Photo_Descriptions.docx

DOCX document 13 KB Posted

Attached to
Packaging and moving an IT warehouse and offices
Solicitation number
FA8201-14-R-Relocation
Issued by

About this file

Description by photo number

View the file

Other files

File Type Posted
Photo_Attachment_2.pdf PDF
12._Contractor_Q_and_A.docx DOCX document
1._Relocation_PWS_revised_10_Mar_14.docx DOCX document
12._Building_850__Warehouse_Floorplan.pdf PDF
Photo_attachment_1.pdf PDF
12._Registration_Form_for_Relocation.xlsx XLSX spreadsheet
IT_Relocation_PWS_revised(10_Feb_2014).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Photo Descriptions Photo attachment 1:

1: Building 830: one of the “floating” cubicles throughout the warehouse 2: Building 830: Shelves 3: Building 830: Shelves 4: Building 830: one of the “floating” cubicles throughout the warehouse 5: Building 830: Pallets of material will need to be moved, shelves will stay 6: Building 830: Pallets of material will need to be moved, shelves will stay 7-9: Building 830: Material to be moved 10: Building 830: Shrink Wrap machine 11: Building 830: Desks and equipment to be moved 12-15: Building 830: Material to be moved 16: Pallets must be moved 17: Building 830: Work stations to be moved 18: same as 17 19: Building 830: Stacks of cubicle walls to make the additional 15 cubicles

20. Building 830: Stacks of cubicle walls to make the additional 15 cubicles 21-24: Building 830: Material to be moved

Photo attachment 2:

1-2: Building 830: Material to be moved 3: Building 830: laptop lockers 4-6: Building 830: Current break room 7-8: Building 830 offices: Cubicles 9-10: Building 830 offices: Offices 11-12: Building 830 offices: Kitchen 13-14: Building 830 offices: Offices 15: Building 830 offices: Hallway 16: Building 850: New office Space (downstairs) 17: Building 850: New office space (Upstairs) 18: Building 850: New Break room (Upstairs) 19-20: Building 850: Shelves to be built 21: Building 850: More warehouse space 22: Building 850: Shelves to be built 23-24: Building 510: Material to be moved 25-30: Building 510: Offices to be moved 31: Building 510: Docking Bay

File details come from the government source that posted it. Updated .