Section_L_PSSC_20140221_FBO.docx

DOCX document 117 KB Posted

Attached to
Propulsion Subsystem Support Contract Federal contract opportunity
Solicitation number
FA8214-14-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Propulsion Subsystem Support Contract, newest first.
File Type Posted
PSSC_Bidders_Library_Instructions.docx DOCX document
Section_L_Attachment_5_Draft_PSSC_Commercial_Client_Auth_20140320.doc DOC document
Section_J_Attachment_5_Draft_PSSC_Labor_Categories_20140321.docx DOCX document
Section_J_Attachment_8_Draft_PSSC_QASP_20140325.docx DOCX document
Section_J_Attachment_10_PSSC_DD254.pdf PDF
FA820414R0003.pdf PDF
Section_J_Attachment_4_Draft_PSSC_Labor_Rate_Matrix_20140320.xlsx XLSX spreadsheet
Section_J_Attachment_1_Draft_PSSC_Performance_Work_Statement_20140326.docx DOCX document
Section_L_Attachment_2_Draft_PSSC_Questionnaire_Cover_Letter_20140320.doc DOC document
Section_J_Attachment_6_Draft_PSSC_Mapping_Worksheet_20140320.xlsx XLSX spreadsheet
Section_L_Draft_PSSC_Instructions _Conditions _and_Notices_to_Offerors_20140327.docx DOCX document
Section_L_Attachment_6_Draft_PSSC_Roles_and_Responsibilities_20140320.xlsx XLSX spreadsheet
Section_J_Attachment_2_Draft_PSSC_Government_Rights_in_Data_GRID_20140327.docx DOCX document
Section_J_Attachment_3_Draft_PSSC_CDRL_Instructions_and__Master__Listing_20140327.pdf PDF
Section_L_Attachment_10_Draft_PSSC_CLIN_Pricing_Matrix_Award_Fee_20140320.xlsx XLSX spreadsheet
Section_J_Attachment_9_Draft_PSSC_ICBM_GFP_Listing_20140321.docx DOCX document
Section_M_Draft_PSSC_Evaluation_Factors_for_Award_20140327.docx DOCX document
Section_L_Attachment_4_Draft_PSSC_Consent_Form_20140320.doc DOC document
Section_L_Attachment_7_Draft_PSSC_Cross_Reference_Matrix_20140321.xlsx XLSX spreadsheet
Section_J_Attachment_7_Draft_PSSC_Award-Fee_Plan_20140327.docx DOCX document
Section_L_Attachment_8_Draft_PSSC_Encryption_Instructions_20140320.docx DOCX document
Section_L_Attachment_9_Draft_PSSC_EZ_Source_Instructions_20140320.docx DOCX document
Draft_Section_L_PSSC_Attachment_2_Questionnaire_Cover_Letter_20140211.doc DOC document
Draft_Section_L_PSSC_Attachment_8_Encryption_Instructions_20140212.docx DOCX document
Draft_Section_L_PSSC_Attachment_9_EZ_Source_Instructions_20140212.docx DOCX document
Draft_Section_L_PSSC_Attachment_7_Cross_Reference_Matrix_20140212.xlsx XLSX spreadsheet
Draft_Section_L_PSSC_Attachment_1_PPI_Tool_20140221.docx DOCX document
Draft_Section_J_PSSC_Attachment_1_Performance_Work_Statement_20140221.docx DOCX document
Draft_Section_L_PSSC_Attachment_3_Questionnaire_20140221.doc DOC document
Section_M_PSSC_20140221_FBO.docx DOCX document
Draft_Section_J_PSSC_Attachment_2_Government_Rights_in_Data_(GRID)_20140221.docx DOCX document
Draft_Section_J_PSSC_Attachment_7_CLIN_Pricing_Matrix_Award_Fee_20140221.xlsx XLSX spreadsheet
Draft_Section_L_PSSC_Attachment_5_Commercial_Client_Auth_20140211.doc DOC document
Draft_Section_J_PSSC_Attachment_5_Labor_Categories_20140221.docx DOCX document
Draft_Section_L_PSSC_Attachment_4_Consent_Form_20140211.doc DOC document
Draft_Section_J_PSSC_Attachment_6_Mapping_Worksheet_20140221.xlsx XLSX spreadsheet
Draft_Section_L_PSSC_Attachment_6_Roles_and_Responsibilities_20140212.xlsx XLSX spreadsheet
Section_L_PSSC_Draft_Attachment_5_Commercial_Client_Auth_20140211.doc DOC document
Section_L_PSSC_Draft_Attachment_4_Consent_Form_20140211.doc DOC document
PSSC_Draft_Section_L_FBO_20140212.docx DOCX document
Section_L_PSSC_DRaft_Attachment_6_Roles_and_Responsibilities_20140212.xlsx XLSX spreadsheet
Section_L_PSSC_Draft_Attachment_3_Questionnaire_20140211.doc DOC document
Section_L_PSSC_Draft_Attachment_9_EZ_Source_Instructions_20140212.docx DOCX document
Section_L_PSSC_Draft_Attachment_2_Questionnaire_Cover_Letter_20140211.doc DOC document
Section_L_PSSC_Draft_Attachment_7_Cross_Reference_Matrix_20140212.xlsx XLSX spreadsheet
Section_L_PSSC_Draft_Attachment_1_PPIS_20140211.docx DOCX document
PSSC_Performance_Work_Statement_20140122.docx DOCX document
ICBM_PSSC_GFP_Listing_20140122.pdf PDF
Complete_CDRL_Package_PSSC_16_Jan_14.pdf PDF
ICBM_PSSC_GFP_Listing_20140122.docx DOCX document
Show all 50

Propulsion Subsystem Support Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

