This document is a request for proposal for multiple award construction contract services at Hill Air Force Base in Utah. The solicitation seeks to establish an indefinite-delivery, indefinite-quantity contract covering general construction disciplines to be managed by the 75th Civil Engineering Group at Hill Air Force Base and Utah Air National Guard Base. Task orders will define specific project requirements and may include locations such as remote sites in Wyoming, Utah, and Carter Creek, Utah. Responses are due no later than January 7, 2021 at 2:00 PM MST. A bidder's library of accompanying attachments is available upon request. Questions are due by December 11, 2020 and government responses will be posted on approximately December 18, 2020. Points of contact are provided for contracting specialists and the contracting officer.
View the file
Other files for this federal contract opportunity
Show all 50
Hill AFB Multiple Award Construction Contract (MACC IV) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basic SOW
| MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-21-R-0001 - Nov 2020 | ||||
| Question # | Reference | Discussion | Question/Comment | Government Response |
| 1 | 1.5.1.2. | PM Responsibilities | This paragraph does not indicate if the PM is required to be on site. Can this function be completed with off site resources? | See response to Question 1 in the Basic SOW tab of the Q&As posted on 18 Dec 2020. |
| 2 | Staging Area | Will a project specific staging area be identiried for the seed project? | See response to Question 239 in the Sample Project SOW tab of the Q&As posted on 12 Jan 2021. | |
| 3 | Attachment 5 para 2.2.13 & 2.2.14 | The Sample SOW has required work for Bay 11 and Bay 12 that does not include the removal and relocation of storate racks. Upon the site visit it was apparant that that these bays have substantial xray storage racks full of films. The SOW calls for storage for bays 14,15,16. | Is the contractor expected to provide storage for bays 11,12,14,15,16? | See response to Question 240 in the Sample Project SOW tab of the Q&As posted on 12 Jan 2021. |
| 4 | Site Walk | Most open bays have existing roof insulation some of which is saging. | What is the requirement to provide insulation at the ceilings of open bays? | See response to Question 241 in the Sample Project SOW tab of the Q&As posted on 12 Jan 2021. |
| 5 | Attachment 5 para 2.2.2 | All bays shall have insulation and new 5/8” gypsum board, type X installed over the insulation. | What type of furring (thickness) and insulation (R value) is required at interior walls? | See response to Question 204 in the Sample Task Order SOW tab in the Q&As posted on 18 Dec 2020. |
| 6 | Attachment 5 para 2.2.2 | All bays shall have insulation and new 5/8” gypsum board, type X installed over the insulation. | Will the GWB extend to the roof? Will the sloped ceilings require a hard lid finish? | See response to Question 242 in the Sample Project SOW tab of the Q&As posted on 12 Jan 2021. |
| 7 | Site Visit Roster | Due to limited access, we request a list of site visit attendees that can assist in scope and pricing | Can the site visit attendee list be posted to assist in proposal development? | See response to Question 16 in the Draft Solicitation tab of the Q&As posted on 11 Dec 2020. |
| 8 | Attachment 5 para 2.2.1 | The clerestory glazing shall be removed and infilled with wood construction. | Is the clerestory identical on the west side of the building? This was not observable at the job walk and no photos of that area are shown. | See response to Question 243 in the Sample Project SOW tab of the Q&As posted on 12 Jan 2021 |
| 9 | Attachment 5 para 2.2.4 & 2.2.5 | Except for the repairs to the earthen roof between Bay 1 and Bay 2, no other roof work is noted for Bays 2 & 3. | Is there any roofing work required for Bays 2 & 3 except as noted? | See response to Question 244 in the Sample Project SOW tab of the Q&As posted on 12 Jan 2021. |
| 10 | Attachment 5 para 2.2.1 | install a new standing seam roof on the lower structure and clerestory area which matches the existing roof. | The upper roof represents only about 25% of the entire standing seam roof. Would it be in the best interest of the government to replace the upper roof as well and start a new material & warranty period on all of the metal? | See response to Question 245 in the Sample Project SOW tab of the Q&As posted on 12 Jan 2021. |
| 18 | Appendix's 34 - 39 | These are the listed Wage Decisions for the MACC IV contract and affect the pricing structure for administrative and construction efforts. There is a requirement to perform multiple award construction contract for Hill AFB, tenant units, and UTANG. | ||
| What is the percentage of projects to be performed outside the Hill AFB and at the other locations? | The percentage of projects performed in different areas outside of Hill AFB is variable. |
In the past over 90% of projects have been on Hill AFB; however, this could change in the future depending on construction needs of Hill AFB, it's tenant units, and the UTANG.
Section L
| MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-21-R-0001 - Jan 2021 | ||||
| Question # | Reference | Discussion | Question/Comment | Government Response |
| 1 | Section L - pg. 18 Volume III, Factor 3: Past Performance |
Section M - pg. 15 Volume III, Factor 3: Past Perfromance
Q&A Response 18 Dec 2020 / Section L - Question 24 The Past Performance Volume shall contain past performance information in accordance with the format contained in Section L, Appendix A, Past Performance Questionnaire. The Offeror’s submission is limited to a maximum of three (3) contracts, if available, for Offeror, and three (3) contracts, if available, for any joint venture members.
