FA821224R0007_0001_Add SECTION M.pdf
PDF 1 MB Posted
- Solicitation number
- FA8212-24-R-0007
About this file
This document is an amendment to a solicitation for a 5-year, single-award, Firm Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) contract to provide F-16 Circuit Card Assemblies (NSN 5998-01-653-6192 WF) to support the U.S. Air Force (USAF) and Foreign Military Sales (FMS) requirements. The amendment changes the solicitation number from FA8212-24-Q-0010 to FA8212-24-R-0007 and extends the solicitation closing date to May 30, 2024. Key details include:
The contract consists of a First Article unit and production quantities. The First Article must be approved prior to production, which will occur in annual ordering periods over the 5-year contract period. The contract also requires a Counterfeit Prevention Plan and First Article Test Report/Plan. The solicitation is for a small business set-aside, with a Buy American requirement. Delivery will be to the USAF at Hill Air Force Base. Pricing is firm-fixed per unit, with quantity variance allowed up to 10% over or 0% under. The government will conduct origin inspection and destination acceptance.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NO.
FA8212-24-R-0007-0001
3. EFFECTIVE DATE
22 MAY 2024
4. REQUISITION/PURCHASE REQ. NO.
FD20202400219 01
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFSC PZABA
6050 GUM LANE BLDG 1215
HILL AIR FORCE BASE UT 84056-5825
BUYER: Leslie G Evans/AFSC leslie.evans.1@us.af.mil Phone: (801) 586- 3964
7. ADMINISTERED BY (If other than item 6) CODEFA8212
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA821224R0007
9B. DATED (SEE ITEM 11)
9-MAY-2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FMS REQUIREMENT
ROUTINE
Orders authorized for USAF and Foreign Military Sales (FMS). Details shall be in the individual delivery order(s).
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8212-24-R-0007-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
THE PURPOSE OF THE AMENDMENT IS TO INCORPORATE SECTION M, EVALUATION BASIS FOR
AWARD (ATTACHMENT 14).
THE SOLICITATION HAS NOT BEEN EXTENDED. ALL OTHER TERMS AND CONDITIONS REMAIN
THE SAME.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
FIRST ARTICLE
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
NSN: 5998-01-653-6192 WF
F-16 CIRCUIT CARD ASSEMBLY
15 days prior to FA shipment the Contractor shall notify the PCO (leslie.evans.1@us.af.mil) and the PM (carlos.chacon.1@us.af.mil).
Conditions for First Article (FA) Waiver: The FA may only be waived if GE AVIATION SYSTEMS (CAGE 35012) or a contractor approved by GE AVIATION SYSTEMS makes the original part with part number 187218-001.FA waiver is only authorized during the solicittion phase and before award. If the Offeror submits an FA waiver, the Offeror shall submit two (2) proposals: Bid A, with FA price and Bid B, without FA price.
