GSSC_Questions_and_Answers_Combined_2.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- Modification of Equipment Federal contract opportunity
- Solicitation number
- FA8214-14-R-0005
About this file
RFP Questions Answers
View the file
Other files for this federal contract opportunity
Show all 50
Modification of Equipment has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Number | Document | Page # | Para # | Line # | Background | Issue | Suggested Resolution | Government Resolution | |
| 1 | Section L | 6 | Table 2.2 | Vol II | The Proposal Organization Table for Volume II shows that the Transition Strategy should be a maximum of 25 pages of the 225 pages for the Technical Volume. | Does this page limit apply just for Section L, Section 4.2.3.3.1 Tasks and Responsibilities Transfer (PWS 1.6.3.2.3.1, 1.6.3.2.3.2) or does it apply for the entire Subfactor 3 response? | Provide clarification regarding the page count for Subfactor 3. | This page limit applies to the Transition Strategy specific to Section L Paragraph 4.2.3.3.1 | |
| 2 | Section L | 7 | b | Section L, paragraph 2.2.1.1 states tables, charts, graphs, figures must be searchable in MS Word and/or PDF formats, while Section L, paragraph 2.3 states electronic copies can NOT be PDF format. | Graphics tools native to MS Word are inadequate for quality graphics production PowerPoint graphics inserted into MS Word are either not searchable or if inserted as Enhanced Windows Metafiles with editing enabled (this allows text searches) the quality is unacceptably compromised. | ||||
| Request that the AF delete the requirement for searchable inserted graphics in MS Word, allow PDF delivery, or share the best practice on how to make inserted graphics searchable in Word easy to accomplish. | Updated Section L paragraph 2.2.1.1. Words ''to the maximum practical extent". Will be released with RFP Amendment 3. | ||||||||
| 3 | 1.6.4.2.4.2.3 | 54 | The paragraph states technician support and response times are listed in APPENDIX G, TABLES 3a and 3c and Bidders Library. | Tables 3a - 3c describe different Hours X Days and response requirements without clearly outlining the conditions which would drive the varying requirements | Which table does the government intend for us to use in our fixed price bid? | PWS has been updated to only include 1 table. Will be released with RFP Amendment 3. | |||
| 4 | PWS 1.6.4.1.12 | Software development/modification/study/review scope is found in CLIN 0001 (General Sustainment [PWS 1.6.4.1.12 SW Development]), CLINs 0006 and 0007 (IOSSP and HACRMPE) and CLIN 0022 (the software awardable task). | There are multiple ways to interpret how much software development should be bid in each CLIN. For example, bidders could interpret that the IOSSP and HAC/RMPE CLINs match historical workloads in those areas and additional staff is likely required to address the awardable task requirements. Bidders could also interpret that software development will be part of awardable/future tasks. | Please confirm the Government's intent for Offerors to bid just the facility and infrastructure support in sustainment CLINs 1, 6, and 7, and all software development activities will be priced in awardable/ future task orders. | IOSSP and HAC/RMPE are existing programs and the software development associated with them should be bid in these CLINs. Software development associated with future efforts will be bid to those task orders. | ||||
| 5 | PWS 1.6.3.1.6.2 | 19 | 1 | 5 | PWS paragraph 1.6.3.1.6.2, 1.6.3.1.6.2.5 and 4.2.3 states…See Section J Attachement 5, Labor Categories Description for personnel qualifications." | Labor Categories Description is Attachment 12 and Attachment 5 is Awardable Task #1 RFP documents. | Please clarify that the statement in the PWS should read as, "Attachment 12." | Corrected. Will be released with RFP Amendment 3. | |
| 6 | Data Library | 1 | N/A | N/A | The Bidders librarycontains a document that requires SACCS support at Hill AFB and Offutt | The RFP does not have requirement for SACCS support at Hill AFB. | Please confirm that there are no RFP requirements for SACCS support at Hill AFB | There are no requirements for SACCS support at Hill AFB. | |
