Contractor_Questions_3.pdf

PDF 181 KB Posted

Attached to
BOMB FUZE PROTECTION ASSEMBLY Federal contract opportunity
Solicitation number
FA8213-17-R-3031
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to BOMB FUZE PROTECTION ASSEMBLY, newest first.
File Type Posted
Contractor_Questions_4.pdf PDF
dd1694-Instruction.pdf PDF
dd1692-Instruction.pdf PDF
dd1692_ECP.pdf PDF
dd1694_RFV.pdf PDF
Contractor_Questions_2.pdf PDF
FA821317R3031_______0001.RTF RTF text file
FA8213-17-R-3031_Contractor_Questions_1.pdf PDF
FA821317R3031_AirSpec.docx DOCX document
FA821317R3031_ADC_SOW.doc DOC document
FA821317R3031_ASTMD3951VendorPackagingInstructions.pdf PDF
FA821317R3031_EDL.pdf PDF
FA821317R3031_REPSHIP.doc DOC document
FA821317R3031_158.pdf PDF
FA821317R3031_L-2_TEPWorksheet.xlsx XLSX spreadsheet
FA821317R3031_L-1_past_performance_information.docx DOCX document
FA821317R3031_ES7034_Attach5.doc DOC document
FA821317R3031_Section_L.pdf PDF
FA821317R3031_TransInstruction4.pdf PDF
FA821317R3031_1653.pdf PDF
FA821317R3031_Section_M.pdf PDF
FA821317R3031_CDRLsFD2020-16-51322.pdf PDF
FA821317R3031.RTF RTF text file
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8213-17-R-3031

Questions with Responses (7)

Listed below are questions submitted by Potential Offerors and the applicable Government Response.

7. Contractor Question:

We have been getting quotes for boxes. The inner box spec says 4 ¾” square. We have asked for quotes from three different companies and have found that 5” square box is a standard. If we go with custom it will be double the cost that we will need to add into the piece price. Can we use standard size and use additional packing to make sure parts are secure?

Government Response:

A 5” square box will be sufficient. If offerors are planning to use a 5” square inner box instead of the 4 ¾” square inner box, a Request for Variance (RFV) or Engineering Change Proposal (ECP) should be submitted as part of the offerors proposal.

As a reference, blank copies of the RFV and ECP forms have been attached to FedBizOpps.