16_-_Seed_Project_Price_Sheet_(5_Jun_2018).xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Flooring IDIQ Federal contract opportunity
- Solicitation number
- FA820117R0002
About this file
Seed Project Price Sheet
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Flooring IDIQ | |||||||
| Base Year, Hill AFB, UT | |||||||
| Attn: | Capital Project Number: 1026842 | 2018 | DATE: | ||||
| Project: | Bldg 507 Room 252 | ||||||
| Line Item and Description | 2018 | Unit | Quantity | Price | Total | ||
| Demolition and Disposal | |||||||
| AA | Remove and dispose of VCT(Non ACM) | sf | $0.00 | ||||
| AB | Remove and dispose of sheet vinyl flooring (Non ACM) | sf | $0.00 | ||||
| AC | Remove and dispose of rubber tile floor | sf | $0.00 | ||||
| AD | Remove and dispose of carpet | sy | $0.00 | ||||
| AE | Remove and dispose of rubber/vinyl base | lf | $0.00 | ||||
| AF | Remove and dispose of carpet base | lf | $0.00 | ||||
| AG | Remove and dispose of wood base | lf | $0.00 | ||||
| AH | Remove and dispose of ceramic tile | sf | $0.00 | ||||
| Install Carpet (including all labor, equipment, transportation shipping and handling, etc.) | |||||||
| BA | 24"X24" Modular Carpet Tiles | sy | $0.00 | ||||
| BB | Shipping and handling | sy | $0.00 | ||||
| BC | Rolled (Broadloom) Carpet | sy | $0.00 | ||||
| BD | Shiping and handling | sy | $0.00 | ||||
| BE | Entry mats/Walkoff carpet | sy | $0.00 | ||||
| Furnish Carpet (material only, utilizing one of four enterprise contracts) | |||||||
| BF | Organic Tile with Moisture Proof Backing | sy | $0.00 | ||||
| BG | Organic Tile with Cushion Backing | sy | $0.00 | ||||
| BH | Organic Rolled with standard Backing | sy | $0.00 | ||||
| BI | Organic Rolled with Moisture Barrier Backing | sy | $0.00 | ||||
| BJ | Organic Rolled with Cushion Backing | sy | $0.00 | ||||
| BK | Geometric Tile with Moisture Proof Backing | sy | $0.00 | ||||
| BL | Geometric Tile with Cushion Backing | sy | $0.00 | ||||
| BM | Geometric Rolled with Standard Backing | sy | $0.00 | ||||
| BN | Geometric Rolled with Moisture Barrier Backing | sy | $0.00 | ||||
| BO | Geometric Rolled with Cushion Backing | sy | $0.00 | ||||
| BP | Complementary Tile with Moisture Proof Backing | sy | $0.00 | ||||
| BQ | Complementary Tile with Cushion Backing | sy | $0.00 | ||||
| BR | Entry mats/Walkoff carpet | sy | $0.00 | ||||
| BS | Low VOC Wet Adhesive for Tile Carpet | pail | $0.00 | ||||
| BT | Low VOC Wet Adhesive for Rolled Carpet | pail | $0.00 | ||||
| BU | Dry Adhesive | sy | $0.00 | ||||
| Furnish and Install Base (including adhesive) | 0 | ||||||
| CA | 4" Vinyl cove base | sy | $0.00 | ||||
| CB | 4" Carpet base | sy | $0.00 | ||||
| CC | 3 1/2" Pine Wood base (to include painting of trim) | sy | $0.00 | ||||
| CD | 3 1/2" OakWood base (to include stain finish of trim) | sy | $0.00 | ||||
| CE | Ceramic base | sf | |||||
| Miscellaneous Flooring (including adhesive, all materials needed for installation) | |||||||
| DA | Furnish and install 12"X12" VCT | sf | $0.00 | ||||
| DB | Furnish and install 4" ceramic tile/grout | sf | $0.00 | ||||
| DC | Furnish and install 6" ceramic tile/grout | sf | $0.00 | ||||
| DD | Furnish and install 12" ceramic tile/grout | sf | $0.00 | ||||
| DF | Furnish and install 18" ceramic tile/grout | sf | $0.00 | ||||
| DG | Furnish and install 24" ceramic tile/grout | sf | $0.00 | ||||
| DH | Furnish and install sheet vinyl | sy | $0.00 | ||||
| DI | Furnish and install ESD tiles | sf | $0.00 | ||||
| DJ | Furnish and install vinyl stair treads | lf | $0.00 | ||||
| DK | Furnish and install vinyl stair risers | lf | $0.00 | ||||
| DL | Furnish and install stair nosing | lf | $0.00 | ||||
| DM | Furnish and install transition strips | lf | $0.00 | ||||
| DN | Furnish and install plywood sheathing sub floor | sf | $0.00 | ||||
| Miscellaneous | |||||||
| EA | Furniture lifting/moving | sy | $0.00 | ||||
| EB | Sub floor prep(existing floors) | sy | $0.00 | ||||
| Total | $0.00 |
File details come from the government source that posted it.