The Past Performance Evaluation considers each Offeror’s demonstrated recent and relevant record of performance (maximum of three (3) contracts, if available, for Offeror, and three (3) contracts, if available, for any joint venture members) in supplying construction services that meet the contract’s requirements.
| Offerors shall provide three (3) contracts for their company, three (3) for their joint venture partner, and three (3) for their A-E partner for a total of nine (0) contracts. | Will this be contractor/joint venture/A-E's choice to submit up to 3 or is it now required to submit 3? | This is a requirement and is not optional. | |||
| 2 | Q&A Response 18 Dec 2020 / Section L - Question44 | Section L 1.1, 1.3.1, and Table 1 will be updated to reflect that electronic copies must be sent via DoD Safe safe.apps.mil, and that paper copies must be received by the Contracting Officer no later than five (5) business days after the proposal due date. | Will we be provided the recipient code to upload through DoD Safe? | Guidance on how to submit proposals has been included in the updated Section L document, Attachment 02 - MACC IV Section L Rev 02 - 13 Jan 2021 posted on 20 Jan 2021. | |
| 3 | Amendments | a. Will the documents provided on 12/18/20 be incorporated into an official Amendment to the solicitation? | |||
| b. Will any future Q&A responses or documents be provided as official Amendment? | No. The documents posted on 18 Dec 2020 were the Site Visit sign in sheets and Q&A responses. Any of the solicitation attachments noted in the Q&As as needing to be updated, will be updated and posted in a solicitation amendment. |
The Q&A responses will not be incorporated by amendment however, the responses may be relied on for proposal creation. Any updates to solicitation attachments will be.
4 3.3.2 3.3.2 Subfactor 2: Architect-Engineer (A-E) Qualifications (b) A-E Qualifications shall be submitted on Standard Form (SF) 330, Section L Appendix D, for each discipline: Architectural, Civil, Structural, Electrical, Geotechnical, Mechanical, and Fire Protection Engineering. A minimum of 5 years of experience as a licensed Professional is required for the Fire Protection Engineer, and a minimum of 15 years of experience as a licensed Professional is required for all other disciplines. SF330, Section F information shall be completed and formatted IAW Section L, Appendix C, and not entered into the form. A previous answer to what sections of the SF330 need to be included indicated that all sections of the SF 330 need to be filled out EXCEPT SECTION F since the project experience will be covered in 3.3.2 a, c, and d. However, SF330 FORM SECTION G KEY PERSONNEL is directly tied to projects of SECTION F. Should this section be omitted as well? The requirement will be updated in Section L 3.3.2.b. SF 330 Sections F and G are not required to be filled in.
"SF330, Sections F and G shall not be filled in. Instead, the relevant information shall be completed and formatted IAW Section L, Appendix C., and not entered into the form."
| 5 | Section L - Appendix C | ||||
| Multiple Govt. Response provided on the Q&A Response 12 Dec 2020 stated an updated Appenix C will be updated to provide more detail on what the Offerors ne to submit for example projects. | Will and updated Section L, Appendix C be provided? | Yes. It was posted on 20 Jan 2021. | |||
| 6 | Section L - Volum IV: Contract Documents | SF30's | Are SF30's required to be provided in Volume IV: Contract Documents? | Yes. As directed in Section M 6.0. Section L 5.1 and Section M 6.0 have been updated to make this clear. | |
| 7 | Section L 4.2 askes for the organizational structure change history. | If we are submitting a proposal as a joint venture, does the government want this information about the joint venture or about each member? | About each member. | ||
| 8 | Also the Q&A mentions that revised contract documents would be posted and I have not seen those yet. Is the plan still to post a new revised set of documents that have been changed? | Yes. The updated documents were posted on 20 Jan 2021. | |||
| 9 | In the Q&A issued on 11 December 2020, Tab “Section L,” Question #10, the government responded that TCIR/DART information for 2020 should be submitted with the proposal; however, the OSHA 300A forms are not due to OSHA until February. Many companies are still working to gather and consolidate applicable data. Please confirm that we will NOT be required to provide TCIR/DART information for 2020 with our proposal. | Yes. TCIR/DART information for 2020 will not be required in Offeror's proposals. |
This response supersedes the response issued on 11 Dec 2020.
| 10 | In the Q&A issued on 18 December 2020, Tab “Section L,” Question # 23 asked if IDIQ contracts could be submitted in Volume III, Factor 3: Past Performance. Based on the government response that “contract refers to any contracted project that is similar in scope and complexity to the technical requirements and is active or completed within the past five (5) years from the issuance date of this solicitation,” please confirm that an IDIQ type contract that meets the above criteria will be accepted for evaluation. | Yes. However, without seeing the actual example the Government cannot state with certainty that it will be acceptable. The Past Performance Evaluation Team will evaluate the past performance, and if they determine the past performance is not relevant, it will be documented | ||
| 11 | Revised Section L - Pg 19 - Para 5.1.1 | Proposal Volume IV: Contract Documentation - Section A | Instructions dictate to include a hard copy of completed SF1442 but no hard copies are requried for Volume IV (only CDs). Please clarify. |
If hard copies of the SF1442 are required with Volume IV CDs, are hard copies of the completed SF30 for each amendment also required? The requirement for hard copies has been removed.
Only electronic copies of the SF1442 and any issued amendments (SF30) must be submitted.
| 12 | Revised Section L - Pg 11 - Para 2.6 | Proposal Volume I: Price - Accounting System | Instructions dictate "Small Business' are not requried to be CAS compliant; however the offeror must have an accounting system adequate for determining cost applicable to the contract." Please clarify what type of deliverable, if any, is requred to comply with this paragraph. | The Accounting System paragraph, Section L 2.6, has been removed. There are no requirements the Offeror's need to meet for an accounting system. |
| 13 | Beta Sam Posting 12/18/2020 | No SF30 was provided for documents posted to Beta.Sam on 12/18/2020. Will an offical amendment be issued incorporating those documents? | See response to Question 3 above. | |
| 14 | Attachment 2, |
Section L, 4.1 General, pg 18 of 30
18-Dec-20, QandA Matrix, #24 Each Offeror shall submit a Past Performance Volume with its proposal... The Past Performance Volume shall contain past performance information in accordance with the format contained in Section L, Appendix A, Past Performance Questionnaire. The Offeror’s submission is limited to a maximum of three (3) contracts, if available, for Offeror, and three (3) contracts, if available, for any joint venture members.
