About this file

Air Spec

View the file

Other files

File Type Posted
ADCSOW.doc DOC document
0537QAIR.pdf PDF
ES7034.doc DOC document
AIRSPEC.docx DOCX document
3847QAIR.pdf PDF
0537JQRS.pdf PDF
0537EDL.pdf PDF
18-50031-EDL-0552-UPDATE.pdf PDF
2801EDL.pdf PDF
PHSTSOW.pdf PDF
CADPADMarkingInstrApr2016.doc DOC document
3847JQRS.pdf PDF
IDCombined.pdf PDF
AirSpecAttachments.pdf PDF
0537ID.pdf PDF
IHCJHCS50031.pdf PDF
HRCDROGUEGYROQALI.pdf PDF
18-50031-EDL-0548-UPDATE.pdf PDF
F010528208.pdf PDF
F013193847.pdf PDF
EDL.pdf PDF
ItemDescription.pdf PDF
2801QAIR.pdf PDF
EDLCombined.pdf PDF
CDRLS.pdf PDF
GFP.pdf PDF
2CDRLS.pdf PDF
8208ID.pdf PDF
3847EDL.pdf PDF
8208EDL.pdf PDF
SOWOct152013.doc DOC document
2801ID.pdf PDF
CDRL50032.pdf PDF
CEDHarnessCartIHC.pdf PDF
8208QAIR.pdf PDF
FA821319R3012_______0002.pdf PDF
FA821319R3012_______0001.pdf PDF
FA821319R3012.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIRMUNITION SPECIFICATION

FD2020-16-50032

NSN: 1377-01-128-8405ES

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with ATTACHMENT 1.

2. Department of Defense Identification Code (DODIC) __SQ21__

3. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. CDRL (DI-MISC-80043)

4. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.2., 04 Nov 2014, reference attachment.

5. Shelf Life Code marking NOT required per MIL-STD-129.

6. Hazard Classification Information:

Hazard Class/Division: 1.4 Storage Compatibility Group: S DOT Marking: Fuses, Detonating DOT Class: 1.4S DOT Label: Explosive 1.4S UN Serial No.: UN10367 UN Proper Shipping Name: Fuses, Detonating Net Explosive Weight per item (N.E.W): 0.0008 LBS (note: include unit of measurement) NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the MSDS and applicable supporting documentation.

7. Contracts involving ammunition and explosives (AE) will contain:

- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives

- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments

8. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with MIL-STD-3046. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the: COGNIZANT GOVERNMENT ENGINEER / ACO / CONTRACTOR ECPs - CDRL (DI-SESS-81880) RFVs - CDRL (DI-SESS-81883)

Distribution Statement:_B_, Reason:__Admin Only______

9. Item(s) must pass both gross and fine leak checks. MIL-STD-883, Method 1014.13 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same. Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553)

10. Lot Acceptance Test Requirements are: IAW latest Gov approved ATP (USAF)

11. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s):WAWF

CDRL: (DI-NDTI-80809)

12. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day Air Force Engineering Organization: AFLCMC/EBHJ Organization Fax/E-mail: (801)775-3062 / ( david.monk.1@us.af.mil)

13. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-81315)

14. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.

15. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html). Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The waiver shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly.

16. Percussion primers shall have been certified /recertified by performing sensitivity (all- fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2 year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item.

17. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI. Other characteristics requiring inspection or special oversight from DCMA: See attached QALI