Manufacturer Part Number 05924 205-4401 35012 187218-001 Priority: R Quantity Variance (Over Percent): 10 (Under Percent): 00
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B FB2029 DESTINATION
Type / Ship To PACRN Mark For B FB2029 PAB Acct 09 Type / Ship To Quantity (U/I) *ARO Contract Req No / Pri
Required Delivery
B FB2029 1 EA *20 Weeks Non-MilStrip
Proposed Delivery
B FB2029 1 EA
PRODUCTION ARTICLES
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
39 EA
NSN: 5998-01-653-6192 WF
F-16 CIRCUIT CARD ASSEMBLY
**ORDERING PERIODS** YEAR 1: 12 Aug 2024 - 11 Aug 2025; BEQ, 7EA; $U/P_______** YEAR 2: 12 Aug 2025 - 11 Aug 2026;
BEQ, 8EA; $U/P______ ** YEAR 3: 12 Aug 2026 - 11 Aug 2027; BEQ, 8EA; $U/P_____ ** YEAR 4: 12 Aug 2027 - 11 Aug 2028;
BEQ, 8EA; $U/P____ ** YEAR 5: 12 Aug 2028 - 11 Aug 2029; BEQ 8EA; $U/P_______ Manufacturer Part Number 05924 205-4401 35012 187218-001 Priority: R Quantity Variance (Over Percent): 10 (Under Percent): 00
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: COMBO REPORT Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGIN
Type / Ship To PACRN Mark For A SW3210 PAB Acct 09 Type / Ship To Quantity (U/I) *ARO Approval of
First Article Req No / Pri
Required Delivery
A SW3210 39 EA *6 Weeks
Proposed Delivery
A SW3210 39 EA
EXHIBIT A001: CDRL COUNTERFEIT PREVENTION PLAN
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Data Counterfeit Protection Plan Priority: R
EXHIBIT A001: CDRL COUNTERFEIT PREVENTION PLAN
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: COMBO REPORT Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ CNOTE DESTINATION
Type / Ship To Quantity (U/I) IAW DD 1423-1 Req No / Pri
Required Delivery
+ CNOTE 1 LO IAW DD 1423-1
Proposed Delivery
+ CNOTE 1 LO
IAW DD 1423-1
EXHIBIT B001: CDRL FIRST ARTICLE TEST REPORT
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Data Counterfeit Protection Plan Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ CNOTE DESTINATION
Type / Ship To Quantity (U/I) IAW DD 1423-1 Req No / Pri
Required Delivery
+ CNOTE 1 LO IAW DD 1423-1
Proposed Delivery
EXHIBIT B001: CDRL FIRST ARTICLE TEST REPORT
+ CNOTE 1 LO
IAW DD 1423-1
EXHIBIT C001: CDRL FIRST ARTICLE TEST PLAN & PROCEDURES
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Data Counterfeit Protection Plan Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: COMBO REPORT Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ CNOTE DESTINATION
Type / Ship To Quantity (U/I) IAW DD 1423-1 Req No / Pri
Required Delivery
+ CNOTE 1 LO IAW DD 1423-1
Proposed Delivery
+ CNOTE 1 LO
IAW DD 1423-1
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + CNOTE
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A SW3210
DLA DISTRIBUTION DEPOT HILL
7537 WARDLEIGH RD BLDG 849W
CML 385 519 8898
HILL AFB UT 84056-5734
HILL AFB UT 84056-5734 49 84056-5734
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: B FB2029
809 MXSS/MXDEB
BLDG 849 ATTN: NON-ACCOUNTABLE BAY
(DEAR JOHN BAY)
TRANSPORTATION OFFICE
HILL AIR FORCE BASE UT 84056-5713
UNITED STATES
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
IAW DD 1423-1
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.302)
(Applicable for supplies, services furnishing of supplies, fixed-price and exceeds the simplified acquisition threshold)
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
(IAW FAR 46.316)
(Applicable to the furnishing of supplies, services involving the furnishing of supplies, or research and development, when a fixed-price contract is contemplated and the contract amount is expected to exceed the simplified acquisition threshold)
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503)
(Applicable to all orders issued hereunder)
Government Contract Quality Assurance Inspection and Acceptance will be at (Final):
[CONTRACTOR FILL-IN]
Item No(s): See schedule for items with the following code(s) listed below :
Inspection Code and Address:
Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).
Item No(s): 0003, 0005
PART I - THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.211-16 VARIATION IN QUANTITY (APR 1984)
(IAW FAR 11.703(a))
(b) The permissible variation shall be limited to:
Percent increase (See individual line item(s)) Percent decrease (See individual line item(s)) This increase or decrease shall apply to (See individual line item(s)).
