FA8201-17-R-0002-0004.pdf

PDF 139 KB Posted

Attached to
Flooring IDIQ Federal contract opportunity
Solicitation number
FA820117R0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Amendment FA8201-17-R-0002-0004

View the file

Other files for this federal contract opportunity

Other files attached to Flooring IDIQ, newest first.
File Type Posted
FA8201-17-R-0002-0003.pdf PDF
FA8201-17-R-0002-0002.pdf PDF
SOW_Bldg_507_Room_252_Carpet_(9_July_2018).docx DOCX document
New_Flooring_IDIQ_SOW_(9_July_18)_(002).docx DOCX document
FA8201-17-R-0002-00001.pdf PDF
00_FA8201-17-R-0002_RFP.pdf PDF
04_-_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
03_-_SOW_APPENDIX_C.pdf PDF
15_-_SOW_Bldg_507_Room_252_Carpet_(6_June_2018).pdf PDF
13_-_Wage_Determination_UT180104_(Davis_County).pdf PDF
10_-_09_68_00_Carpeting_(30_Apr_18).pdf PDF
14_-_Wage_Determination_UT180110_(Weber_County).pdf PDF
09_-_01_57_20_Environmental_Protection.pdf PDF
12_-_Wage_Determination_UT180102_(Box_Elder_County).pdf PDF
00_FA8201-17-R-0002_RFP.pdf PDF
17_-_Bldg_507_Asbestos_Survey.pdf PDF
Exhibit_A-B___Pricing_Sheet_(5_Jun_18).xlsx XLSX spreadsheet
05_-_01_00_00_General_Requirements_(002).pdf PDF
20_-_Tier_1_Price_Schedule.xlsx XLSX spreadsheet
02_-_SOW_APPENDIX_A.pdf PDF
19_-_Section_M_(11_June_18).pdf PDF
06_-_01_32_00_Project_Schedule.pdf PDF
16_-_Seed_Project_Price_Sheet_(5_Jun_2018).xlsx XLSX spreadsheet
08_-_01_45_00.00_10_Quality_Control_(30_Apr_18).pdf PDF
01_-_Basic_Statement_of_Work_(12_Apr_18).pdf PDF
18_-_Section_L_(11_June_18).pdf PDF
07_-_01_35_26_Government_Safety_Requirements_(30_Apr_18).pdf PDF
11_-_Engineering_Technical_Letter_07_4.pdf PDF
Engineering_Technical_Letter.pdf PDF
SOW_APPENDIX_A.pdf PDF
SOW.pdf PDF
SOW_APPENDIX_C.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s:

- Remove Attachment 11 Engineering Technical Letter as an attachment to the solicitation as all references to Engineering Technical Letter 07-4 w as removed from the 9 July 2018 version of the Basic Flooring IDIQ Statement of Work.

- Extend the solicitation due date from 3:00 PM MT 1 August 2018 to 3:00 PM MT 6 August 2018.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA820117R0002

X 9B. DATED (SEE ITEM 11)

11-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Aug-2018

CODE

OL:H/PZIOC

GREGORY HALES 6038 ASPEN AVE BLDG 1289

HILL AFB UT 84056-5805

FA8201 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA820117R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 01-Aug-2018 03:00 PM to 06-Aug-2018 03:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CLIN 0001 Exhibit(s) 1 Exhibit A/B Exhibit A/B Price List 05-JUN-2018 Exhibit B CLIN 1001 Exhibit(s) 1 Attachment 01 Basic SOW - Amended 9

Jul 2018

6 09-JUL-2018

Attachment 02 SOW Appendix A 1 06-JUN-2017 Attachment 03 SOW Appendix C 16 23-JUL-2015 Attachment 04 Base Facility Desging

Standard

87 13-APR-2017

Attachment 05 01 00 00 General Requirements (002)

24 01-FEB-2017

Attachment 06 01 32 00 Project Schedule 5 01-AUG-2011 Attachment 07 01 35 26 Government

Safety Requirements

47 01-FEB-2018

Attachment 08 01 45 00.00 Quality Control

18 01-NOV-2016

Attachment 09 01 57 20 Environmental Protection

19 01-JUN-2013

Attachment 10 09 68 00 Carpeting 23 01-NOV-2017 Attachment 11 Engineering Technical

Letter 07_4

17 28-MAR-2007

Attachment 12 Wage Determination UT180110 (Weber County)

5 09-FEB-2018

Attachment 13 Wage Determination UT180104 (Davis County)

5 09-FEB-2018

Attachment 14 Wage Determination UT180102 (Box Elder County)

5 09-FEB-2018

Attachment 15 Seed Project SOW - Amended 9 Jul 2018

3 09-JUL-2018

Attachment 16 Seed Project Pricing Sheet

Attachment 17 Limited Inspection Report 7 09-JAN-2018 Attachment 18 Section L 11 11-JUN-2018 Attachment 19 Section M 6 11-JUN-2018 Attachment 20 Enterprise Tier I Pricing

FA820117R0002

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A/B Exhibit A/B Price List 05-JUN-2018 Attachment 01 Basic SOW - Amended 9

Jul 2018

6 09-JUL-2018

Attachment 02 SOW Appendix A 1 06-JUN-2017 Attachment 03 SOW Appendix C 16 23-JUL-2015 Attachment 04 Base Facility Desging

Standard

87 13-APR-2017

Attachment 05 01 00 00 General Requirements (002)

24 01-FEB-2017

Attachment 06 01 32 00 Project Schedule 5 01-AUG-2011 Attachment 07 01 35 26 Government

Safety Requirements

47 01-FEB-2018

Attachment 08 01 45 00.00 Quality Control

18 01-NOV-2016

Attachment 09 01 57 20 Environmental Protection

19 01-JUN-2013

Attachment 10 09 68 00 Carpeting 23 01-NOV-2017 Attachment 12 Wage Determination

UT180110 (Weber County)

5 09-FEB-2018

Attachment 13 Wage Determination UT180104 (Davis County)

5 09-FEB-2018

Attachment 14 Wage Determination UT180102 (Box Elder County)

5 09-FEB-2018

Attachment 15 Seed Project SOW - Amended 9 Jul 2018

3 09-JUL-2018

Attachment 16 Seed Project Pricing Sheet

Attachment 17 Limited Inspection Report 7 09-JAN-2018 Attachment 18 Section L 11 11-JUN-2018 Attachment 19 Section M 6 11-JUN-2018 Attachment 20 Enterprise Tier I Pricing

(End of Summary of Changes)

File details come from the government source that posted it.