About this file

ES

View the file

Other files

File Type Posted
ADCSOW.doc DOC document
0537QAIR.pdf PDF
AIRSPEC.docx DOCX document
3847QAIR.pdf PDF
0537JQRS.pdf PDF
0537EDL.pdf PDF
18-50031-EDL-0552-UPDATE.pdf PDF
2801EDL.pdf PDF
PHSTSOW.pdf PDF
CADPADMarkingInstrApr2016.doc DOC document
3847JQRS.pdf PDF
IDCombined.pdf PDF
AirSpecAttachments.pdf PDF
0537ID.pdf PDF
IHCJHCS50031.pdf PDF
AIRSPEC50032.docx DOCX document
HRCDROGUEGYROQALI.pdf PDF
18-50031-EDL-0548-UPDATE.pdf PDF
F010528208.pdf PDF
F013193847.pdf PDF
EDL.pdf PDF
ItemDescription.pdf PDF
2801QAIR.pdf PDF
EDLCombined.pdf PDF
CDRLS.pdf PDF
GFP.pdf PDF
2CDRLS.pdf PDF
8208ID.pdf PDF
3847EDL.pdf PDF
8208EDL.pdf PDF
SOWOct152013.doc DOC document
2801ID.pdf PDF
CDRL50032.pdf PDF
CEDHarnessCartIHC.pdf PDF
8208QAIR.pdf PDF
FA821319R3012_______0002.pdf PDF
FA821319R3012_______0001.pdf PDF
FA821319R3012.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)