(Applicable when a variation in quantity is authorized)
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
(IAW FAR 11.703(b))
(Applicable when fixed-price supplies are furnished)
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1))
(Applicable for supplies, services, or research and development)
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
(IAW FAR 42.1305(c))
(Applicable to fixed-price for supplies other than commercial or modified-commercial items)
52.247-29 F.O.B. ORIGIN (FEB 2006)
(IAW FAR 47.303-1(c))
(Applicable when specifying f.o.b. origin)
52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)
(IAW FAR 47.303-2(c))
(Applicable to f.o.b. origin at contractor's facility)
52.247-34 F.O.B. DESTINATION (NOV 1991)
(IAW FAR 47.303-6(c))
(Applicable when delivery term is f.o.b. destination)
52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT (FEB 1999)
(IAW FAR 47.305-4(c))
Applicable Item No(s) 0001 0003 0004 0005
(Applicable when f.o.b. destination but inspection and acceptance will be at origin)
52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)
(IAW FAR 47.303-17(f))
(Applicable when specifying f.o.b. origin)
F.O.B. ORIGIN (OCT 1993)
(IAW FAR 47.305(b))
Any supply item applicable to this document shall be delivered F.O.B. at:
F.O.B. Address
[CONTRACTOR FILL-IN]
(Applicable when delivery term is f.o.b. origin)
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
(Contracting Officer: Insert applicable document type(s).
Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC Inspect By DoDAAC Ship To Code Ship From Code Mark For Code Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.
timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(Applicable in solicitations and contracts or task or delivery orders, including solicitations and contracts using FAR part 12 procedures for the acquisition of commercial items, when 252.232-7003 is used and none of the exceptions at 232.7002(b)(1) apply. See PGI 232.7004 for instructions on completing the clause)
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(JUN 2020)
(IAW FAR 3.808(b))
(Applicable over $150,000)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
(IAW FAR 3.909-3 (b))
(Applicable in all solicitations and resultant contracts other than personal services contracts with individuals)
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))
(Applicable to all solicitations and contracts)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(DEC 2022)
(IAW DFARS 203.970)
(Applicable to all solicitations and contracts)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
(IAW FAR 4.1403(a))
(Applicable over $30,000, unless not required to be reported in FPDS)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
(IAW FAR 4.1105(b))
(Applicable to solicitations that contain the provision at 52.204-7, and resulting contracts)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
(IAW FAR 4.1804(c), FAR 12.301(d))
(Applicable when there is a requirement to be registered in SAM or to have a DUNS Number)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
(DEC 2014)
(IAW FAR 4.1202(b))
(Applicable to all solicitations and contracts)
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(NOV 2021)
(IAW FAR 4.1903)
(Applicable to all solicitations and contracts, except COTs, when a contractor’s system may contain Federal contract information)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)
(IAW FAR 4.2004)
(Applicable in all contracts and solicitations)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
(IAW 4.2105(b))
52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)
(IAW FAR 4.2203)
(Applicable in all solicitations and contracts, unless an exception is granted in accordance with OMB Memorandum M-23-13)
52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION
(DEC 2023)
(IAW FAR 4.2306(c))
Applicable in solicitations and contracts if the conditions specified at 4.2304(a)(1) apply, except for Federal Supply Schedules, Governmentwide acquisition contracts, and multi-agency contracts.
252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)
(IAW DFARS 204.404-70(a))
(Applicable when the contractor will have access to or generate unclassified information that may be sensitive and inappropriate for release to the public)
252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED (APR 2020)
(IAW DFARS 204.7109(a))
(Applicable to all not separately priced subline items)
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b))
(Applicable to all orders issued hereunder)
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING (JAN 2023)
(IAW DFARS 204.7304(c))
(Applicable to all solicitations and contracts, including commercial except when solely for commercial-off-the-shelf items)
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (JAN 2023)
(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))
(Applicable to solicitations and contracts that involve litigation support services when 252.204-7014 is not included)
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)
(IAW DFARS 204.2105(c))
(Applicable to all solicitations.)
