16_-_Seed_Project_Price_Sheet_(5_Jun_2018).xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Flooring IDIQ Federal contract opportunity
Solicitation number
FA820117R0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Seed Project Price Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Flooring IDIQ, newest first.
File Type Posted
FA8201-17-R-0002-0004.pdf PDF
FA8201-17-R-0002-0003.pdf PDF
FA8201-17-R-0002-0002.pdf PDF
SOW_Bldg_507_Room_252_Carpet_(9_July_2018).docx DOCX document
New_Flooring_IDIQ_SOW_(9_July_18)_(002).docx DOCX document
FA8201-17-R-0002-00001.pdf PDF
00_FA8201-17-R-0002_RFP.pdf PDF
06_-_01_32_00_Project_Schedule.pdf PDF
08_-_01_45_00.00_10_Quality_Control_(30_Apr_18).pdf PDF
01_-_Basic_Statement_of_Work_(12_Apr_18).pdf PDF
18_-_Section_L_(11_June_18).pdf PDF
07_-_01_35_26_Government_Safety_Requirements_(30_Apr_18).pdf PDF
11_-_Engineering_Technical_Letter_07_4.pdf PDF
10_-_09_68_00_Carpeting_(30_Apr_18).pdf PDF
14_-_Wage_Determination_UT180110_(Weber_County).pdf PDF
09_-_01_57_20_Environmental_Protection.pdf PDF
04_-_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
03_-_SOW_APPENDIX_C.pdf PDF
15_-_SOW_Bldg_507_Room_252_Carpet_(6_June_2018).pdf PDF
13_-_Wage_Determination_UT180104_(Davis_County).pdf PDF
12_-_Wage_Determination_UT180102_(Box_Elder_County).pdf PDF
00_FA8201-17-R-0002_RFP.pdf PDF
17_-_Bldg_507_Asbestos_Survey.pdf PDF
Exhibit_A-B___Pricing_Sheet_(5_Jun_18).xlsx XLSX spreadsheet
05_-_01_00_00_General_Requirements_(002).pdf PDF
20_-_Tier_1_Price_Schedule.xlsx XLSX spreadsheet
02_-_SOW_APPENDIX_A.pdf PDF
19_-_Section_M_(11_June_18).pdf PDF
Engineering_Technical_Letter.pdf PDF
SOW_APPENDIX_A.pdf PDF
SOW.pdf PDF
SOW_APPENDIX_C.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Flooring IDIQ
Base Year, Hill AFB, UT
Attn:Capital Project Number: 10268422018DATE:
Project:Bldg 507 Room 252
Line Item and Description2018UnitQuantityPriceTotal
Demolition and Disposal
AARemove and dispose of VCT(Non ACM)sf$0.00
ABRemove and dispose of sheet vinyl flooring (Non ACM)sf$0.00
ACRemove and dispose of rubber tile floorsf$0.00
ADRemove and dispose of carpetsy$0.00
AERemove and dispose of rubber/vinyl baself$0.00
AFRemove and dispose of carpet baself$0.00
AGRemove and dispose of wood baself$0.00
AHRemove and dispose of ceramic tilesf$0.00
Install Carpet (including all labor, equipment, transportation shipping and handling, etc.)
BA24"X24" Modular Carpet Tilessy$0.00
BBShipping and handlingsy$0.00
BCRolled (Broadloom) Carpetsy$0.00
BDShiping and handlingsy$0.00
BEEntry mats/Walkoff carpetsy$0.00
Furnish Carpet (material only, utilizing one of four enterprise contracts)
BFOrganic Tile with Moisture Proof Backingsy$0.00
BGOrganic Tile with Cushion Backingsy$0.00
BHOrganic Rolled with standard Backingsy$0.00
BIOrganic Rolled with Moisture Barrier Backingsy$0.00
BJOrganic Rolled with Cushion Backingsy$0.00
BKGeometric Tile with Moisture Proof Backingsy$0.00
BLGeometric Tile with Cushion Backingsy$0.00
BMGeometric Rolled with Standard Backingsy$0.00
BNGeometric Rolled with Moisture Barrier Backingsy$0.00
BOGeometric Rolled with Cushion Backingsy$0.00
BPComplementary Tile with Moisture Proof Backingsy$0.00
BQComplementary Tile with Cushion Backingsy$0.00
BREntry mats/Walkoff carpetsy$0.00
BSLow VOC Wet Adhesive for Tile Carpetpail$0.00
BTLow VOC Wet Adhesive for Rolled Carpetpail$0.00
BUDry Adhesivesy$0.00
Furnish and Install Base (including adhesive)0
CA4" Vinyl cove basesy$0.00
CB4" Carpet basesy$0.00
CC3 1/2" Pine Wood base (to include painting of trim)sy$0.00
CD3 1/2" OakWood base (to include stain finish of trim)sy$0.00
CECeramic basesf
Miscellaneous Flooring (including adhesive, all materials needed for installation)
DAFurnish and install 12"X12" VCTsf$0.00
DBFurnish and install 4" ceramic tile/groutsf$0.00
DCFurnish and install 6" ceramic tile/groutsf$0.00
DDFurnish and install 12" ceramic tile/groutsf$0.00
DFFurnish and install 18" ceramic tile/groutsf$0.00
DGFurnish and install 24" ceramic tile/groutsf$0.00
DHFurnish and install sheet vinylsy$0.00
DIFurnish and install ESD tilessf$0.00
DJFurnish and install vinyl stair treadslf$0.00
DKFurnish and install vinyl stair riserslf$0.00
DLFurnish and install stair nosinglf$0.00
DMFurnish and install transition stripslf$0.00
DNFurnish and install plywood sheathing sub floorsf$0.00
Miscellaneous
EAFurniture lifting/movingsy$0.00
EBSub floor prep(existing floors)sy$0.00
Total$0.00

File details come from the government source that posted it.