#24 states “Offerors shall provide three (3) contracts for their company, three (3) for their joint venture partner, and three (3) for their A-E partner for a total of nine (9) contracts.” If the Offeror is a Joint Venture (consisting of two construction companies) which has completed many successful JV task order projects, does the govt. require the past performance submissions to consist of projects performed by each of the JV members individually? (As stated in #24) Or is it preferable/acceptable to submit past performance by the JV, if available? Or is a combination of past performance from individual joint venture members, as well as from the JV itself, acceptable for the 6 past performance projects? (As stated in Attach. 2, Sec. L, 4.1) (It is understood the A-E firm will provide the remaining 3 past performance projects.) Offerors are to turn in 3 past performance examples per team member for Past Performance information in Volume III for each individual JV member as well as the JV, and the A-E firm.
For example: JV AA-BB would turn in 3 past projects (if available) for AA, 3 past projects (if available) for BB, 3 past projects (if available) for AA-BB, and 3 past projects (if available) for their A-E team members
For the technical volume, the past example projects may be from the individual JV members as well as the JV.
15 Attachment 2, Section L, 1.1 General pg 4 of 30
| 18-Dec-20, QandA Matrix, #24 | ...Offerors are requested to submit Volume III Past Performance Information, so that it is received ten (10) calendar days prior to the required due date for proposals. Failure to submit Volume III by the earlier date will not result in Offeror disqualification. | The answer to #10 in the 18Dec20 QandA Matrix states that Section L 4.1 and Section M 5.0 will be updated to reflect that Past Performance is required for the A-E partner. As no revised documents have been posted as of 01/05/21 and the govt. has requested that the Past Performance volume be submitted 10 days in advance of the Proposal due date of 01/21/21, will the due date for the Proposal/Past Performance Volume be extended? | Yes. The Proposal due date and requested early delivery of the Past Performance volume have both been extended. See MACC IV Amendment 04, Attachment 02 Section L Rev 02 posted on 20 Jan 2021. |
| 16 | Attachment 2, |
Section L, 3.3.2
pg. 14 of 30
18-Dec-20, QandA Matrix, #24 d) Successfully designed and constructed examples of three (3) past projects similar in scope with regards to complexity, cost, and size of the Sample Project. These example projects shall be design-build or design-bid-build projects. Example projects shall be completed and formatted IAW Section L, Attachment C, and less than seven (7) years old from the issue date of the RFP.
| #24 states “Offerors shall provide three (3) contracts for their company, three (3) for their joint venture partner, and three (3) for their A-E partner for a total of nine (9) contracts.” | Are the three past performance projects for the A-E partner mentioned in the answer to #24, the same as the three projects that are requested by Section 3.3.2. d) ? Assuming that the age of the projects meets the qualifications in each section, can the same projects in be used in both sections? Are there any additional qualifications that will apply to the A-E Firm past performance? | See response to Question 1 in the Section L tab of the Q&As posted on 18 Dec 2020. | |||
| 17 | Section L, 3.3.2 Subfactor 2: A-E Qualifications (b); SF330 Section G | A-E Qualifications shall be submitted on Standard Form (SF) 330, Section L Appendix D, for each discipline: Architectural, Civil, Structural, Electrical, Mechanical, and Fire Protection Engineering. | RFI responses stated Section F does not need to be filled out as past performance will be submitted IAW Section L, Appendix C. Does Section G need to be filled out? This section corresponds with Section F. | See response to Question 4 above | |
| 18 | Section L, 3.3.2 Subfactor 2: A-E Qualifications (b); SF330 | A-E Qualifications shall be submitted on Standard Form (SF) 330, Section L Appendix D, for each discipline: Architectural, Civil, Structural, Electrical, Mechanical, and Fire Protection Engineering. | On the SF330, confirm if Prime Contractor is to fill out SF330. This is called out only for AE firm qualificatoins and not required to be filled out for Subfactor 3 - Contractor Requirements. | The Offeror is responsible for ensuring their AE firm team members information is entered into the SF330. It is not required for contractor personnel. | |
| 19 | Section L, 3.3.2 Subfactor 2: A-E Qualifications (b); SF330 Part I D | A-E Qualifications shall be submitted on Standard Form (SF) 330, Section L Appendix D, for each discipline: Architectural, Civil, Structural, Electrical, Mechanical, and Fire Protection Engineering. | Is the Organizational Chart for the Prime Contractor and AE firms or just the AE firms? | It is only for the AE firms. See response to Question 18 above. | |
| 20 | Section L, 3.3.2 Subfactor 2: A-E Qualifications (b); SF330 Part I E | A-E Qualifications shall be submitted on Standard Form (SF) 330, Section L Appendix D, for each discipline: Architectural, Civil, Structural, Electrical, Mechanical, and Fire Protection Engineering. | Is part E of the SF330 to be filled out by the Prime Contractor? Requirement is only listed under AE qualifications under Subfactor 2 and is not required under subfactor 3 Contractor Requirements. Are resumes required for General Contractor staff. | No. See response to Question 18 above. | |
| 21 | Section L, 3.3.2 Subfactor 2: A-E Qualifications (b); SF330 Part I E | A-E Qualifications shall be submitted on Standard Form (SF) 330, Section L Appendix D, for each discipline: Architectural, Civil, Structural, Electrical, Mechanical, and Fire Protection Engineering. | Can projects used on resume be outside of the 7 year requirement for past performance projects? | For the SF 330, yes. |
For the Example Projects required in the technical area, and Past Performance area, no.
