Section_L_PSSC_Draft_Attachment_8_Encryption_Instructions_20140212.docx

DOCX document 485 KB Posted

Attached to
Propulsion Subsystem Support Contract Federal contract opportunity
Solicitation number
FA8214-14-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

PSSC Draft Section L Draft Attachment 8 Encryption Instructions 20140212

View the file

Other files for this federal contract opportunity

Other files attached to Propulsion Subsystem Support Contract, newest first.
File Type Posted
PSSC_Bidders_Library_Instructions.docx DOCX document
Section_L_Attachment_5_Draft_PSSC_Commercial_Client_Auth_20140320.doc DOC document
Section_J_Attachment_5_Draft_PSSC_Labor_Categories_20140321.docx DOCX document
Section_J_Attachment_8_Draft_PSSC_QASP_20140325.docx DOCX document
Section_J_Attachment_10_PSSC_DD254.pdf PDF
Section_L_Attachment_8_Draft_PSSC_Encryption_Instructions_20140320.docx DOCX document
Section_L_Attachment_9_Draft_PSSC_EZ_Source_Instructions_20140320.docx DOCX document
Section_L_Attachment_1_Draft_PSSC_PPI_Tool_20140320.docx DOCX document
Section_L_Attachment_10_Draft_PSSC_CLIN_Pricing_Matrix_Award_Fee_20140320.xlsx XLSX spreadsheet
Section_J_Attachment_9_Draft_PSSC_ICBM_GFP_Listing_20140321.docx DOCX document
Section_M_Draft_PSSC_Evaluation_Factors_for_Award_20140327.docx DOCX document
Section_L_Attachment_4_Draft_PSSC_Consent_Form_20140320.doc DOC document
Section_L_Attachment_7_Draft_PSSC_Cross_Reference_Matrix_20140321.xlsx XLSX spreadsheet
Section_J_Attachment_7_Draft_PSSC_Award-Fee_Plan_20140327.docx DOCX document
FA820414R0003.pdf PDF
Section_J_Attachment_4_Draft_PSSC_Labor_Rate_Matrix_20140320.xlsx XLSX spreadsheet
Section_J_Attachment_1_Draft_PSSC_Performance_Work_Statement_20140326.docx DOCX document
Section_L_Attachment_2_Draft_PSSC_Questionnaire_Cover_Letter_20140320.doc DOC document
Section_J_Attachment_6_Draft_PSSC_Mapping_Worksheet_20140320.xlsx XLSX spreadsheet
Section_L_Draft_PSSC_Instructions _Conditions _and_Notices_to_Offerors_20140327.docx DOCX document
Section_L_Attachment_6_Draft_PSSC_Roles_and_Responsibilities_20140320.xlsx XLSX spreadsheet
Section_J_Attachment_2_Draft_PSSC_Government_Rights_in_Data_GRID_20140327.docx DOCX document
Draft_Section_L_PSSC_Attachment_2_Questionnaire_Cover_Letter_20140211.doc DOC document
Section_L_PSSC_20140221_FBO.docx DOCX document
Draft_Section_L_PSSC_Attachment_8_Encryption_Instructions_20140212.docx DOCX document
Draft_Section_L_PSSC_Attachment_9_EZ_Source_Instructions_20140212.docx DOCX document
Draft_Section_L_PSSC_Attachment_7_Cross_Reference_Matrix_20140212.xlsx XLSX spreadsheet
Draft_Section_J_PSSC_Attachment_6_Mapping_Worksheet_20140221.xlsx XLSX spreadsheet
Draft_Section_L_PSSC_Attachment_6_Roles_and_Responsibilities_20140212.xlsx XLSX spreadsheet
Draft_Section_J_PSSC_Attachment_4_Labor_Rate_Matrix_20140221.xlsx XLSX spreadsheet
Draft_Section_J_PSSC_Attachment_7_CLIN_Pricing_Matrix_Award_Fee_20140221.xlsx XLSX spreadsheet
Draft_Section_L_PSSC_Attachment_5_Commercial_Client_Auth_20140211.doc DOC document
Draft_Section_J_PSSC_Attachment_5_Labor_Categories_20140221.docx DOCX document
Draft_Section_L_PSSC_Attachment_4_Consent_Form_20140211.doc DOC document
Draft_Section_L_PSSC_Attachment_1_PPI_Tool_20140221.docx DOCX document
Draft_Section_J_PSSC_Attachment_1_Performance_Work_Statement_20140221.docx DOCX document
Draft_Section_L_PSSC_Attachment_3_Questionnaire_20140221.doc DOC document
Section_M_PSSC_20140221_FBO.docx DOCX document
Section_L_PSSC_Draft_Attachment_5_Commercial_Client_Auth_20140211.doc DOC document
Section_L_PSSC_Draft_Attachment_3_Questionnaire_20140211.doc DOC document
Section_L_PSSC_Draft_Attachment_9_EZ_Source_Instructions_20140212.docx DOCX document
Section_L_PSSC_Draft_Attachment_2_Questionnaire_Cover_Letter_20140211.doc DOC document
Section_L_PSSC_Draft_Attachment_7_Cross_Reference_Matrix_20140212.xlsx XLSX spreadsheet
Section_L_PSSC_Draft_Attachment_1_PPIS_20140211.docx DOCX document
PSSC_Draft_Section_L_FBO_20140212.docx DOCX document
Section_L_PSSC_DRaft_Attachment_6_Roles_and_Responsibilities_20140212.xlsx XLSX spreadsheet
Section_L_PSSC_Draft_Attachment_4_Consent_Form_20140211.doc DOC document
ICBM_PSSC_GFP_Listing_20140122.docx DOCX document
PSSC_Performance_Work_Statement_20140122.pdf PDF
Complete_CDRL_Package_PSSC_16_Jan_14.pdf PDF
Show all 50

Propulsion Subsystem Support Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section L Attachment 8 Encryption Instructions to Offerors Electronic Format for All Proposal Volumes

When submitting electronic versions of their proposal, offerors shall follow these instructions:

a. Electronic storage media shall be submitted in one of the following formats:

CD-R or DVD-R.

b. Submitting documents using Microsoft Office 2013 or earlier:

1. Word documents – Set "Save as type" to "Word Document (*.docx)" only.

1. Excel spreadsheets – Set "Save as type" to "Microsoft Excel Workbook (*.xlsx)."

1. PowerPoint presentations – Set "Save as type" to "Microsoft PowerPoint 2010 Presentation (*.pptx)."

c. Submitting documents using Microsoft Office 2013 or earlier:

1. Word documents – Set "Save as type" to "Word Document (*.docx)" only.

1. Excel spreadsheets – Set "Save as type" to "Microsoft Excel Workbook (*.xlsx)."

1. PowerPoint presentations – Set "Save as type" to "Microsoft PowerPoint 2007 Presentation (*.pptx)."

d. Submitting documents using Microsoft Office 2013 or earlier:

1. Word documents – Install the Office Compatibility Pack from www.microsoft.com

1. Excel spreadsheets – Install the Office Compatibility Pack from www.microsoft.com

1. PowerPoint presentations – Install the Office Compatibility Pack from www.microsoft.com

e. Submit any Microsoft Project files in Microsoft Project 2013 or earlier. There are no special “save” functions required for later versions of Project.

f. Submit PDF documents using only Adobe Acrobat 9.0 or later. Do NOT submit any documents in PDF format that are copied as “images.” When creating PDF files always create to enable textual search and copy functions.

Past Performance Information (PPI) for Offerors

Offerors must use the PPI Tool (Use latest version from FBO.gov) in order to electronically submit the Past Performance Volume in accordance with the RFP.

Downloading the PPI Tool The PPI Tool can be downloaded by performing the following steps (if you are unable to download the Tool, contact the contracting officer for assistance):

1. Access the FedBizOpps (https://www.fbo.gov/) website.

2. Find the solicitation posting.

3. Locate the “ppi tool” link from the “All Files” column on the solicitation’s “Notice Details” tab .

4. Select the link and save the “ppi tool” to your computer. Name the file as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA861710R6158.mdb).

Note: PPI Tools saved in Microsoft Office versions 2007 and greater will be saved with “.accdb” file extension. Files saved with versions less than Microsoft Office 2013 or earlier will be saved with “.mdb” extension.

Entering information in the PPI Tool After selecting and saving the tool, enter information by performing the following steps:

1. Open the saved PPI Tool.

2. Select the “Options” button from the “Security Warning” banner, if applicable . The “Security Alert” pop-up screen displays.

Figure 1: Security Alert Pop-up

Note:

· Files saved using Microsoft Office 2010 will have the “Enable Content” button on the “Security Warning” banner and therefore will not get a Security Alert pop-up.

· If a "read only" file is opened, in order to populate data in the file, click "Save As" in the "Read-Only" message bar. Enter the filename as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA861710R6158.mdb).

3. Select the radio button “Enable this content” and then click “OK.” A setup pop-up screen displays.

Figure 2: Setup Pop-Up

4. Select the “Start” button. The “Application Setup” screen displays.

Figure 3: Application Setup Screen

5. Enter the Offeror’s Name and RFP Number and then click the “Next” button. The application setup continues.

Figure 4: Continue the Application Setup

6. Choose the appropriate option by selecting the corresponding radio button and then click the “Next” button. The “Contractor’s Menu” displays.

Figure 5: Contractor’s Menu

7. Click the “Step 1: Set up Business Relationships” button to create a business relationship, if applicable, for each contributing contracting organization before proceeding throughout the PPI Tool (refer to Section L of the RFP for detailed instructions). Identify all prime and sub-prime organizations and categorize them according to the appropriate role in the proposed acquisition. The “Business Relationships” screen displays.

Figure 6: Business Relationships

8. Click the “New” button to create a business relationship for the proposed acquisition. An additional “Business Relationships” screen displays.

Figure 7: Enter New Business Relationship

9. Complete the fields as follows (fields marked on the screen with an asterisk ‘*’ are required):

· Contractor’s Name: Self-explanatory

· Role in Proposed Acquisition: Choose one of the four options – Prime, Sub, Joint Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

· Place of Work: Location where contractor will perform work.

· Percentage of Work: Identify percentage of work contributed by specified contracting organization.

· Responsibilities: Detail responsibilities of specified contracting organization.

10. Select one of the buttons at the bottom of the screen.

· Add – Saves the current business relationship and allows for the addition of a new one.

· Close – Cancels the current business relationship without saving.

Note: In order to edit or delete an existing business relationship in the list, double-click on it.

11. Select the “Close” button on the “Business Relationships” screen after all of the business relationships has been added.

12. Click the “Step 2: Enter Past Performance Information (PPI)” buttonto enter the Past Performance Information. The “Past Performance” screen displays.

Figure 8: Past Performance

13. Click the “New” button to enter Past Performance Information for the proposed acquisition. An additional “Past Performance” screen displays.

Figure 9: Enter Past Performance Information

14. Complete the fields on each of the tabs as follows (fields on the screen marked with an asterisk ‘*’ are required):

· Contract Information Tab

· Contractor: Select from the dropdown the appropriate contractor.

· Cage Code: Self-explanatory.

· Contract Number: If you don’t have a contract number, enter “N/A.”

· Program Title: Enter full name of program.

· Contr Agency/Customer: Enter servicing contracting agency and customer (office symbols suffice).

· DUNS Number: Self-explanatory

· Delivery Task/Order: If the order is provided as a stand-alone reference, enter the task/call/delivery/purchase order number.

· Contract Type: Enter Firm-Fixed-Price (FFP), Cost Plus Fixed-Fee (CPFF), Indefinite Delivery/Indefinite Quantity (ID/IQ), LH, Blanket Purchase Agreement (BPA), Cost Plus Incentive-Fee (CPIF), Cost Plus Award Fee (CPAF), etc. For additional clarification, click the question mark button.

· Short Program Title (i.e. Acronym): Enter abbreviated title for the program or enter “N/A.”

· Contract Dollar Value:

· Original: Input total contract dollar value, with all options if applicable, in the amount originally awarded on the referenced contract.

· If ID/IQ or BPA, provide total ceiling.

· If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

· Current: Input total contract dollar value, with all options if applicable, as the contract stands at time of PPI submission.

· If ID/IQ or BPA, provide total ceiling.

· If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

· Period of Performance (mm/dd/yy)

· Start Date: Input start date of contract.

· Original End Date: Input original end date based on award.

· Current End Date: Input end date, as the contract stands at time of PPI submission.

· Explain the differences in Period of Performance, if applicable: Enter an explanation of the difference between “Original End Date” and “Current End Date.”

· Program Details Tab

· Brief Description of Effort as:

· Select Prime, Sub, Joint Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

· Provide a brief description of the service provided and actual work performed under this contract reference.

· ****If applicable: Provide information on problems encountered on the identified contracts. At a minimum, briefly describe the problem experienced, actions taken to alleviate the problem, and whether or not the problem was satisfactorily overcome.****

· Explain how your experience on this program is relevant for each subfactor under the Technical Factor in Section M of the RFP, including any unique aspects that demonstrate relevancy in this effort: Provide evidence to support how the contract referenced has relevant experience and demonstrates the ability to perform the solicitation requirements as described in Section M of the RFP. As applicable, address how the proposed reference relates to each of the Technical Subfactors.

· Include relevant information concerning your compliance with FAR 52.219-8, Utilization of Small Business Concerns, on the contract you are submitting: Enter the information if applicable.

· Identify whether a subcontracting plan was required for the contract you are submitting. If one was required, identify in percentage terms the planned versus achieved goals during contract performance. Explain why goals were not met, if applicable: Enter the information if applicable.

· POC & Key Individuals Tab

· Key Individuals: Click the “New” button to specify any key individual or individuals who participated in this program or who may support the proposed acquisition. Also indicate their roles for both acquisitions, previous and current. To edit or delete an existing key individual, double-click an item from the list.

Note: In accordance with FAR 15.305(a)(2)(iii), relevant experience from key personnel may be evaluated. If you wish to include the past performance of individual key personnel, select the “New” button for each individual and fill out the necessary information.

· Customer Points of Contact: Click the “Program/Site Manager,” “Contracting Officer” or “Admin POC” button for the point of contact that you would like to add, edit, or delete.

Note: For government contracts provide current information on Program Manager, Contracting Officer, and Admin POC, if available.

For commercial contracts provide points of contact fulfilling these same roles, if available.

15. Select from the buttons at the bottom of the Past Performance screen:

· Save – Saves the Past Performance Information and displays the “Contract Information” tab on the Past Performance screen.

· Close – Closes the Past Performance screen. If there were any updates, a pop-up window displays asking to save before closing.

· Delete – Deletes the current PPI record. A pop-up window displays, select “Yes” to delete the record or “No” to close the window without deleting the record.

Note: In order to edit or delete an existing PPI record in the list, double-click on it.

16. Select the “Close” button on the “Past Performance Information” screen after all of the PPI records have been added.

Printing Reports and Submitting PPI Tool In order to print the Business Relationships and PPI reports, perform the following steps:

1. Click the “Step 3: Print Report” button . A pop-up displays asking which report to print.

Figure 10: Select Report to Print

2. Select separately each of the two options, “Business Relationships” or “Past Performance.” The Business Relationships and Past Performance documents will print separately; combine the two to create your Past Performance Volume.

In order to submit the Business Relationships and PPI, perform the following steps:

3. Click the “Step 4: Submit” button . The “Submission Instructions” screen displays.

Figure 11: Submission Instructions

4. Follow the submission instructions. Hard copies of the pages generated from this tool shall be used in the hard copy of the past performance volume subject to the limitations outlined in this RFP and should be Tab 1 of the past performance volume.

Note:

· Submit an electronic copy (e.g. CD) of the saved PPI database file with your proposal. Enter the filename as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA861710R6158.mdb).

· Once the file is saved to a CD or any location that is marked as “Read-only,” it must first be saved to the desktop in order to read/edit the file.

image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png

File details come from the government source that posted it. Updated .