This document provides answers to industry questions regarding a draft request for proposal for the ICBM Ground Subsystem Support Contract 2.0 opportunity. The answers clarify that subfactors two through six under the technical factor will each receive individual ratings rather than being combined, and that proposed labor rates should be mapped to the government's predefined labor categories. When multiple contractor categories map to one government category, an evaluation methodology is defined. The document also updates budget tables and statements of work to reflect scope changes and normal sustainment levels for the opportunity.

Answers to Industry Questions

View the file

Other files for this federal contract opportunity

Other files attached to ICBM Ground Subsystem Support Contract (GSSC) 2. 0, newest first.
File Type Posted
Attachment_6_GSSC_2.0_Section_M_03272019.pdf PDF
Attach_14_TEP_Workbook.xlsx XLSX spreadsheet
Synopsis_for_Ground_Subsystem_Support_Contract.docx DOCX document
Attach_5_Pricing_Matrix.xlsx XLSX spreadsheet
Attach_2g_ALCS_Sustainment_GRID.docx DOCX document
Attach_7_Government_Labor_Category_Description.docx DOCX document
Attach_13_Section_M.pdf PDF
GSSC_2.0_Answers_to_Industry_Questions.docx DOCX document
Attach_2c_HAC_RMPE_CLS_GRID.docx DOCX document
Attach_6_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attach_11_DD_254.pdf PDF
Attach_9_Labor_Hours_Summary.xlsx XLSX spreadsheet
Attach_2d_Trainers_CLS_GRID.docx DOCX document
Attach_3b_ALCS_GFP_List.xlsx XLSX spreadsheet
Attach_8_Offeror_Labor_Category_Description_and_Mapping.xlsx XLSX spreadsheet
Attach_10_Labor_Rate_Matrix.xlsx XLSX spreadsheet
Attach_2b_IOSSP_Sustainment_GRID.docx DOCX document
Attach_14_TEP_Workbook.xlsx XLSX spreadsheet
Exhibit_A_CDRL_Package.pdf PDF
Industry_Day_3_Schedule_and_Instructions.pdf PDF
GSSC_2.0_Section_L_18Jan19.pdf PDF
DRAFT_FA820419R0001_11212018.pdf PDF
Attach_14_TEP_Matrix.xlsx XLSX spreadsheet
GSSC_2_Summary_of_Changes.pdf PDF
Attach_5_Pricing_Matrix.xlsx XLSX spreadsheet
Attach_8_Offeror_Labor_Category_Description_and_Mapping.xlsx XLSX spreadsheet
GSSC_2.0_Industry_Day_2_Schedule.pdf PDF
Attach_2d_Codes_CLS_GRID.docx DOCX document
Attach_13_Section_M.pdf PDF
Attach_4_Award_Fee_Plan.docx DOCX document
Exhibit_A_CDRL_Package.docx DOCX document
Attach_3b_SerializedGFP.pdf PDF
RFI_5_Questions.docx DOCX document
Attach_12_Section_L.pdf PDF
Attach_X_WBS.xlsx XLSX spreadsheet
Attach_2g_SACCS_CLS_GRID.docx DOCX document
Attach_2c_HAC_RMPE_CLS_GRID.docx DOCX document
Attach_1_Performance_Work_Statement.pdf PDF
Attach_11_DD254.pdf PDF
GSSC_2.0_Draft_Solicitation_FA8204-19-R-0001.pdf PDF
Attach_9_Labor_Hours_Summary.xlsx XLSX spreadsheet
Attach_14_TEP_Matrix.xlsx XLSX spreadsheet
Attach_2f_GMATS_CLS_GRID.docx DOCX document
Industry_Day_2_Schedule_and_Instructions.docx DOCX document
Attach_5_Pricing_Matrix.xlsx XLSX spreadsheet
Attach_2a_General_Sustainment_GRID.docx DOCX document
Attach_3a_NonSerializedGFP.pdf PDF
Attach_10_Labor_Rate_Matrix.xlsx XLSX spreadsheet
Attach_8_Offeror_Labor_Category_Description_and_Mapping.xlsx XLSX spreadsheet
Attach_2b_IOSSP_Sustainment_GRID.docx DOCX document
Show all 50

ICBM Ground Subsystem Support Contract (GSSC) 2. 0 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSSC 2.0

Answers to Industry Questions to Draft RFP #4 Posted 7 March 2019

1) H.004 – Labor Rate Adjustment Clause – If, after the contractor submitted its actual and projected cost data as required in the clause, the projected cost data is outside 5% of the Labor Rate Matrix on contract, the Government would make a determination on whether making an adjustment to the rate(s) in question would be in the best interest of the Government. If it is determined in the Government’s best interest, the Government would perform a fair and reasonable analysis of the proposed updated rates and provide a negotiation position to the contractor. These negotiated rates are what would then be incorporated into the contract in the form of an updated Labor Rate Matrix.

2) The General Sustainment budget in Table 1 of Section L is based on the past 15 plus years of actuals and was not updated for this draft.

3) The GMATS budget in Table 1 of Section L was updated to reflect a normal level of sustainment for years 1 through 3. The increase in years 4 through 6 reflects possible tech refresh efforts and the remaining years reflect a return to normal sustainment activities.

4) Some of the scope that was in the Codes PWS was moved to the IOSSP PWS. The rest of the work that was in the Codes PWS is within scope of General Sustainment. The IOSSP budget in Table 1 of Section L has been updated to include the incorporated Codes scope of work.

5) Subfactors two-six will not be rolled up into a combined rating. Subfactor one is significantly more important than subfactors two-six. Subfactors two-six will receive their own individual adjectival and risk rating. Subfactor two-six ratings are approximately equal in importance in relation to each other.

6) Section L, paragraph 3.9.5 – Direct Labor & Indirect Labor Rates, has been updated to provide instructions to offerors if an FPRA has not been negotiated with the ACO by the time of proposal submittal.

7) Per Section L, paragraph 3.10.1, it is the offeror's responsibility to map proposed labor categories in Section J, Attachment 8 to the Government defined labor categories provided in Section J, Attachment 7. The Government will use the rate of the offeror's labor category that is mapped to the Government's defined labor category when applying to notional hours. If multiple offeror labor categories are mapped to a single Government-defined labor category, the methodology as described in Section M, Paragraph 3.7.2 will be used. The “etc.” in instruction #6 of the Direct Labor Rates Tab in the TEP Matrix Section, J Attachment 14 includes any projected rates from the company’s cost estimating system.

8) Section M, Paragraph 3.7.2 has been updated to clarify that notional hours will be applied to both the offeror’s and/or subcontractor rates.

File details come from the government source that posted it. Updated .