| 22 | Section L, Section 1.3.2 Page Limitations; Table 1 Proposal Organization, Volume II Sub Factor 1 Page Limit | Page limit listed for subfactor 1 is 30 pages. RFI response #17 changed page limit to 50 pages. | This requirement is for an overall safety plan and QC Plan for the MACC. Safety and QC plans are typically longer than the allotted page limit for an accurate safety and QC plan to be submitted. Please exclude page limits from this factor. | See response to Question 32 below. |
| 23 | Section L, Volume II, Factor 3, Past Performance | Appendix A or Appendix C format for A-E Project Examples | In the answer to Question 24 of the Q&A Matrix Responses dated 18 Dec 2020, the response indicates that the A-E partner must provide three project examples in Volume III, Factor 3, Past Performance, together with the three required by the Prime. The A-E Designer is required to submit project examples in Factor 2 of Volume II, IAW Appendix C. Are they also required to provide three project examples in Volume III? If so, should their projects be formatted IAW Appendix C or Appendix A? | The project examples for the Technical Factor, Volume II, are required to be formatted IAW Appendix C. |
The past performance projects submitted for the Past Performance Factor, Volume III, are required to be submitted in the Appendix A, PPI Tool.
| 24 | 1.3.9 Electronic Offers | The electronic copies of the proposal shall be submitted in a format readable and searchable by MS Office Word, Adobe PDF, and MS Office Excel (2016 or later). | With the extensive number of subfactors, drawings, exhibits, etc. it is not possible to submit Volume II completely as one file searchable by three types of software and maintain page numbering sequentially. Is it acceptable to submit all of Vol II as a readable and searchable PDF for the electronic version to maintain page numbering sequentially for the Volume? | Yes. Submitting Vol II as a searchable PDF to maintain page numbering sequentially is acceptable. |
| 25 | 1.3.9 Electronic Offers | Paragrah 1 |
Use separate files to permit rapid location of all portions, including subfactors, exhibits, annexes, and attachments, if any.
Paragraph 2 The Table of Contents of all proposal volumes shall be hyperlinked to the corresponding material within each proposal volume such that clicking the mouse on an item in the Table of Contents will take the reader to the corresponding section within the body of the proposal volume. The two statements are contradictory. Please clarify what you mean by "separate files," as you cannot hyperlink to Volume documents in the Table of Contents if you use separate files on the CD/DVD. We are not asking you to link from one artifact to another artifact in separate volumes. We are asking you to link the table of contents to sections within the document, just like the Table of Contents in Section L, links to each specific section. We want the links within the Table of Contents to work.
For example if I click on 3.1 in the Table of Contents in Section L it will take me straight down to 3.3.1.2. In Section L 3.3.1 it references the MACC IV Basic SOW that you have access to through the solicitation attachments, but we haven't linked to the Basic SOW within Section L, only referenced it; however the Basic SOW document is easily found within the solicitation documents as a reference.
| 26 | 1.3 Volume Organization | |||
| Table 1 Proposal Organization | ||||
| Please provide the updated document indicating all of the changes to the Table 1 criteira published in the Questions and Answeres of 18 DEC 2020. To include revised Subfactor page counts, reduction in number of hardcopies for Volume II and the removal of hardcopies for Volume III. | The updated documents were posted on 20 Jan 2021 under MACC IV Amendment 03, Attachment 02 - MACC IV Section L Rev 02 - 13 Jan 2021. | |||
| 27 | 3.3.2 Subfactor 2 - AE Qualifications SF330; paragraph b. | Section L, Rev 01 09DEC2020, states "A-E Qualifications shall be submitted on Standard Form (SF) 330, Section L Appendix D, for each discipline: Architectural, Civil, Structural, Electrical, Geotechnical, Mechanical, and Fire Protection Engineering". | This paragraph indicates that a SF330 resume is required for the Geotechnical Engineer. Please advise if a resume for Geotechnical Engineer is required? | Yes, a resume for the Geotechnical Engineer is required. |
The Government originally responded on 18 Dec 2020 that the Geotechnical Engineer would not be need; however, we have since revised the response - see response to Question 18 in the changes to Prior Q&A Responses tab.
28 3.3.2 Subfactor 2 - AE Qualifications SF330; paragraph b. SF330 Section G
In the questions and answers dated 18DEC2020, on tab Section L, question #43, the government response states: "All parts of the SF330 are to be filled out, except Section F as indicated in Section L 3.3.2.b."
| Because Section G uses the projects that are presented in Section F, are we to refer to the AE's projects submitted on Attachment C? | See response to Question 4 above. | ||||
| 29 | 4.0 Volume III, Factor 3: Past Performance | ||||
| 4.1 General | In the questions and answers dated 18DEC2020, on tab Section L, question #24, the government response states: "Offerors shall provide three (3) contracts for their company, three (3) for their joint venture partner, and three (3) for their A-E partner for a total of nine (0) contracts. " | Is the criteria for the A-E firm Past Performance Information to be included in Vol. III supposed to follow the exact same categories laid out in Section L, Appendix A, based on the downloaded PPI Tool? | See response to Question 23 above. | ||
| 30 | L section 3.3.3 | Signed Partnership Letter | 3.3.3 staes that the signed partnership letter will meet the requirements in the Basic MACC IV SOW Section 1.5.1.5. We cannot find section 1.5.1.5 | MACC IV Basic SOW is Attachment 01 to the solicitation. Section 1.5.1.5 can be found on page 7. |
The words, "signed partnership" will be added to this section to provide clarity.