| 7 | Lab Rate Matrix | N/A | N/A | N/A | Attach 15, Labor Rate Matrix, does not include a table for Government Site. | How should bidders address the pricing of personnel operating at Government Sites. | Add a Government Site Labor Rate Matrix. | The offerors should evaluate their expected costs incurred given their personnel locations and incorporate those costs into their rates as appropriate. | |
| 8 | Labor Cat Description | 2 | N/A | N/A | Attach 12, Labor Category Description, states that "salaries shall be no lower than the 50th Salary Percentile in the state for which the work will be performed for each labor category." | Need to know what data source the Government will use to determine the 50th Salary Percentile by Labor Category and State for evaluation purposes and how will the evaluation be performed? | Provide the name of the salary survey data set the Government will use to ensure compliance. | Sentence was deleted. Will be released with RFP Amendment 3. | |
| 9 | Labor Cat Description | 3-4 | N/A | N/A | The Labor Categories Description Document includes four titles for Systems Engineer (Principal, Senior, Mid-level, and Junior) whereas the Labor Rate Matrix only has Senior and Mid-level Systems Engineer. | Labor Category Derscription Document contains labor categories that are not included in the Labor Rate Matrix. | Please clarify how you would like offerors to address this discrepancy in their proposal. | Attachments 14 and 15 have been updated to include all of the Labor Categories listed in Attachment 12. Will be released with RFP Amendment 3. | |
| 10 | PWS | 8/124 | 1.3 | All | PWS line 217-225 contains a requirement to integrate current programs and is provided for informational purposes only, Appendix E WBS at Page 124 contains 1.1.1.3, Rivet MILE and PWS paragraph 1.6.2.2 incudes reference to Rivet MILE. | There's no PWS paragraph that outlines the specific requirements for Rivet MILE. | Clarify that the support requirements for Rivet MILE are limited to only the Integration requirements outlined in PWS paragraph 1.6.2. | Yes Rivet MILE support is specific to PWS paragraph 1.6.2 | |
| 11 | PWS | 59 | 1.6.4.2.4.3.3 | All | PWS Para 1.6.4.2.4.3.3, Technical Support to Site Visits, requires contractor to accompany the SACCS IA staff by being physically present at every location/unit visited during all site visits. | Need to know the estimated number of site visits that will be conducted each Fiscal Year and clarification is to whether or not these site visits in addition to the Site visits required in PWS Para 1.6.4.2.4.3.14.1. | Provide an estimate for the number of site visits that will be conducted each Fiscal Year? Clarify whether or not these site visits are in addition to the site visits required in PWS Para 1.6.4.2.4.3.14.1? | PWS Paragraph 1.6.4.2.4.3.14.1 deleted and combined with 1.6.4.2.4.3.3. Will be released with RFP Amendment 3. | |
| 12 | Section L | 30 | 7.3.4.2 | 7.3.4.2 GFP and/or Base Support Requirements | |||||
| The Government will provide a list of GFP and/or Base Support Requirements in the Bidder’s Library. If the offeror requires the use of Government-furnished items other than those specified, the offeror shall provide a listing including quantity, federal stock number, nomenclature, date needed, and duration of availability per FAR 45.1, Government Property - General and 45.2, Government Property - Solicitation and Evaluation Procedures. | RFP states "the contractor is responsible for all costs related to making the property available for use such as all transportation, installation, or rehabilitation costs IAW FAR 45.201b. The offeror shall also provide the written authorization from the cognizant ACO, as applicable. The offeror shall supply this information in the format shown in Table 7.3" | Please confirm that the Government will provide all GFP in a usable, proper working condition that will allow it to be used for its intended purpose. | To the maximum extent possible GFP being offered by the government will be in usable proper working condition. The quote identified in the issue pertains only when the "offeror requires the use of Government-furnished items other than those specified." | ||||||