As of 20140221

SECTION L

Instructions, Conditions, and Notices to Offerors or Respondents

L-I - Solicitation Provisions Incorporated by Reference

NOTICE: Pursuant to FAR 52.252-1, “SOLICITATION PROVISIONS INCORPORATED BY REFERENCE”, the following provisions are incorporated herein by reference:

A. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) SOLICITATION PROVISIONS:

PARAGRAPH
TITLE
DATE

B. DEPARTMENT OF DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT (48 CFR CHAPTER 2) SOLICITATION PROVISIONS:

PARAGRAPH
TITLE
DATE

C. AIR FORCE FEDERAL ACQUISITION REGULATION SUPPLEMENT SOLICITATION PROVISIONS:

PARAGRAPH
TITLE
DATE

L-II - Solicitation Provisions in Full Text

NOTICE: The following provisions are hereby incorporated in full text:

A. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) SOLICITATION PROVISIONS:

B. DEPARTMENT OF DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT (48 CFR CHAPTER 2) SOLICITATION PROVISIONS:

C. AIR FORCE FEDERAL ACQUISITION REGULATION SUPPLEMENT SOLICITATION PROVISIONS:

D. ADMINISTRATIVE AND ONE-TIME USE PROVISIONS:

L-III INFORMATION TO OFFERORS (ITO) AND INSTRUCTIONS FOR PROPOSAL PREPARATION

1.0 Program Structure and Objectives

The Government intends to award a single contract for the Propulsion Subsystem Support Contract (PSSC) in Fiscal Year 2016. The contractor will perform Propulsion Subsystem Program Management Support and Technical Services to include Sustaining Engineering and Propulsion Subsystem Assessment requirements as referenced in the Performance Work Statement (PWS).

2.0 General Instructions

a. The offeror's proposal must include all data and information requested by this ITO and must be submitted in accordance with these instructions. The offer shall be compliant with the requirements as stated in the PWS and Contract Data Requirements List (CDRL). Nonconformance with the instructions provided in this ITO may result in an unfavorable proposal evaluation.

b. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government’s requirements but rather shall provide a description addressing how the offeror intends to meet these requirements and convincing evidence of the effectiveness and the offeror’s ability to execute their proposed methodology. Where supporting evidence of capabilities is based on systems other than Minuteman III (MMIII), the offeror shall clearly demonstrate how the capabilities will translate/apply to the MMIII Propulsion Subsystem. The proposed approach must be sound (well developed), feasible, effective, and clearly demonstrate with explicit evidence the full capability and experience their team possesses for performing activities to meet PWS requirements. Offerors shall assume the Government has no prior knowledge of their facilities and experience and will base their evaluation solely on the information provided in the offeror's proposal.

c. Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.

d. The proposal acceptance period is specified in Section A of the solicitation. The offeror shall make a clear statement in Section A of Volume V Contract Documentation of the offeror’s proposal that the offer is valid for a minimum of 365 days from the solicitation closing date.

e. In accordance with Federal Acquisition Regulation (FAR) Subpart 4.8, Government Contract Files, the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.

2.1 General Information

2.1.1 Point of Contact (POC)

The Procuring Contracting Officer (PCO) is the sole point of contact for this acquisition. Address any questions or concerns you may have to Mr. Jed Noorda at 6014 Dogwood Ave, Bldg 1258, Hill AFB UT 84056-5820 or via e-mail to the following: Jed.Noorda@us.af.mil. Bidder(s) will submit comments and questions to the PCO via e-mail and when appropriate, answers will be published on the Federal Business Opportunities (FedBizOpps) website. Written requests for clarification may be sent to the PCO at the address located in Section A of the solicitation.

2.1.2 Debriefings

The PCO will promptly notify offerors of any decision to exclude them from the competitive range; whereupon, they may request and receive a debriefing in accordance with FAR 15.505, Pre-Award Debriefing of Offerors. Offerors excluded from the competitive range may request a pre-award debriefing or they may choose to wait until after the source selection decision to request a post-award debriefing. However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. After award, the PCO will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506, Post-Award Debriefing of Offerors. Upon such notification, successful/unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.

2.1.3 Discrepancies

If an offeror believes the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the PCO in writing with supporting rationale, as well as the remedies the offeror is asking the PCO to consider as related to the omission or error. Government responses will be published on the FedBizOpps website for access by all offerors. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.

2.1.4 Electronic Reference Documents

The referenced documents for this solicitation are available on the FedBizOpps website at http://www.fedbizopps.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.

Technical documents not available electronically will be made available through the Bidder’s Library per instructions posted on FedBizOpps.

2.1.5 Classified Bidder’s Library/Vault

2.1.5.1 The Classified Bidder’s Library will reside within the vault of Building 1258, 6014 Dogwood Ave, Hill AFB UT 84056. It will consist of only hard copies of classified documents that may be necessary to propose to the PSSC. Visits are by appointment only (see contact information in paragraph 2.1.5.2) to view classified or other restricted access documentation that only exists in hard copy form in the Intercontinental Ballistic Missile Systems Directorate (ICBMSD) vault. The library will be open during normal business hours, Monday through Thursday for 9 hours (0700-1600) and 7 hours (0700-1100 and 12001500) on Friday. All contractors will be treated equally and will be provided access to the documents/information as requested, consistent with need-to-know and security clearance. The library will consist of data the ICBMSD believes is necessary to prepare a proposal. Offerors are encouraged to check the data list prior to setting an appointment. Requests for additional data will be considered by the Government and will be added at the discretion of the Government. No more than one contractor will be scheduled in the library at any given time. No more than four (4) persons per visit, per contractor will be permitted. There will be no copying of data and nothing with which to record data on is allowed in the vault. Mail order requests for data/documentation will not be honored. Contractors will not be permitted to remove data from the vault.

