), RCC-324-11(T), and AFSPCMAN 91-710, and coordinated with Range Safety accordingly.
2.1.3.7 The contractor shall provide management and engineering support to ensure qualification and acceptance test activities meet the latest version of DODI 5000.89_DAFI 99- 103, Capabilities-Based Test and Evaluation criteria and the latest version of MMIII Systems Program Office HB 99-1110, Test and Evaluation and are coordinated with MMIII Program Office accordingly.
2.1.3.8 The contractor shall provide engineering support for resolution of system/subsystem Acceptance Test Procedure (ATP) failures and anomalies.
2.1.3.9 The contractor shall conduct Materiel Defect Reporting using standard Air Force ICBM maintenance reporting processes IAW TO 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.
2.1.3.10 The contractor shall ensure that any materiel defects identified during flight test kit acceptance testing are reported to the FT3 Program Manager. The Government will assess the defect and determine the appropriate corrective action.
2.1.3.11 The contractor shall notify the Government within the timeframe specified in the latest RCC 319-14(T) for all acceptance test failures.
2.1.3.12 The contractor shall notify the Government within the timeframe specified in the latest RCC 324-11(T) for all acceptance test failures.
2.1.3.13 The contractor shall provide a full failure analysis IAW latest FT3 tailored revision of RCC 319-14(T) for any flight safety component which does not meet all of its Acceptance Test criteria. [CDRL A059.1, DI-MISC-80508B/T, Technical Report - Studies/Services - Failure/Anomaly Resolution Report]
2.1.3.14 The contractor shall provide a full failure analysis IAW latest FT3 tailored revision of RCC 324-11(T) for any range tracking component which does not meet all of its Acceptance Test criteria. [CDRL A059.1, DI-MISC-80508B/T, Technical Report - Studies/Services - Failure/Anomaly Resolution Report]
2.1.3.15 The contractor shall implement Engineering Change Orders (ECO)/Engineering Change Proposals (ECP) as directed to include associated drawings updates, and Specification Change Notices (SCN) if any are required during contract execution. [CDRL A027, DI-SESS- 81000F/T, Product Engineering Design Data and Associated Lists and CDRL A030, DI-SESS- 80643E, Specification Change Notice (SCN)]
2.1.3.16 The contractor shall deliver Missile Guidance Set (MGS) (AN/DSW-23) assemblies in the modified flight test configuration to VSFB 120 calendar days in advance of the scheduled OTL flight. NOTE: All MGS assemblies will be furnished by United States Air Force (USAF) for contractor modification. MGS assemblies delivered beyond contract PoP end will be delivered under the Sustainment contract.
2.1.3.17 The contractor shall, for the first five flight test kits, modify an MGS (AN/DSW-23) with a new port hole while at Boeing Guidance Repair Center (BGRC) at Heath, Ohio, per drawing 25-94970 and using procedure 21-62947 to mount the antenna onto the MGS. For flight test kits stored beyond PoP end, modification of the MGS and the mounting of the antenna will be billed to the sustainment contract.
2.1.3.18 The contractor shall report actual measured weight for all flight test kit components at the ATP level. [CDRL A064, DI-QCIC-81891, Acceptance Test Reports]
2.1.3.19 The contractor shall deliver this list of weights to include the final IIS subkit weight to the Government as part of the delivery package of each flight test kit before launch. (This will not be included as a CDRL-Mass Properties Report) [CDRL A064, DI-QCIC-81891, Acceptance Test Reports]
2.1.3.20 The contractor shall test, troubleshoot, and certify the IIS for the first five flight test kits for flight, using the Minuteman Integrated Instrumentation System (IIS) Test Station (MITS) installed in the Integrated Laboratory (ILAB) at VSFB.
2.1.3.21 When executing ECOs, the contractor shall conduct T&E activities for potential flight test kit redesign and requalification to include test integration, scheduling and conduct (execution), simulated environment testing, necessary requirement updates, and revise test requirements and test plan development IAW Minuteman III Systems Program Office HB 99- 1110, Test and Evaluation. [CDRL A059.2, Technical Report - Study/Services (Verification Analysis Report); CDRL A060, DI-NDTI-80566, Test Plan; CDRL A061, DI-NDTI-80603, Test Procedure;
CDRL A062, DI-NDTI-80809, Test/Inspection Report; CDRL A064, DI-QCIC-81891, Acceptance Test Reports].
2.1.3.21.1 The contractor shall execute Class I and II changes as follows: Class I changes shall be performed under the GuSSC 2.0 Sustainment Contract, Appendix H using MMIII SPO-HB- 63-1101, Technical Review Board (TRB) as a reference. Class II changes for Production shall be performed under the Production Contract using MMIIISD-HB-99-1108 as a reference. Class determination must be done IAW 62-CMP Rev A, Appendix A.
2.1.3.22 The contractor shall provide safety assessments when there are changes to safety hazards IAW CDRL A067, DI-SAFT-80102, Safety Assessment Report (SAR).