| 13 | Section L | 21 | 6.3 | All | Section L, paragraph 6.3, Estimating Methodology states that the information in subsequent paragraphs are only applicable to CPAF CLINs 0001, 0005, 0006 and 0009. CLINs 0005 and 0009 are FFP CLINs. | Paragraph should be consistent with the CPAF CLINs referenced under 6.1.7 (X001, X006, X007 X010 and X022). | Corrected. Will be released with RFP Amendment 3. | ||
| 14 | PWS | 66 | Please include FAR 52.232-16, Progress Payments | The value of the FFP portions of the anticipated contract are significant. Progress Payments allow the contractor some reimbursement of costs incurred during the period of performance. | The FFP CLINs unit of issue is monthly. The contractor is allowed to invoice monthly against these CLINs. Billing instructions to allow contractor to invoice monthly for the FFP CLINs will be included in Section G of the contract. | ||||
| 15 | PWS | 8 | 1.3 APPLICABLE GROUND SUBSYSTEM(S) | 227 | Please clarify which SSC will be responsible for the VAFB LSS, which is also included in the 27 November 2013 Guidance SSC work scope (1.2) | Inclusion of the VAFB LSS under the GSSC work scope is inconsistent with the Guidance SSC work scope which also includes VAFB LSS and other ground equipment. | The VAFB LSS is listed in Paragraph 1.3 as an applicable subsystem for information pertaining to how the current Ground Subsystems IPT structure. Support to the sustainment of the LSS is within the work scope of the Guidance SSC. | ||
| 16 | PWS | 16 | 1.6.3, Program Management Support; 1.6.3.1.1.1; 1.6.3.1.1.3; 1.6.3.1.1.4; others | 420 and throughout PWS | Please clarify what the Government means by the word "projects" in "acquisition and sustainment projects placed on this contract through the basic contract or through separate task orders" and elsewhere in the PWS. Please define, compare, and contrast the terms "project", "program", and "effort" as used throughout the PWS and provide examples if necessary. | "Projects" could be interpreted as CLINs, sub-CLINs, CWBS elements at some level, budget control accounts, PWS elements at some level, or something else. Later PWS uses require additional management and reporting effort if something is designated as a project or a program. For example, PWS 1.6.3.1.1.1 and 1.6.3.1.1.4 seem to use "program" and "project" interchangeably for CDRL A002, program management plan. PWS 1.6.3.1.1.3 uses the term "effort" in relation to applying EVMS and IPMR (CDRL A001). Offerors need a clear understanding of the Government management and reporting requirements. | Effort: Is being used in a generic sense. It can refer to a Program or a Project which is part of a Program, or as a standalone Project. In any case the purpose of 1.6.3.1.3 is to say that if that effort is over a dollar threshold then full EVMS will be required. |
The below definitions are sourced from the Project Management Institute:
Project: A temporary group activity designed to produce a unique product, service or result. A project is temporary in that it has a defined beginning and end in time, and therefore defined scope and resources. And a project is unique in that it is not a routine operation, but a specific set of operations designed to accomplish a singular goal. So a project team often includes people who don’t usually work together – sometimes from different organizations and across multiple geographies. The development of software for an improved business process, the construction of a building or bridge, the relief effort after a natural disaster, the expansion of sales into a new geographic market — all are projects. And all must be expertly managed to deliver the on-time, on-budget results, learning and integration that organizations need.
Project management: The application of knowledge, skills, tools, and techniques to a project to meet the project requirements.
Program: A group of related projects, subprograms, and program activities that are managed in a coordinated way to obtain benefits not available from managing them individually.
Program Management: The application of knowledge, skills, tools, and techniques to a program to meet the program requirements and to obtain benefits and control not available by managing projects individually.