| 31 | Section L 4.2 askes for the organizational structure change history. If we are submitting a proposal as a joint venture, does the government want this information about the joint venture or about each member? | The Government wants the information about individual Joint Venture members and the Joint Venture. |
| 32 | Section L 3.3.1 Subfactor 1: Basic MACC IV Plans asks offerors to submit a safety and health plan that meets the requirements in the MACC IV SOW Section Appendix C and a construction quality control plan that meets MACC IV Basic SOW Section 3.1 and IAW USGS 01 45 00. Section Appendix C alone has 15 pages of requirements that the safety plan must meet. USGS 01 45 00 has 15 pages of requirements for the quality control plan. Meeting 30 pages of requirements is going to be nearly impossible to do within a 30-page limit. Can the government give us 100 pages this section? | Yes, the Government will increase the page limit for Subfactor 1 from 50 pages to 100 pages to allow more pages for Offerors to create their CQC Plan and Safety Plan.. |
Section L Table 1 will be updated with this change.
Section M
| MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-21-R-0001 - Jan 2021 | ||||
| Question # | Reference | Discussion | Question/Comment | Government Response |
Solicitation
| MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-21-R-0001 - Jan 2021 | ||||
| Question # | Reference | Discussion | Question/Comment | Government Response |
| 1 | Amendments | Will the documents provided on 12/18/20 be incorporated into an official Amendment to the solicitation? | Yes. They were posted with Amendment 03 on 20 Jan 2021. | |
| 2 | Per the draft RFP, Attachment 4, the estimated cost range of the sample project is $1M - $5M. | Given that other parts of the RFP suggests that the example projects need to be similar in scope with regards to cost, complexity, and size of the sample project, will the Government accept example projects that are greater than $5 million in construction value? | Yes. | |
| 3 | RFP | The majority of our projects over $5M were completed from 2010 - 2012. We have many projects less than $5M completed within the past 7 years, but none over $5M. | Can the past performance period be increased from 7 years prior to the RFP release date to 10 years prior to the RFP release date? | No. |
TEP
| MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-21-R-0001 - Jan 2021 | ||||
| Question # | Reference | Discussion | Question/Comment | Government Response |
| 1 | Attachment 04 TEP Matrix | The government will apply a Notational number of hours multiplied by the rates provided by the contractor for the 4 project management positions noted as part of the evaluation of offers.. | Should the contractor include their own project management costs for these managers in their general conditions within the sample task order or will the government compensate them according to the Notational Amount matrix? Or is this matrix strictly for evaluation purposes and not contractural? | IAW Section M (3.4.1 Total Evaluated Price), the TEP matrix will be used for evaluation purposed only, however all proposed rates are contractually binding. |
Sample Project SOW
| MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC IV) FA8201-21-R-0001 - Jan 2021 | ||||
| Question # | Reference | Discussion | Question/Comment | Government Response |
| 1 | Q&A Response 12/18/20 | Question #1 - Photos | Will additional photos of existing panels and disconnects be provided as stated in Q&A Response 12/18/20? | Additional photos will be posted in new appendix section. |
| 2 | Q&A Response 12/18/20 | Question #165 - "Eyebrow" | The Govt. Response states the Eyebrow is a "metal eyebrow over a concrete door", the pictures show a concrete eyebrow with a metal door track. Do you want the eyebrow and the metal door track to be replaced or ONLY the metal door track? | Both the eyebrow and the track will need to be replaced with like in order to replace the concrete door. |
For an alternate door design (any design other than sliding) the eyebrow and track will still need to be replaced by a design that will work with the alternate door design.
| 3 | Appendix 07 & Attachment 05 / Q&A Response 12/18/20 | Question #118 - Our question: The required motion/direction of travel measurements have not been provided. Can you please confirm axis and travel distances? | |
| Govt Response: The travel of motion of the system will not change. | Our question was not answered. Can you provide the axis and travel distance? | The travel distance is 16 ft. (see response to Question 68 in the Q&As posted on 12 Jan 2021.) |
The axis is the center of the X-ray platform, which only moves vertically.
4 Appendix 07 / Q&A Response 12/18/20 Question #119: Safety Requirements Our question: A radiation alarm inside the vault will be required along with the E-stops. These x-ray safety requirements are not called out. What are the x-ray safety requirements?
| Govt Response: All existing safety systems will remain | Our question was not answered: Can you provide the x-ray safety requirements? | The output of the unit of the X-ray was provided in the Sample Project SOW para 2.9.1.1.1. which is what is needed for the alarm. | |
| 5 | Appendix 07 and Attachment 05 - page 19 | 2.9 Bay 2 Concrete Door Replacment - Alternate Design |
2.9.1.1 Design Criteria. The door will have to meet the following radiation and explosive requirements:
2.9.1.1.1.The radiation is based off the Equipment B-2113 CT M9 X-Ray M9. The system is 450KV, 10 ma 16,000 RADs Question #120: Moving the x-ray equipment. Who will do this? Will the Varian M9 be put under power while stored? Will there be additional radiation shielding required?
| Govt Response: Refer to response to Question #298. | There is no question #298 to reference for theoriginal question. |
| Will there be additional radiation shielding requirements with the x-ray modifications? | The existing x-ray machine in Bay-2 will be modified and not replaced. Applicable sections in the SOW will be revised to reflect this. See response to Question 73 in the Changes to 18 Dec Q&A Responses Tab in the Q&As posted on 12 Jan 2021. |
Therefore, there will be no additional radiation shielding requirement with the x-ray modifications.
| 6 | Attachment 05 - page 5 | 2.2.4 Bay 2: Missle X-Ray Maintenance Bay | |
| We asked on 12/11/20 - response has not yet been provided. | Are we supposed to fur out the walls and drywall them in Bay 2? | No. No gypsum board walls are required in Bay 2. | |
| 7 | Attachment 05 - pg. 4 | 2.2.1 Exterior - The contractor shall dry ice blast (using a process such as Coldsweep or approved equivalent) |
the exterior to remove all paint, patch, prep, and repair all damaged brick for a new coat of paint to match HAFB Base Facility Design Standard (See Appendix). All doors and windows shall be replaced and shall meet current energy efficient standards. The clerestory glazing shall be removed and infilled with wood construction. The contractor shall install a new standing seam roof on the lower structure and clerestory area which matches the existing roof. It shall follow the HAFB Architectural Compatibility Plan (See Appendix). The contractor shall ensure the existing structure is up to current seismic standards following 2018 International Existing Building Code (EIBC).