2.1.3.23 The contractor shall update the Failure Mode Effects and Criticality Analysis (FMECA) Report when the design is changed, new failure modes are identified or if required by Government. [CDRL A102, DI-SESS-81495, Failure Mode Effects and Criticality Analysis (FMECA) Report]
2.1.4 Parts Management Working Group and Parts, Materials, and Processes (PMP) Management Plan
2.1.4.1 The contractor shall use the latest revision of the D2-28994-1 Parts, Materials, and Processes (PMP) Management Plan for requirements and guidance when procuring parts during production.
2.1.4.2 The contractor shall support the PMP Control Board to coordinate any obsolescence mitigation, parts, materials, process concerns or changes.
2.1.4.3 The contractor shall archive lot conformance data (screening and testing at piece-part level) and make available upon request for the duration of the service life of the deployed product.
2.1.4.4 The contractor shall ensure that each supplier of mission critical hardware performs the applicable incoming tests and inspections of parts and materials and meets the requirements of the procurement specification. For categories I and II, the contractor shall develop and maintain a database that captures all relevant data for received parts to include date code, purchase order requirements, and certificate of conformance data for the life of the program. The incoming inspection and testing of parts and materials shall be conducted IAW with the supplier’s approved PMP Management Plan.
2.1.4.5 The contractor shall perform assessments of subcontractor PMP implementation as required to verify compliance with PMP management and control practices as defined in the approved critical supplier’s hardware PMP plan.
2.1.4.6 The contractor shall conduct a failure analysis, in addition to PMP Management Plan requirements, when directed by the Government.
2.1.4.7 The contractor shall purchase piece part quantities sufficient to mitigate the potential of continual lot screening and requalification. This is necessary to reduce costs associated with screening and qualification of new lot date code piece parts as required per the RCC 319-14 (T) Appendix B and the FT3 Parts Management Plan.
2.1.5 Production Readiness Review and Audits
The contractor shall hold a Production Readiness Review (PRR) if necessary due to changes to the production line to ensure that the system design is ready for production, and the supplier has accomplished adequate production planning for entering Full Rate Production (FRP). The PRR shall be conducted IAW IEEE 15288.2, IEEE Standard for Technical Reviews and Audits on Defense Programs to review the specified technical data products and meet the exit criteria stated within. [CDRL A002, DI-ADMN-81249C; Meeting Agenda; CDRL A003, DI- MGMT-81605, Briefing Material; CDRL A004, DI-ADMN-81250C, Meeting Minutes]
2.1.6 Manufacturing Practices and Materiel Fielding
2.1.6.1 The contractor shall update the Manufacturing and Producibility Plan for full rate production with updated Manufacturing Bill of Materials; production and acceptance plan, and definition of responsibilities during production; and delivery plan. This plan shall include specific manufacturing and handling procedures required to maintain program protection IAW the D2-28817-1 Guidance Subsystem Support Contract (GuSSC) Program Protection Implementation Plan (PPIP) which is delivered on the GuSSC 2.0 Appendix H. FT3 Requirements contract. [CDRL A009, DI-MGMT-81889, Manufacturing Plan]
2.1.6.2 The contractor shall ensure flight test kit support equipment (GFE) is functioning in support of production. The GFE listing is maintained as part of the Guidance Subsystems Support Contract 2.0 Appendix H. FT3 Requirements and is updated annually.
2.1.6.3 The contractor shall monitor in-process hardware to include electronic components and assemblies for compliance with MIL-STD-1568, Materials and Processes for Corrosion Prevention and Control in Aerospace Weapons Systems, Society of Automotive Engineers (SAE); AS12500, Corrosion Prevention and Deterioration Control in Electronic Components and
Assemblies, AFNWC/NM-HB-21-1100, Corrosion Program and the D2-28991-1 FT3 Corrosion Prevention & Control (CPC) Plan during the various stages of manufacture. Final specifications will continue to be documented on drawings and any required Engineering Orders updates. Any production line corrosion or contamination problems that occur or may occur shall be reported to the FT3 program and the CPC representative. The problem will be reviewed and corrective action implemented. If there are any changes, the CPC Plan will need to be updated as required as part of the sustainment contract. (see MIL-STD-2073-1, Standard Practice for Military Packaging)
2.1.6.4 The contractor shall have an Integrated Product Team (IPT) managing all aspects of its subsystem/component product manufacturing and operational support activities. The contractor's supplier management will work with each IPT through the assigned responsible engineer and the procurement agent to include representatives from other appropriate disciplines to assist in defining supplier requirements for system safety, quality assurance, logistics support, reliability and maintainability, and other specialty disciplines, as required.