| 17 | PWS | 26 | 1.6.4.1.1.3 | 782 | 1.6.4.1.1.3 Upon Government approval of an Engineering Change Proposal (ECP), tThe contractor shall design changes, modifications, and integration as a result of correcting deficiencies, replacing obsolete parts, responding to operational requirement changes, incorporating technological advances, and changes driven by service life extensions. | Clarify that these actions require a contract change. | PWS has been updated to include this language. Will be released with RFP Amendment 3. |
| 18 | PWS | 24 | 1.6.3.5.1 | 729-732 | 1.6.3.5.1 The contractor shall provide impact statement inputs and/or rough order of magnitude (ROM) estimates for program contract modification exercises. These exercises may include budget increases or decreases, schedule accelerations or stretch-outs, or program scope or content changes. The contractor shall provide firm proposals in response to Government Requests for Proposals (RFP). [CDRL A024, DI-MISC-80508B/T, Tradeoff Studies and Analysis (subtitle)] | Ensures the contractor is responsive to Government requests for pricing of new or changed work. Consistent with current pricing practices on the ICBM Prime contract. | PWS has been updated to include this language. |
| 19 | PWS | 32 | 1.6.4.1.8.8 | 991-992 | CDRL A032, Reliability and Maintainability Program Plan, Block 5, references PWS Para. 1.6.4.1.8.8, but the PWS paragraph is not about reliabiltiy and maintainabiltiy, rather it addresses safety and does not refer the this CDRL item. Similarly, the SELM/GMLEC SOO and GRID include this CDRL item, but lacks a requirement for a reliability and maintainability program. Please clarify the application and intent of CDRL A032 | Clarify scope so that offerors can plan an approach, estimate cost, and measure performance | PWS paragraph 1.6.4.1.8.5 has been updated to include this CDRL. CDRL has been updated to include the correct reference. Will be released with RFP Amendment 3. |
| 20 | PWS | 75 | Part 2, Table 1, ref 1.6.3 | Please define the work related to the "Task Log" mentioned in the Frequency column. | This term appears in PWS Part 2, Table 1, the QASP, and in the award fee plan, but is not defined in any of these solicitation documents. | The task log is not a formal document, but rather the running list of tasks to be coordinated by the IPTs on what efforts are on-going and require contractor support for the General Sustainment CLIN. | |
| 21 | CDRL | 45 | A032, Reliability and Maintainability Program Plan | Block 5 references PWS Para. 1.6.4.1.8.8, but the PWS paragraph is not about reliabiltiy and maintainabiltiy, rather it addresses safety and does not refer the this CDRL item. Similarly, the SELM/GMLEC SOO and GRID include this CDRL item, but lacks a requirement for a reliability and maintainability program. Please clarify the application and intent of this CDRL item. | Clarify scope so that offerors can plan an approach, estimate cost, and measure performance | CDRL has been updated to include the correct reference. Will be released with RFP Amendment 3. | |
| 22 | CDRL | 95 | CDRL A074, DI-ILSS-80095/T, Integrated Logistics Support Plan | Suggest tailoring the DID to identify the specific “inputs” required for the Logistics Support Plan | The referenced DID DI-ILSS-80095 is for a complete Integrated Logistics Support Plan for a new development program.It is assumed that the Government's need is for replacement pages in the style and format of the existing Logistics Support Plan. | CDRL has been updated. Will be released with RFP Amendment 3. | |
| 23 | QASP | Attachment 1, ref 1.6.3 | Please define the work related to the "Task Log" mentioned in the Frequency column. | This term appears in PWS Table 1, the QASP, and in the award fee plan, but is not defined in any of these solicitation documents. | The task log is not a formal document, but rather the running list of tasks to be coordinated by the IPTs on what efforts are on-going and require contractor support for the General Sustainment CLIN. | ||
| 24 | SELM/GMLEC SOO | 6 | 8.0 Deliverables; A032-001, Reliability and Maintainability Program Plan | CDRL A032, Reliability and Maintainability Program Plan, Block 5, references PWS Para. 1.6.4.1.8.8, but the PWS paragraph is not about reliabiltiy and maintainabiltiy, rather it addresses safety and does not refer the this CDRL item. Similarly, the SELM/GMLEC SOO and GRID include this CDRL item, but lacks a requirement for a reliability and maintainability program. Please clarify the application and intent of CDRL A032 | Clarify scope so that offerors can plan an approach, estimate cost, and measure performance | CDRL has been updated to include the correct reference. Will be released with RFP Amendment 3. | |
| 25 | Software SOO | 3 | 3.5.1 | CDRL A032, Reliability and Maintainability Program Plan, Block 5, references PWS Para. 1.6.4.1.8.8, but the PWS paragraph is not about reliabiltiy and maintainabiltiy, rather it addresses safety and does not refer the this CDRL item. Similarly, the SELM/GMLEC SOO and GRID include this CDRL item, but lacks a requirement for a reliability and maintainability program. Please clarify the application and intent of CDRL A032 | Clarify scope so that offerors can plan an approach, estimate cost, and measure performance | CDRL has been updated to include the correct reference. Will be released with RFP Amendment 3. | |
| 26 | Labor Category Description | Attachment 12 does not contain descriptions for: |
"Principle Mathematician," "Senior Mathematician," "Mathematician," "Junior Mathematician," "Principle Mathematician Statistician," "Senior Mathematician Statistician," "Mathematician Statistician," "Junior Mathematician Statistician."
