This document contains a past performance questionnaire template for an architect-engineer services contractor. The questionnaire requests information about a previous contract, including the contract type and price, whether work was completed on schedule and budget, and ratings of the contractor's quality, cost control, and schedule performance. It also provides fields for the customer to describe the architect-engineer services provided and indicate whether performance is reported in the Contractor Performance Assessment Reporting System. The customer must return the completed questionnaire by May 20th to an identified point of contact regarding Solicitation Number FA8201-19-R-0001 for architect-engineer services in support of Hill A-E19 for the Department of the Air Force Materiel Command.
Hill A-E19 PPQ Template
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Att_2_-_Hill_A-E19_SOW_-_final.pdf | ||
| Att_5_-_Qualification_Evaluation_Guide.pdf | ||
| Att_1_-_Hill_A-E19_Submission_Reqs_-_final.pdf | ||
| Hill_A-E19_Request_for_Qualifications_-_final.pdf | ||
| Att_4_-_SF330_Template.pdf | ||
| A-E_QA.xlsx | XLSX spreadsheet | |
| 1_-_Hill_A-E19_Synopsis_-_draft_-_20_Dec.docx | DOCX document | |
| 2_-_Hill_A-E19_Submission_Reqs_-_draft_-_20_Dec.docx | DOCX document | |
| 3_-_Hill_A-E19_SOW_-_draft_-_20_Dec.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8201-19-R-0001
Hill A-E19
Attachment 3 18 April 2019
PAST PERFORMANCE QUESTIONNAIRE (PPQ)
for Architect-Engineer (A-E) Services
(Fields 1-4 to be completed by the Contractor)
1. Name of Contractor:
2. Title or Description of Project:
3. Contract Number:
4. What role did the Contractor fill in the referenced contract:
Please return completed PPQ by 20 May 2019 to: mandi.johnson.3@us.af.mil
(Fields A-J to be completed by the Customer) A. Contract Type:
B. Contract Price:
C. Was the final contract price the same as the initially proposed price:
(if Yes, skip to D; otherwise answer C.i. and C.ii.)
C.i. Did the final contract price increase or decrease after contract award:
C.ii. Briefly explain the reason for the change:
D. Was the work completed on or before the initially proposed completion date:
(if Yes, skip to E; otherwise answer D.i. and D.ii.)
C.i. How long past the proposed completion date did performance take:
C.ii. Briefly explain the reason for the change:
E. Describe the A-E Service provided:
F. Is performance for this contract reported in CPARS:
(if No or Unsure, answer H-J and complete page 2; if Yes, answer G-J and ignore page 2) G. Has an out-of-cycle CPAR been initiated to document changes in performance:
If Yes, briefly describe the reason:
H. Name of entity completing the PPQ:
I. Name/Title of person completing the PPQ:
J. Contact phone and/or email of person completing this PPQ:
Please use the following ratings to answer sections 1-3 on page 2 and the dropdown menu to answer section 4.
N/A To be used instead of a rating for a particular area that has not been evaluated.
Exceptional Performance meets contractual requirements and exceeds many to the Customer’s benefit. Performance was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
Very Good Performance meets contractual requirements and exceeds some to the Customer’s benefit. Performance was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
Satisfactory Performance meets contractual requirements. Performance was accomplished with some minor problems for which corrective actions taken by the Contractor were, or appear to be, satisfactory.
Marginal Performance does not meet some contractual requirements. Performance reflects a serious problem for which the Contractor has not identified, or not implemented, satisfactory corrective actions.
Unsatisfactory Performance does not meet most contractual requirements. Performance reflects serious problems for which the Contractor’s corrective actions were, or appear to be, ineffective.
FA8201-19-R-0001
Hill A-E19
Attachment 3 18 April 2019
Evaluation of A-E Services
N /A
E xc ep ti on al
V er y G oo d
S at is fa ct or y
M ar gi na l
U ns at is fa ct or y
1. Quality of Service
a) The Contractor provided a service that conforms to contract requirements, specifications and standards of good workmanship.
b) The Contractor provided effective quality control and/or inspection procedures to conform with contract requirements.
c) The Contractor utilized qualified personnel to fulfill contract requirements.
d) The Contractor acted promptly to resolve problems in a manner conforming to contract requirements and their quality control plan.
2. Cost Control
a) The Contractor completed the effort within the negotiated cost/price.
b) The Contractor was responsive to requirement changes and provided accurate and reasonable proposals for change orders.
c) The Contractor submitted accurate invoices on a timely basis.
d) The Contractor paid employees/subcontractors/suppliers in a timely manner.
3. Schedule
a) The Contractor completed the effort in accordance with the period of performance of the contract.
b) The Contractor provided submittals on schedule and in accordance with contract requirements.
4. Customer Satisfaction
Customer has no reservations about awarding another contract to the Contractor.
5. Comments
| Project Title or Description: |
| Contractor Name: |
| Contract Price: |
| Contractor Role: [ ] |
| Price Change: [ ] |
| Same Price: [ ] |
| Contract Type: |
| Extra Performance Time: |
| Reason Price Changed: |
| Contract Number: |
| Work on Schedule: [ ] |
| In CPARS: [ ] |
| Reason Schedule Changed: |
| Reason Out of Cycle: |
| A-E Services Description: |
| Customer Name: |
| POC Name: |
| POC Contact Info: |
| 1a: Off |
| 1b: Off |
| 1c: Off |
| 1d: Off |
| 2a: Off |
| 2b: Off |
| 2c: Off |
| 2d: Off |
| 3a: Off |
| 3b: Off |
| Out of Cycle: [ ] |
| Reservations: [ ] |
| Comments: |