We asked on 12/11/20 - response has not yet been provided. Can we frame the clerestory walls with metal studs in lie of wood? Yes.
Please infill the clerestory window area with metal studs.
| 8 | Attachment 05 - pg. 4 | 2.2.2 General - The contractor shall upgrade all HVAC, lighting, and Fire Suppression systems to current industry design standards and codes. All floors shall be leveled. Provide floor with finishes as stated in the individual bay requirements sections. All bays shall have insulation and new 5/8” gypsum board, type X installed over the insulation. All bays shall be painted. All bays shall be demolished where applicable. | |||
| We asked on 12/11/20 - response has not yet been provided. | Are we to install drywall over the sloped ceilings and clerestory walls? | No. No gypsum board will be over the sloped ceilings and clerestory walls. | |||
| 9 | Q&A Response 12/18/20 | Question #56 - Are photographs of the west side exterior of the building available? | |||
| Govt. response: Additional photos including the west side will be posted. | Will the additional photos including the west side still be posted? | Additional photos of the west side of the building will be posted. | |||
| 10 | Q&A Response 12/18/20 | Question #57: Civil - gas lines | |||
| Govt. response: A site plan with all existing utilities will be posted. | Will the site plan with all existing utilities still be posted? | A site plan with existing utilities will be posted. | |||
| 11 | Attachment 15 | Electrical - (See photo in Attachment 15 – pic 20 of 109) | What is the required voltage and amperage of the refrigerated safe /storage container located in Bay # 6? | For bidding purposes assume 208V, 3-Phase, 30A for this equipment. | |
| 12 | Electrical | What is the required voltage and amperage of the CT and X-ray equipment? | Refer to response to Question 131 below. | ||
| 13 | Attachment 15 | Electrical - (See photo in Attachment 15 – Pics 22,46,61 of 109) | There are various existing special use electrical receptacles located along the exterior wall of the building. Do we need to provide any special use electrical receptacles on the interior and/or the exterior of the building? Where, what amperage, voltage, pin-n-sleeve, explosion proof? | Only weatherproof GFCI 120VAC duplex power receptacles are required. Refer to revised SOW para 2.7.5.1. | |
| 14 | Electrical | What is the kVA of TX # B2136A (12,470 volt to 277/480-volt oil filled) primary transformer that serves building # 2113? | Utility transformer data will be provided. | ||
| 15 | Electrical | Are any other buildings fed from the TX # B2136A (12,470 volt to 277/480-volt oil filled) primary transformer? Is so, which building and what is the load (amps)? | This transformer also feeds B2114 located north of B2113. The associated 1200A MDP has (1) 600A-3P breaker feeding B2113 and (1) 300A-3P breaker feeding B2114. The peak demand load for this transformer is 28.8KW in summer of 2020; for bidding purposes use 70% of this load for B2113's calculations. | ||
| 16 | Electrical | What is the kVA of TX # B2136A (12,470 volt to 120/208-volt oil filled) primary transformer that serves building 2113? | This transformer serves other buildings at 208/120V and will not be used for the building renovation. Refer to revised SOW. para. 2.7.3.2. | ||
| 17 | Electrical | Are any other buildings fed from TX # B2136A (12,470 volt to 120/208-volt oil filled) primary transformer? Is so, which building and what is the load (amps)? | This transformer serves other buildings at 208/120V and will not be used for the building renovation. Existing conductors which extend to B2113 are to be removed. Refer to revised SOW para 2.7.3.3. | ||
| 18 | Electrical | What is the existing load (amps) on the switching cabinet located near transformers # B2136A and B2136B? | Refer to response to Question #16 above with respect to the 208/120V transformer. Refer to response to Question #15 above with respect to the 480/277V transformer. | ||
| 19 | Electrical | Does the building’s lightning protection system have an existing buried ground ring (aka counterpoise)? If so, what size? | Refer to response to Questions 5 and 36 in the Sample Project SOW tab of the Q&As posted on 12 Jan 2021, and see updated Sample Project SOW para 2.7.7.3. |
The size of the counterpoise is not available.
20 Attachment 05 General RFP RFI Responses Typically unless accopanied by an Amendment - RFI Responses are not a formal document and cannot be relied upon as change to the RFP Documents. Please confirm as to whether or not the government's RFI Repsonses can be accepted as changes to the RFP Documents. It is true that until an amendment is issued, the changes are not formally incorporated into the RFP; however, the Government does intend to amend the solicitation to update the changes that have been detailed in the RFI responses.
The Q&A Matrices posted will not be incorporated by amendment however, the responses may be relied on for proposal creation. Any updates to solicitation attachments will be incorporated through an Amendment.
21 Attachment 05, Section 2.2.1 - Exterior Architectural Design and Construction Per Section 2.2.1 - States: All doors and windows shall be replaced and shall meet current energy efficient standards. In general must of the work for doors and door hardware is discernable. However there appears to be a pair of doors at the plan north/east corner of the concete vault where the new updated ADA Rest Rooms are to be locted. There are no drawings or photos available that depict these doors. Several questions: Is there work required at these doors and if so please provide details as to what type and gauge of door is required, Is there any special door hardware requirements (Simialr to other exterior doors - new egress only panic hardware and what would be the funtion of these doors? Are there any special X-Ray safety requirements for these doors? Yes, these doors need to be replaced and are required to be lead lined.