This is inconsistent with the labor categories included in Attachment 14 - Labor Mapping Worksheet, and Attachment 15 - Labor Rate Matrix. Please clarify.
| Please clarify definitions so that offerors can assign qualified personnel, and complete the labor category mapping worksheet and rate tables | Attachment 12 has been updated to include the Mathematician and Mathematician Statistician categories. Will be released with RFP Amendment 3. | |||
| 27 | Labor Category Description | Attachment 14 - Labor Mapping Worksheet, and Attachment 15 - Labor Rate Matrix do not include the Attachment 12 - Labor Category Description categories of” "Principle Database Management Specialist", "Senior Database Management Specialist", "Database Management Specialist", "Jr. Database Management Specialist". | Please clarify definitions so that offerors can assign qualified personnel, and complete the labor category mapping worksheet and rate tables | Attachment 14 and Attachment 15 have been updated to include the Database Management Specialist categories. Will be released with RFP Amendment 3. |
| 28 | Mapping Worksheet | Attachment 14 - Labor Mapping Worksheet, and Attachment 15 - Labor Rate Matrix do not include the Attachment 12 - Labor Category Description categories of” "Principle Database Management Specialist", "Senior Database Management Specialist", "Database Management Specialist", "Jr. Database Management Specialist". | Please clarify definitions so that offerors can assign qualified personnel, and complete the labor category mapping worksheet and rate tables | Attachment 14 and Attachment 15 have been updated to include the Database Management Specialist categories. Will be released with RFP Amendment 3. |
| 29 | Mapping Worksheet | Attachment 12 does not contain descriptions for: |
"Principle Mathematician," "Senior Mathematician," "Mathematician," "Junior Mathematician," "Principle Mathematician Statistician," "Senior Mathematician Statistician," "Mathematician Statistician," "Junior Mathematician Statistician."
This is inconsistent with the labor categories included in Attachment 14 - Labor Mapping Worksheet, and Attachment 15 - Labor Rate Matrix. Please clarify. This is inconsistent with the labor categories included in Attachment 14 - Labor Mapping Worksheet, and Attachment 15 - Labor Rate Matrix. Please clarify.
| Please clarify definitions so that offerors can assign qualified personnel, and complete the labor category mapping worksheet and rate tables | Attachment 12 has been updated to include the Mathematician and Mathematician Statistician categories. Will be released with RFP Amendment 3. | |||
| 30 | GSSC Labor Rate Matrix | Attachment 14 - Labor Mapping Worksheet, and Attachment 15 - Labor Rate Matrix do not include the Attachment 12 - Labor Category Description categories of” "Principle Database Management Specialist", "Senior Database Management Specialist", "Database Management Specialist", "Jr. Database Management Specialist". | Please clarify definitions so that offerors can assign qualified personnel, and complete the labor category mapping worksheet and rate tables | Attachment 14 and Attachment 15 have been updated to include the Database Management Specialist categories. Will be released with RFP Amendment 3. |
| 31 | GSSC Labor Rate Matrix | Attachment 12 does not contain descriptions for: |
"Principle Mathematician," "Senior Mathematician," "Mathematician," "Junior Mathematician," "Principle Mathematician Statistician," "Senior Mathematician Statistician," "Mathematician Statistician," "Junior Mathematician Statistician."
