QALI_CLEA_FD2020-20-50151.pdf

PDF 117 KB Posted

Attached to
CHARGE ASSEMBLY Federal contract opportunity
Solicitation number
FA8213-20-R-3016
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document summarizes a federal contract solicitation for the procurement of charge assemblies and associated test plans and reports. The solicitation involves line items for first article test plans and reports to be delivered within 30 days of award, low-rate initial production charge assemblies to be delivered within 120 days of award, and higher-rate full production charge assemblies to be delivered in batches over a 12-month period following approval of the first article. The solicitation also provides pricing and delivery information for the line items. The solicitation is being issued by the Department of the Air Force Materiel Command Lifecycle Management Center and involves an incumbent contractor and another potential offeror. The solicitation includes requirements for charge assemblies as well as associated testing and reporting deliverables.

View the file

Other files for this federal contract opportunity

Other files attached to CHARGE ASSEMBLY, newest first.
File Type Posted
FA821320R3016-0002.pdf PDF
FA821320R3016-0001.pdf PDF
CDRLS_PR.pdf PDF
ADC_SOW_Jan2018Final.pdf PDF
Engineering_Data_List.pdf PDF
Packaging_Statement_of_Work.pdf PDF
CADPAD_Item_Marking_Instruction.pdf PDF
Rework_and_Repair_of_Nonconforming_Material.pdf PDF
GFPFA821320R3016_1.pdf PDF
First_Article_CDRLs_FD2020-20-50151.pdf PDF
REPSHIP.pdf PDF
AIR_SPEC_FD2020-20-50151_REVISED_02.pdf PDF
JFQR_ShapeChargeAssembly_009313590ES.pdf PDF
FA821320R3016.RTF RTF text file
SPI.pdf PDF
Item_Description_009313590ES.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Noun

Sheet1

Contract No: 20-50151
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: LGM30
DODIC: 995-4999-2
undefined: V
undefined_2: V
undefined_3: W
undefined_4: V
undefined_5: V
undefined_6: V
undefined_7: N
Text19: Ensign Bickford, Pacific Scientific
Text20: 96336, 06331
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. X-Ray/N-Ray
Text26: 3. LAT
Text27: 4. Preparation for Shipment
Text28: 5. AMMO Data Card Review
Text29: 6. Shippers (DD250, DD1149, Reports)
Text30: 7. Additional Requirements
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

3. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

4. Ensure Paperwork is correct.

5. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

6. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

7. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2020-04-06T14:47:13-0600
JOHNSON.AVERY.STEVEN.1457505112
Text46: 6 Apr 2020
Type name_1:
Part Number: KY69
Noun: CLEA

File details come from the government source that posted it. Updated .