2.1.6.5 In compliance with the clause entitled “Inspection of Services,” 52.246-3 and 52.246-4, the contractor shall establish a complete Quality Control Program to ensure the requirements of this contract are provided as specified IAW the clause. The contractor shall institute quality assurance processes IAW D2-28843-1 Quality Assurance Program Plan (QAPP) to ensure quality of documentation, testing, analyses, and hardware during the manufacturing of systems/subsystems.
2.1.6.6 The contractor shall perform quality product evaluation audits during fabrication, assembly and installation activities. These audits may be in conjunction with first article inspection activities. Ensuring production process surveillance processes provide the surveillance requirements and methodology to verify compliance with processes, procedures, work instructions, and other requirements. Internal audits should be performed IAW processes as identified in the FT3 QAPP which establish requirements and responsibilities for implementing and maintaining an internal audit program that evaluates the Quality Management System (QMS), applicable contract requirements, conformity, effectiveness, and efficiency.
2.1.6.7 The contractor shall ensure all products provided to the Government are compliant with MIL-STD-130, Identification Marking of U.S. Military Property and Technical Manual 00- 25-260, Asset Marking and Tracking Item Unique Identification (IUID) Marking Procedures.
2.1.7 Packaging, Handling, Storage and Transportation (PHS&T)
2.1.7.1 The contractor shall coordinate the plan for assembly, kitting and delivery timeline for flight test kits (subkits) prior to contract award with final delivery schedule confirmed within 120 calendar days post contract award.
2.1.7.2 The contractor shall coordinate flight test kit (subkits) delivery with the MMIII Systems Program Office and the 377 TEG/576 FLTS.
2.1.7.3 The contractor shall ship subkits (first five flight test kits or up until PoP ends) IAW D2-29691-1, FT3 Transportation Plan, appropriate Air Force and Military Standard PHS&T requirements to VSFB from BGRC. (MIL-STD-2073-1E, Standard Practice for Military Packaging Requirements)
2.1.7.4 The contractor shall kit FDS assemblies, Electronic Safe and Arm Devices (ESAD) to include the Conduit Support System, at the BGRC, Heath OH, using fiberboard containers and placed in a wooden crate per MIL-STD-2073-1, Method 54.
2.1.7.5 The contractor shall handle electrostatic discharge sensitive (DS) parts of the flight test kit per MIL-STD-1686, Class 2.
2.1.8 Program Management
The contractor shall perform program management of the production of the flight test kits.
Program management includes the resources necessary to manage, direct, and control all efforts contributing to the production of the flight test kits. The contractor shall conduct bi-weekly leadership tag-ups which include development and distribution of briefings. The tag-ups shall include production status, detailing material buys, lot acceptance testing, requalification effort schedule and status, component build and shipment specifics. [A003, DI-MGMT-81605, Briefing Material]
2.1.8.1 Subcontract Management
2.1.8.1.1 The contractor shall manage all aspects of subcontract oversight. The contractor shall provide a bi-weekly performance update to the Government. Subcontractor Deliverable Requirement Lists (SDRL) shall be planned appropriately to support Government reporting requirements. [CDRL A008.1, DI-MGMT-81911, Work Management Plan (Subcontractor Management Plan)]
2.1.8.1.2 The contractor shall identify all subcontractors and develop subcontract management plans to include use of Small Business minority set asides such as Service Disabled Veteran- Owned Small Business (SDVOSB) and HubZone. The Subcontractor Management Plan must include small business goals, and detailed explanations for any standard goals that are not met.
[CDRL A008.2, DI-MGMT-81911, Work Management Plan (Small Business Subcontractor Report)]
2.1.8.2 Risk Management
2.1.8.2.1 The contractor shall manage the program risk IAW the D2-28801-1 Contractor’s Risk Management Plan.
2.1.8.2.2 The contractor shall identify, track, report, and present risks as part of the Risks, Issues, and Opportunities (RIO) Board.
2.1.8.2.3 The contractor shall provide standardized risk assessment and management functions, utilizing techniques which easily interface with the Government’s current risk management process. Program Management Reviews.
2.1.8.2.4 The contractor shall mitigate supply chain risk as referenced in Boeing’s delivered Supply Chain Risk Management (SCRM) Plan (delivered as part of the FT3 Sustainment contract modification) to ensure piece-parts, circuit boards, components, repair parts, etc., do not incorporate counterfeit parts, malicious code, or any other elements that would allow adversaries to gain unauthorized access to data, alter data, interrupt communications, or otherwise disrupt operations.
2.1.8.3 Cost and Software Data Reporting (CSDR)
2.1.8.3.1 The contractor shall systematically collect and report to Cost Assessment Data Enterprise (CADE) and the United States Government (USG) the actual contract costs and technical information based on the Office of the Secretary of War (OSW) Deputy Director Cost Analysis (DDCA)-approved CSDR plan (Attachment 1) in accordance with (IAW) the CSDR Manual, DoDM 5000.04.