This is inconsistent with the labor categories included in Attachment 14 - Labor Mapping Worksheet, and Attachment 15 - Labor Rate Matrix. Please clarify. This is inconsistent with the labor categories included in Attachment 14 - Labor Mapping Worksheet, and Attachment 15 - Labor Rate Matrix. Please clarify.
| Please clarify definitions so that offerors can assign qualified personnel, and complete the labor category mapping worksheet and rate tables | Attachment 12 has been updated to include the Mathematician and Mathematician Statistician categories. Will be released with RFP Amendment 3. | |||||
| 32 | Award Fee | 4 | 4.c | Please define the work related to the "Task Log" mentioned in this paragraph. | This term appears in PWS Table 1, the QASP, and in the award fee plan, but is not defined in any of these solicitation documents. | The task log is not a formal document, but rather the running list of tasks to be coordinated by the IPTs on what efforts are on-going and require contractor support for the General Sustainment CLIN. |
| 33 | Section L | 15 | 4.2.3.3.1 Tasks and Responsibilities Transfer | Please clarify how an offeror who is not a party to the IPIC PBC can address transferring responsibilities from the PBC to the Government. |
Suggest in 2 places:
to the GSSC/Government
| Not being the prime contractor for the IPIC PBC, and without providing the contract in the bidder's library, the offeror has no basis for addressing transferring work between the IPIC PBC prime contractor and the Government. | Section L has been updated to remove the language. Will be released with RFP Amendment 3. | |||
| 34 | Section L | 30 | 7.3.4.2 | 7.3.4.2 GFP and/or Base Support Requirements |
This paragraph states, "The Government will provide a list of GFP and/or Base Support Requirements in the Bidder’s Library. If the offeror requires the use of Government-furnished items other than those specified...."
The final RFP posted on FBO includes Attachment 18, which lists property at Government locations but is not otherwise referenced in the RFP.
This offeror responded to the draft solicitation posted October 11, 2013, with comments to a GFP list.
In the Bidder's Library "Ground Subsystem / Government Furnished Property folder", there is a GFP list that is significantly out of date. There are no status dates on the GFP lists identified under the "GFP/ F900 GFP" folder. Please clarify which GFP list the offerors should use when responding to this instruction and if unable to provide current GFP lists, identify the status dates of these lists. If one or more of the bidder's library lists, please include the path.
| Clarification. The accuracy of the Government provided GFP lists will determine what additional GFP offerors will request. | All offerors are expected to use Attachment 18 as the GFP list for the proposal. Additional information in the bidder’s library should be considered reference material. | |||
| 35 | Section L | 31 | 7.3.4.5.3 Applicable Documents | This paragraph states, "The offeror shall submit a list of these documents, including any tailoring instructions, as an annex to the proposed PWS." |
There is no "proposed PWS" required in the proposal. The location of this instruction implies that the list and the documents themselves should be Annexes to Volume V, Contract Documentation. Please clarify in which volume offerors are to provide this list and the documents themselves.
| Necessary in order to plan, assemble, print, and deliver a compliant proposal | “proposed PWS” has been changed to “Volume V. “ The list and documents should both be provided as an annex to Volume V. Will be released with RFP Amendment 3. | ||||
| 36 | Bidder's Library | Based on our analysis of the entire final RFP and Op SW Overview_bidders_library, slide 2 includes all GS operational software CSCIs, except IMPSS. (a) Recommend that IMPSS be added; (b) please confirm that the list is otherwise exhaustive for GSSC operational software scope. | |||
| (c) With respect to non-operational software (e.g., trainer software), we have not found any listing of GSSC scope in the bidder's library or solicitation. Please add a complete list, including the same information as for the operational software. | Please clarify scope so that offerors can plan an approach, estimate cost, and measure performance | Additional information has been posted to the Bidders Library including IMPSS. This is an exhaustive list for operational software. Working with the IPTs to get a list of non-operational software. | |||
| 37 | Bidder's Library | The email message regarding the content in the classified bidder’s library, dated 21 January cites S-133-128C Appendix III. Appendix I is also classified according to the entry in ICBM-MM III Weapon System Specification – 1 March 2010 (Appendix I and III are classified) | Offerors need a complete understanding of the weapon system requirements. | S-133-128C Appendix I is now available in the classified Bidder’s Library. |