Section_L_Attachment_1_Draft_PSSC_PPI_Tool_20140320.docx

DOCX document 28 KB Posted

Attached to
Propulsion Subsystem Support Contract Federal contract opportunity
Solicitation number
FA8214-14-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Draft Section L Attachment 1 PPI Tool

View the file

Other files for this federal contract opportunity

Other files attached to Propulsion Subsystem Support Contract, newest first.
File Type Posted
PSSC_Bidders_Library_Instructions.docx DOCX document
Section_L_Attachment_5_Draft_PSSC_Commercial_Client_Auth_20140320.doc DOC document
Section_J_Attachment_5_Draft_PSSC_Labor_Categories_20140321.docx DOCX document
Section_J_Attachment_8_Draft_PSSC_QASP_20140325.docx DOCX document
Section_J_Attachment_10_PSSC_DD254.pdf PDF
Section_L_Attachment_8_Draft_PSSC_Encryption_Instructions_20140320.docx DOCX document
Section_L_Attachment_9_Draft_PSSC_EZ_Source_Instructions_20140320.docx DOCX document
FA820414R0003.pdf PDF
Section_J_Attachment_4_Draft_PSSC_Labor_Rate_Matrix_20140320.xlsx XLSX spreadsheet
Section_J_Attachment_1_Draft_PSSC_Performance_Work_Statement_20140326.docx DOCX document
Section_L_Attachment_2_Draft_PSSC_Questionnaire_Cover_Letter_20140320.doc DOC document
Section_J_Attachment_6_Draft_PSSC_Mapping_Worksheet_20140320.xlsx XLSX spreadsheet
Section_L_Draft_PSSC_Instructions _Conditions _and_Notices_to_Offerors_20140327.docx DOCX document
Section_L_Attachment_6_Draft_PSSC_Roles_and_Responsibilities_20140320.xlsx XLSX spreadsheet
Section_J_Attachment_2_Draft_PSSC_Government_Rights_in_Data_GRID_20140327.docx DOCX document
Section_J_Attachment_3_Draft_PSSC_CDRL_Instructions_and__Master__Listing_20140327.pdf PDF
Section_L_Attachment_10_Draft_PSSC_CLIN_Pricing_Matrix_Award_Fee_20140320.xlsx XLSX spreadsheet
Section_J_Attachment_9_Draft_PSSC_ICBM_GFP_Listing_20140321.docx DOCX document
Section_M_Draft_PSSC_Evaluation_Factors_for_Award_20140327.docx DOCX document
Draft_Section_L_PSSC_Attachment_2_Questionnaire_Cover_Letter_20140211.doc DOC document
Section_L_PSSC_20140221_FBO.docx DOCX document
Draft_Section_L_PSSC_Attachment_8_Encryption_Instructions_20140212.docx DOCX document
Draft_Section_L_PSSC_Attachment_9_EZ_Source_Instructions_20140212.docx DOCX document
Draft_Section_L_PSSC_Attachment_7_Cross_Reference_Matrix_20140212.xlsx XLSX spreadsheet
Draft_Section_J_PSSC_Attachment_6_Mapping_Worksheet_20140221.xlsx XLSX spreadsheet
Draft_Section_L_PSSC_Attachment_6_Roles_and_Responsibilities_20140212.xlsx XLSX spreadsheet
Draft_Section_J_PSSC_Attachment_4_Labor_Rate_Matrix_20140221.xlsx XLSX spreadsheet
Draft_Section_L_PSSC_Attachment_1_PPI_Tool_20140221.docx DOCX document
Draft_Section_J_PSSC_Attachment_1_Performance_Work_Statement_20140221.docx DOCX document
Draft_Section_L_PSSC_Attachment_3_Questionnaire_20140221.doc DOC document
Section_M_PSSC_20140221_FBO.docx DOCX document
Draft_Section_J_PSSC_Attachment_2_Government_Rights_in_Data_(GRID)_20140221.docx DOCX document
Draft_Section_J_PSSC_Attachment_7_CLIN_Pricing_Matrix_Award_Fee_20140221.xlsx XLSX spreadsheet
Draft_Section_L_PSSC_Attachment_5_Commercial_Client_Auth_20140211.doc DOC document
Draft_Section_J_PSSC_Attachment_5_Labor_Categories_20140221.docx DOCX document
Draft_Section_L_PSSC_Attachment_4_Consent_Form_20140211.doc DOC document
Section_L_PSSC_Draft_Attachment_5_Commercial_Client_Auth_20140211.doc DOC document
Section_L_PSSC_Draft_Attachment_3_Questionnaire_20140211.doc DOC document
Section_L_PSSC_Draft_Attachment_9_EZ_Source_Instructions_20140212.docx DOCX document
Section_L_PSSC_Draft_Attachment_2_Questionnaire_Cover_Letter_20140211.doc DOC document
Section_L_PSSC_Draft_Attachment_7_Cross_Reference_Matrix_20140212.xlsx XLSX spreadsheet
Section_L_PSSC_Draft_Attachment_1_PPIS_20140211.docx DOCX document
Section_L_PSSC_Draft_Attachment_8_Encryption_Instructions_20140212.docx DOCX document
Section_L_PSSC_Draft_Attachment_4_Consent_Form_20140211.doc DOC document
PSSC_Draft_Section_L_FBO_20140212.docx DOCX document
ICBM_PSSC_GFP_Listing_20140122.docx DOCX document
PSSC_Performance_Work_Statement_20140122.pdf PDF
PSSC_Performance_Work_Statement_20140122.docx DOCX document
ICBM_PSSC_GFP_Listing_20140122.pdf PDF
Complete_CDRL_Package_PSSC_16_Jan_14.pdf PDF
Show all 50

