First_Article_CDRLs_FD2020-20-50151.pdf

PDF 151 KB Posted

Attached to
CHARGE ASSEMBLY Federal contract opportunity
Solicitation number
FA8213-20-R-3016
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This Contract Data Requirements List (CDRL) outlines two data items required under a federal contract for charge assemblies. The contractor must submit a First Article Inspection Report within 30 days of completing first article acceptance testing, documenting dimensions, tolerances, materials, and markings. A Qualification Test Plan is due 30 days after contract award for government approval within 30 days, with any subsequent changes requiring approval. Five charge assemblies must be delivered within 120 days of award, with 200 more due within 12 months of first article approval and another 200 within 12 months of award. Submittals are to be sent through WAWF to AFLCMC/EBHJ at Hill Air Force Base. Distribution of deliverables is restricted to U.S. government agencies for administrative and operational use.

View the file

Other files for this federal contract opportunity

Other files attached to CHARGE ASSEMBLY, newest first.
File Type Posted
FA821320R3016-0002.pdf PDF
FA821320R3016-0001.pdf PDF
GFPFA821320R3016_1.pdf PDF
REPSHIP.pdf PDF
AIR_SPEC_FD2020-20-50151_REVISED_02.pdf PDF
JFQR_ShapeChargeAssembly_009313590ES.pdf PDF
FA821320R3016.RTF RTF text file
SPI.pdf PDF
Item_Description_009313590ES.pdf PDF
Engineering_Data_List.pdf PDF
Packaging_Statement_of_Work.pdf PDF
CADPAD_Item_Marking_Instruction.pdf PDF
Rework_and_Repair_of_Nonconforming_Material.pdf PDF
CDRLS_PR.pdf PDF
QALI_CLEA_FD2020-20-50151.pdf PDF
ADC_SOW_Jan2018Final.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

1336009313590ES

E. CONTRACT/PR NO.

FD2020-20-50151

F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

TEST PROCEDURE

3. SUBTITLE

FIRST ARTICLE INSPECTION REPORT, CONTRACTOR

TEST

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80603A

5. CONTRACT REFERENCE

Airmunition Specification

6. REQUIRING OFFICE

AFLCMC/EBHJ

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

1TIME

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Follow format per DID. Incorporate the following applicable requirements:

a. Dimension and tolerances specified on the manufacturing data shall be listed in one column with the actual corresponding reading obtained from inspection of the part, listed in another column.

b. Material utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable data requirements.

c. Certification that identification markings, i.e. part number per MIL-STD-130 and Federal Supply manufacturer (FSCM) per H4-1 Cataloging Handbook (if applicable) have been complied with.

e. The test report will be certified by the responsible DCMA/QAR.

(Authorization for any deviations from the requirements specified by the manufacturing data must be obtained from the procuring agency prior to inclusion in the test report).

BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number, and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at https://wawf.eb.mil.

BLK 9: DISTRIBUTION STATEMENT B. Distribution authorized to U.S.

Government agencies only, (Administrative/Operational Use) (Date of Contract Award).

Other requests for this document shall be referred to AFLCMC/EBHJ.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec.

2751, et seq.) or the Export Administration Act of 1979(Title 50, U.S.C. App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLK 12: Submit no later than 30 days after completion of First Article Acceptance Testing. Submit through WAWF under DoDAAC FA8213.

FOB DESTINATION

EBH 20-098-001(20-033-001)

Terry McCurdy, AFLCMC/EBHTC, 586-0535

WAWF 0 1 0

DoDAAC, FA8213

15. TOTAL 0 1 0

G. PREPARED BY

mccurdy.terry.d.1075978215

H. DATE

2020/04/07

I. APPROVED BY

hargrove.eric.v.1167016843

J. DATE

2020/04/07

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

17. PRICE GROUP

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

1336009313590ES

E. CONTRACT/PR NO.

FD2020-20-50151

F. CONTRACTOR

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

First Article Qualification Test Plan and Procedures

3. SUBTITLE

Qualification Test Plan

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-81307A

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHJ

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:

https://wawf.eb.mil. The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement.

BLK 8: Comments/approval/disapproval will be submitted within 30 working days of receipt by AFLCMC/EBHJ.

BLK 9: DISTRIBUTION STATEMENT B. Distribution authorized to U.S.

Government agencies only, (Administrative/Operational Use) (Date of Contract Award). Other requests for this document shall be referred to AFLCMC/EBHJ.

DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directives 5230.25.

BLK 10, 11, 12, 13: The contractor shall provide a Qualification Test Plan/Procedures 30 days after contract award, allowing for 30 days approval time. No changes to previously approved government Test Plans shall be made without prior approval from AFLCMC/EBHJ Engineering approval, IAW Airmunitions Specification.

BLK 14: Submittals shall be in Microsoft Office software or PDF format. Submit through WAWF, DoDAAC, FA8213.

FOB DESTINATION

EBH 20-098-001(20-033-001)

Terry McCurdy, AFLCMC/EBHTC, 586-0535

WAWF 0 1 0

DoDAAC, FA8213

15. TOTAL 0 1 0

G. PREPARED BY

mccurdy.terry.d.1075978215

H. DATE

2020/04/07

I. APPROVED BY

hargrove.eric.v.1167016843

J. DATE

2020/04/07

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

17. PRICE GROUP

File details come from the government source that posted it. Updated .