252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)
(IAW DFARS 204.7304(e))
(Applicable in all solicitations and contracts, task orders, or delivery orders, including those using FAR part 12 procedures for the acquisition of commercial items, except for those that are solely for the acquisition of COTS items)
252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)
(IAW DFARS 204.804-70)
(Applicable in solicitations and contracts when the contracting officer intends to expedite contract closeout through the mutual waiver of entitlement to a residual dollar amount of $1,000 or less determined at the time of contract closeout)
52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)
(IAW FAR 9.206-2)
(b)
Item No Agency Name/Address
0001 DEPARTMENT OF THE AIR FORCE
AFSC PZABA
6050 GUM LANE BLDG 1215
HILL AIR FORCE BASE, UT 84056-5825
(801) 888-4549 leslie.evans.1@us.af.mil
0002 DEPARTMENT OF THE AIR FORCE
AFSC PZABA
6050 GUM LANE BLDG 1215
HILL AIR FORCE BASE, UT 84056-5825
(801) 888-4549 leslie.evans.1@us.af.mil
(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.
Offeror's Name _____________________________
Manufacturer's Name ________________________
Source's Name _____________________________
Item Name _________________________________
Service Identification _________________________
Test Number _______________________________ (to the extent known)
(Applicable when the acquisition is subject to a qualification requirement)
52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)
(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))
(a) The Contractor shall deliver ** units(s) of Lot/Item * within *** calendar days from the date of this contract to the Government at **** for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
First Article Item **Quantity ***Calendar Days ****Type/Location
1EA 140 B FB2029
(b) Within ** calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.
A notice of disapproval shall cite reasons for the disapproval.
*Lot/Item **Approval Days ELIN No.
0001 120 0004
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor—
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(The above Clause/Provision has been modified.)
(Applicable when fixed-price or cost-reimbursement, first article approval is required and the Government will be responsible for conducting the first article test)
52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING -- ALTERNATE I (JAN 1997)
(IAW FAR 9.308-2(a)(2), FAR 9.308-2(b)(2))
(Applicable when the contractor is required to produce the first article and the production quantity at the same facility)
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(NOV 2021)
(IAW FAR 9.409)
(Applicable when exceeding $35,000)
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(NOV 2015)
(IAW FAR 9.108-5(b))
(Applicable to all solicitations and contracts for the acquisition of products and services (including construction) unless waived
IAW FAR 9.108-4)
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM
(MAY 2019)
(IAW DFARS 209.409)
(Applicable to solicitations and contracts with a value of $150,000 or more)
52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
(IAW FAR 11.304)
(Applicable to supplies that are not commercial items)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
(IAW FAR 11.604(b))
This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
(Applicable to all rated orders)
52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN
COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES) (DEC 2023)
(IAW FAR 13.302-5(d))
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L.
117-328), unless the agency grants an exception - see paragraph (b) of 52.204-27.
(v) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
(vi) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(vii) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).
(viii) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(ix) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).
(x) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(xi) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (Apr 1984).
(ii) 52.232-8, Discounts for Prompt Payment (Feb 2002).
(iii) 52.232-11, Extras (Apr 1984).
(iv) 52.232-25, Prompt Payment (Jan 2017).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (Jun 2013).
(vi) 52.233-1, Disputes (May 2014).
(vii) 52.244-6, Subcontracts for Commercial Products and Commercial Services (Jun 2023).
(viii) 52.253-1, Computer Generated Forms (Jan 1991).
(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).
(ii) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2022) (E.O. 13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in FAR 2.101 on the date of award of this contract).
(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment (JUN 2020) (41 U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).
(iv) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(v) 52.222-36, Equal Employment for Workers with Disabilities (JUN 2020) (29 U.S.C. 793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, “United States” includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)
(vi) 52.222-37, Employment Reports on Veterans (JUN 2020)(38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(vii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).
(viii)(A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).
(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).
(ix) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (Applies when 52.222–6 or 52.222–41 are in the contract and performance in whole or in part is in the United States (the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, et seq.))).
(x) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))
(xi) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O. 13423) (Applies to services performed on Federal facilities).
