About this file

QALI

View the file

Other files

File Type Posted
ADCSOW.doc DOC document
0537QAIR.pdf PDF
ES7034.doc DOC document
AIRSPEC.docx DOCX document
3847QAIR.pdf PDF
0537JQRS.pdf PDF
0537EDL.pdf PDF
18-50031-EDL-0552-UPDATE.pdf PDF
2801EDL.pdf PDF
PHSTSOW.pdf PDF
CADPADMarkingInstrApr2016.doc DOC document
3847JQRS.pdf PDF
IDCombined.pdf PDF
AirSpecAttachments.pdf PDF
0537ID.pdf PDF
IHCJHCS50031.pdf PDF
AIRSPEC50032.docx DOCX document
18-50031-EDL-0548-UPDATE.pdf PDF
F010528208.pdf PDF
F013193847.pdf PDF
EDL.pdf PDF
ItemDescription.pdf PDF
2801QAIR.pdf PDF
EDLCombined.pdf PDF
CDRLS.pdf PDF
GFP.pdf PDF
2CDRLS.pdf PDF
8208ID.pdf PDF
3847EDL.pdf PDF
8208EDL.pdf PDF
SOWOct152013.doc DOC document
2801ID.pdf PDF
CDRL50032.pdf PDF
CEDHarnessCartIHC.pdf PDF
8208QAIR.pdf PDF
FA821319R3012_______0002.pdf PDF
FA821319R3012_______0001.pdf PDF
FA821319R3012.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 19-50065, 19-50066
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: ACES II HRC, Drouge, Gyro
DODIC: MD87, MD89, MD92
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: V
undefined_8: V
undefined_9: N
undefined_10:
undefined_11:
undefined_12:
Text19: UPCO, Chemring
Text20: 17610, 93455
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2018-05-04T07:50:39-0600
HANCEY.ALLEN.R.1386816111
Text46: 4 May 2018
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: HRC: 1002-41, 6284200 Drogue 1003-24, 6284100 Gyro 1004-3, 606610-02

File details come from the government source that posted it.