2.1.8.3.2 The CSDR requirements are outlined per Attachment 1, CSDR Plan (DD Form 2794).
Inclusive in the plan is the information required by Cost Working Integrated Product Team (CWIPT) for the respective prime and subcontractors, i.e., schedule for report submission, and specific information as to format, address to send the information, and other pertinent facts.
2.1.8.3.3 The contractor shall submit electronically CDRL A231, DI-FNCL-82162, Cost and Hour Report (FlexFile); CDRL A238, DI-MGMT-82164, Quantity Data Report; CDRL A237, DI-MGMT-82165, Technical Data Report; and CDRL A235, DI-FNCL-81765C, Contractor Business Data Report (CBDR). The required form and file type for each CSDR is specified in its Data Item Description (DID).
2.1.8.3.4 The contractor data submitters must register through the CADE website (http://cade.osd.mil) and possess a DoD-approved External Certification Authorities (ECA) digital certificate or DoD-issued Common Access Card (CAC) to obtain a CADE Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the CADE Portal and requesting a CSDR submitter user role.
2.1.8.3.5 The contractor shall flow down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in DoDI 5000.73, or as required by the CWIPT. This includes subcontractors to electronically report directly to the CADE Portal using the CSDR Submit-Review System.
2.1.8.3.6 CSDR Readiness Review: A CSDR Readiness Review Meeting will be held 60 calendar days after contract award to include a discussion of the CSDR process that satisfies the guidelines contained in the DoDM 5000.04 and the requirements in the approved CSDR Plan and related Resource Distribution Table.
2.1.8.4 Requalification Effort
The contractor shall prepare and submit a Contract Funds Status Report (CFSR) to provide the Government with visibility into the flow of funds, track actual and projected expenditures, and accurately forecast future funding requirements. CFSR tracking and reporting requirements are tailored to apply exclusively to CLIN 004 Requalification. All Firm-Fixed-Price (FFP) CLINs are explicitly exempt from CFSR tracking and reporting requirements, and the Contractor shall ensure FFP costs are not co-mingled in the CFSR data. [A018, DI-MGMT-81468, Contract Funds Status Report (CFSR)]
3 SECTION III. General Requirements
3.1 Contractor Travel
The contractor shall perform travel in support of this effort, as required on a Cost Reimbursable No Fee (CRNF) CLIN basis.
3.1.1 Travel Expenses
The contractor shall ensure all contractor travel is in accordance with RFO 31.205-46 and the DoD Joint Travel Regulation (JTR) for all costs, airfares, per diem, allowances, and reimbursement of travel expenses. First class air travel is not authorized. Travel costs will be considered reasonable and allowable only to the extent that they do not exceed the maximum per diem rates in effect at the time of the travel. The Government reserves the right to disallow unreasonable travel. The contractor shall bill all travel expenses as a separate line item on all invoices. Labor costs are not allowed under the Travel Contract Line Item Number (CLIN); the Travel CLIN will be a cost reimbursement with no fee.
3.2 Scientific Technical Information (STINFO) and Controlled Unclassified Information
(CUI)
Department of Defense Instruction (DoDI) 5230.24, Distribution Statements on Technical Documents, Enclosure 4, Table 5, identifies six (6) authorized distribution statements for Scientific Technical Information (STINFO). The contractor shall mark all scientific technical data, regardless of media or form, with the appropriate STINFO markings (i.e., distribution statement, export control warning [when applicable], and destruction notice) as specified on the DD Form 1423-1, Contract Data Requirements List (CDRL).
For written or printed material, the STINFO markings shall appear in full text on the front cover/title page as specified in the CDRL. Distribution statements shall include all applicable “reasons” based on the contents of the document. The “date of determination” within each distribution statement shall reflect the date of the document, unless otherwise agreed to upon contract award. The Controlling DoD Office (CDO) will review all technical data (e.g., technical reports, test reports, final summaries, and briefings) prior to finalization to ensure the correct STINFO markings are applied to all scientific/technical documents. A distribution statement designation is distinct from, and in addition to, a security classification marking applied in accordance with (IAW) DoD Manual (DoDM) 5200.01, Volume 2, DoD Information Security Program: Marking of Information.
Controlled Unclassified Information (CUI) markings shall be applied to all applicable scientific, technical information documents IAW DoDI 5200.48_DAFI 16-1403, Controlled Unclassified Information (CUI). Utilize the Critical Information Indicators List when categorizing CUI data as AFI10-701, Operation Security (OPSEC) is applicable. The STINFO information (i.e., Distribution statement, Export Control Warning [when applicable] and destruction notice) will be fully spelled out, and will be placed above the CUI Designation Indicator box. The CUI box only lists the “Distribution Statement line and letter. Place “Controlled Unclassified Information” (do not abbreviate) in the header and footer of each page. NOTE: If the information does not fall within law, regulation, or government policy then the information is not CUI. IAW DFARS 252.204-7008, Compliance with Safeguarding Covered Defense Information Controls and 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
3.3 Applicable Documents
Compliance and reference documents related to specifications, standards, handbooks, regulations, instructions and tables applicable to the work required in the performance of this contract are listed in APPENDIX B: Reference Documents. If vendors are knowledgeable of critical documents or requirements not listed in this PWS, it is expected they inform the Government to ensure adequate coverage. The contractor shall use the latest version of compliance documents.