The Door measurements are 4'-0"W x 7'-0"H.
| 22 | Attachment 05, Section 1.4 | Risk Category | Could you please clarify as to what Risk Category this facility would fall under? Based upon the description of occupancy, would Risk Category IV be required? | See response to Question 98 in the Sample Project SOW tab of the Q&As posted on 12 Jan 2021. |
| 23 | Attachment 05, Section 1.4 and 2.2.1 | Current Codes and Standards | In section 1.4, it is stated that "This MACC IV Sample Project will address various facility deficiencies and provide a general building upgrade to current codes and standards." While section 2.2.1 states "The contractor shall ensure the existing structure is up to current seismic standards following 2018 International Existing Building Code (IEBC)." These two statements could be interpreted as in conflict with one another. Is it the desire of the Base to upgrade the seismic resisting system to the latest edition of the 2018 International Building Code (IBC) or can the 2018 International Existing Building Code (IEBC) be followed? The IEBC would require seismic retrofit or upgrade only if triggered by several different parameters based upon extent of renovation, alteration or change in occupancy. Or is it the desire of the Base to perform a Basic Performance Objective for Existing Buildings per the ASCE 41 Standard? | The desire of the base is to follow the 2018 IEBC. |
A structural analysis is not required for this project.
| 24 | Attachment 05 Section 2.1.1 | 2.1 - Architectural Design and Construction - 2.2.1 - | States “The Contractor shall install a new standing seam metal roof at the lower structure and the clearstory area which matches the existing roof”. We take this to mean the government wants an entire new roof. Please confirm this is the case. | Yes,. The Government would like to replace the existing standing seam roof with a new standing seam roof. |
| 25 | RFI Response #44 | RFP RFI Responses | The response to RFI #44 indicated that “The Offeror's Fire Protection Engineer must be consulted when making any comparisons between the requirements of the existing system and the new system”. Per UFC 3-600-01, paragraph 1-12.7.1, the government is required to determine if the available water supply is sufficient without a fire pump. There is nowhere near enough information provided in the RFP for the offeror’s fire protection engineer to make a determination at bid stage. Since a fire pump is a significant cost and space item, please clarify if a fire pump will be required or not. | For the purposes of bidding Offerors are to assume the existing water flow is sufficient. After task order award and during design, the contractor's fire protection engineer would need to confirm this. A complete demolition of existing fire suppression, a design of a new fire suppression system, and the instillation of that system will still be required. During design the contractor's fire protection engineer needs to show that pumps are more cost effective than larger pipe sizes using the existing water connections. The Government will address contractor's stance of pumps vs larger pipe sizes if the issue arises. |
| 26 | RFI Response #51 | RFP RFI Responses | The response to RFI #51 indicated that “Please consult the contractor's Fire Protection Engineer on fire protection criteria.” There is not adequate information provided in the RFP to determine the answer to this question, hence the question was provided. Please clarify any special fire suppression system requirements. With this being a design/build project, it is difficult to “assume” fire protection requirements without sufficient knowledge. This information is required to be provided by the Government per UFC 3-600-01, paragraph 1-12.8.1. | The response references was in response to Question 54, not 51. |
For purposes of bidding, Offerors are to assume wet pipe and combination mass notification fire alarm systems will meet requirements.
| 27 | RFI Response #77 | RFP RFI Responses | The response to RFI #77 indicated that “Please consult the contractor's Fire Protection Engineer on fire protection criteria.”. We do not have this information at bid stage, therefore, this determination cannot be made. The Government needs to determine if the X-ray equipment is “essential electronic equipment” as defined in UFC 3-600-01 paragraph 1-12.8.1. | X-ray equipment is not deemed as "essential electronic equipment" - see response to Question 26 above. |
| 28 | RFI Response #79 | RFP RFI Responses | The response to RFI #79 states “As required by the SOW: "It is the responsibility of the contractor’s QFPE and design team to investigate, evaluate, and determine the code requirements for this design. This investigation, evaluation, and final determination of possible code requirements must include 1) Possible requirement of pre-action suppression system, and 2) suppression system requirements for film storage. It is the contractor’s responsibility to insure that a thorough investigation of Federal, DoD, USAF, and NFPA regulations and codes is conducted and employed in the design and installation of all systems for this project." Please clarify how this is to be performed at bid stage without sufficient information provided in the RFP. As this is a design/build project, we cannot “assume” which system is to be provided for pricing. The Government needs to at least state to assume a wet pipe sprinkler system for the basis of bid and if a preaction system is determined to be required, then that would be a change order. The survey and analysis required by the SOW is applicable to a design only project where the QFPE can investigate and determine the proper design criteria. With design/build, we do not have sufficient information to determine pricing. | For the purposes of bidding Offerors are to assume wet pipe and combination mass notification fire alarm systems will be sufficient. |
After award, during design the QFPE will still be required to investigate, evaluate, and determine the code requirements for this design. If it is then determined that changes to the scope need to be made the Government will assess it at that time.
29 RFI Response #190 RFP RFI Responses The response to RFI #190 states “Yes, for proposal purposes, Offerors should assume the existing water supply is sufficient for fire protection needs. See response to Question 91.” Please confirm that if it is determined that a fire pump is needed during design, then this would be a change order. Also, the response to question 91 does not pertain to water supply. Please confirm the correct reference. The decision to make a change order will be determined by the Administering Contracting Officer over the Task Order.