2.1.5.2 Each contractor will be limited to four 2-hour visits. All visits must be scheduled, through Joint Personnel Adjudication System (JPAS), using the Security Management Office (SMO) code HP1MFGKQ, with the Propulsion Subsystem Contract Data POC, Mr. Paul Catmull (Paul.Catmull@us.af.mil) or his alternate, Mr. Jason Nelson (Jason.Nelson.2@us.af.mil). Visitors must have, at a minimum, a Secret clearance with access to restricted data.

2.1.6 Communications

Exchanges of source selection information between Government and offerors will be controlled by the PCO. E-mail may be used to transmit such information to offerors only if the e-mail can be sent and received encrypted and includes “Source Selection Information – See FAR 2.101 & 3.104” in the Subject line. Otherwise, source selection information will be transmitted via other means as appropriate. Information on e-mail encryption procedures can be found in Section L Attachment 8.

2.1.7 Oral Presentations

Oral presentations will not be allowed.

2.1.8 Amendments to Solicitation

If this Request for Proposal (RFP) is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this RFP by the date and time specified in the amendment(s) by signing and returning the front page of each.

2.1.9 Submission, Modification, Revision, and Withdrawal of Proposals

2.1.9.1 Proposals and modifications to proposals shall be submitted in both paper and electronic media to the address located in paragraph 2.4 of this document, and show the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Late proposals will only be considered in accordance with FAR 15.208, Submission, Modification, Revision, and Withdrawal of Proposals.

2.1.9.2 Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

2.1.9.3 Proposals may be withdrawn by written notice received at any time before award. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting the withdrawal is established and the person signs a receipt for the proposal before award.

2.1.10 Alternate Proposals

Proposals that do not address requirements within the ITO or meet program objectives will be considered alternate proposals. Alternate proposals will not be considered.

2.1.11 Use of Non-Government Advisors

2.1.11.1 Offerors are advised that data submitted to the Government in response to this solicitation will be released to individuals who work for the following companies as nonGovernment advisors for review and analysis:

Company Name
Address
The Aerospace Corporation
P.O. Box 92957

Los Angeles CA 90009-2957

2.1.11.2 Per DOD Source Selection Procedures, paragraph 1.4.5.2 and AFFARS MP5315.3 Source Selection Procedures, support contractors, including Federally Funded Research and Development Center (FFRDC) employees may not serve as an advisor to the Past Performance Team, as Chairperson of a Source Selection Advisory Council (SSAC), or as a Source Selection Authority (SSA). Access to offerors’ proposals shall be restricted to only those portions for which the individual’s expertise is required to support the evaluation (e.g., software support contractor only reviews software hours proposed) but in no event will non-Government advisors have access to any offeror’s past performance information.

2.1.11.3 The individuals participating in the review and analysis of proposals have signed individual non-disclosure agreements with the Government which strictly prohibits any release or disclosure of information outside of the Source Selection Team.

2.2 Organization/Number of Copies/Page Limits

The offeror shall prepare the proposal as set forth in the Proposal Organization Table (Table 2.2 below). The titles and contents of the volumes shall be as defined in this Table, all of which shall be within the required page limits and with the number of copies as specified in Table 2.2. The volumes identified in the table shall be separately bound in three ring, loose leaf binders. Page limitations will still apply to each respective volume as shown in Table 2.2. The contents of each proposal volume are described in the ITO paragraph as noted in the table below.

Table 2.2 - Proposal Organization

VOLUME
ITO Paragraph

Number

VOLUME TITLE
SOFT

COPIES

HARD

COPIES

PAGE LIMIT

(not to exceed)

I
3.0
Executive Summary
2
4
10
II
4.0
· Technical

· Transition Strategy, max. 30 of 200 pages

· Note: Data Rights GRID (Section J Attachment 2) does not count towards page limit

2
4
200
III
5.0
Past Performance

· Note: Consent letters do not count towards page limit

2
3
6 pages per Past Performance Information (PPI) entry from the EZSource PPI Tool
IV
6.0
Cost/Price
2
4
unlimited
V
7.0
Contract Documentation
2
4
unlimited

2.2.1 Page Limitations

Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal and (for paper copies) will be shredded. If Evaluation Notices (EN) are issued, page limitations may be placed on responses. The specified page limits for EN responses will be identified in the letters forwarded with the ENs to the offerors. Each page shall be counted except the following: blank pages, title pages, tables of contents, lists of tables and drawings, cross-reference matrices, tabs, glossaries, and all reproduced sections of the solicitation.

2.2.1.1 Page Size and Format

a. A page is defined as each face of a sheet of paper containing information. When both sides of a sheet display printed material, it shall be counted as two pages. Page size shall be 8.5 x 11 inches, not including foldouts, and shall be printed doublesided. Pages shall be typed with 1.5 line spacing. Except for the reproduced sections of the solicitation document, the text size shall be Times New Roman font and no less than 12 point. Tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software. Use 1 inch margins on the top and bottom and ¾-inch side margins. Pages shall be numbered sequentially by volume. These page format restrictions shall also apply to responses to ENs. These limitations shall apply to both electronic and hard copy proposals.

b. Organizations, systems and layout, implementation schedules, plans, and etc. shall be depicted in tables, charts, graphs, or figures wherever practical. These items shall be uncomplicated, legible, and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, and count as a single page. Foldout pages may only be used for large tables, charts, graphs, diagrams, and schematics, not for pages of text. For tables, charts, graphs and figures, the text shall be no smaller than 8 point font. Ensure all tables, graphics, and figures in the electronic version of the proposal are pasted into the proposal in a format that allows a word search by the host program (do not paste as pictures only). These limitations shall apply to both electronic and hard copy proposals.