3.4 Base or Area Badges for Access to Government Facilities
The Government Program Manager will assist contractor personnel to obtain and process the necessary DoD forms for base or area badges for access to Government facilities and property.
The contractor shall have limited access to Government facilities, and must coordinate access and usage dates and times with the Government Program Manager at least 15 working days prior to the access date. The contractor shall protect Government property to prevent damage during the period of time the property is in the possession of the contractor. The contractor shall report promptly to the Contracting Officer (CO) all available facts relating to each instance of damage to Government property. The contractor shall not be in a Government facility without a Government supervisor present. Control of the facilities shall remain with the Government.
3.5 Common Access Card (CAC)
When a CAC is required in support of this effort and the Security Clearance level is UNCLASSIFIED, the following instructions apply. Note – The CAC approval process may take up to 4 weeks to complete and contractors are urged to consider these instructions before award (i.e., when preparing a proposal in response to an RFP) and prior to changing contractor personnel after award. The contractor shall have encryption capabilities in place to send and receive secure encrypted emails.
In accordance with Hill AFB Instruction 36-812, Issue of Common Access Cards to Contractors (Contractor Verification System), paragraph 6.1.5 the contractor "Must have favorable or higher adjudication based on a National Agency Check with Inquiries (NACI) or higher investigation."
In accordance with AFSSI 8522, Communications and Information, Chapter 3, Access to Information Systems and Networks, states:
3.5.1.1 Favorable Background Investigation. CSAs, in coordination with the security manager, will verify proper security clearance and background investigation checks, NACI, Single Scope Background Investigation) are submitted prior to granting a network user access to the AF-GIG.
Upon successful completion of initial Information Awareness training and verification of favorable background check, the user is authorized use of the network and is granted access to authorized network resources.
Refer to DAF Part 42, Common Access Cards (CAC) for Contractor Personnel, under the basic contract(s) for additional instructions and procedures that apply to obtain and manage CACs under individual task orders. One of the provisions of this clause is that the contractor shall provide a listing of personnel who require a CAC to the Contracting Officer. For purposes of individual task orders, in addition to the Contracting Officer, the contractor shall also submit the listing to the Program Manager and Contracting Officer Representative (COR).
3.6 Continuation of Mission-Essential Services During a Crisis
Designation of Services as Mission-Essential: The Functional Commander (FC) or civilian equivalent has determined certain services under this contract/order are mission-essential and will continue in the event of a crisis. The designation of services as mission-essential will not apply to an entire contract, but will apply only to services specifically identified as mission-essential by the FC or civilian equivalent. The mission-essential services under this contract/order include sustainment activities as required to support the OTL mission.
3.7 Mission-Essential Contractor Services Plan
The contractor shall submit a plan describing procedures for continuing performance of mission-essential services during a crisis. The contractor shall identify provisions for ensuring required personnel and resources are available to support continuity of operations for up to 30 calendar days or until normal operations can be resumed. The contractor shall submit any revision to the plan for approval prior to implementation. The contractor shall activate the plan only if authorized by the Government Contracting Officer acting under the direction of the FC or civilian equivalent.
3.8 Days and Hours of Operation
When work is performed at the Government’s location, the contractor shall perform the services during workdays Monday through Friday between the hours of 6:00 am and 6:00 pm, excluding Federal Holidays, local or national emergencies, administrative closings, or similar government directed facility closings. The days and hours of operation may be changed with prior approval from the government program manager and contracting officer. The days and hours of operation, (i.e., alternate work schedule) will be evaluated by the Government on an individual basis, depending upon the type and estimated duration of work activities and workload.
At all times, the contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons and when hiring contractor personnel, the contractor shall ensure the stability and continuity of the contractor’s workforce.
Recognized holidays. The contractor shall not provide service on the following days: New Year’s Day, Martin Luther King Day, Presidents’ Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day and Christmas Day. If the holiday falls on Saturday, then it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
3.9 Conservation of Utilities
The contractor shall ensure contractor personnel understand and comply with utilities conservation practices. The contractor shall operate under conditions which prevent the waste of utilities to include the following:
• Lights shall be used only in areas where and when work is being performed.
• Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by contractor personnel unless authorized by the Government Contracting Officer.
• Water faucets or valves shall be turned off after the required use has been accomplished.
• Government telephones shall be used only for official Government business.
3.10 Standards of Conduct
Contractor personnel shall abide by all Government rules, procedures, and standard of conduct.
