Line Item descriptions for Supplemental Schedule B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8201-15-R-0005-0003.pdf | ||
| FA8201-15-R-0005-0002.pdf | ||
| Supplemental_Schedule_B_Rev._3.xlsx | XLSX spreadsheet | |
| Asbestos_Abatement_Questions.docx | DOCX document | |
| Line_Item_Descriptions_Rev1.pdf | ||
| Wage_Determination_UT104_Davis_County.pdf | ||
| Wage_Determination_UT107_Tooele_County.pdf | ||
| FA8201-15-R-0005.pdf | ||
| Asbestos_Abatement_Statement_of_Work_Final.pdf | ||
| Minimum_Order_Statement_of_Work.pdf | ||
| Revised_Supplemental_Schedule_B.xlsx | XLSX spreadsheet | |
| SSPP_DD_Form_1423_-_CDRL.pdf | ||
| Wage_Determination_UT102_Box_Elder_County.pdf | ||
| Past_Performance_Information_Sheet.pdf | ||
| QCIC_DD_Form_1423_-_CDRL.pdf | ||
| Minimum_Order_Letter_RFP.pdf | ||
| Wage_Determination_UT100_Summit_County.pdf | ||
| Wage_Determination_UT110_Weber_County.pdf | ||
| FA8201-15-R-0005-0001.pdf | ||
| Wage_Determination_WY15_Sublette_County _WY.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item # Description of Bid Items Group 1 a All work necessary to remove and dispose of asbestos containing thermal insulation from piping with an outside radius of 3 inches or less (pipe plus insulation). Quantity is lineal feet of removed insulation.
b All work necessary to remove and dispose of asbestos containing thermal insulation from piping with an outside radius greater than 3 inches but less than 8 inches (pipe plus insulation). Quantity is lineal feet of removed insulation.
c All work necessary to remove and dispose of asbestos containing thermal insulation from piping with an outside radius greater than 3 inches (pipe plus insulation). Quantity is lineal feet of removed insulation.
d All work necessary to remove and dispose of asbestos containing insulation from pipe fittings with an outside radius of 3 inches or less (fitting plus insulation).
Quantity is each fitting.
e All work necessary to remove and dispose of asbestos containing insulation from pipefitting’s with an outside radius greater than 3 inches but less than 8 inches (fitting plus insulation). Quantity is each fitting.
f All work necessary to remove and dispose of asbestos containing insulation from pipefitting’s with an outside radius greater than 8 inches (fitting plus insulation).
Quantity is each fitting.
g All work necessary to remove and dispose of asbestos containing pipe saddles with an outside radius greater than 3 inches, but less than 8 inches (saddle plus insulation). Quantity is each saddle.
h All work necessary to remove and dispose of asbestos containing pipe saddles with an outside radius greater than 8 inches (saddle plus insulation). Quantity is each saddle.
i All work necessary to remove and dispose of asbestos containing insulation from exterior of boilers, tanks, pressure vessels. Quantity is square feet of asbestos insulation surface area (one side only).
j All work necessary to remove and dispose of asbestos containing insulation from interior of boilers, tanks, ovens, pressure vessels. Quantity is square feet of asbestos insulation surface area (one side only).
k All work necessary to remove and dispose of asbestos containing millboard from walls, ceiling, duck work, ovens. Quantity is square feet of asbestos insulation surface area (one side only).
l All work necessary to remove and dispose of asbestos containing gasket materials from ovens, boilers, HVAC systems. Quantity is lineal feet of asbestos containing gasket material.
m All work necessary to remove and dispose of asbestos containing insulation from exterior of HVAC ducting. Quantity is square feet of asbestos surface area (one side only).
n All work necessary to remove and dispose of asbestos containing insulation from interior of HVAC ducting. Quantity is square feet of asbestos surface area (one o All work necessary to remove and dispose of asbestos containing cloth tape typically found as a seal on ductwork seams. Quantity is lineal feet of tape.
p All work necessary to remove and dispose of asbestos containing cloth flex connections typically found between fan housings and ductwork. Quantity is lineal feet of flex.
q All work necessary to remove and dispose of asbestos containing, lay in ceiling tiles. Quantity is square feet of ceiling tile surface area (one side only).
r All work necessary to remove and dispose of asbestos containing 12” x 12” acoustical ceiling tiles and adhesive. Quantity is square feet of ceiling tile surface area (one side only).
s All work necessary to remove and dispose of asbestos containing 12” x 12” acoustical wall tiles and adhesive. Quantity is square feet of wall surface area (one t All work necessary to remove and dispose of asbestos containing 12” x 12” acoustical tile adhesive. Quantity is square feet of surface area (one side only).
u All work necessary to remove and dispose of asbestos containing spray-on texture coatings over drywall, plaster or masonry surfaces. Quantity is square feet of surface area.
v All work necessary to remove and dispose of asbestos containing fireproofing insulation over structural members. Quantity is square feet of insulated surface.
w All work necessary to remove and dispose of asbestos containing fire proofing or textural insulation applied over non-smooth surfaces requiring an unusually high level of additional detail work. An example of this type of work would be a waffle textured concrete ceiling. Quantity is square feet of insulated surface.
x All work necessary to remove and dispose of asbestos containing floor tiles, (9” x
9” or 12” x 12”). Quantity is square feet of floor surface.
y All work necessary to remove and dispose of asbestos containing mastic/adhesive.