See response to Question 28 above.
The reference to question 91 was updated - see response to Question 190 in the Changes to 18 Dec Q&A Responses tab that was posted on 12 Jan 2021.
30 SOW Section 2.5.1 SOW Section 2.5.1 states that the contractor shall….bring Building 2113 into compliance with all…codes. Without performing a detailed survey of the building, this cannot be performed at bid stage. Per UFC 3-600-01, paragraph 1-12.13.1, the Government is required to determine if any deficiencies exist and include them in the scope of work. We recommend that the SOW be revised to require the QFPE to perform a life safety/fire protection survey and analysis of the existing building and document any additional deficiencies not noted in the SOW. Correction of those deficiencies can be negotiated with the contractor after review by the Government. Section 2.5.1 is the requirement for the wet pipe sprinkler system and combination mass notification and fire alarm system.
The life safety and fire protection analysis are requirements at 100% design.
Deficiencies other than with the sprinkler system and fire alarm system that are not noted in the Sample Project SOW that are discovered during design, will be addressed by the Government at that time.
| 31 | SOW | The statement of work does not provide any information as to the type of hazards, storage height and storage arrangement in each bay. This information is required to determine fire sprinkler system criteria in order to determine the cost of the fire sprinkler system. Please provide either the type of hazard/storage height/storage arrangement or the fire sprinkler design criteria for each bay. | It is up to the Offeror to determine the design of the bays given the information they have been provided. This is a design-build requirement, therefore, the Government will not be providing the design. Offerors need to follow NFPA 40 for storage of film. | |
| 32 | SOW Section 2.5 | SOW section 2.5 (or any other portion of the SOW) does not indicate the total quantity of explosives and hazardous materials to be provided within each bay. Please confirm that the building and/or each bay is not classified as an H occupancy per the IBC or NFPA 400 (as referenced by UFC 3-600-01). | Only Bays 2 and 4 hold any explosives, and the limit for the building was given in Sample Project SOW para. 2.5.2. | |
| 33 | SOW | The SOW indicates the existing system is a preaction sprinkler system, however, no information is provided to indicate if the replacement system is to be a preaction or standard wet pipe sprinkler system. The offeror’s fire protection engineer does not have adequate information to make that determination at bid stage. Due to the cost difference between the two systems, please clarify if the government is expecting a preaction or wet pipe sprinkler system. If preaction, please specify the preferred manner of detection. | See response to Question 28 above. | |
| 34 | Please confirm that no cellulose nitrate film is being stored or used at this site. | The Government cannot confirm that at this time; however, for proposal purposes, Offerors are to assume ALL the film is Mylar. | ||
| 35 | Attachment 05, Section 2.2.1 - General | Architectural Design and Construction | There is a requirement for all walls interior and exterior to receive new furring and 5/8" gypsum board. For interior walls, does the furring and gypsum board need to extend full height into the "Clearstory Areas" as well as the concrete walls? Can the furring and gypsum board stop slighly above ceilings for bays for which a new ceiling is installed? | In bays 3, 9, and 10, the 5/8" type X gypsum board shall be installed. It may stop slightly above the ceilings where the new ceiling is to be installed. The interior walls in the other bays shall have insulation with a polymembrane over it. |
| 36 | Attachment 05 Section 2.4 Security | Architectural Design and Construction | Are there any requirements for SiprNet? | No requirements for SIPRNET. |
| 37 | Attachment 05, Section 2.4 Security | Architectural Design and Construction | Per previous RFI Responses - Bay 16 is classified as "Open Storage". Is there any requirements for RF shielding for this bay? | No. There is no requirement for RF shielding for Bay 16. |
| 38 | Electrical | Has transformer TX # B2136A (12,470 volt to 277/480-volt oil filled) primary transformer that serves building # 2113 been tested for PCBs? | For bidding purposes assume there are no PCBs present for this transformer. An inspection sticker on this equipment indicates <50ppm for PCBs. | |
| 39 | Electrical | Has transformer TX # B2136A (12,470 volt to 120/208-volt oil filled) primary transformer that serves building 2113 been tested for PCBs? | For bidding purposes assume there are no PCBs present for this transformer. An inspection sticker on this equipment indicates <50ppm for PCBs. | |
| 40 | Electrical | The solicitation calls for the power analysis software program EasyPower be utilized to calculate the short circuit calculations, coordination study and arc flash study. Can the software program SKM System Analysis be used in lieu of the specified EasyPower? | No. Only EasyPower is allowed as per Air Force requirements. (UFC 3-501-01, Section 3-2.2.1) | |
| 41 | In the MACC IV Sample Project “Statement of Work” document 2.2.1 Exterior States that in the last sentence that “The contractor shall ensure the existing structure is up to current seismic standards following 2018 International Existing Building Code” Our structural engineer has informed us that complying with this code will make it will necessary to seismically upgrade this building. This will require us to remove the existing perimeter clay tile walls and replace them with new reinforced 8” solid grouted CMU walls. It will also require us to place new 22 gauge B‐deck installed on top of the existing roof structure This will strengthen the buildings diaphragm and shear capacity of lateral (seismic) forces as the 2018 IEBC requires. We need to know if this is really the intent of the Government, for the design build contractor to perform a seismically (structurally) upgrade on this building. This work will be very costly, and if other companies are not understanding this requirement the same, it could cause huge price variations. Disastrous financial consequences would occur if the low bid price did not include this work in their bid and the government required the low price firm to comply with a seismic upgrade on this building. | Please clarify the governments intent on this issue so everyone |
designs/bids this sample project the same; and does not get hurt by a very expensive impact of the 2018 IEBC code
| requirements. | See response to Question 23 above. |