The contractor shall not divulge any information regarding files, data, processing activities/functions, user IDs, passwords, or other knowledge that may be gained, to anyone not authorized to have access to such information. Contractor personnel requiring access to Government Automated Information Systems (AIS) shall have background investigations and security awareness training completed, after task order award and prior to AIS access. When the period of performance is complete or contractor personnel leave work on this contract, the contractor shall complete within 5 working days, terminate all network user access, account information, return all access cards, and base identification badges to applicable Government entities.
3.11 Identification of Contractor Personnel
All contractor personnel shall identify themselves as contract personnel, when attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to a third party to avoid creating a public impression, they are Government personnel. The contractor shall ensure all documents or reports produced by contractors are marked as contractor products or that contractor participation is appropriately disclosed. The contractor shall obtain and wear contractor identification badges, visibly displayed during meetings or other gatherings where identification of contractor personnel is required.
3.12 Direct and Immediate Removal of Contractor Personnel.
The Government reserves the right for direct and immediate removal of permanent or temporary contractor personnel for the following reasons, and not fully inclusive: Security, safety, health, ethical, fraudulent credentials or qualifications, unprofessional or unacceptable behavior IAW MMIII Systems Directorate, USAF, Department of War (DoW), and the Federal Government, IAW governing laws and regulations.
The Government Contracting Officer will provide a written removal request to the contractor for said contractor personnel to be acted upon immediately. The contractor shall provide qualified replacement personnel within 45 calendar days, at no additional cost to the Government.
3.13 Qualified Workforce
The contractor shall maintain a qualified workforce with the necessary skills and abilities to meet the duties and requirements described in the PWS. The contractor shall provide training, acquire and maintain certifications, and provide the necessary tools, systems, etc., for all contractor personnel.
APPENDIX A: ACRONYMS
ACRONYM DESCRIPTION
DAF
Compass
Department of the Air Force Contracting Compass
AFGSC Air Force Global Strike Command
AFI Air Force Instruction
AFSPCMAN Air Force Space Command Manual
AIS Automated Information Security
AO Authorizing Official
AODS All Ordnance Destruct System
AT Anti-Terrorism
ATO Authority to Operate
ATP Acceptance Test Procedures
BGRC Boeing Guidance Repair Center
CAC Common Access Card
CC Critical Components
CDRL Contract Data Requirements List
CFSR Contract Funds Status Report
CLIN Contract Line Item Number
CM Configuration Management
CMP Configuration Management Plan
CNSSD Committee on National Security Systems Directive
CO Contracting Officer
CPFF Cost-Plus-Fixed-Fee
CPI Critical Program Information
CPINS Computer Program Identification Number System
WELLS, TAMARA R CTR USAF AFMC AFNWC/NIMG
Add CFSR
CPP Counterfeit Parts Prevention
CS Cybersecurity
CSCI Computer Software Configuration Item
CSDR Cost and Software Data Reporting
CSIP Cybersecurity Implementation Plan
CSS Cybersecurity Strategy
CUI Controlled Unclassified Information
DCMA Defense Contract Management Agency
R-DFARS Regulatory Defense Federal Acquisition Regulation Supplement
DoD Department of Defense
DoDI Department of Defense Instruction
DoDM Department of Defense Manual
Dow Department of War
DR Deficiency Reports
ECA External Certification Authorities
ECO Engineering Change Orders
ECP Engineering Change Proposal
EDB Environments Data Book
EEE Electrical, Electronic and Electromechanical
ESAD Electronic Safe and Arm Device
ESD Electrostatic Discharge
ESOH Environmental, Safety and Occupational Health
RFO Revolutionary FAR Overhaul
FC Functional Commander
FDS Flight Destruct System
FLTS Flight Test Squadron
FRP Full Rate Production
FT3 Flight Test, Telemetry and Termination
FTUE Flight Test Unique Equipment
FY Fiscal Year
GFE Government Furnished Equipment
GFM Government Furnished Materiel
GFP Government Furnished Property
GIDEP Government Industry Data Exchange Program
GIG Global Information Grid
GRID Government Rights in Data
GuSSC Guidance Subsystems Support Contract
HB Handbook
HubZone Historically Underutilized Business Zone
HW/SW Hardware/Software
IA Information Assurance
IAW In Accordance With