2.2.2 Cost or Pricing Related Data

2.2.2.1 All cost data requested in 6.0, Volume IV – Factor 3: Cost/Price, of this section should be in .xls file format (MS-Excel 2013 or earlier) compatible format. All electronic cost/pricing data submission should be in accordance with Section 2.3, Electronic Offers.

2.2.2.2 All cost or pricing information shall be addressed only in the Cost/Price proposal and Contract Documentation Volumes. Cost trade-off information, work-hour estimates, and material kinds and quantities may be used in other volumes only as appropriate for presenting rationale for alternatives or design and tradeoff decisions.

2.2.3 Classified Information

Classified information is not to be submitted in the proposal. A DD Form 254, Department of Defense Contract Security Classification Specification is required for the performance of this contract.

2.2.4 Cross-Referencing

2.2.4.1 Each volume shall be written on a stand-alone basis so that its contents may be evaluated without cross-referencing to other volumes of the proposal. Information required for proposal evaluation which is not found in its designated volume will be assumed to have been omitted from the proposal.

2.2.4.2 Cross-referencing within a proposal volume is permitted where its use would conserve space without impairing clarity, but must be hyperlinked in accordance with Section 2.3.2, Hyperlink.

2.2.4.3 The offeror shall provide a cross-reference matrix indicating by ITO, PWS, and/or specification paragraph number, the corresponding proposal paragraph in that section which addresses the referenced item using the Government provided template (Section L Attachment 7). The cross reference matrix does not count towards the volume page limit.

2.2.5 Indexing

Each volume shall contain a more detailed Table of Contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections.

2.2.6 Glossary of Abbreviations and Acronyms

Each volume shall contain a glossary of all abbreviations and acronyms used, and with an explanation for each. Glossaries do not count against the page limitations for their respective volumes.

2.2.7 Binding and Labeling

Each volume of the proposal should be separately bound in a three-ring, loose leaf binder permitting the volume to lie flat when open. Staples shall not be used. The outside of each binder shall include a cover sheet, clearly marked as to volume number, title, copy number, solicitation identification, and the offeror's name. The same identifying data should be placed on the spine of each binder. All unclassified document binders shall have a color other than blue, red, or orange. Be sure to apply all appropriate markings including those prescribed in accordance with FAR 52.215-1(e), Restriction on Disclosure and Use of Data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.

2.3 Electronic Offers

The content and page size of electronic copies must be identical to the hard copies. In the event there is a discrepancy between the hard copy and the electronic copy, the hard copy will take precedence and will be used for evaluation. The offeror shall submit Volumes I through V in electronic format, using virus-free CD-R. In no cases shall the offeror use CD-RW. Each disk shall be properly labeled. For electronic copies, indicate on each CD the volume number and title. Use separate files to permit rapid location of all portions, including subfactors, exhibits, annexes, and attachments, if any. When naming files, use titles to describe the content of the file rather than using numbers alone to more easily navigate and identify specific data. Each volume shall be in a different directory on a separate CD. If files are compressed, the necessary decompression program must be included. The electronic copies of the proposal shall be submitted in a format readable and searchable by Microsoft (MS) Office Word 2007-2013, MS Office Excel 2007-2013, MS Office Project 2007-2013, and MS Office Power Point 2007-2013, as applicable. PDF files are not acceptable. Ensure all graphics (to include tables, charts, and foldouts) in the electronic version of the proposal are pasted into the proposal (do not paste as picture only).

2.3.1 Electronic File Names

For electronic submissions, the file naming convention for the proposal volumes is as follows:

VolumeFile Name
Executive Summaryexecsum.xxxx
Technicaltech.xxxx
Past Performancepastperf.xxxx
Cost/Priceprice.xxxx
Contract Documentationcontv.xxxx

NOTE: You may expand on these file names as appropriate; just provide a list of the content of each. xxxx = appropriate default file extension for document type (e.g., .mdb for MS Database, docx for MS Word, .xlsx for MS Excel, etc.)

2.3.2 Hyperlink

The Table of Contents of all proposal volumes shall be hyperlinked to the corresponding material within each proposal volume such that clicking the mouse on an item in the Table of Contents will take the reader to the corresponding section within the body of the proposal volume. Any heading or sub-heading appearing in the Table of Contents shall be hyperlinked as described above. The Table of Contents shall include the file names, as well as page numbers where content is cross-referenced between subfactors. Also, any reference within the body of the proposal volume that refers the reader to another location within the referring document shall be hyperlinked in the manner described above. Hyperlinking references between different filenames is not necessary.

2.4 Distribution

2.4.1 The original proposal shall be identified “Original”. The proposal shall be addressed to the PCO and mailed to:

AFNWC/PZBF

Attn: Mr. Jed Noorda 6014 Dogwood Avenue, Building 1258 Hill AFB UT 84056-5820 Jed.Noorda@us.af.mil

2.4.2 Delivery of proposals shall be coordinated at least 24 hours in advance of the due date/time with the PCO. Electronic and paper copies of proposals must be received within 45 calendar days of release of the RFP. Proposals received after the due date and time specified herein shall be treated in accordance with FAR 15.208, Submission, Modification, Revision, and Withdrawal of Proposals. Be sure to advise the Administrative Contracting Officer (ACO) and the Defense Contract Audit Agency (DCAA) for prime and subcontractors that the proposal is “For Official Use Only” and “Source Selection Information–See FAR 2.101, Definitions and FAR 3.104, Procurement Integrity”.

2.5 Proposal Inquiries

All inquiries must be submitted via e-mail to the PCO listed in 2.4, Distribution, above. Questions will be answered as quickly as possible during the proposal preparation period. Government responses will be published on the FedBizOpps website for access by all offerors.

