About this file
This document provides submission requirements for the Hill A-E19 federal contract opportunity. Firms are required to submit Standard or Half size binders containing an SF330 proposal with specified page limits and content. Binder 1 must include sections on qualifications, organizational charts, resumes of key personnel limited to 1 page each for up to 20 people, up to 5 example project descriptions limited to 1 page each, descriptions of key personnel participation and capacity, and up to 5 past performance narratives with headers. Binder 2 requires an SF330 Part II for the prime contractor and any subcontractors, as well as copies of executed teaming agreements. The opportunity is a solicitation from the Department of the Air Force Materiel Command for architectural and engineering services at Hill Air Force Base, with a submission deadline consistent with the document date of 20 December 2018.
Hill A-E19 Submission Reqs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Att_3_-_Hill_A-E19_PPQ.pdf | ||
| Att_2_-_Hill_A-E19_SOW_-_final.pdf | ||
| Att_5_-_Qualification_Evaluation_Guide.pdf | ||
| Hill_A-E19_Request_for_Qualifications_-_final.pdf | ||
| Att_4_-_SF330_Template.pdf | ||
| A-E_QA.xlsx | XLSX spreadsheet | |
| 1_-_Hill_A-E19_Synopsis_-_draft_-_20_Dec.docx | DOCX document | |
| 2_-_Hill_A-E19_Submission_Reqs_-_draft_-_20_Dec.docx | DOCX document | |
| 3_-_Hill_A-E19_SOW_-_draft_-_20_Dec.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8201-19-R-0001
Hill A-E19
Attachment 1 20 December 2018
Hill A-E19 Submission Requirements
1. Firms interested in being considered for Hill A-E19 contract award shall submit the following:
a. Binder I
i. Submit four (4) hard copies, each in individual 3-ring binders, with a label on the spine in the format “Binder 1 – SF330 Part I – Copy #” with the # being replaced by the numbers 1-4.
ii. Submit one (1) hard copy, unbound and unpunched, in a single envelope labeled:
“Binder 1 – SF330 Part I – Original”. In the event of discrepancies among submittals, to include the CDs, this copy will take precedence.
b. Binder 2
i. Submit one (1) hard copy, in an individual 3-ring binder, with the spine labeled “Binder 2 – SF330 Part II – Copy 1”.
ii. Submit one (1) hard copy, unbound and unpunched, in a single envelope labeled:
“Binder 2 – SF330 Part II – Original”. One hard copy of this document, Hill A-E19 Submission Requirements, shall be placed on top of all other pages within the Binder 2 envelope. In the event of discrepancies among submittals, to include the CDs, this copy will take precedence.
c. CD
Submit two (2) electronic copies of SF330 Parts I and II on CDs, in PDF format, with a table of contents hyperlinked to the relevant content in the SF330. The CDs shall be provided in jewel cases and inserted at the top of all documents within the Binder 2 envelope. The CDs and cases shall be labeled with:
Contractor: (insert Prime name) Solicitation: FA8201-19-R-0001 Contents: SF330 for Hill A-E19 Date Prepared: (insert date)
2. Firms shall keep the total page count of SF330 Part I submittals to no more than 37 pages.
Pages will be Standard size (8.5” x 11”) or Half size (11” x 17”) with margins no smaller than ½” on top and bottom and 1” on each side. Black font, no smaller than 10-point Arial or 11-point Times New Roman, shall be used throughout. Pages with print on both sides will count as 2 pages if Standard size and 4 pages if Half size. The cover letter, table of contents, tab pages used to separate sections of the submittal, and individual subcontracting reports will not be attributed to the page count.
Firms shall keep SF330 Part II submittals to no more than one (1) page for the Prime, one (1) additional SF330 part II page for each of the Prime’s non-local offices that may be tasked to contribute under the Hill A-E19 contract, and one (1) additional SF330 Part II page per Teaming Partner. Teaming Agreements will not be attributed to the page count. Any pages provided in excess of those described in this section will not be considered for evaluation.
Attachment 1
3. Submission Requirements Checklist
BINDER 1
Section Reference Information/Instructions Page Limit
Check if Submitted
Cover Letter, Table of
Contents, Tabs and Acronyms
For each Binder 1, include in this order:
- Cover Letter (with authorized signature, company information and POC information)
- Table of Contents
- “Tab” sheets separating the SF330 Part I into sections as identified by the left most column of this checklist
- Optional: if acronyms beyond those identified in the Hill A- E19 documents are used, a one-page Acronym List may be included
Not applied to page limit
I SF330 Part I, Sections A-C
Contract-Specific Qualifications 2
II
SF330 Part I, Section D
Organizational Chart of Proposed Team
- Provide a graphical org chart depicting the relationship of the Prime to each Teaming Partner and the proposed type and percentage of work to be subcontracted to each
III
SF330 Part I, Section E Resumes of Key Personnel 1 page per person, maximum 20
IV
SF330 Part I, Section F
Example Projects 1 page per project, maximum 5
- Submit 3 example projects demonstrating Title I and/or Other A-E Services that the Firm feels best represents their capacity to perform the required services as described in the Hill A-E19 documents
- Optional: submit 1 example project demonstrating airfield design experience
Attachment 1
- Optional: submit 1 example project demonstrating Title II experience
V SF330 Part I, Section G Key Personnel Participation 1
VI
SF330 Part I, Section H
Capacity
- Provide a narrative describing how the Prime will manage and coordinate work within the Prime and amongst Teaming Partners
VII
SF330 Part I, Section H
Past Performance 1 page per project, maximum 5
- Provide a brief narrative addressing past performance in terms of cost control, quality of work and compliance with work schedules for each example project listed in Section F
- Provide a header for each narrative that includes:
Project Name Contract (and TO) Number POC name POC phone number POC email address
VIII
SF330 Part I, Section H
Commitment to Small Business applicable to large business firms only
- Provide three “final” or “most recent” Individual Subcontracting Reports or commercial equivalent
- If small business goals were not met, firms shall include a brief narrative (no more than 1 page per ISR) explaining why not and providing details of how the firm has improved their small business subcontracting process
Not applied to page limit
Attachment 1
BINDER 2
Section Reference Information/Instructions Page Limit
Check if Submitted
IX SF330 Part II
General Qualifications
* Provide 1 SF330 part II page for the Prime’s local office, 1 additional SF330 part II page for each of the Prime’s non-local offices that may be tasked to contribute under the Hill A- E19 contract, and 1 SF330 part II page for each proposed teaming partner
- Optional: firms with $0 in revenue from Federal Work over the last 3 years may enter “0” for the index number in Block 11 instead of “1”
X Teaming
Information Provide a copy of all executed Teaming Agreements
N/A
Checklist and CDs in Binder 2 envelope
File details come from the government source that posted it. Updated .