(xii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).
(xiii) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).
(xiv) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR® Program or Federal Energy Management Program (FEMP) will be—
(A) Delivered;
(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;
(C) Furnished by the Contractor for use by the Government; or
(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).
(xv) 52.223-20, Aerosols (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).
(xvi) 52.223-21, Foams (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.
(xvii) 52.225-1, Buy American—Supplies (NOV 2021) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold, as defined in FAR 2.101 on the date of award of this contract, and the acquisition—
(A) Is set aside for small business concerns; or
(B) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $25,000).
(xviii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792) (Applies to contracts greater than the threshold specified in FAR 26.404 on the date of award of this contract, that provide for the provision, the service, or the sale of food in the United States).
(xix) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) as its source of EFT information).
(xx) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL 2013) (Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information.)
(xxi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) (46 U.S.C. 55305) (Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d).)
(2) Listed below are additional clauses that may apply:
(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (NOV 2021) (Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system).
(ii) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (Applies to contracts over the threshold specified in FAR 9.405-2(b) on the date of award of this contract).
(iii) 52.211-17, Delivery of Excess Quantities (SEP 1989) (Applies to fixed-price supplies).
(iv) 52.247-29, F.o.b. Origin (FEB 2006) (Applies to supplies if delivery is f.o.b. origin).
(v) 52.247-34, F.o.b. Destination (NOV 1991) (Applies to supplies if delivery is f.o.b. destination).
(c) FAR 52.252-2, Clauses Incorporated by Reference (FEB 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/dfars https://www.acquisition.gov/affars
(d) Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. The Government must exercise its postacceptance rights—
(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(e) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence, such as acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(f) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges that the Contractor can demonstrate to the satisfaction of the Government, using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.
(g) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(h) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN
COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES) (DEC 2023)
(IAW FAR 13.302-5(d))
52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
(IAW FAR 15.209(h))
(Applicable when using uniform contract format that is not commercial or for construction)
52.216-18 ORDERING (AUG 2020)
(IAW FAR 16.506(a))
(a) Such orders may be issued from 12-AUG-2024 through 11-AUG-2029.
(Applicable to all orders issued hereunder)
52.216-19 ORDER LIMITATIONS (OCT 1995)
(IAW FAR 16.506(b))
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than quantity of 5, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor--
(1) Any order for a single item in excess of $ 250,000.00;
(2) Any order for a combination of items in excess of $ 250,000.00; or
(3) A series of orders from the same ordering office within 10 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(Applicable to all orders issued hereunder)
52.216-22 INDEFINITE QUANTITY (OCT 1995)
(IAW FAR 16.506(e))
(d) Contractor shall not be required to make any deliveries under this contract after 11-AUG-2030 .
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2023)
(IAW FAR 19.309(c))
(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.
(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]
(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) and through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]
(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.
(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.
(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and
(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture.
[The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _________________________________________.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.
[Contractor to sign and date and insert authorized signer’s name and title.]
(Applicable in solicitations and contracts exceeding the micro-purchase threshold when the contract will be performed in the United States or its outlying areas)
52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (NOV 2023)
(IAW FAR 22.1505(b))
(Applicable when the acquisition of supplies are expected to exceed the micro-purchase thresholds).
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
(IAW FAR 22.810(a)(1))
(Applicable when exceeding $10,000, except those exempted by FAR 22.807 (b) which includes those for work to be performed outside the U.S. by employees who were not recruited within the U.S.)