3.0 Volume I Executive Summary

The Executive Summary Volume is not evaluated, scored, or used to clarify other discrepant information in other volumes. Do not include cost information in Volume I Executive Summary.

In the executive summary volume, the offeror shall provide the following information:

3.1 Narrative Summary

The Narrative Summary of the entire proposal should be concise to include addressing the significant risks, and highlighting any key or salient features, excluding cost/price. The salient features should tie in with Section M, 2.1 Evaluation Factors and Subfactors. Any summary material provided here shall not be considered as meeting the requirements for any portions of other volumes of the proposal.

3.2 Table of Contents

Include a master Table of Contents of the entire proposal.

4.0 Volume II – Factor 1: Technical Volume

4.1 General

The Technical Volume should be specific and complete. Legibility, clarity, and coherence are very important. Your responses will be evaluated against the technical subfactors defined in Section M, Evaluation Factors for Award. Using the instructions provided below, provide as specifically as possible the actual capabilities and approaches (processes/methodologies) you would use for accomplishing/meeting these subfactors. All requirements specified in the solicitation are mandatory. By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation. It is not necessary or desirable for you to tell us so in your proposal. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation.

4.2 Format and Specific Content

4.2.1 Technical

In the Technical Volume, address the proposed approach (processes and methodologies) and capabilities meeting or exceeding the minimum performance or capability requirements of each Technical subfactor, as well as the risks in the proposed capabilities in terms of technical performance, cost, and schedule.

4.2.1.1 Technical Risk

Address technical risk associated with those aspects of your proposed technical approach you consider to have the potential for disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. Classify each risk IAW DOD Source Selection Procedures Table 3, Technical Risk Rating. Provide the rationale for each risk and its rating, including quantitative estimates of the impact on cost, schedule, and performance. Describe the impact of each identified risk in terms of its potential to interfere with or prevent the successful accomplishment of other contract requirements, whether or not those requirements are identified as subfactors. Propose a realistic “work-around” or risk mitigators for identified risks that will eliminate or reduce risk to an acceptable level. Identify and classify any new risks introduced by such risk mitigation. The Government will not be bound by the offeror’s proposed acceptable level of risk mitigation or proposed risk rating determination and the Government will make the final determination of the Technical Risk Rating assigned in the evaluation.

4.2.2 Volume Organization

The Technical Volume shall be organized according to the following general outline:

Section
Title
1
Table of Contents
2
List of Tables and Drawings
3
Glossary
4
Cross Reference Matrix
5
Subfactor 1: Propulsion Subsystem Assessment
6
Subfactor 2: Technical Skills and Services
6-1
Team Structure
6-2
Modeling and Simulation
6-3
Program Management Information
6-4
Sustaining Engineering
7
Subfactor 3: Transition
7-1
Tasks and Responsibilities Transfer
7-2
Facilities, Equipment, and Data
8
Subfactor 4: Program Management Support
8-1
Data Rights
8-2
Small Business Subcontracting Plan
9
Factor 2: Past Performance
10
Factor 3: Cost/Price

Offerors shall not address Appendix C, Safety, Fire Protection and Health Specification, Industrial Safety Requirements of the PWS in their proposal. However, the successful offeror shall be required to obtain 75th Air Base Wing Safety Office approval of their Safety Plan after contract award.

4.2.3 Technical Subfactors

The Technical subfactors for the Propulsion Subsystem Support Contract are:

Subfactor 1: Propulsion Subsystem Assessment
Subfactor 2: Technical Skills and Services
Subfactor 3: Transition
Subfactor 4: Program Management Support

4.2.3.1 Subfactor 1: Propulsion Subsystem Assessment (PWS 1.6.6.2.6, 1.6.6.2.8) The purpose of this subfactor is to assess the offeror’s ability to examine a complex subsystem, and assess and sustain the Propulsion Subsystem to include solids, liquids, flight controls, system ordnance, and flight batteries. The offeror’s technical proposal shall provide their capabilities and approach (processes/methodologies), detailing how their program team (including subcontractors) will meet or exceed the Propulsion Subsystem Assessment requirements of selecting assets, conduct of test, and analysis of test requirements, results, and data. The offeror shall provide explicit evidence that demonstrates the use of the capabilities and approach (processes/methodologies) on the MMIII Propulsion Subsystem or successful use on efforts of similar magnitude and complexity and how it applies to Propulsion Subsystem requirements.

a. Solid propulsion AS testing of propellant, liner, insulator, materials, and stage subsystems and components to include providing test samples, sample preparation, and alternate capabilities to obtain solid propellant samples

b. Liquid AS test and evaluation of the Propulsion System Rocket Engine (PSRE) system and all subcomponents, including evaluation of test data, and how the offeror will conduct AS testing of PSRE subcomponents

c. Ordnance AS test and evaluation of the ordnance devices, including selection of test articles, and evaluation of how the offeror would conduct ordnance AS testing

d. Flight control test and evaluation of the flight control units and subcomponents, including evaluation of monthly missile test data, closed loop failure analysis, and how the offeror would conduct an aging assessment

e. Battery AS test article selection, evaluation, and assessment of batteries and materials

4.2.3.2 Subfactor 2: Technical Skills and Services

The purpose of this subfactor is to assess the offeror’s ability to provide engineering capability and the associated engineering skills required to sustain the Propulsion Subsystem. The offeror shall provide their capabilities and approach (processes/methodologies) for transforming Government needs into work products, systems, or materials to resolve technical deficiencies, detailing how their program team (including subcontractors) will meet or exceed the following PWS Technical Skills and Services requirements: Team Structure, Modeling and Simulation, Program Management Information, and Sustaining Engineering.

4.2.3.2.1 Team Structure (PWS 1.6.5.6.1)

The offeror’s proposal shall provide their intended team structure, including partnerships and subcontractors, and their team’s skills and experience that demonstrate their ability to perform the requirements of the PWS. Provide the following:

a. Team organization chart(s) and written explanation, detailing the roles, responsibilities, and capabilities of all team members (to include subcontractor, supplier, and interdivisional team). Specifically explain relevance to MMIII Propulsion Subsystem acquisition and sustainment, as well as their interdependencies, key relationships, and communication channels.

b. The blend of skill sets and MMIII acquisition and sustainment experience levels for all personnel. Specifically expain relevance of skills and experience to MMIII Propulsion Subsystem acquisition and sustainment.

c. The contractual agreements planned or in force with each team member.

4.2.3.2.2 Modeling and Simulation (PWS 1.4.11, 1.6.6.2.10)

The offeror shall provide their capability and approach (processes/methodologies) for developing, simulating, and updating models, and how their capability and approach (processes/methodologies) meets or exceeds the requirements for modeling and simulation in the PWS.

4.2.3.2.3 Program Management Information (PWS 1.6.5.4)

The offeror’s proposal shall provide their engineering capabilities and approach (processes/methodologies) for developing a task (work package) log, creating and adjusting tasks, and for reprioritizing resources, including manpower to meet or exceed the requirements in the PWS.

4.2.3.2.4 Sustaining Engineering (1.6.6.1.8, 1.6.6.1.11)

The offeror’s proposal shall provide their capabilities and approach (process and methodology), detailing how the offeror’s team (including all subcontractors) will meet or exceed the requirements in the Sustaining Engineering listed below. The offeror shall provide explicit evidence that demonstrates the successful use of the approach and how it meets or exceeds the Minuteman III Propulsion Subsystem requirements.

a. Software Sustainment

b. Maintenance Support

4.2.3.3 Subfactor 3: Transition

4.2.3.3.1 Tasks and Responsibilities Transfer (PWS 1.6.5.8.3.1, 1.6.5.8.3.2, and 1.6.5.8.3.6) The offeror shall provide a transition strategy, describing the approach for transferring responsibilities from the Partial Bridge Contract (PBC) to the PSSC contractor/Government, including identifying how Government-furnished property (GFP), data, documentation, tools, and models can be effectively used in the execution of sustainment and acquisition support requirements while minimizing negative impacts to on-going Propulsion Subsystem efforts. The approach shall include transition risk identification and mitigation for transitioning Propulsion Subsystem tasks from the PBC to the PSSC contractor/Government. The proposed approach shall include a schedule that demonstrates how the offeror will assume the full responsibilities of the PSSC effort no later than 6 months after the Post Award Conference.

4.2.3.3.2 Facilities, Equipment, and Data (PWS 1.6.5.8.3.3)

The offeror shall describe their facilities, equipment, and data or their ability to obtain facilities,equipment, and data necessary to meet the requirements of the PWS. If the offeror does not have current possession and/or access to these necessary facilities, equipment, and/or data, the offeror shall submit with their proposal an approach for gaining access to and/or establishing the necessary facilities, equipment, and/or data within the 6-month transition period along with supporting information that the offeror is knowledgeable of the work to be performed.

4.2.3.4 Subfactor 4: Program Management Support (PWS 1.6.5.2 and 1.6.5.7, Section L 7.1.7.1 and 7.3.4.1, and Clause H-133) The purpose of this subfactor is to assess the offeror’s ability to meet the Government’s Program Management Support requirements. The offeror’s technical proposal shall describe their capabilities and approach (processes/methodologies) for providing Program Management Support for the Propulsion Subsystem to address the following elements:

a. Data Rights

b. Small Business Subcontracting Plan

5.0 Volume III – Factor 2: Past Performance

5.1 General

5.1.1 Each offeror shall submit a Past Performance Volume with its proposal, containing past performance information which includes:

Results from the populated PPI Tool (Microsoft Database)

· PPI Tool is located at Section L Attachment 1 and the instructions for the PPI Tool can be found in Section L Attachment 9 Subcontractor/Teaming Partner Consent Form for the Release of Past Performance Information to the Prime Contractor (Section L Attachment 4) Commercial Client Authorization Letter (Section L Attachment 5) Recent/Relevant Contracts (Section L 5.3) Roles and Responsibilities Worksheet (Section L Attachment 6)

5.1.2 This information is required on the offeror and all subcontractors, teaming partners, and/or joint venture partners who are proposed to perform 10 percent or more of the proposed effort based on the total proposed price or perform aspects of the effort the offeror considers critical to overall successful performance. Offerors are cautioned that the Government will use data provided by each offeror in this volume and data obtained from other sources in the evaluation of past performance.

5.2 Consent and Client Authorization Letters

The offeror shall submit a consent letter (see Section L Attachment 4, Subcontractor/Teaming Partner Consent Form for the Release of Past Performance Information to the Prime Contractor), signed and executed by the subcontractors, teaming partners, and/or joint venture partners, authorizing release of adverse past performance information to the offeror so the offeror can respond to such information. For each identified effort for a commercial customer, the offeror shall submit a client authorization letter signed by the commercial client (see Section L Attachment 5, Commercial Client Authorization Letter), authorizing release to the Government of information on the offeror's performance.

5.3 Recent/Relevant Contracts

Submit past performance information for up to five (5) recent (within past five years) contracts for the prime offeror and up to three (3) recent (within past five years) contracts for all subcontractor/teaming partners and/or joint venture partners performing more than 10% of the cost of the contract, considered most relevant in demonstrating an ability to perform the proposed effort. For a description of the characteristics or aspects the Government will consider in determining recency and relevance, see Section M, Evaluation Factors for Award, 2.0 Evaluation Factors, Factor 2: Past Performance. Offerors shall use the Roles and Responsibilities Worksheet (see Section L Attachment 6) to indicate how much each team member will contribute towards each Technical subfactor. The data from the worksheet will be used by the Government to determine the past performance relevancy of information provided by the offeror via the PPI Tool.

5.3.1 Specific Content

Offerors are required to explain what aspects of the past performance contracts are deemed relevant to the proposed effort and to what aspects of the proposed effort they relate. This may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts, as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a limited or no confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a higher confidence candidate. For example, submittal of quality performance indicators or other management indicators that clearly support that an offeror has overcome past problems is required. Categorize the relevant information into the specific Technical subfactors and Cost/Price Factor used to evaluate the proposal.

5.3.2 Organizational Structure Change History

Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. A pamphlet or other commercial document describing such reorganizations may suffice. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider past performance information provided by other sources, as well as that provided by the offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.

This historical roadmap will not count against the page limits of the Volume III Past Performance.

5.4 Early Proposal Information

Each offeror is requested to submit the Past Performance Volume (Volume III) 14 calendar days prior to the proposal due date. Offerors shall complete Section 1 of the Past Performance Questionnaire (see Section L Attachment 3) and e-mail it and the Performance Questionnaire Cover Letter (see Section L Attachment 2) to all POCs the offeror has listed in the PPI Tool. The POCs will complete the questionnaires and forward them by e mail directly to Mr. Jed Noorda at Jed.Noorda@us.af.mil. Respondents to the questionnaires shall not send the completed information sheets back to the offeror! Offerors shall not follow-up with respondents to ensure they have completed the questionnaires. The Past Performance Evaluation Team will conduct such follow-up with any POC as necessary. Past Performance Questionnaires may be received electronically, using the Encryption Instruction in Attachment 8. All other past performance information for Volume III will be delivered in accordance with Table 2.2, Proposal Organization, and Paragraph 2.4, Distribution.

6.0 Volume IV – Factor 3: Cost/Price

6.1 General Instructions

6.1.1 Cost/Price Reasonableness and Realism

This section is to assist you in submitting data other than certified cost or pricing data that is required to evaluate the reasonableness, balance, and realism (where identified) of your proposed cost/price. Compliance with these requirements is mandatory and failure to comply may result in rejection of your proposal. Unbalanced pricing poses an unacceptable risk to the Government and may be a reason to reject an offeror’s proposal. Offers should be sufficiently detailed to demonstrate their reasonableness. The burden of proof for credibility of proposed costs/prices rests with the offeror.

6.1.2 Total Evaluated Price (TEP) Pricing Matrix

Offerors shall populate the pricing and cost cells in Section J Attachment 4 as appropriate. The Government will use this worksheet to calculate the TEP.

6.1.2.1 Cost Reimbursable No Fee (CRNF) Contract Line Item Numbers (CLIN).

It is not necessary to propose these CLINs. The CRNF CLINs will be established when requirements become known and funds are available. Actual costs incurred under these CLINs will be reimbursed to the contractor as approved by the ACO.

6.1.2.2 Award Fee Arrangements. All Cost-Plus Award Fee (CPAF) CLINs shall be bid with zero percent (0%) base fee. Award fee may be bid as offeror deems appropriate; however, it will be analyzed for realism using the techniques in Section M.

6.1.3 Labor Rate Matrix, Section J Attachment 4

Offerors shall populate the pricing and cost cells, as appropriate, according to the instructions on the worksheet. The Government will use this worksheet to price all future contractual modifications and awards. Provide fully burdened Labor Rates (to include all associated direct and indirect costs, EXCEPT profit/fee) for each labor category specified. Descriptions of the labor categories can be found in the Labor Category Descriptions, Section J Attachment 5.

6.1.3.1 Labor Rates. The offeror shall submit one rate to be used for the prime contractor (including interdivisional units, subsidiaries, affiliates, divisions, sectors, groups) and all subcontractor(s). The proposed Labor Rates for each of the Government specified labor categories shall include all applicable direct and indirect costs, including facilities capital cost of money. Profit/Fee shall not be included in the rates, but should be included separately as a percentage on the appropriate row. These rates shall be used for all future contractual modifications and all future awards not already priced otherwise on the basic contract. The base rates will be used for all pricing arrangements after the application of the appropriate profit/fee percentage. Share ratios/ceilings/min-max and other incentive fee type arrangements for CPIF and FPIF arrangements will be negotiated at the time they are utilized after award. Refer to the pricing attachments for additional instructions.

6.1.4 Cost/Price Data

Data beyond that required by this instruction shall not be submitted, unless you consider it essential to document or support your cost/price position. All data relating to the proposed price, including all required supporting documentation, must be included in the section of the proposal designated as the Cost/Price Volume. Under no circumstances shall this data and documentation be included elsewhere in the proposal.

6.1.5 Cost or Pricing Data Requirements

6.1.5.1 In accordance with FAR 15.403-1(b), Prohibition on Obtaining Certified Cost or Pricing Data (10 U.S.C. 2306a and 41 U.S.C. 254b) and 15.403-3(a), Requiring Data Other than Certified Cost or Pricing Data may be required to support a determination of price reasonableness. Data shall be provided in accordance with FAR 15.403-5, Instructions for Submission of Certified Cost or Pricing Data and Data Other than Certified Cost or Pricing Data. If, after receipt of proposals, the PCO determines that there is insufficient data available to determine price reasonableness and none of the exceptions in FAR 15.403-1, Prohibition on Obtaining Certified Cost or Pricing Data (10 U.S.C. 2306a and 41 U.S.C. 254b) apply, the offeror shall be required to submit additional cost or pricing data.

6.1.5.2 Facility costs will not be priced separately. Offerors need to account for this cost in their rate structure. For offerors interested in the Enhanced Use Lease (EUL) facility on Hill AFB, the points of contact are Gary Stewart, Sunset Ridge Development – 801-870-2701 – gary.stewart@huntcompanies.com or Travis Lish – Woodbury Corp. – 801-485-7770 – t_lish@woodburycorp.com (note this is t_lish).

6.1.7 Basis of Estimate (BOE)

The offeror shall provide a priced BOE for Cost-Plus Award-Fee (CPAF) line items XXXXAA to third level Work Breakdown Structure (WBS) detail. The contractor shall show base labor rate, material (if applicable), a breakout of all indirect rates applied, any other applicable costs, and fee. Also, indicate the basis for these rates and reference (if applicable) the current Forward Rate Pricing Agreement (FRPA) or audit the rates were taken from. Additionally, the offeror shall provide the rationale behind proposed labor hours, labor mix, and any material considered major under 6.3.8, Major Material Items and Equipment. The organization of this BOE shall follow the offeror’s technical proposal, and be arranged in a logical fashion.

6.1.8 Rounding

All dollar amounts provided shall be rounded to the nearest dollar. All loaded labor rates shall be rounded to the nearest penny.

6.2 Volume Organization

The Cost/Price Volume shall be organized according to the following general outline:

Section
Title
1
Table of Contents
2
Listing of Abbreviations and Acronyms (used within pricing volume)
3
Cross Reference Matrix
4
General
4-1
TEP Worksheet
4-2
Labor Rate Matrix
4-3
Basis of Estimate
5
Estimating Methodology
5-1
Estimating Techniques and Methods
5-2
Pricing Assumptions
5-3
Purchasing System
5-4
Accounting System
5-5
Direct Labor & Indirect Rates
5-6
Explanation of Estimating Methods Used
5-7
Management Reduction
5-8
Major Material Items and Equipment
6
Other Information
6-1
Evaluation of Compensation for Professional Employees
6-2
Labor Categories Mapping Worksheet
6-3
Probable Subcontractors
6-4
Submission of Cost Models

6.3 Estimating Methodology

All information requested in this section only applies to CPAF CLINs XXXXAA.

6.3.1 Estimating Techniques and Methods

6.3.1.1 When responding to the Cost/Price Volume requirements in the solicitation, the offeror and associated subcontractors may use any generally accepted estimating technique, including contemporary estimating methods (such as Cost-to-Cost and Cost-to-Non-Cost Estimating Relationships, commercially available parametric cost models, in-house developed parametric cost models, etc.) to develop their estimates. If necessary, reasonable and supportable allocation techniques may be used to spread hours and/or costs to lower levels of the WBS.

6.3.1.2 Provide a summary description of your standard estimating system or methods. Identify deviations (if any) from your standard estimating procedures in preparing this proposal volume. If a FPRA has been negotiated with the ACO covering the period of the proposal, provide appropriate comments and the date of agreement. Indicate whether you have Government approval of your estimating and purchasing systems and provide evidence of such approval.

6.3.2 Pricing Assumptions

Summarize all significant pricing assumptions, scope limitations, and/or qualifications of the cost proposal. List each exception to the ground rules and assumptions provided in the solicitation and each qualification of the Cost/Price Volume, if any. Provide complete rationale for any exceptions. This section shall not exceed five pages.

6.3.3 Purchasing System

Provide a summary description of your purchasing system or methods (e.g., how material requirements are determined, how sources are selected, when firm quotes are obtained, what provision is made to ensure quantity and other discounts). Also, identify any deviations from your standard procedures in preparing this proposal. Indicate whether you have Government approval of your system and if so, provide evidence of such approval.

6.3.4 Accounting System

Because portions of the contract are contemplated as a contract type other than Firm Fixed-Price, indicate whether you have Government approval of your accounting system and if so, provide evidence of such approval. Also, identify any deviations from your standard procedures in preparing this proposal. If your accounting system has been disapproved in whole or in part, provide the status of action taken to correct noted deficiencies.

6.3.5 Direct Labor & Indirect Rates

If a FPRA has been negotiated with the ACO covering the period of the proposal, provide appropriate comments and the date of agreement.

6.3.6 Explanation of Estimating Methods Used

Explain the methodology used to estimate each cost element. As a minimum, provide the following information for each cost element. If a portion of the required information is not applicable for a particular cost element, so state.

6.3.6.1 Past Experience-Based Estimates

Where cost estimates are based upon past experience, identify the past experience, explain how the past experience relates to the current effort, including similarities and differences, and how cost data available from the past experiences was adapted to the current effort.

6.3.6.2 Learning Curve Estimates

Where cost estimates are based upon learning/improvement curve applications, identify the specific area subject to learning, the curve hypothesis (unit or cumulative) and the slope of the curve as a percent. Also, identify the data used to develop the first unit cost and slope and explain how this data related to the current effort and how entry on the learning curve was attained (i.e., how the first unit cost was derived).

6.3.6.3 Engineering Labor Hours

If engineering labor hours have been estimated based upon other than past experience, provide detailed rationale on how they have been estimated.

6.3.6.4 Engineering Labor Hour Skill Mix

Explain how the proposed engineering labor hour skill mix has been derived and how the skill mix on this proposal compares with the overall plant skill mix. Explain why the cost element requires an average, higher, or lower than average skill mix, as applicable. If the offeror’s normal estimating system uses a plant wide average for proposal purposes, so state.

6.3.6.5 Manufacturing Labor Hours

If manufacturing labor hours have been estimated based upon other than past experience and/or learning curve application, provide detailed rationale on how…