Propulsion Subsystem Support Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The following Past Performance Information Sheet (PPIS) is provided for informational purposes only. The Government will request this information be provided through the use of the PPI Tool. The PPI Tool Use Instructions are located in Section L Attachment 9. At the time of RFP release the PPI Tool will be released as Section L Attachment 1 for offeror’s completion.

SECTION L ATTACHMENT 1

PAST PERFORMANCE INFORMATION SHEET (PPIS)

(NOTE: All information contained in a “NOTE”, including this line, may be deleted in the submittal to maximize the available space for responses.)

(NOTE: Provide the information listed below for each contract identified. Provide frank, concise comments regarding performance on the contracts you identify. Provide a separate completed form for each contract submitted.)

A. Offeror Name (Company/Division):

Cage Code:

DUNS Number:

(NOTE: If the company or division performing this effort is different than the offeror or the relevance of this effort to the instant acquisition is impacted by any company/corporate organizational change, note those changes below.)

B. Program title:

C. Contract Specifics:

1. Contracting agency or customer:

2. Contract number:

3. Contract type:

4. Period of performance:

5. Original contract $ value (do not include unexercised options):

6. Current contract $ value (do not include unexercised options):

7. If amounts for 5 and 6 above are different, provide a brief description of the reason below.

8. Original completion date:

9. Current scheduled completion date:

10. Estimated completion date:

11. Number of contract changes:

12. Enter primary cause for contract changes below:

D. Enter below a brief description of effort as Prime, Subcontractor or teaming arrangement.

(NOTE: Please indicate whether it was development and/or production, or other acquisition phase and highlight portions considered most relevant to the current acquisition and whether performance was as Prime or Subcontractor.)

E. Primary customer points of contact:

(NOTE: For Government contracts/orders, provide current information on all three individuals. For commercial contracts, provide points of contact fulfilling these same roles.)

1. Program Manager and/or Site Manager
2. Procurement Contracting Officer
3. Lead Program Engineer

Name

Office

Address

Telephone

FAX No

E-mail

F. Address below any technical (or other) area about this contract considered unique.

G. Describe the relevancy of this contract to the technical aspects of the Propulsion Subsystem Support Contract (PSSC) Performance Work Statement.

(NOTE: Include ICBM and other related weapon system support experience)

H. Include below relevant information concerning your compliance with FAR 52.219-8, Utilization of Small Business Concerns, on the contract you are submitting.

I. Subcontracting Plan Requirements

1. Was a subcontracting plan required? _______ If YES, go to # 2. If NO, go to item J

2. Planned goal (%)

Achieved goal (%)

3. Explain below why goals were not met.

J. Describe below the nature of the work to be performed on the contract by the business entity being reported here.

(NOTE: Also, estimate the percentage of the proposed PSSC effort to be performed by this entity and whether this entity will be performing as the prime, subcontractor, joint venture/teaming arrangement (define relationship).

K. Briefly summarize the major contract issues and corrective actions taken for the contract listed in Paragraph B above.

L. Describe unfavorable and/or marginal past performance ratings/reports and progress towards correction.

File details come from the government source that posted it. Updated .