52.222-26 EQUAL OPPORTUNITY (SEP 2016)
(IAW FAR 22.810(e))
(Applicable to all orders issued hereunder)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))
(Applicable when the expected value is $150,000 or more except when work is performed outside the United States by employees recruited outside the United States or the Director, Office of Federal Contract Compliance Programs, has waived, in accordance with 22.1305(b), all of the terms of the clause)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
(IAW FAR 22.1408(a))
(Applicable over $15,000 except when performance of work and recruitment of workers will occur outside the United States, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island, or the agency head has waived, in accordance with 22.1403(a) or 22.1403(b) all the terms of the clause)
52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
(IAW FAR 22.1310(b))
(Applicable when the expected value is $150,000 or more and workers were recruited within the United States)
52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)
(IAW FAR 22.1705(a)(1))
(Applicable to all orders issued hereunder)
52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
(IAW FAR 23.505)
(Applicable when the simplified acquisition threshold is exceeded except if performance is entirely outside the U.S. and its outlying areas)
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING (JUN 2020)
(IAW FAR 23.1105)
(Applicable to all solicitations and contracts)
252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JAN 2023)
(IAW DFARS 223.7306, DFARS 212.301(f)(xxi))
(Applicable to solicitations and contracts for supplies, maintenance and repair services, or construction)
252.223-7009 PROHIBITION OF PROCUREMENT OF FLUORINATED AQUEOUS FILM-FORMING
FOAM FIRE-FIGHTING AGENT FOR USE ON MILITARY INSTALLATIONS (OCT 2023)
(IAW DFARS 223.7404)
5352.223-9000 ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS)
(JUN 2023)
(IAW DAFFARS 5323.804-90)
(Applicable to all orders issued hereunder)
52.224-3 PRIVACY TRAINING (JAN 2017)
(IAW FAR 24.302(a))
(Applicable to all solicitations and contracts where contractor employees will have access to a system of records or personally identifiable information)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
(IAW FAR 25.1103(a))
(Applicable to supplies or services involving the furnishing of supplies unless an exception applies)
252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (JAN 2023)
(IAW DFARS 225.1101(2)(i) and (2)(ii))
(Applicable except when an exception to the Buy American statute or Balance of Payments Program is known to apply, or if using the clause at 252.225-7021, Trade Agreements; or 252.225-7036, Buy American —Free Trade Agreements—Balance of Payments Program)
252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (MAR 2022)
(IAW DFARS 225.1101(3))
(Applicable if one of the following clauses are included: DFARS 252.225-7001, 252.225-7021 or 252.225-7036)
252.225-7013 DUTY-FREE ENTRY (NOV 2023)
(IAW DFARS 225.1101(4))
(Applicable to DFARS 225.1101(4) Use the clause at 252.225-7013, Duty Free Entry, instead of the clause at FAR 52.225-8. Do not use the clause for acquisitions of supplies that will not enter the customs territory of the United States.)
252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)
(IAW DFARS 225.7901-4)
(Applicable to all solicitations and contracts)
252.225-7061 RESTRICTION ON THE ACQUISITION OF PERSONAL PROTECTIVE EQUIPMENT
AND CERTAIN OTHER ITEMS FROM NON-ALLIED FOREIGN NATIONS (JAN 2023)
(IAW DFARS 225.7023-4)
(Applicable in solicitations and contracts that are for the acquisition of covered items, for use within the United States, and have an estimated value greater than $150,000)
252.225-7972 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT
SYSTEMS (DEVIATION 2020-O0015) (MAY 2020)
(IAW Deviation 2020-O0015)
(Applicable in solicitations and contracts, including solicitations and contracts using FAR part 12 procedures for the acquisition of commercial items, unless—
(a) The acquisition is for—
(1) Counter-unmanned aircraft system surrogate testing and training; or
(2) Intelligence, electronic warfare, and information warfare operations, texting, analysis, and training; or
(b) A waiver has been granted by the Secretary of Defense in accordance with section 848 of the National Defense Authorization Act for Fiscal Year 2020 (Pub. L. 116-92).)
52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)
(IAW FAR 27.201-2(a)(1))
(Applicable except when both complete performance and delivery are outside the United States)
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT
(JUN 2020)
(IAW FAR 27.201-2(b))
252.227-7013 RIGHTS IN TECHNICAL DATA-OTHER THAN COMMERCIAL PRODUCTS AND
COMM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .