Asbestos Abatement Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Abatement Services, newest first.
File Type Posted
FA8201-15-R-0005-0003.pdf PDF
FA8201-15-R-0005-0002.pdf PDF
Asbestos_Abatement_Questions.docx DOCX document
Line_Item_Descriptions_Rev1.pdf PDF
Supplemental_Schedule_B_Rev._3.xlsx XLSX spreadsheet
Line_Item_Descriptions.pdf PDF
Minimum_Order_Statement_of_Work.pdf PDF
Revised_Supplemental_Schedule_B.xlsx XLSX spreadsheet
SSPP_DD_Form_1423_-_CDRL.pdf PDF
Wage_Determination_UT102_Box_Elder_County.pdf PDF
Past_Performance_Information_Sheet.pdf PDF
QCIC_DD_Form_1423_-_CDRL.pdf PDF
Minimum_Order_Letter_RFP.pdf PDF
Wage_Determination_UT100_Summit_County.pdf PDF
Wage_Determination_UT110_Weber_County.pdf PDF
FA8201-15-R-0005-0001.pdf PDF
Wage_Determination_WY15_Sublette_County _WY.pdf PDF
Wage_Determination_UT104_Davis_County.pdf PDF
Wage_Determination_UT107_Tooele_County.pdf PDF
FA8201-15-R-0005.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION, SPECIFICATIONS

AND

STATEMENT OF WORK (SOW)

FOR

ABATEMENT INDEFINITE-DELIVERY/INDEFINITE-QUANTITY (IDIQ) CONTRACT

HILL AIR FORCE BASE

UTAH

26 January 2015 i

TABLE OF CONTENTS

PARA TITLE PAGE

A-01 Description of Work 1

A-02 Qualifications 1

A-03 Project Management 1

A-04 General Requirements 3

A-05 Existing Facilities/Job Site Verification 4

A-06 Submittals 4

A-07 Medical Requirements 4

A-08 Training 5

A-09 Health and Safety 5

A-010 Respirator Program 5

A-011 Industrial Hygienist 5

A-012 Testing Laboratory 6

A-013 Landfill 6

A-014 Work Procedures 6

A-015 Clearance Sampling 8

A-016 Waste Handling 9

A-017 Protection and Clean-Up 10

A-018 Applicable Publications 10

A-019 Contractor Furnished Equipment/Supplies 11

A-020 Government Furnished Equipment/Materials 12

A-021 Base Entry 13

A-022 Base Regulations 14

A-023 Hill Range Access Requirements 15

A-024 Environmental Protection 18

A-025 Green Procurement 23

A-026 Utilities Services 24

A-027 Weather Conditions 25

A-028 Fire Prevention and Protection 25

A-029 Safety and Accident Prevention 26 i

A-030 Emergency Medical Treatment 28

A-031 Facilities Damages 28

A-032 Contract Completion and Phase-Out 28

Appendix A Electronic Publications 29

Appendix B Definitions 31

Appendix C Safety, Fire Protection and Health Specification 34

Appendix D Hill AFB Asbestos/LBP Abatement Prequalification 50

A-01. DESCRIPTION OF WORK:

Abatement is a multiple award Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract to provide a streamlined means to complete asbestos, Lead Based Paint (LBP), heavy metals, animal excrement and other abatement activities, sampling and inspection activities. The vast majority of the abatement projects will be at Hill Air Force Base (Hill AFB), with a small quantity of projects at Little Mountain, Utah Test and Training Range (UTTR), Dugway, Carter Creek and other associated sites located in Utah and Pinedale, Wyoming.

All work shall be in conformance with the requirements of the contract including, but not limited to: furnishing all materials, labor, tools, equipment, transportation, supervision, management, disposal, and other services to include incidentals necessary for the successful completion of issued task orders in accordance with these specifications, Environmental Protection Agency (EPA), Occupational, Safety and Health Administration (OSHA), Utah Division of Air Quality (UDAQ), and all other applicable federal, state, and or local regulations.

The government estimates that the volume of work will be between $3,500K and $10,000,000 during a 5-year performance period exclusive of option to extend services. The work will consist primarily of removal and disposal of asbestos and LBP containing materials, but may include heavy metals cleanup, mold remediation, and pigeon/rodent excrement cleanup. Task orders may include removing/re-installation of hard walls, hard ceilings, sub-flooring, suspended drop-in ceiling systems, pipes, sub-flooring, insulation, acoustical ceilings, etc.

when these building components and or materials were removed as part of an abatement project.

A-02. QUALIFICATIONS:

All offerors must submit, for approval by the 75 CES/CEOHA office, all the necessary information requested in Appendix D, Hill AFB asbestos/LBP abatement contractor qualifications document. . The contractor is required to maintain compliance with these qualifications requirements for the duration of the contract and may be required at any time to provide further documentation of compliance. If at any time the contractor is found to not be in compliance with the qualification requirements this may be used to terminate the contract. In addition all abatement contractors must carry active “occurrence” type liability insurance while performing any work under this contract.

Any subcontractors performing abatement activities must also meet these qualification requirements and be approved by the 75 CES/CEOHA office prior to performing any work at Hill AFB and its associated sites.

A-03. PROJECT MANAGEMENT: The following functions are required for contract management for the duration of the contract.

Contractor: The general (prime) contractor awarded this contract is responsible for:

(1) Successful completion of all terms and conditions of this contract.

(2) All employees, subcontractors, suppliers and consultants under his/her employ.

(3) All labor, materials, equipment, supervision, transportation and all else required to successfully complete each Task Order (TO) issued.

(4) The contractor shall perform fifteen (15) percent or more of the actual construction using prime contractor personnel for each project, office and field supervision will not be included in the 15%.

Local Contractor Office: The contractor shall maintain a local office/warehouse with all the necessary equipment and materials to facilitate responding within twenty-four hours of receipt of delivery orders requiring emergency response. The contracting officer shall determine when such an emergency response is required. The Contractor will be responsible for obtaining a waiver of the ten-day notification requirement from the UDAQ if required.

Personnel: The contractor shall provide qualified personnel to perform all functions necessary to execute this contract, to include but not limited to the following:

Project Designer: The project designer will be responsible for creating the abatement work plans for each TO. This individual(s) shall have direct oversight of all project design and planning activities. The name of this person and any alternates shall be designated in writing to the Contracting Officer (CO) and the 75 CES/CEOHA Project Manager (PM).

Project Supervisor: The project supervisor will be responsible for the day to day execution of abatement activities in accordance with the approved work plan. The contractor shall ensure that a UDAQ certified supervisor is onsite at all times for asbestos and LBP abatement projects. This individual(s) shall have direct responsibility for ensuring abatement is performed in accordance with the abatement work plan and all applicable regulations.

Contractor Employee Requirements: The contractor shall ensure that employees and subcontractor employees have current/valid licenses and certifications necessary to perform their functions. At a minimum all employees performing asbestos/LBP abatement activities shall have up to date UDAQ worker certification and have documented awareness training for heavy metals (must be specific to the metals being abated), mold, and excrement abatement activities. Any cost or time associated with obtaining licenses or certifications shall be at the contractor’s expense. The contractor shall not employ any person who is nor was an employee of the US Government, if the employment of that person would create a real or perceived conflict of interest. Any questions on this issue should be addressed to the CO.

A-04. GENERAL REQUIREMENTS:

Regulations: Contractors shall abide by all applicable EPA, OSHA, UDAQ, and Hill AFB regulations as referenced in section A-18 of this document. These standards are not meant to be exhaustive and if there is a conflict between these standards with other codes, regulations, and specifications included in this contract, the most stringent requirement shall apply at all times.

Changes: If the Government requires changes the contractor considers significant enough to add time or money, the contractor must immediately notify the 75 CES/CEOHA PM and CO in writing of its position. Field changes, modifications, or possible expenditures of Government funds must be coordinated through Contracting (PK), Civil Engineering (CE), the Using Agency, and the Contractor. Modifications to TO’s must be made through PK after the contractor provides a proposal for incorporating the change. Government review and approval of the contractor’s proposal as well as modifications to the work plan and UDAQ notifications will be required prior to any changes being implemented.

Government Acceptance and Payment: Final payment (NET 30) will be made after final project acceptance is made by the Government and after the contractor submission of all closeout project documentation, as referenced in A-06, and an invoice is submitted through Wide Area Work Flow (WAWF). Progress payments (NET 14) may be included in the Task Order award at the Government’s discretion, typically Task orders that exceed 60 days or $150K will be authorized for Progress Payments. Further guidance for Progress Payments will be included in the contract with the applicable contract clauses (FAR 52.232-16 Alternate I &

DFARS 252.232-7004).

Coordination and Scheduling: In order for the work to progress smoothly and cause minimal difficulties it will be necessary for the contractor, 75 CES/CEOHA PM and CO to maintain close and active coordination. The contractor shall keep the Government informed at all times of when and what work will be accomplished. All work schedules will be coordinated with the appropriate representatives of the Contracting and Technical Offices and accomplished in such a manner that minimum inconvenience will be caused to the Government. The contractor is required to schedule, at a minimum 2 hours prior, with the 75 CES/CEOHA for both pre-abatement and post-abatement visual inspections.

Pre-Abatement Inspections: The contractor shall schedule a pre-abatement inspection of the containment on all abatement projects to ensure compliance with the approved work plan and all applicable regulations. This must be done prior to any abatement being done.

Post-Abatement Inspections: The contractor shall schedule a post-abatement inspection after completion of all abatement activities and the containment has been cleaned and ready for clearance sampling. The containment shall not be encapsulated, tore down, or clearance sampling performed before an inspection has been completed by the 75 CES/CEOHA office.

A-05. EXISTING FACILITIES/JOB SITE VERIFICATION:

Dimensions, quantities, elevations, and site conditions shall be verified by the contractor.

Discrepancies between statement of work, specifications and existing conditions shall be referred to the 75 CES/CEOHA PM in writing before submitting a proposal, if possible, or before work affected is performed. Failure to make such notifications shall place responsibility upon the contractor to carry out work in satisfactory, workman like manner. Any duplication of work made necessary by failure or neglect on the contractor's part to comply with this requirement shall be completed at their sole expense.

A-06. SUBMITTALS:

System Safety Program Plan (SSPP) shall be submitted no later than 30 days after contract award, and shall follow the requirements listed in the attached Contract Data Requirements List (CRDL) and Data Item Description (DID) DI-SAFT-81626.

Quality Assurance Program Plan (QAPP) shall be submitted no later than 30 days after contract award, and shall follow the requirements listed in the attached Contract Data Requirements List (CRDL) and Data Item Description (DID) DI-QCIC-81794.

Abatement work plans are required to be submitted, for each task order after the minimum order, to the 75 CES/CEOHA PM and approved prior to any work being done. All abatement plans shall be written by a UDAQ certified project designer. The contractor shall be responsible for submitting all notifications to UDAQ when required and providing a copy of approved notification to the 75 CES/CEOHA office.

Upon completion of any abatement task order the contractor shall submit copies of all project documentation to the 75 CES/CEOHA office. Documentation shall include but is not limited to daily logs, sign-in sheets, UDAQ notifications, air sampling results, and waste manifests.

With the exception of the waste manifest all documentation must be received before final payment will be made. Waste manifest must be received within 30 days of acceptance by the approved landfill.

A-07. MEDICAL REQUIREMENTS:

A. Medical Examinations: Provide workers exposed to airborne asbestos fibers or LBP with a comprehensive medical examination. The content of the examination shall be in accordance with all applicable regulations.

B. Medical Records: Maintain complete and accurate records, as required by all applicable regulations, of employees’ medical examinations and make records of the required medical examinations available for inspection and copying to: An authorized representative for The Director of The National Institute for Occupational Safety and Health (NIOSH), and an employee’s physician upon the request of the employee or former employee.

A-08. TRAINING:

All personnel performing abatement activities or project management duties as outlined in section A-03 shall be trained and certified in accordance with state and federal regulations. At a minimum all personnel performing asbestos/LBP abatement activities shall be certified by UDAQ at the worker level. All asbestos/LBP abatement TO’s require a project supervisor to be on site at all times and these supervisors shall be certified by UDAQ at this level. Project designer’s shall be certified by UDAQ at this level and shall be responsible for drafting all work plans for each TO. Training shall be provided by a UDAQ approved course provider and all employees must have a valid UDAQ issued state certification card on site.

A-09. HEATLH AND SAFETY:

In addition to detailed requirements of this specification, comply with laws, ordinances, rules, and regulations of federal, state, regional, and local authorities regarding handling, storing, transporting, and disposing of waste materials. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where specification requirements and performance documents vary, the most stringent requirement shall apply.

A-010. RESPIRATOR PROGAM:

Establish a respirator program as required by ANSI Z88.2 and 29 CFR 1910.134. Submit a summary of respirator fit testing and medical qualification to wear respirators (specify Types).

A-011. INDUSTRIAL HYGIENIST:

The Industrial Hygienist shall be certified by the American Board of Industrial Hygienists or have a college degree and four or more years of professional experience in the field of industrial hygiene. The IH must be an independent third party not employed by the abatement contractor. The IH shall perform and personally supervise all clearance sampling for the abatement contractor. The IH may use a representative for other on-site work but this individual must have formal training in respirator fit testing, have a minimum of five abatement projects of similar complexity, serving as the supervisory industrial hygienist on at least three of those five and be UDAQ Contractor/Supervisor and Inspector Certified for both asbestos and LBP.

A-012. TESTING LABORATORY:

Testing Laboratory: Submit the name, address, and telephone number of the testing laboratory selected to perform all sample analysis when required by this contract. Submit certification that persons analyzing the samples have been judged proficient by successful participation within the last year in the NIOSH Proficiency Analytical Testing (PAT) Program. The lab shall be certified under the National Voluntary Lab Accreditation program (NVLAP) and American Industrial Hygiene Association (AIHA) accredited.

A-013. LANDFILL:

Submit written evidence that the landfill(s) selected are approved for disposal of asbestos by the EPA, state, and local regulatory agencies. Containers and disposal of Lead and Heavy metals shall be coordinated through the Hill AFB Hazardous Waste Facility.

A-014. WORK PROCEDURE:

Perform abatement related work in accordance with Air Force, OSHA, EPA and UDAQ regulations, and as specified herein. At times the Government may require that the work shall be supervised at all times by an independent third party consultant. This individual shall be certified in the State of Utah as a Contractor/Supervisor. Also at times, the government may choose to perform all sample analysis on base. Such requirements will be spelled out specifically in the Statement of Work for each delivery order prior to negotiating fees.

Personnel shall wear and use protective clothing and equipment as specified. Eating, smoking, drinking, chewing tobacco or chewing gum shall not be permitted when wearing a respirator of any type. Personnel of other trades not engaged in the abatement activities shall not be exposed to asbestos, LBP, heavy metals, etc., unless they are trained in the use of and are wearing the necessary protection as specified above. The contractor shall isolate the Heating, Ventilation, and Air Conditioning (HVAC) system to prevent contamination when feasible.

When using amended water as required, the contractor shall also provide temporary electrical service to the work area that is ground fault protected and isolate the remaining electrical service so that power can be interrupted without disrupting service to the occupied areas. At times when the building is turned over to the contractor and is unoccupied, the contractor shall lock out and tag out the building HVAC system and electrical services, when abatement is performed and provide temporary electrical service protected by a ground fault circuit interrupter.

A. Movable Furnishings: All movable furnishings, equipment, and fixtures in the proposed work area shall be pre-cleaned with High Efficiency Particulate Air (HEPA) filter equipped vacuuming devices or wet cleaning methods. After cleaning, the items shall be removed from the work area and stored in an area that is not subject to asbestos contamination. Cover all non-movable objects in the work area with 6-mil polyethylene sheeting secured into place. The items shall not be returned to the work area until final cleanup has been completed, a final visual inspection by Civil Engineering has been completed and a final aggressive air clearance sampling has been completed when required and has been successfully documented.

B. Accessibility of Work Areas:

The Government will rearrange areas to the extent of providing a reasonable, direct, and unobstructed path to the work site. During abatement, the Contractor shall confine his equipment and employee pattern to these designated areas. Where the building is still occupied during the removal operations, interference with the functional operation of the building occupants outside of these areas will not be permitted. Where conflicts arise due to

Contractor’s operations, the decision of the Contracting Officer or their authorized representative shall be final.

C. Asbestos Handling Procedures:

1. General: Adequately wet asbestos material with a fine spray of amended water before and during removal, cutting, or other handling to reduce the emission of airborne fibers. Remove material and immediately place in plastic disposal bags. Where water is generated it will be necessary to filter the water to remove asbestos fibers using a 5-micron water filtration system before disposal. When wrap and cut method is used to remove both piping and insulation, wet the insulation, then, using the negative pressure glove bag technique, remove 10-inch to 12-inch sections of the pipe insulation and encapsulate exposed edges of the asbestos insulation to remain, and remove the pipe. Where unusual circumstances prohibit the use of plastic disposal bags, the industrial hygienist shall submit, in the asbestos plan, an alternate proposal for removal of asbestos materials and containment of asbestos fibers.

2. Exposed Pipe Insulation Edges: Encapsulate exposed edges of asbestos insulation to remain.

Wet and cut the rough ends true and square with sharp tools and encapsulate the edges with a ¼-inch-thick layer of insulating cement troweled to a smooth, hard finish. When cement is dry, lag the end with a layer of fiberglass cloth and thermal insulation adhesive, overlapping the existing ends by 4 inches. When insulating cement and cloth are an impractical method of sealing raw edges of asbestos, take appropriate steps to seal the raw edges as approved by the Contracting Officer. Remove existing asbestos insulation for new piping connections during the asbestos handling and disposal procedures as specified herein.

D. Identification of Asbestos-free Insulation:

Apply “ASBESTOS-FREE” markings to the exterior jackets of non-asbestos insulated piping installed herein. Letter size shall be in accordance with MIL-STD-101. Apply marking at maximum of 20-foot intervals. Indicate the limits of “ASBESTOS-FREE” insulation with a 1-inch wide band with attached arrow pointing in the direction of the label “ASBESTOS-FREE.”

Paint markings in orange, No. l2246 of Fed. Std. 595.

E. Air Monitoring:

Monitoring of airborne concentrations of asbestos, LBP, or heavy metals shall be in accordance with applicable regulations for the specific materials identified. The Government shall have the option to perform independent monitoring if needed.

1. Monitoring Prior to Abatement Work: Provide area monitoring and establish the baseline Time Weighted Average (TWA) 1 day prior to the construction of regulated work areas when required. The baseline TWA is determined by taking at least three general area air samples in each abatement site.

2. Monitoring During Abatement Work: Provide personal and area monitoring to establish the TWA and excursion levels during the exposure to airborne concentrations of asbestos.

A-015. CLEARANCE SAMPLING:

When required after the removal site has passed the visual inspection, the Industrial Hygienist shall perform an aggressive air sample of the area (at least 3 samples per removal site, with minimum volume of 1800 liters per sample). Submit the results of these samples to the 75 CES/CEOHA office. The contractor shall not remove the containment area until written permission is received from the 75 CES/CEOHA office. Should any of the final samplings indicate an unacceptable value, (acceptable clearance levels shall be identified based on the materials identified for each individual project) the Contractor shall re-clean the area and shall repeat the clearance process until acceptable levels are achieved. All costs associated with re-cleaning and re-testing as a result of failure to meet clearance-sampling limits or visual inspections mentioned above shall be borne by the contractor.

A-016. WASTE HANDLING:

Asbestos Collect asbestos waste, scrap, debris, bags, containers, equipment, and asbestos-contaminated clothing, which may produce airborne concentrations of asbestos fibers in leak-tight impermeable container for disposal, using one of the following containment methods:

A. If asbestos waste contains sharp edged components, use metal or fiber drums with locking-ring tops.

B. Double polyethylene bags, each of at least 6-mil thickness and which can be securely sealed, may be used for asbestos waste, provided it does not contain sharp edged components.

C. Large components or structural members covered or coated with friable asbestos-containing materials may be removed intact and wrapped in two layers of 6-mil polyethylene sheeting secured with tape for disposal.

D. Alternate containment methods may be used if written approval is obtained in advance from the UDAQ.

E. The name Hill Air Force Base and the location of the site where the asbestos waste was generated must be clearly and permanently affixed to the container or wrapping.

F. Dispose of asbestos materials in the approved EPA landfill designated in the submittals.

G. Vehicles used to transport Asbestos Containing Materials (ACM) Waste must be demarcated during loading and unloading as specified in 40 CFR section 61.149 (d) (1).

Before transporting off base, complete the required EPA waste shipping record and have it signed by the contracting officer or their representative. No asbestos waste will be permitted to leave Hill Air Force Base without a completed and signed Waste Shipping Record (WSR). Upon arrival at the approved disposal site, the WSR is to be signed by the site personnel and a copy of the signed WSR is to be sent to the contractor within the time frame as required by 40 CFR 61.149(e). A copy of the returned WSR is to be provided to the Contracting officer or their representative. If the contractor does not receive the signed copy of the WSR within 35 days, the contractor must contact the site to determine the status of the waste shipment. If after 45 days a copy has still not been received, the contractor must notify the Utah Division of Air Quality in writing and provide the following information: (a.) A copy of the WSR for the load in question. (b.)

A cover letter signed by the contractor explaining his efforts to locate the waste shipment and the results of those efforts. Failure to comply with this or other requirements of the specification will constitute sufficient grounds for termination of this contract. For temporary storage, store sealed impermeable bags in asbestos waste drums. Procedure for hauling and disposal shall comply with 40 CFR 61, Subpart M, 49 CFR 172-177, 40 CFR 241 and 257, and state, regional, and local standards. Sealed plastic bags may be removed from drums and deposited into the burial site unless the bags have been broken or damaged. Damaged bags shall remain in the drum and the entire contaminated drum shall be buried. Uncontaminated drums may be recycled. Workers unloading the sealed drums shall wear appropriate respirators and personal protective equipment when handling asbestos materials at the disposal site.

LBP/Heavy Metals Collect LBP/Heavy metals waste, scrap, debris, bags, containers, equipment, and contaminated clothing in leak-tight impermeable container for disposal. Containers and disposal of LBP and Heavy metals shall be coordinated with the Hill AFB Hazardous Waste Facility at no cost to the contractor.

A-017. PROTECTION AND CLEANUP:

Protection: All abatement work shall be performed without damage to or contamination of adjacent areas, equipment, items, or materials. Should existing equipment, items, or materials become damaged or contaminated by work done under this contract, the contractor shall restore all areas to original condition at no additional cost to the government.

A-018. APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. The latest version of applicable regulations shall take precedence over the requirements of this specification when the regulation results in a higher standard of performance. If there is a conflict between these codes, regulations, and specifications, the most stringent requirement shall apply at all times.

A. Federal Standard (Fed. Std.): Fed. Std. 595A Colors & Notices 2, 3, 4, 5, 7 & Errata, 8

B. Military Standard (Mil. Std.): MIL-STD-lOIB Color Code for Pipelines and for Compressed-Gas Cylinders

C. Code of Federal Regulations (CFR) Publications:

29 CFR Access to Employee Exposure and Medical Records 1910.20 29 CFR Respiratory Protection 1910.134 29 CFR 1910.145 Specifications for Accident Prevention Signs and

Tag 29 CFR 1926.1101 Asbestos Construction Standard 29 CFR 1910.1001 Asbestos General Industry Standard 29 CFR 1926.62 Lead Construction Standard 29 CFR 1910.1025 Lead General Industry Standard 29 CFR 1910.1018 Inorganic Arsenic 29 CFR 1910.1027 Cadmium 29 CFR 1919.1026 Hexavalent Chrome (Chrome VI) 40 CFR 61, General Provisions Subpart A 40 CFR 61, National Emission Standard for Hazardous Air Pollutants

(NESHAP) Subpart 40 CFR 241, Guidelines for the Land Disposal of Solid Wastes 40 CFR 257, Criteria for Classification of Solid Waste Disposal Facilities and Practices.

D. American National Standards Institute (ANSI) Publications:

Z9.2-79 Fundamentals Governing the Design and Operation of Local Exhaust Systems Z88.2-80 Practices for Respiratory Protection

E. National Institute of Occupational Safety and Health (NIOSH) Publications:

Manual of Analytical Methods, 2nd Ed., Vol. 1, Physical and Chemical Analysis Method (P&CAM) Method 239 Asbestos Fibers in Air

Method 7400 Fibers (NI, 3rd Ed., Vol. 1) F. National Institute of Occupational Safety and Health (NIOSH) Publications:

NIOSH 7082: Atomic absorption spectroscopy – Flame (AAS-F) NIOSH 7105: Atomic absorption spectroscopy – Graphite furnace (AAS-GF)

NIOSH 7300: Inductively coupled plasma – Atomic emission spectroscopy

(ICP-AES).

G. Underwriters Laboratories, Inc. (UL) Publication:

586-77 (R 1982) Test Performance of High Efficiency Particulate, Air Filter Units

H. Utah Division of Air Quality:

R307-1-8 Asbestos Certification, Asbestos work practices, and AHERA Implementation

I. Hill AFB asbestos operations plan Hill AFB LBP operations plan

A-019. CONTRACTOR FURNISHED EQUIPMENT/SUPPLIES:

A: RESPIRATORS: Respirators shall be of a type approved by the NIOSH, for use in atmospheres containing asbestos, LBP, and heavy metals. At a minimum the contractor shall be required to use half face negative pressure air purifying respirators with appropriate cartridges, but depending on air sampling results may be required to provide respirators with higher protection values as established by OSHA/NIOSH.

Where Type C supplied air respirators are in use the air supplied shall conform to the requirements of 29 CFR 1910.134 (d) regarding air quality. All equipment used shall be usable as a complete system.

B. Protective Clothing: The contractor shall provide protective outerwear to all abatement workers and others entering abatement areas. This protective outerwear shall include head coverings and foot coverings. Furnish disposable plastic or rubber gloves to protect hands.

Cloth gloves may be worn inside the plastic or rubber gloves for comfort, but shall not be used alone. Use tape to secure sleeves at the wrists and to secure foot coverings at the ankles.

Provide eye protection for personnel engaged in abatement operations when the use of a full-face respirator is not required.

C. Warning Signs and Labels: Display caution signs in accordance with OSHA regulations at all approaches to any location where abatement activities are taking place. Provide and attach labels to waste containers as required.

D. Back-up Generator: During abatement of friable asbestos, the contractor may be required to provide an auxiliary back-up generator, capable of supplying power automatically to the negative pressure enclosure, should commercial power fail. This requirement will be spelled out specifically in the Statement of Work.

E. Temporary Utilities: The contractor must supply water and power to the work site as necessary. In most cases, though not always, electrical power and cold water for use will be available within 200 ft of work site. However, hot water in quantities needed for showers will not be available and must be provided by the contractor.

A-020. GOVERNMENT FURNISHED EQUIPMENT/MATERIALS:

Government Furnished Materials (GFM): Government Furnished Materials will not be furnished to the contractor as a general rule. However, the Government reserves the right to provide GFM and/or Government Furnished Equipment (GFE) to be used on any task order.

The contractor shall follow the instructions of the Contracting Officer's representative regarding the disposition of all Government-furnished property not consumed in performance of the task order.

Contractor Transporting: The contractor with his own forces shall transport all GFM and/or GFE, if any described on the task order from the Government’s storage area to the work site indicated in the task order.

Risk and Responsibility: Once accepted, the contractor assumes the risk and responsibility for the loss or damage to any GFM/GFE.

Transportation Cost: It is anticipated that the majority of GFM/GFE will be provided at or adjacent to the project site. In such instances, no separate transportation costs would be incurred or cost. If transportation of GFM/GFE is other than what would normally be encountered, a separate cost would be included in the final negotiated price of the project order.

Location: The location (as well as the type, quantity, and description) of GFM/GFE will be identified in each project ordered when applicable.

A-021. BASE ENTRY:

Conformance with Regulations/Directives: The contractor shall conform to base regulations and directives pertaining to security, safety, traffic, fire, and personnel clearances while on Hill

AFB.

Base Access: The contractor is responsible for requesting access to the base for their personnel by completing and submitting AF Form 496 to the contracting officer or their representative at

OL:H/PZIOA.

Secure/Restricted Area: The contractor is responsible for requesting access to secure and restricted areas by submitting AF Form 2583 for a Controlled Area badge or AF Form 2586 for an Unescorted Entry Authorization Certificate. A background check of each individual requesting entry to a secure or restricted area will also be made before access is authorized.

Two forms of picture identification are required each time such areas are entered. Secured area badges will be issued by 75 CEG Group Security Manager, currently located in Building 593 North.

The Government may require at times that the contractor be under escort during performance of a project. These escorts might be Government employees at times or the contractor may be required to accomplish these escort duties. Controlled areas contain valuable resources and are clearly marked with a “Controlled Area” sign. A warning sign marks restricted work areas.

Restricted work areas contain priority resources and all personnel must obtain specific written permission to enter. Work in some areas of the base may require special briefings for the contractor’s employees (special briefings are required before work is accomplished in the flight line area).

Personnel and equipment entry may be subject to delays due to security processing. The contractor shall not be compensated for reasonable delays in accessing the site. Also, due to the nature of controlled areas, the contractor may be requested to leave the controlled area at any given time. The Contracting Officer may extend the contract performance time when area designations change while the contractor is working.

Processing Time: The above information shall be submitted to the CO a minimum of ten (10) calendar days [fifteen (15) calendar days for access to secure/restricted areas] in advance of when access to the job site will be required.

Unauthorized Activity: The contractor shall inform all personnel working under his/her jurisdiction (including subcontractor and supplier personnel) that access to areas outside of the immediate work area (excluding cafeterias and restroom near the work site, direct haul and access routes, Contracting and Civil Engineering offices, and points of supply and storage) is prohibited. Circulation of said personnel will be limited to official business only. Persons engaged in unauthorized reconnaissance of other contractor or Government activity will be referred to the CO for disposition Infractions involving possible compromise of national security will be turned over to the FBI for disposition, with termination of contract.

A-022. BASE REGULATIONS: Contractor employees and visitors are subject to the same restrictions as are Government personnel.

Smoking: Smoking is permitted in designated, outside smoking areas only. No smoking will be allowed within 25 feet of any base facility.

Seatbelts: The use of seatbelts by all vehicle operators and passengers is mandatory on Hill AFB and in the state of Utah. On Hill AFB, vehicle operators and passengers caught not wearing their seatbelts will be issued a traffic citation and may lose their on-base driving privileges.

Firearms/Illegal Drugs: No firearms or illegal drugs are allowed to be brought onto Hill AFB.

By accepting a vehicle pass, each person gives their consent to a search of their vehicle while it is entering on or off of Hill AFB.

Speed Limit: The speed limit on base ranges from 15-40 MPH and in parking lots it is 5

MPH.

Parking: Contractor vehicles and equipment will be parked in common parking areas or as otherwise approved in writing by the Facility Manager, 75 CES/CEOHA PM, and/or CO.

Cell Phones: Use of cell phones while driving is prohibited unless equipped with hands free device. On Hill AFB, vehicle operators caught talking on a cell phone while driving will be issued a traffic citation and may lose their on-base driving privileges.

Communications: In accordance with Air Force Instruction (AFI) 33-211, all communications with DoD organizations are subject to communications security (COMSEC) review.

Contractor personnel will be aware telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at DoD organizations. Therefore, civilian contractor personnel are advised any time they place a call to, or receive a call from a USAF organization, they are subject to COMSEC procedures. The contractor will assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees.

A-023. HILL RANGE ACCESS REQUIREMENTS:

Range Access Criteria: For access to the Hill Range Complex, these criteria must be met:

(1) Access has been granted by the appropriate authority.

(2) The individual has a range user point of contact.

(3) Access is for official Government business only.

(4) The individual possesses valid official photo identification.

(5) The individual complies with all security requirements.

(6) The individual signs a Secrecy (Non-disclosure) Agreement

(7) The individual acknowledges the Range Security and Safety Briefing.

(8) The individual is a United States Citizen.

Visitor Access Procedures: All visitors who require access to Hill Air Force Range facilities must comply with the following:

Utah Test and Training Range (UTTR) Visit Request Form 0-17: Submit the form 0-17 ten (10) working days prior to the visit (15 working days prior for groups of 15 or more) to the CO for each visit for Range Squadron approval. UTTR Form 0-17 will be completed with the following information:

(1) Name and rank

(2) Social Security number

(3) Security clearance

(4) Job title

(5) Date and place of birth

(6) If nationalized, provide naturalization number, port of entry, and date

(7) Organization

(8) Dates of visit

(9) Purpose of visit

(10) Mode of transportation

(11) Entry and exit locations

Property Removal Authorization: All property that is being removed from the range shall be accompanied by a property removal pass. Property that is not accompanied by the appropriate removal authorization will be confiscated and held, pending an investigation of the incident.

Property Removal Procedures: All contractor property and equipment must be clearly marked. An inventory shall be submitted of property and equipment that the contractor will bring on to the Range area. The inventory shall include make, model, and serial number of high value equipment (i.e. power tools, scaffolding, aerial lifts, etc). Hand tools shall be included on the inventory, listed as "tool box with assorted carpentry tools." The inventory will be used to issue Property Removal Passes.

Search, Inspection, and Seizure: All vehicles, personnel, and hand-carried items entering or exiting any range control point, or while on the range, are subject to search and inspection and seizure of any prohibited item at any time. Random, unannounced, and regular searches and inspections will be conducted. These searches and inspections are intended to assure the prohibited articles are not introduced into and Government property is not removed, from the range or its facilities.

Vehicles:

Privately-Owned Vehicles (POV): No POV's will be permitted on Range. The contractor shall transport his personnel from outside the main gate (Pt Able) to the work site via their commercial vehicles. The contractor shall only drive on the approved haul route identified in the Vicinity Map as may be included in individual projects.

Commercial Vehicle Authorization: Commercial vehicles may be permitted on Range, provided the driver has been authorized by the appropriate authority to drive on range and that the vehicle is currently registered, licensed, insured, and used by personnel who have been authorized range access.

Rental Vehicles: Rental Vehicles are permitted, provided a current rental agreement is produced and that the rental vehicle is currently registered, licensed, and used by personnel who have been authorized range access to conduct official business.

Range Travel:

Prohibited Travel: Travel by personnel in any area that is outside of their regular assigned duty area is prohibited. Should special assignments require personnel to travel off roads, or into areas where they would not normally be expected to work, prior written permission must be obtained from the Security Administrator and the affected range user.

Sightseeing: Sightseeing is strictly prohibited. Personnel who violate this requirement are subject to disciplinary action, withdrawal of access authorization, or arrest and prosecution and termination of contract.

Sensitive Equipment:

General: Certain equipment is considered sensitive and without written authorization, this equipment is prohibited from use on the Range. Sensitive equipment shall not be brought onto the range without specific written authorization from the 75 CES/CEOHA office located in Building 597, Hill AFB. Personnel who are found to be in possession of sensitive equipment without the appropriate authorization will be challenged and the item confiscated pending an investigation. Personnel in possession of sensitive equipment without authorization, or suspected of improper use of sensitive equipment, are subject to withdrawal of access authorization, or arrest and prosecution.

Sensitive Equipment: The following is a list of equipment that would be considered “sensitive". Provided list may not be all inclusive. NOTE: Use of sensitive equipment will be subject to current Government restrictions

(1) Recording or copying devices of any type.

(2) Electronic equipment that is equipped with a data exchange port which could be used to connect Automated Information System (AIS) equipment. (Excludes items such as pocket computers, wrist watches, or data diaries, not equipped with a data exchange port).

(3) Computers and associated hardware

(4) Cameras and photograph equipment

(5) Binoculars and optical magnifying equipment

(6) Night Vision Devices

Request for Authorization: Sensitive equipment may be authorized for official use on and removal from the range, to obtain sensitive equipment passes, the contractor will submit a letter that identifies the personnel who will operate the equipment. Requests for sensitive equipment passes shall contain:

(1) Name of the responsible person and Social Security Number.

(2) Period of use of the sensitive item.

(3) General purposes of use.

(4) Method of identification.

(5) Identification of item(s) by description, specific serial number, and Government control number.

(6) Copy of any licensing (e.g. FCC).

(k) Prohibited Items: Certain items are prohibited on the range. Personnel who are found to be in possession of prohibited items will be challenged and the item confiscated pending an investigation. Personnel in possession of prohibited items are subject to disciplinary action, withdrawal of access authorization, or arrest and prosecution. The following non- Government owned items are prohibited on the Range, unless an exception is noted:

(1) Alcohol.

(2) Controlled substances including illegal drugs and associated paraphernalia, except for prescription medicine.

(3) Firearms, ammunition, and other dangerous or deadly weapons.

(4) Explosives, incendiary, and explosives or deadly weapons.

(5) Weapons: Mace, stun guns, clubs.

(6) Two-way radios, CB Radios, Cellular phones (Except two-way or CB radios) which are permanently installed in a commercial vehicle, whose frequency has been approved by the installation commander.

(7) Recording or copying devices of any type.

(8) Electronic equipment that is equipped with a data exchange port which could be used to connect Automated Information System (AIS) equipment. (Excludes items such as pocket computers, wrist watches, or data diaries that are not equipped with a data exchange port).

(9) Computers and associated media.

(10) Binoculars, optical magnifying equipment.

(11) Night vision devices.

(12) Recreational vehicles.

(13) Pets, wild or domestic.

(14) Children under 18 years of age.

(15) Other items prohibited by law.

Range Access Gates, Road Access and the UTTR Main Gate: Operational hours for the gates are 0730 -1700, Monday through Thursday.

Materials: The contractor will provide physical security for the materials and work.

A-024. ENVIRONMENTAL PROTECTION:

Solid, Liquid, and Gaseous Contaminants: The contractor shall be responsible for the proper disposal of all solid, liquid and gaseous contaminants including asbestos and lead based paint in accordance with all applicable federal, state, local and Hill AFB regulations, codes, and guidance policies.

Disposal of Refuse: The contractor shall maintain all work sites free from construction debris and trash. The contractor will be required to remove all refuse daily from each job site for work performed under the Abatement contract. All construction debris shall be sorted and recycled, or disposed of in a permitted landfill. No trash or debris shall be disposed of on the base or any other Federal Lands, nor shall it be disposed of in violation of any Municipal, County, or State Ordinances (with the exception of the base landfill and applicable materials as outlined in the Base Facility Design Standards for Hill AFB). The contractor may utilize the base landfill for asphalt, dirt, and clean wood (the asphalt and concrete may be mixed with soil or aggregate). In order to utilize the on-base landfill, the contractor shall contact the 75 CES/CEOHA PM 48 hours prior to disposal of refuse to schedule access to base landfill. The contractor may keep proceeds from all recycled materials. The contractor is responsible for paying all tipping fees associated with off-base landfills.

Covered Chutes/receptacles: All chutes receptacles for refuse and the like, shall be covered or of such design to fully confine the material to prevent the dissemination of dust.

Soil Erosion: The contractor shall provide protective barriers to prevent soil erosion on all required excavations. The contractor will also provide environmental protection to prevent sediment drainage of silts into storm drains.

Safety Data Sheets (SDS): The contractor shall submit an SDS for any chemical or hazardous materials as defined in Federal Acquisition Regulation (FAR) 52.223-3. Hazardous Material Identification and Safety Data for each 75 CES/CEOHA task order at the conclusion of clarification negotiations and prior to award. Each SDS shall be submitted in 3 copies, and the contractor shall retain a copy for on-site use.

Contaminated Soils: Work requested of the contractor may include removal and/or dumping of contaminated soils. Contaminated soils are defined as containing non-hazardous materials such as JP-4/5/8 aircraft fuel, heating fuel oil, asbestos, lead, cadmium, or other materials as identified by the Base Environmental Coordinator. Any contaminated material shall be removed, hauled and disposed of in accordance with all applicable laws, regulations, and policies and shall include submittals of all required permits and disposal certificates.

Hazardous Materials: The contractor shall bring to the attention of the Contracting Officer (CO) any previously unknown material suspected of being hazardous with in accordance with federal, state and local laws and regulations which they may encounter during execution of the work period. A determination may be made by the CO as to whether the contractor shall perform tests to determine if the material is hazardous If the CO directs the contractor to perform the tests, and/or if the material is found hazardous and additional protective measures are needed, a contract change may be required, subject to equitable adjustment under the terms of the contract.

(1) Where applicable, the contractor will use environmentally safe, low Volatile Organic Compound (low-VOC) products, in the course of completion of project.

(2) There will be no on base disposal allowed including use of drains (sanitary, storm, or industrial)

(3) All hazardous material such as sandblast media, chlorinated solvents, paint thinners, and fuels will be labeled and an inventory management system initiated to ensure timely removal and proper disposal.

(4) Fuel storage will be limited to 110 gallons. The base Fire Department and the

Environmental Management office will approve the siting.

(5) Storage of oils, greases, chemicals, or other liquids will require a fully contained facility for spill prevention and security. A minimum of 40 pounds of absorbent material per 44 gallons of chemical/oil/grease will be on hand for spill control.

(6) All spills shall be reported by dialing 911 and giving information as to spill location, type of material and estimated quantity, and if the spill is contained. The contractor will ensure appropriate Personnel Protective Equipment (PPE) is available to take care of spill clean-up and handling of residue.

(7) Spray-painting shall utilize high-transfer efficiency equipment with low volatile organic compound (low-VOC) paints or water-based paints. The VOC content of low- VOC paint shall be 3.5 lbs/gallon or less for primers, topcoats, and specialty coatings.

For clear coats it will be 4.3 lbs or less. If a low-VOC paint is not available for the application, a paint waiver shall be obtained from Environmental Management (EM), by contacting the Contracting Officer's…