Atch 4_FT3 Prod_Sustainment WBS_CLIN Structure_Draft_v4_Base Only.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production and Sustainment Federal contract opportunity
Solicitation number
FA8214-22-R-7000
Issued by
Department of the Air Force Materiel Command Nuclear Weapons Center

About this file

This request for proposal solicits proposals for the production of flight test kits and sustainment of FT3 systems in support of the Air Force Global Strike Command Minuteman III Operational Test Launch Program. The Boeing Company is invited to submit a proposal to produce flight test kits through fiscal year 2035, with an initial basic ordering period of eight years beginning in February 2022. Proposals should include pricing for the basic period of performance as well as two two-year and one one-year option to extend through September 2035. A separate sustainment contract line item number period of performance would begin on February 2023 for support including systems engineering, contractor logistics support, program management, and data for the initial eight-year ordering period and option years. Proposals are due by 1600 MST on February 11, 2022 and should comply with the requirements specified in the attached performance work statement, data requirements list, and draft contract line item structure.

View the file

Other files for this federal contract opportunity

Other files attached to Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production and Sustainment, newest first.
File Type Posted
Atch 4_FT3 Prod_Sust_WBS_CLIN Structure_v5_Draft_12 Apr 22.xlsx XLSX spreadsheet
Attach 4_FT3 Prod_Sust_WBS CLIN Structure_v6_13 Apr 22.xlsx XLSX spreadsheet
Atch 1_FT3 Production and Sustainment PWS_12 Oct 21_revised 17 Nov 21_Base Only.docx DOCX document
Atch 7- FT3 Clauses Attachment Final.pdf PDF
Atch 6_FT3_Initial_Spares_Updated_Final(11-17-20).xlsx XLSX spreadsheet
Atch 5_MOD7_Property_FT3 GFP.xlsx XLSX spreadsheet
Atch 1_FT3 Production and Sustainment PWS_12 Oct 21.docx DOCX document
Atch 2_FT3 Production and Sustainment GRID_12 Oct 21.docx DOCX document
Atch 4_FT3 Prod_Sustainment WBS_CLIN Structure_Draft_v2.xlsx XLSX spreadsheet
Atch 8_AFNWC-NMOS DD-254 OPSEC Addendum.docx DOCX document
Atch 9_FA2814-21S-FT3PE_DDFM 254_Boeing.pdf PDF
Atch 3_Complete FT3 CDRL package for RFP Release 12 Oct 2021 - Signed.docx DOCX document
Atch 10- FT3_VSFB_locations for shipping Attachment.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN TIMELINE

BY16$KTotal202220232024202520262027202820292030
add1ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.1ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.1.1ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
add1.1.1.1ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
add1.1.1.2$ 80,8488983.18983.18983.18983.18983.18983.18983.18983.18983.1
1.1.2$ 25,0573692.92602.42602.42602.42602.43147.62602.42602.42602.4
add1.1.2.1$ 1,6361090.4545.2
add1.1.2.2$ 23,4222602.42602.42602.42602.42602.42602.42602.42602.42602.4
1.1.3ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.1.4ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.1.5ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
add1.1.6$ 14,6981633.21633.21633.21633.21633.21633.21633.21633.21633.2
add1.1.7$ 4,475497.2497.2497.2497.2497.2497.2497.2497.2497.2
1.2ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.2.1ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.2.20.00.00.00.00.00.00.00.0
1.2.3ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.2.4ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.2.5ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.3ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.3.1ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.3.1.1ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.4ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.4.1ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.4.2ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.4.3ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.4.4ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.4.5ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.5ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
1.5.1
1.5.2
1.6
1.6.1
1.7$ 2,3941196.81196.80.00.00.00.00.00.00.0
1.7.1$ 2,3941196.81196.8
1.8
1.8.1
add1.9ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!9.81%(current Mod-7 fee)

add 1.9 ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! 9.81% (current Mod-7 fee)

FY202220232024202520262027202820292030
CLIN TYPECRCRCR/FFPFFPFFPFFPFFPFFPFFP
QTY444444
MaterialsCLINSMaterials

(CR)

Build Components
(CR)Order, Build, Assemble 4 flight test kits
(FFP)Order, Build, Assemble 4 flight test kits
(FFP)Order, Build, Assemble 4 flight test kits
(FFP)Order, Build, Assemble 4 flight test kits
(FFP)Order, Build, Assemble 4 flight test kits
(FFP)Order, Build, Assemble 4 flight test kits
(FFP)Data

NSP

Build ComponentsCLINSBuild Components
(CR)Materials
(CR)Build Components
(CR)Data
NSPData
NSPData
NSPData
NSPData
NSPTravel

(No Fee)

Order, Build, and Assemble 4 flight test kitsCLINSInitial Spares
(FFP)Initial Spares
(FFP)Materials
(CR)Travel
(No Fee)Travel
(No Fee)Travel
(No Fee)Travel
(No Fee)Travel

(No Fee)

Deliver 4 flight test kitsCLINSData
NSPData
NSPData

NSP

DataCLINSTravel
(No Fee)Travel
(No Fee)Travel

(No Fee)

TravelCLINSBoeing Labor
CRBoeing Labor

CR

Initial Spares
Boeing LaborCLIN TYPECPFFCPFFCPFFCPFFCPFFCPFFCPFFCPFF
SUSTAINMENTCLINS

Sys Eng

Sys Eng

Sys Eng

Sys Eng

Sys Eng

Sys Eng

Sys Eng

Sys Eng

CLINSCLSCLSCLSCLSCLSCLSCLSCLS
CLINSPgm MgmtPgm MgmtPgm MgmtPgm MgmtPgm MgmtPgm MgmtPgm MgmtPgm Mgmt
CLINSData
NSPData
NSPData
NSPData
NSPData
NSPData
NSPData
NSPData

NSP

CLINSTravel
(No Fee)Travel
(No Fee)Travel
(No Fee)Travel
(No Fee)Travel
(No Fee)Travel
(No Fee)Travel
(No Fee)Travel

(No Fee)

CLIN DESCRIPTIONS

CLIN #CLIN TITLECLIN DESCRIPTIONPoP (months)PWS Ref.
1MaterialsPiece parts order that requires 36-month lead time or must buy now to meet 1st FRP delivery need date. This CLIN is used for those piece parts requiring lot screening and qualification, and long lead purchase time. Attention to lot date codes necessary to ensure continued compliance with Parts Management Plan and RCC 319 requirements throughout life of MMIII OTL Program. In addition, procure, screen and qualify piece parts vs. end items required to enable the delivery of 24 flight test kits at a rate of one per quarter starting at the beginning of the 1st quarter of FY25. Labor included.361.4, 1.8
2Build ComponentsLabor included.241.3, 1.8
3Order and Assemble flight test kitsLabor included.121.3, 1.5, 1.6, 1.8
4Deliver 4 flight test kitsLabor included.121.6, 1.7, 1.8
5DataIncludes CDRLs, labor included125
6TravelAs approved by Government121.1
7Initial SparesPurchase initial spare parts for ground systems (LSS and test/support equipment), using Initial Spare Parts Listing provided at RFP.246
10SUSTAINMENTIncludes Labor for Systems Engineering, Contractor Logistics Support, Program Management and Data (to include deliverables) CLIN effective no earlier than 1 February 202312
11Boeing LaborBoeing Labor24Section 1
PWS/SOO Reference and Title
1.3AVE Integration, Assembly, Test and Checkout12
1.4Parts Management Plan12
1.5Production Readiness Review and Audits12
1.6Manufacturing Practices and Materiel Fielding12
1.7Packaging, Handling, Storage, and Transportation12
1.8Program Management12
2Systems Engineering122.1, 2.2, 2.3, 2.4, 2.5
3Contractor Logistics Support123.1, 3.2
4Program Management124.1, 4.2., 4.3, 4.4.
5Data125.1., 5.2
6Initial Spare Parts126.1, 6.2

File details come from the government source that posted it. Updated .