Quantity is square feet of floor surface.
z All work necessary to remove and dispose of asbestos containing sheet vinyl floor covering. Quantity is square feet of floor surface.
aa All work necessary to remove and dispose of asbestos containing sheet vinyl adhesive. Quantity is square feet of floor surface.
bb All work necessary to mobilize, remove, and dispose of asbestos containing roof flashing from HVAC curbs, parapet walls, roof drains, and vent pipes. Less than 300’ lineal feet per day. Quantity is lineal feet of roof flashing.
cc All work necessary to mobilize, remove, and dispose of asbestos containing roof flashing from HVAC curbs, parapet walls, roof drains, and vent pipes. Greater than 300’ lineal feet per day. Quantity is lineal feet of roof flashing.
dd All work necessary to remove and dispose of asbestos containing galbestos panels from roofs. Quantity is square feet of panel surface (one side only).
ee All work necessary to remove and dispose of asbestos containing galbestos panels from walls. Quantity is square feet of panel surface (one side only).
ff All work necessary to remove and dispose of asbestos containing cementitious transite panels from roofs. Quantity is square feet of panel surface (one side only).
gg All work necessary to remove and dispose of asbestos containing cementitious panels from walls. Quantity is square feet of panel surface (one side only).
hh All work necessary to remove and dispose of asbestos containing cementitious transite shingles or siding, by removing nails without breaking the shingle or siding. Quantity is square feet of surface one side.
ii All work necessary to remove and dispose of contaminated soil to a depth of 3 inches. Quantity is square feet of soil surface.
jj All work necessary to remove and dispose of cementitious transite pipe 3-8” inches in diameter. Does not include any costs of excavation or use of heavy equipment to lift or remove the pipe. Quantity is lineal feet of pipe.
kk All work necessary to remove and dispose of cementitious transite pipe 8-12” inches in diameter. Does not include any costs of excavation or use of heavy equipment to lift or remove the pipe. Quantity is lineal feet of pipe.
ll All work necessary to remove and dispose of transite pipe greater than 12 inches in diameter. Does not include any costs of excavation or use of heavy equipment to lift or remove the pipe. Quantity is lineal feet of pipe.
mm All work necessary to decontaminate by wet wiping, surfaces such as floors, desks, shelves, chairs, equipment etc. Quantity is square feet of wiped area.
nn All work necessary to decontaminate by wet wiping HVAC duct work and air handler units. Quantity is square feet of surface space and square feet in the case of bundled cables.
oo All work necessary to decontaminate by wet wiping, cable, conduit, and comm.
lines. Quantity is square feet of wiped area in the case of duct and conduit.
Square feet of bundled area in the case of bundled cables.
pp All work necessary to remove and dispose of ceiling track used to support asbestos containing ceiling tiles. Work includes removing track by untying the support wires (cutting not allowed). Also includes carefully disconnecting (without damaging) all electrical and other fixtures such as lighting and fire alarm systems and storing them for re-installation. Quantity is lineal feet of two-sided track.
qq All work necessary to decontaminate ceiling track used to support asbestos containing ceiling tiles by wet wiping. Quantity is lineal feet of two-sided track.
rr All work necessary to remove and dispose of particle board sub-flooring that has been coated with asbestos containing mastic, vinyl or floor tile. Work must be done without damage to the underlying support structure. Quantity is square feet of floor surface.
ss All work necessary to remove and dispose of wood sub-flooring that has been coated with asbestos containing mastic, vinyl or floor tile. Work must be done without damage to the underlying support structure. Quantity is square feet of floor surface.
tt All materials and labor necessary to properly lockdown a cleaned area. Quantity is square feet of decontaminated work area.
uu All work necessary to clean transite roof components with high-pressure water, capture water, and treat for proper disposal. Quantity is square feet of roof vv All work necessary to encapsulate transite roof components with a three part coating system. To include labor and materials. Quantity is square feet of roof ww All work necessary to remove and dispose of asbestos containing materials using a glove bag method with negative air. Quantity is each glove bag.
xx All work necessary to remove and dispose of pipes containing asbestos materials, using a wrap and cut method in 10’ foot lengths. Quantity is lineal feet of pipe.
yy All work necessary to remove and dispose of duct work containing asbestos materials, using a wrap and cut method in 10’ foot lengths. Quantity is square feet of surface space (one side only).
zz All work necessary to remove and dispose of lead based paint from building components by means of lead chemical strippers/solvents. Quantity is square feet of surface area.
aaa All work necessary to remove and dispose of lead based paint from building components by mechanical means. Quantity is square feet of surface area.
bbb All work necessary to remove and dispose of lead based paint from building components by wet scraping. Quantity is square feet of surface area.
ccc All work necessary to remove building components containing or coated with lead based paint. Quantity is square feet of surface area.
ddd All work necessary to remove and dispose of heavy metals from building and components by HEPA vacuum and wet cleaning. Quantity is square feet of surface space.
eee All cost associated with decontaminating area of rodent/pigeon virus and excrement. Quantity is per square foot.
fff All work necessary to remove and dispose of mold from building components by wet scraping/sanding. Quantity is square feet of surface area.
ggg All work necessary to remove building components containing or coated with mold. Quantity is square feet of surface area.
hhh All work necessary to remove building furniture and components to access asbestos containing materials. Quantity is each man hour.
iii All work necessary to remove and dispose of rolled carpet or carpet squares to expose asbestos floor tile or asbestos vinyl floor covering. Quantity is square feet
Item # Description of Bid Item Group 2 a All labor and material to replace insulation on pipes with an inside diameter greater than 1 inch but less than 3 inches. Insulation is 1½-inch fiberglass with paper wrapping. Quantity is linear feet of pipe.
b All labor and material to replace insulation on pipes with an inside diameter greater than 3 inch but less than 8 inches. Insulation is 1½-inch fiberglass with c All labor and material to replace insulation on pipes with an inside diameter greater than 8 inch but less than 10 inches. Insulation is 1½-inch fiberglass with d All labor and material to replace insulation on pipe fittings with a pipe inside diameter greater than 1 inch but less than 3 inches. Insulation is 1½-inch fiberglass with paper wrapping and zeston cover. Quantity is linear feet of pipe.
e All labor and material to replace insulation on pipe fittings with a pipe inside diameter greater than 3 inch but less than 8 inches. Insulation is 1½-inch fiberglass with paper wrapping and zeston cover. Quantity is linear feet of pipe.
f All labor and material to replace insulation on pipe fittings with an inside diameter greater than 8 inch but less than 10 inches. Insulation is 1½-inch fiberglass with paper wrapping and zeston cover. Quantity is linear feet of pipe.
g All labor and material to replace pipe saddles with a non-asbestos calcium silicate material, with an outside radius greater than 3 inches, but less than 8 inches (saddle plus insulation). Quantity is each saddle.
h All labor and material to replace pipe saddles with a non-asbestos calcium silicate material, with an outside radius greater than 8 inches, (saddle plus insulation).
Quantity is each saddle.
i All labor and material to replace insulation on boilers or hot water tanks.
Insulation is 2-inch fiberglass tank wrap. Quantity is square feet of tank wrap.
j All labor and material to replace insulation on exterior of HVAC duct work.
Insulation is 1-1/2 inch fiberglass duck wrap. Quantity is square feet of duct run.
k All labor and material to replace ceiling batt insulation in attic area(s). Insulation is R-38 24 X 48 KR material. Quantity is square feet of attic space.
l All labor and material to replace ceiling batts with stick pin insulation in attic area(s). Insulation is Thermal faced foil batt material. Quantity is square feet of attic space.
m All labor and material to replace wall batt insulation. Insulation is R-13 15 X 93 KR material. Quantity is square feet of wall space.
n All labor and material to install new particleboard sub-floor. Particleboard is ½ inch installed with 1-½ staples. Quantity is square feet of floor area.
o All labor and material to install new plywood sub-floor. Plywood is ¾ inch installed with 8d box nails. Quantity is square feet of floor area.
p All labor and material to install new acoustic drop-in 2’ x 2’ ceiling tiles and grid system, including re-installing existing light fixtures. Quantity is square feet of ceiling area.
q All labor and material to install new acoustic drop-in 2’ x 4’ ceiling tiles and grid system, including re-installing existing light fixtures. Quantity is square feet of ceiling area.
r All labor and material to install new acoustic drop-in 2’ x 2’ ceiling tiles only.
Quantity is square feet of ceiling area.
s All labor and material to install new acoustic drop-in 2’ x 4’ ceiling tiles only.
Quantity is square feet of ceiling area.
t All labor and material to install new labels on pipe insulation covers. Quantity is each label.
u All labor and material to install new labels on duct work. Quantity is each label.
v All labor and material to install new labels on acoustic ceilings. Quantity is each label.
w All labor and material to construct temporary hard walls out of 2x4x10’ studs and 5/8”x 4’x 8’ wafer board. Government to retain ownership of the materials.
Quantity is square feet of surface area.
x All labor and material to provide 5/8”x 4x8’ wafer board. Government to retain ownership of the materials. Quantity is each sheet.
y All labor and material to repair and paint damaged walls and ceilings. Quantity is square feet of surface area.
z All labor and material to repair/replace damage floor tile. Quantity is square feet of floor area.
aa All labor and material to repair/replace carpet. Quantity is square yard of floor area.
bb All labor and material to repair/replace damage sheet vinyl floor covering.
Quantity is square yard of floor area.
Item # Description of Bid Item Group 3.
a All additional cost associated with responding to an emergency clean up as specified in contract documents (Within 24 Hours). Quantity is each emergency incident.
b All costs associated with supplying one complete set of scaffolding. One set includes two ends, two cross braces. Quantity is each complete set for a period of 1 month.
c All costs associated with supplying one complete set of scaffold planking. One set includes two planks to form a complete floor. Quantity is each complete set for a period of 1 month.
d All costs associated with supplying one complete set of scaffold safety railing.
One set includes 3 sides. Quantity is each complete set for a period of 1 month.
e All cost associated with taking personnel air samples. Quantity is each sample.
f All cost associated with taking background/area air samples. Quantity is each sample.
g All cost associated with running aggressive air clearance samples. Quantity is each sample.
h All cost associated with taking personnel air samples for lead based paint abatement (LBP). Quantity is each sample.
i All cost associated with taking background/area samples for lead based paint abatement (LBP). Quantity is each sample.
j All cost associated with providing clearance wipe samples for lead based paint abatement (LBP) Quantity is each sample.
k All cost associated with providing laboratory analysis of asbestos samples using TEM methods. Quantity is each sample.
l All cost associated with providing laboratory analysis of asbestos samples using PCM methods. Quantity is each sample.
m All cost associated with providing laboratory analysis of lead based paint (LBP) air samples using NIOSH 7082. Quantity is each sample.
n All cost associated with providing laboratory analysis of clearance wipe samples for lead based paint abatement. Quantity is each sample.
o All cost associated with providing laboratory analysis for a toxic characteristic leaching procedure (TCLP) for disposal of materials. Quantity is each sample.
p All cost associated with providing a licensed electrician. Quantity is per hour.
q All cost associated with providing a licensed plumber. Quantity is per hour.
r All cost associated with providing 3 stage decontamination unit as specified by the Utah Division of Air Quality. Quantity is each unit.
s All cost associated with providing a containment area 12ft. by 12 ft by 12ft or smaller. Quantity is each unit.
t All cost associated with providing a containment area larger than 12ft. by 12ft. by 12ft. Quantity is per square foot.
u All cost associated with providing a containment area larger than 12ft. by 12ft. by 12ft above 20ft. Quantity is per square foot.
v All cost associated with providing a generator capable of supplying enough electricity to support asbestos or lead based paint removal projects and equipment.
Quantity is per day.
w All cost associated with providing a backhoe. Quantity is per day.
x All cost associated with providing a scissor lift or JLG to access abatement areas less than 40 feet. Quantity is per day.
y All cost associated with providing a scissor lift or JLG to access abatement areas greater than 40 feet and less than 60 feet. Quantity is per day.
z All cost associated with providing a scissor lift or JLG to access abatement areas greater than 60 feet and less than 80 feet. Quantity is per day.
aa All cost associated with providing a scissor lift or JLG to access abatement areas greater than 80 feet and less than 100 feet. Quantity is per day.
bb All cost associated with providing a scissor lift or JLG to access abatement areas greater than 100 feet. Quantity is per day.
cc All cost associated with disposal of materials as construction debris. Quantity is per pound.
dd All cost associated with demolition of drywall material on walls and ceiling.
Quantity is per square foot.
ee All cost associated with demolition of lath/plaster material on walls and ceiling.
Quantity is per square foot.
ff All cost associated with demolition of brick or block walls. Quantity is square feet gg All cost associated with the services of an independent Certified Industrial Hygienist for consulting fee and work plans. Quantity is per job.
hh All cost associated with the services of a independent Certified Industrial Hygienist for on-site consultation beyond that required specifically under this contract. Quantity is per day.
ii All cost associated with the services of an independent Certified Industrial Hygienist representative to run area and clearance samples. Quantity is per day.
jj All cost associated with performing set-up and abatement work at Little Mountain Facility. Quantity is per day.
kk All cost associated with performing set-up and abatement work at Utah Test and Training Range (UTTR) Facility. Quantity is per day.
File details come from the government source that posted it. Updated .