ICBM Intercontinental Ballistic Missile
IEEE Institute of Electrical and Electronics Engineers
IIS Integrated Instrumentation System
ILAB Integrated-LAB
IPT Integrated Product Team
IUID Item Unique Identification Plan
JTR Joint Travel Regulation
KPP Key Performance Parameters
KSA Key System Attributes
LCSP Life Cycle Sustainment Plan
LSCDA Linear Shaped Charge Destruct Assembly
LSS Launch Support System
MAT Miniature Analog Transmitter
MGS Missile Guidance Set
MITS Minuteman Integrated Instrumentation System (IIS) Test Station
MMIII Minuteman III
NACI National Agency Check with Inquiries
NIST National Institute of Standards and Technology
OPSEC Operations Security
OSS&E Operational Safety, Suitability, and Effectiveness
OT&E Operational Test & Evaluation
OTL Operational Test Launch
PBV Post Boost Vehicle
PCA Physical Configuration Audit
PHS&T Packaging, Handling, Storage and Transportation
PMP Parts, Materials, and Processes
PMPWG Part Materials and Process Working Group
PoP Period of Performance
PRR Production Readiness Review
PWS Performance Work Statement
QAPP Quality Assurance Program Plan
QMS Quality Management System
RCC Range Commander’s Council
RFP Request for Proposal
RIO Risks, Issues and Opportunities
RMF Risk Management Framework
SAE Society of Automotive Engineers
SAM System for Award Management
SAR Safety Assessment Report
SCG Security Classification Guide
SCN Specification Change Notice
SDVOSB Service-Disabled Veteran-Owned Small Business
SIB Safety Investigation Board
SLAR Service Life Assessment Report
SLD Space Launch Delta
SoS System of Systems
SP Special Publication
SRDL Subcontract Requirement Data Listing
STINFO Scientific Technical Information
T&E Test and Evaluation
TAT Transportation and Test
TCTO Time Compliance Technical Order
TEG Test and Evaluation Group
TO Technical Orders
TOMA Technical Order Management Agency
TPM Technical Performance Measures
VSFB Vandenberg Space Force Base
VTC Video Teleconference
VV&A Verification, Validation and Accreditation
WBS Work Breakdown Structure
APPENDIX B. REFERENCE DOCUMENTS
DOCUMENT DOCUMENT TITLE
AFGSCI 99-102 Intercontinental Ballistic Missile (ICBM) Operational Test and Evaluation (OT&E)
AFI 10-245 Antiterrorism (AT)
AFI 10-701 Operations Security
AFI 61-201
Management of Scientific and Technical Information
(STINFO)
AFI 63-101/20-101 Acquisition and Sustainment Life Cycle Management
AFI 91-204 Safety Investigations and Reports
AFI 99-103 Capabilities-Based Test and Evaluation
AFMAN 16-1404 Air Force Information Security Program
AFMAN 91-201 Explosive Safety Standards
AFMAN 91-203 Air Force Occupational Safety Standards
AFMCI 99-103 Test Management
AFNWCI 99-101 Nuclear Enterprise Test and Evaluation Management
AFPAM 63-128
Guide to Acquisition and Sustainment Life Cycle Management
AFPD 63-1/20-1 Integrated Life Cycle Management
ANSI/ASQ Q 9001:2015 Quality Management Systems: Requirements
ANSI/EIA 748 Earned Value Management Systems
AS5553
Fraudulent/Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition
C95-167/201 Telemetry Description Document for the ICBM Operational Software Sustainment Program (IOSSP) of the MMIII Guidance Replacement Program (GRP)
DAFPD 99-1 Test and Evaluation
D2-28994-1 Parts, Materials, and Processes (PMP) Management Plan
DoDI 4650.1 Policy and Procedures for Management and Use of the Electromagnetic Spectrum
DODI 5000.83_DAFI 63-113 Technology and Program Protection to Maintain Technological Advantage
DODI 5000.85 Major Capability Acquisition
DoDI 5200.48_DAFI 16-1403 Controlled Unclassified Information (CUI)
DODI 5230.24 Distribution Statements on DoD Technical Information, DODI 8320.04
DoD Serially Managed Items of Tangible Personal Property and Item Unique Identification 2.0 Standards
DoDI 8500.01 Cybersecurity
DoDI 8510.01 Risk Management Framework (RMF) for DoD Systems, DoDI O-2000.16V1 DoD Antiterrorism (AT) Standards
DoDM 5200.01 Vol 1 DoD Information Security Program: Overview, Classification, and Declassification
DoDM 5200.1 Vol 2 Information Security Program: Marking of Information
DoDM 5200.01 Vol 3 DoD Information Security Program: Protection of Classified Information
DoDM 5200.48 Controlled Unclassified Information (CUI):
62-CMP Rev A ICBM Configuration Management Plan (CMP)
AFMAN 16-1404 Air Force Information Security Program
AFNWC/NM HB 21-1105 Tech Orders
AFNWC/NM HB 21-1100 Corrosion Prevention
AFNWC/NM HB 21-1104 Deficiency Reporting
AFNWC/NM HB-21-1106 Time Compliance Technical Order (TCTO)
AFNWC/NM HB 62-1105 WS Risk Management Handbook
AFNWC/NM HB 62-1107 Engineering Change Proposal
AFNWC/NM HB 62-1110T Configuration Audits
AFNWC/NM HB 62-1113T Software Configuration Management
MMIII SPO HB-63-1101 Technical Review Board (TRB)
AFNWC/NM HB 63-1124 Engineering Order (EO)
ANSI/ESD S20.20 ESD Association Standard for the Development of an Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)
FT3 Parts Age Surveillance Extension Plan
Hill AFB Instruction 36-812 Issue of Common Access Cards to Contractors (Contractor Verification System)
ICBM-HDBK-02 Intercontinental Ballistic Missile Interface Control Management Handbook
ICBM SCG ICBM Security Classification Guide
ICBMSD-HB-63-1104 Operation Safety, Suitability and Effectiveness (OSS&E) Approval Level Determination
ICBMSD HB 63-1105 Request for Waivers or Variance
ICBMSD HB 63-1107 Specification Change Notice (SCN)
ICBMSD OI 62-11 Technical Peer Review
ICBMSD OI 62-12 Technical Trade Studies
ICBMSD OI 63-19 Data Management
ICBMSD OI 63-26 Technical Design Review
ICBMSD OI 99-102 ICBM Operational Test Launch (OTL)
IDEA-STD-1010B Acceptability of Electronic Components Distributed in the Open Market
IEEE 15288.2 IEEE Standard for Technical Reviews and Audits on Defense Programs
IRIG-STD 106-24R1 Telemetry Standards
JTR DoD Joint Travel Regulation
Key Performance Parameters AFGSC approved version
Key System Attributes AFGSC approved version
MIL-HDBK-61 Configuration Management Guidance
MIL-HDBK-1785 Defense Acquisition Guidebook (DAG
MIL-STD-129 Military Marking for Shipment and Storage
MIL-STD-130 Identification Marking of U.S. Military Property
MIL-STD-461
Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment
MIL-STD 810
Test Method Standard for Environmental Engineering Considerations and Laboratory Tests
MIL-STD 881 Work Breakdown Structure
MIL-STD 882 System Safety
MIL-STD 889
Galvanic Compatibility of Electrically Conductive Materials
MIL-STD-11991
DoD Standard Practice for Parts Management;
Standardization Document
MIL-STD 1568 Materials and Processes for Corrosion Prevention and Control in Aerospace Weapons Systems
MIL-STD-1686, Class 2 Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment
MIL-STD-1798 Mechanical Equipment and Subsystems Integrity Program
(MECSIP)
MIL-STD-1839 Calibration and Measurement Requirements
MIL-STD-2073-1 Standard Practice for Military Packaging Requirements
MIL-STD 3018
DoD Standard Practice for Parts Management;
Standardization
Document
MIL-STD-38784
General Style and Format Requirements for Technical Manuals
MMIIISD-HB-63-1136T System Requirement Analysis
MMIIISD-HB-99-1108 Guidance Review Board
MMIII SPO-HB-99-1110 Test Management
NIST SP 800-53
Security and Privacy Controls for Federal Information Systems and Organizations
NIST SP 800-86
Guide to Integrating Forensic Techniques into Incident Response
NIST SP 800-101 Guidelines on Cell Phone Forensics
NIST SP 800-161 Supply Chain Risk Management
NIST SP 800-171 R3 Protecting CUI in Non-Federal Systems and Organizations
OSHA CFR 1910 Occupational Safety Standards
RCC 319-14(T) Flight Termination System Requirements
RCC 324-11(T)
Global Positioning and Inertial Measurements Range Safety Tracking Systems’ Commonality Standard
SAE AS5553
Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition
SAE AS6171
Test Methods Standard; General Requirements, Suspect/Counterfeit, Electrical, Electronic, and Electromechanical Parts
SAE AS6081
Fraudulent/Counterfeit Electronic Parts: Avoidance, Detection, Mitigation, and Disposition - Distributors
SSCMAN 91-710, Volumes 1-7 Range Safety User Requirements:
Technical Manual 00-25-260 Asset Marking and Tracking Item Unique Identification (IUID) Marking Procedures
TO 00-5-1 AF Technical Order System
TO 00-5-3 Air Force Technical Order Life Cycle Management
TO 00-5-15 Air Force Time Compliance Technical Order Process
TO 00-5-16 Computer Program Identification Number Management
TO 00-35D-54 USAF Deficiency Reporting, Investigation, and Resolution
TO 21MLGM30F-1-15
Weapon System Operational Instructions (Operational Launch – Launch Support System)
TO 21MLGM30F-2-17-4
Organizational Maintenance Instructions (Launch Support System)
TO 21MLGM30F-2-17-4-1
Organizational Maintenance Supplemental Manual (Launch Support System)
TO 21MLGM30F-2-30-1 Operation and Maintenance Instructions Remote Environmental Control System Monitor
TO 00-25-260
Asset Marking and Tracking Item Unique Identification (IUID) Marking Procedures
S-133-128D System Specification for MM III (WS-133 A-M Wings I, III, V)
S-133-06400 System Specification for the MMIII Flight Test, Telemetry, and Termination
Various End item specifications
Various
All-Purpose Tool for Engineering, Analytics, and Management (A-TEAM)
Various Parts data in the Integrated Data Environment…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .