This document is a geotechnical engineering memo and subsurface exploration report for the B2280 Chilled Water System and Water Cooling Tower project at Tinker Air Force Base in Oklahoma City, Oklahoma. The memo, dated December 20, 2022, was prepared by Thomas C. Wesling, P.E. of HDR Engineering and provides drilled shaft foundation recommendations based on geotechnical field investigation and laboratory testing completed by Standard Testing & Engineering Company (STEC) in October 2022.
The subsurface investigation included two 51-foot deep borings that encountered five distinct strata: reddish brown clay with sand and asphalt debris (0-8 to 11 feet), weathered shale (8-17 feet), shale (17-30 feet), loosely cemented sandstone (30-50 feet), and shale below 50 feet. Drilled shaft design recommendations specify straight-sided shafts founded at least 5 feet into Stratum 3 shale (22-foot minimum length) with a 24-inch minimum diameter, supporting a maximum axial compression load of 14 kips. Allowable skin friction ranges from 750 psf in weathered shale to 2,500 psf in sandstone, with end bearing values of 12,000 to 24,000 psf. Tensile capacity may be calculated at 70 percent of allowable skin friction values. Maximum anticipated vertical movement is less than 1 inch. The report includes LPILE analysis parameters for lateral load evaluation, construction specifications referencing UFGS-31 63 29 and ACI standards, and corrosion evaluation indicating moderate to severe steel corrosion potential requiring protective measures and mild sulfate attack potential for concrete using Type I/II cement.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
hdrinc.com 613 NW Loop 410, Suite 700, San Antonio, TX 78216 2 of 6 T (210) 841-2800 F (210) 841-2828 Oklahoma Registered Engineering Firm License Number 1446 program included water contents, Atterberg limits, grain size analyses, unconfined compression test, and analytical tests. The subsurface exploration report prepared by STEC is attached to this design memo includes a project vicinity map, boring location plan, boring logs, and laboratory test results.
Subsurface and Depth-to-Water Conditions
Subsurface conditions can best be understood by a thorough review of the boring logs in the attached subsurface exploration report. At the surface 4 inches of asphaltic concrete pavement was encountered over 6 inches of aggregate base at each of the two borings. Below the pavement materials, the two 51-ft deep borings generally encountered 5 strata that are summarized below.
Stratum 1. Reddish brown lean clay with various amounts of sand and asphaltic concrete debris was encountered below the aggregate base and extends to a depth of 8 feet at boring
B-1. Reddish brown sandy lean clay over reddish brown silty sand with asphaltic concrete debris was encountered below the aggregate base and extends to a depth of 11 feet at boring
B-2. Stratum 1 has measured liquid limits varying from 16 to 38, plasticity indices ranging from non-plastic to 24, percent passing the No. 200 sieve varying from 24 to 92, and SPT N-values ranging from 15 to 25 blows per foot (bpf).
Stratum 2. Reddish brown weathered shale was encountered below the upper soils. The weathered shale extends to depths of 17 and 16 feet at the boring B-1 and B-2 locations, respectively. Stratum 2 has measured liquid limits of 26 and 34, plasticity indices of 15 and 19, percent passing the No. 200 sieve of 53 and 96, and SPT N-values of 34, 37, and 47 bpf.
Stratum 3. Reddish brown shale was encountered below the weathered shale. The shale extends to depths of 25 and 31 feet at the boring B-1 and B-2 locations, respectively. Stratum 3 has a measured liquid limit of 32, plasticity index of 19, percent passing the No. 200 sieve of 85, and SPT N-values ranging from 95 blows for 8 inches of penetration to 50 blows for 3 inches of penetration.
Stratum 4. Reddish brown loosely cemented sandstone was encountered below the shale.
The sandstone extends to a depth of 50 feet at each boring location. Stratum 4 has a measured
SPT N-values ranging from 50 blows for 2.5 to 5 inches of penetration.
Stratum 5. Reddish brown shale was encountered below the sandstone in the split-spoon sample driven from 50 to 51 feet. Stratum 5 has a measured SPT N-values of 40 blows for the initial 6-inch seating then 50 blows for 4.5 to 5.5 inches of penetration.
The borings were drilled dry with hollow stem augers. Free water was not observed in either boring during or at the completion of drilling operations. However, it should be noted that shallow groundwater is common on Tinker AFB.
hdrinc.com 613 NW Loop 410, Suite 700, San Antonio, TX 78216 3 of 6
Drilled Shaft Design Recommendations
Based on information provided by the project structural engineers the maximum axial compression column load will be on the order of 14 kips. Drilled shafts should be designed in accordance with the flowing recommendations.
1. The structural loads should be carried on straight-sided drilled shafts founded at least 5 feet into the shale in Stratum 3 (22-ft length from ground surface) and sized using the allowable skin friction and end beading values in the table below.
Drilled Shaft Axial Compressive Design Parameters
Depth Below
Ground Surface *
(feet)
Material
Type
Allowable
Skin Friction
(psf)
Allowable
End Bearing
(psf)
0 – 11 Soil w/ AC Debris neglect neglect
11 – 17 Weathered Shale (Clay) 750 neglect
17 – 30 Shale 1,500 12,000
30 – 50 Sandstone 2,500 24,000
2. Tensile (uplift) capacity may be calculated using 70 percent of the allowable skin friction values provided in the table above for each stratum. Buoyant unit weight of the concrete may be added in the tensile capacity.
3. Drilled shafts should have a diameter of 24 inches or greater.
4. The structural capacities of the drilled shafts should be checked for allowable stresses in the concrete, total downward axial loads, tension forces, lateral forces, and moments produced by dead plus probable maximum live loads. Shaft reinforcement should extend from the top to the bottom of the shafts.
5. Maintain a minimum center-to-center spacing between drilled shafts (including existing shafts) of at least three shaft diameters. If the minimum spacing cannot be maintained, the geotechnical engineer should be retained to consider the group effect of closely spaced shafts.
6. Maximum total vertical movement of drilled shafts designed and constructed in accordance with these recommendations is anticipated to be less than 1 inch.
Design Parameters for Lateral Load Analyses
Ultimate soil design parameters are provided herein for use with the computer program LPILE by Ensoft. This computer program is commonly used to evaluate deflections, moments, and shear forces due to lateral loads and moments. The structural engineer should consider head shaft fixity condition and stiffness condition (cracked or uncracked) and select the required length, diameter, and percent of steel for drilled shafts with regard to lateral and axial loads.
Recommended input values for the computer program LPILE are provided in the following table.
hdrinc.com 613 NW Loop 410, Suite 700, San Antonio, TX 78216 4 of 6
LPILE Ultimate (Unfactored) Soil Parameters
Depth
Below
Ground
Surface *
(feet)
LPILE
Soil / Rock
Type
Effective
Unit
Weight
(pcf)
Undrained
Cohesion
(psf)
Friction
Angle
(degrees)
Soil
Modulus k
(pci)
Strain
Factor
E50
0 – 5 Soft Clay (Matlock) 120 10 na na **
5 – 11 *** Stiff Clay w/o FW 60 1,200 na na **
Sand (Reese) 60 na 30 ** na
11 – 17 Stiff Clay w/o FW 65 3,000 na ** **
17 – 30 Stiff Clay w/o FW 65 6,000 na ** **
30 – 50 Sand (Reese) 70 0 40 ** **
* Depth below ground surface at the boring location.
** Use LPILE default values.
*** Each of the two soil types should be evaluated to achieve conservative design.
Drilled Shaft Construction Recommendations
Drilled shafts should be constructed in accordance with the Unified Facilities Guide
Specifications UFGS-31 63 29 Drilled Concrete Piers and Shafts. UFGS-31 63 29 indicates to install drilled shaft foundations in accordance with current versions of ACI 336.1 and FHWA
NHI-10-016. Drilled shaft operations should be inspected, on a full-time basis, to (a) verify plan depth and penetration into the bearing stratum, (b) verify shaft dimensions and proper reinforcement, (c) monitor cleanness and amount of water in shaft excavations, (d) monitor placement of concrete and use of tremie or pumps, (e) monitor the extraction of casing, if used, and (f) maintain accurate records.
The existing fill and/or silty sand may not remain stable during drilled shaft construction resulting in the need to use casing and/or slurry for drilled shaft construction. Further, groundwater was not encountered during drilling of the geotechnical boring, however shallow ground water is common at Tinker AFB and should be planned for during drilling shaft construction.
Soil Corrosion Potential
Steel and concrete elements in contact with soil, whether part of a foundation or part of the supported structure, are subject to degradation due to corrosion or chemical attack. Therefore, buried steel and concrete elements should be designed to resist corrosion and degradation based on accepted practices. A series of corrosion tests including pH, sulfate ion concentration, chloride ion concentration, and electrical resistivity were performed on three selected soil samples to evaluate the corrosion potential of the soils at the site. The corrosion potential test results are summarized in the attached geotechnical data report.
hdrinc.com 613 NW Loop 410, Suite 700, San Antonio, TX 78216 5 of 6
Corrosion potential of steel is influenced by electrical resistivity, chloride ion concentration, and pH. Corrosion of steel is more likely in soil environments with low resistivity, high chloride ion concentrations, or low pH. Some general guidelines concerning the corrosion potential of soil on steel as a function of soluble chloride, electrical resistivity, and pH are presented in the following table.
Soluble Chloride
Concentrations
(ppm)
Electrical
Resistivity
(ohm-cm) pH Corrosion
Potential
> 500 0 - 1,000 0 - 4.5 Very Severe
100 - 500 1,000 - 2,000 4.5 - 5.5 Severe
25 - 100 2,000 - 5,000 5.5 - 6.5 Moderate
10 - 25 5,000 - 10,000 > 6.5 Mild
----- 10,000 + ----- Very Mild
Each variable should be used independently of the others when evaluating soil corrosion potential. For example, it is not necessary to have both an electrical resistivity less than 1,000 ohm-cm and a pH less than 4.5 to indicate a very severe corrosion potential. The laboratory test results for this study indicate the following.
• Measured soluble chloride contents ranged from 11 to 25 ppm, which indicate the soils have a mild corrosion potential.
• Measured electrical resistivity values varied from 1,622 and 4,919 ohm-cm, which indicate the soils have a moderate to severe corrosion potential.
• Measured pH values ranged from 7.1 to 8.9, which indicate the soils have a mild corrosion potential.
Based on the results of our analyses, the soils at the site appear to exhibit a severe tendency to corrode buried steel. A Corrosion Engineer should review the test results discussed herein, when designing appropriate methods of protecting buried steel.
The degradation of concrete is caused by chemical agents in the soil or groundwater that react with concrete to either dissolve the cement paste or precipitate larger compounds which cause cracking and flaking. The concentration of water-soluble sulfates in the soils is a good indicator of the potential for chemical attack of concrete. Sulfate concentrations in soil can be used to evaluate the need for protection of concrete based on American Concrete Institute (ACI) guidelines. General guidelines concerning the potential for degradation of concrete as a function of sulfate ion concentration are presented in the following table.
hdrinc.com 613 NW Loop 410, Suite 700, San Antonio, TX 78216 6 of 6
Aggressiveness Sulfate Ion Concentration (ppm)
Very severe > 20,000
Severe 2,000 – 20,000
Moderate 1,000 – 2,000
Mild < 1,000
The results of sulfate content tests performed on selected soil samples from this study ranged from 26 to 144 ppm which indicate the potential for deterioration of concrete, based on sulfate ion concentrations, is mild. We recommend that a Corrosion Engineer be consulted to determine if protective measures are warranted.
Limitations
The geotechnical engineering recommendations presented herein are based on the geotechnical engineer’s experience and professional opinion. These services were performed with the degree of skill and care normally utilized by other members of the geotechnical engineering profession practicing in this location and at this time. There is no warranty, either express or implied. The results, conclusions, and recommendations contained herein are directed at, and intended to be utilized within our contracted scope of work. This memo is not intended to be used for any other purposes.
The analyses, conclusions, and recommendations in this memo are based on the subsurface and depth-to-water conditions present in the borings and the engineering characteristics of the soil as determined through field and laboratory testing at this point in time. The memo does not reflect variations in subsurface conditions that may exist between or beyond these borings.
Variations in soil conditions should be expected between the borings, the nature and extent of which may not become evident until construction is undertaken. Subsurface and depth-to-water conditions can change over time due to both natural and manmade forces, including changes in condition and/or use of adjacent properties.
Attachment
Standard Testing and Engineering Company, LLC (STEC) Geotechnical Data Study
SUBSURFACE EXPLORATION
B2280 - Chilled Water System and Water Cooling Tower Tinker Air Force Base
Oklahoma City, Oklahoma
PROJECT NO. 2230-0534
CORPORATE OFFICE • OKLAHOMA CITY
3400 N Lincoln Blvd • Oklahoma City, OK 73105
(405) 528-0541 • (800) 725-0541 • (405) 528-0559 FAX
7648 E 46th Pl Tulsa, OK 74145 (918)289-0005
902 Trails West Loop Enid, OK 73703
(580) 237-3130
202 SE "J" Ave Lawton, OK 73501
(580) 353-0872 www.stantest.com
October 27, 2022
HDR Engineering, Inc.
613 NW Loop 410, Suite 700 San Antonio, TX 78216
Attn: Mr. Thomas Wesling, P.E.
Re: Subsurface Exploration
Tinker Air Force Base Oklahoma City, Oklahoma
Dear Mr. Wesling:
Standard Testing & Engineering, LLC (Standard Testing) is pleased to present the report covering the subsurface exploration for the subject project. This study was authorized by signed Subconsultant Agreement 10003000002062, dated August 9th, 2022.
Standard Testing conducted a geotechnical investigation at the site of the new chilled water system and water cooling tower project in Tinker Air Force Base, Oklahoma. This report contains the detailed results of the geotechnical investigation, including subsurface conditions and laboratory results.
The subsurface soils consist of approximately 50.8 feet of clays with varying amounts of sand and sands with varying amounts of silt overlying weathered shale, shale, and loosely cemented sandstone and exhibit non-plastic to moderately plastic characteristics.
We trust that the results and recommendations contained herein will permit adequate economical design and construction of the proposed structure. Unless you specify otherwise, we will keep samples obtained from these borings in our Oklahoma City laboratory for the next thirty (30) days.
We appreciate the opportunity to assist on this project. Please call on us if we can be of further service.
Respectfully submitted, STANDARD TESTING & ENGINEERING, LLC
Cody Latham, E.I. Roy Khalife, P.E.
Staff Geotechnical Engineer Geotechnical Engineer
Project No. 2230-0534 Account No. 0230HDR20 http://www.stantest.com/
SUBSURFACE EXPLORATION
Tinker Air Force Base
Oklahoma City, Oklahoma
PROJECT NO. 2230-0534
PREPARED FOR
HDR Engineering, Inc.
613 NW Loop 410, Suite 700
San Antonio, TX 78216
PREPARED BY
STANDARD TESTING & ENGINEERING, LLC
3400 N. Lincoln Blvd.
Oklahoma City, OK 73105 Certificate of Authorization No. 7933, Expiration 6/30/2023
(405) 528-0541
Prepared By:
Reviewed By:
Cody Latham, E.I. Roy Khalife, P.E.
Staff Geotechnical Engineer Geotechnical Engineer
I certify my e-signature for the study entitled “Subsurface Exploration.”
Dated 10/27/2022
October 27, 2022
TABLE OF CONTENTS
Page
1. INTRODUCTION
1.1 Authorization
1.2 Purpose and Scope
1.3 Project Location and Description
2. FIELD EXPLORATION
2.1 Drilling Information
2.2 Equipment Used
2.3 Testing and Sampling Performed
2.4 Subsurface Conditions
2.5 Groundwater
3. LABORATORY TESTING
3.1 Tests Performed
3.2 Laboratory Summary
4. ENGINEERING EVALUATION AND RECOMMENDATIONS
4.1 Soil Conditions
4.2 Laboratory Testing Results
pH and Resistivity Test Results Soluble Sulfate and Chloride Content Test Results Unconfined Compressive Strength of Soil Test Results
5. BASIS FOR RECOMMENDATIONS
5.1 General Comments
5.2 Limitations
APPENDICES
Appendix A Vicinity Map Site and Boring Location Plan
Appendix B Boring Logs Soil Profile Definition of Descriptive Terms
Appendix C AASHTO Soil Classification System Unified Soil Classification System
Appendix D Summary of Test Results
LIST OF TABLES
Page
Relative Elevation of Rock Material pH and Resistivity Content Test Results Soluble Sulfate and Chloride Content Test Results Unconfined Compressive Strength Test Results
Project No. 2230-0534 1 October 27, 2022
Section 1
INTRODUCTION
1.1 Authorization
This report presents the results of a subsurface exploration performed by Standard Testing & Engineering, LLC (Standard Testing) in accordance with the proposal (P-2022-207) prepared for Mr. Thomas Wesling, dated July 27th, 2022, and identified as Standard Testing project number 2230-0534. This geotechnical study was authorized by signed Subconsultant Agreement 10003000002062, dated August 9th, 2022.
1.2 Purpose and Scope
A geotechnical investigation was performed for the purpose of (1) determining the subsurface conditions, and (2) evaluating the chemical and plasticity characteristics of the soils
Two (2) exploratory borings (B-1 and B-2) were drilled to a depth 50.8 feet. The boring depths and types of testing were performed according to the scope of work proposed by Standard Testing and accepted by Mr. Wesling. Narrative descriptions of our findings are contained in the body of this report. A site and boring location plan, the boring logs, the soil profile, and a summary sheet of laboratory test results are included in the Appendices of this report.
1.3 Project Location and Description
It is understood that the B2280 - Chilled Water Systems and Cooling Tower project is proposed to be constructed at Tinker Air Force Base in Oklahoma City, Oklahoma.
If the project is not as described or has changed, Standard Testing must be notified in order to reevaluate the recommendations for the project.
Project No. 2230-0534 2 October 27, 2022
Section 2
FIELD EXPLORATION
2.1 Drilling Information
The field exploration work was performed between the 11th and 14th of October, 2022.
Conditions at the site were investigated with two (2) borings at the locations indicated on the site and boring location plan, included in Appendix "A." The boring surface elevations were measured with respect to a Temporary Bench Mark (TBM) established at the N.W. corner of the existing building. The Temporary Bench Mark (TBM) location is also shown in the site and boring location plan in Appendix “A.” Boring surface elevations, rounded to the nearest foot, are reported on the individual boring logs, included in Appendix “A.”
The benchmark has an assigned relative elevation of 100 feet. Boring depths were 50.8 feet within the project site. A total of 10 inches of asphalt pavement and aggregate base were present at both drilling locations and boring and sampling depths were adjusted to account for this. For accurate sampling, cuttings were observed continuously during drilling with specific samples being taken at distinct lithologic changes. The equipment used, field tests performed, and soil samples taken are discussed below.
2.2 Equipment Used
Two (2) borings were drilled with a truck-mounted CME-55 rotary drilling unit equipped with 3.25" I.D. X 7.25" O.D. hollow stem augers (HSA). Standard penetration tests (SPT) used a 1.375" ID split spoon sampler driven by an automatic hammer utilizing a 140 lb. weight falling 30 inches.
2.3 Testing and Sampling Performed
Standard penetration tests were performed in order to estimate the shear strengths of the soils in their natural state. The test was conducted as specified by ASTM D1586, "Penetration Test and Split-Barrel Sampling of Soils." The in-situ bearing strength is related to the N-value from this test. "N" is the number of blows required to drive a split-spoon sampler twelve inches, after a 6-inch seating, into undisturbed soil. The soil samples recovered in the split-spoon barrel were removed from the sample tool in the field, visually classified, and labeled according to boring number and depth. Results of the standard penetration tests are denoted at their respective depths on the boring logs.
Thin-walled tube samples were collected as specified by ASTM D1587, “Standard Practice for Thin-Walled Tube Sampling of Soils for Geotechnical Purposes.” Two (2) thin-walled samples were collected for this project, however due to the presence of asphalt debris in the top five (5) feet, one (1) sample was non-viable for unconfined compressive strength testing.
Project No. 2230-0534 3 October 27, 2022
Depths of individual split spoon (standard penetration tests), thin-walled tube, and grab samples are indicated on the boring logs included in Appendix "B." All samples were labeled and sealed in water tight, protective containers and returned to the laboratory for further evaluation and testing.
2.4 Subsurface Conditions
The soils encountered consist of clays with varying amounts of sand and sands with varying amounts of silt overlying weathered shale, shale, and loosely cemented sandstone. The cohesive soils were found to be firm to very stiff in consistency and the cohesionless soils were found to have medium dense relative density. Rock materials (i.e., defined by standard penetration test refusal) were encountered in the indicated borings at the relative elevation shown in the following table:
Table 1: Relative Elevation of Rock Material
Boring No. Surface Elevation (feet)
Rock Depth (feet)
Rock Elevation (feet) Rock Material
B-1 100.0
16.8 83.2 Shale Rock
25.8 74.2 Sandstone Rock
B-2 99.0
15.8 83.2 Shale Rock
30.8 68.2 Sandstone Rock
2.5 Groundwater
During drilling and at completion of drilling operations, groundwater was NOT encountered in the borings. Water Levels were measured during, at completion, and fifteen minutes after the borings were completed. Presence of water should be anticipated in any excavation. Water travelling through soil (subsurface water) is often unpredictable and may be present at shallow depths. Due to the seasonal changes in groundwater and the unpredictable nature of groundwater paths, groundwater levels will fluctuate. Therefore, it is necessary during construction to be observant for groundwater seepage in excavations in order to assess the situation and make necessary changes. We cannot assume responsibility for difficulties experienced during construction or for future operational problems due to elevation or volume of water encountered.
Project No. 2230-0534 4 October 27, 2022
Section 3
LABORATORY TESTING
Laboratory testing was performed in order to determine the plasticity characteristics of the subsurface materials as well as confirm the soil classifications.
3.1 Tests Performed
• Moisture content tests were performed on split spoon, thin-walled tube, and bag samples, in accordance with ASTM D2216, to determine the in-situ moisture conditions.
• Density tests were performed on intact split spoon, and thin-walled tube samples in accordance with ASTM D7263 Method A.
• Atterberg limits tests were performed on split spoon, thin-walled tube, and bag samples to determine the plasticity characteristics and swell potential of the soil. The tests were performed in accordance with ASTM D4318.
• Sieve analyses were performed on split spoon, thin-walled tube, and bag samples, in accordance with ASTM D2487, for aid in soil classification. These soils were classified according to the Unified Soil Classification System (USCS) and the American Association of State Highway and Transportation Officials (AASHTO) soil classification system.
• Laboratory pH and resistivity tests were conducted on split spoon and grab soil samples.
AASHTO T289 was used to determine the pH of the soil, while AASHTO T288 method was employed to determine the electrical resistivity of the sampled soil. pH and resistivity tests determine the corrosion potential of the on-site soils regard to underground structures and pipelines. The test results are summarized under Laboratory Testing Results in Section 4 of this report.
• Soluble sulfate content tests were performed on split spoon and grab soil samples in accordance with OHDL-49. The test results are summarized under Laboratory Testing Results in Section 4 of this report.
• Soluble chloride content tests were performed on split spoon and grab soil samples by colorimetric method using a SMART2 Colorimeter. The test results are summarized under Laboratory Testing Results in Section 4 of this report.
• Unconfined compressive strength testing was conducted on a thin-walled tube soil sample in accordance with ASTM D2166. The unconfined compressive strength as determined by this test, along with the results of the standard penetration test, is used to estimate the in-
Project No. 2230-0534 5 October 27, 2022 situ shear strength of the various soils encountered. The graph in Appendix “D” depicts the behavior of the tested soil under compression without confinement. The unconfined compressive strength of the soil sample is presented on the boring logs and in the “Summary of Laboratory Test Results” table in Appendix “D.”
3.2 Laboratory Summary
General descriptions of the encountered soils together with visual and laboratory classifications and numerical values of the test results are on the boring logs and soil profile included in Appendix "B." A "Summary of Test Results" is included in Appendix "D."
Project No. 2230-0534 6 October 27, 2022
Section 4
ENGINEERING EVALUATION AND RECOMMENDATIONS
4.1 Soil Conditions
The soils encountered in this investigation consist of clays with varying amounts of sand and sands with varying amounts of silt overlying weathered shale, shale, and loosely cemented sandstone. The cohesive soils were found to be firm to very stiff in consistency and the cohesionless soils were found to have medium dense relative density. These near surface soils exhibit non-plastic to moderately plastic characteristics. Rock materials (i.e., defined by standard penetration test refusal) were encountered in both borings.
4.2 Laboratory Testing Results
pH and Resistivity Test Results
The pH and resistivity of the soil samples tested are summarized in the following table:
Table 2: pH and Resistivity Content Test Results
Boring No. Sample I.D. Depth (feet) pH Resistivity (ohm-cm) Corrosivity
B-1 A 0.8-2.3 7.1 1,622 Moderately B-2 B 2.3-3.8 8.9 3,611 Slightly B-2 E 8.8-10.3 7.8 4,919 Slightly
The pH and resistivity test results indicate that soils are slightly to moderately corrosive with regards to accelerated corrosion of metals.
Soluble Sulfate and Chloride Content Test Results
The soluble sulfate and chloride test results are included in the following table:
Table 3: Soluble Sulfate and Chloride Content Test Results
Boring No. Sample I.D. Depth (feet) Sulfate Content (ppm)
Chloride Content (ppm)
B-1 A 0.8-2.3 144 14 B-2 B 2.3-3.8 26 11 B-2 E 8.8-10.3 27 25
The results of the sulfate and chloride content tests indicate that Type I/II cement may be used for concrete and the sulfate levels are negligible in affecting lime stabilization of the soil.
According to the National Lime Association’s publication entitled “Technical Memorandum:
Project No. 2230-0534 7 October 27, 2022
Guidelines for Stabilization of Soils Containing Sulfates,” which can be found on their website at www.lime.org/documents/publications/free_downloads/technical-memorandum.pdf, If the total level of soluble sulfates is below 0.3%, or 3,000 parts per million (ppm), by weight of soil, then lime stabilization should not be of significant concern. The potential for a harmful reaction is low.”
Unconfined Compressive Strength of Soil Test Results
Unconfined compressive strength test was conducted on thin-walled tube soil sample in accordance with ASTM D2166 testing method. The results are presented in the following table and are also presented in Appendix “D.”
Table 4: Unconfined Compressive Strength Test Results
Boring No. Depth (feet) Moisture Content (%)
Dry Density (pcf)
Max. Stress, qu (psf)
Strain at Max.
Stress (%)
B-1 3.8-5.8 9.5 123.7 7,475 3.1 http://www.lime.org/documents/publications/free_downloads/technical-memorandum.pdf
Project No. 2230-0534 8 October 27, 2022
Section 5
BASIS FOR RECOMMENDATIONS
5.1 General Comments
The recommendations and conclusions contained in this report are based on the borings drilled and tests performed. We would point out that there may be variations in material properties over the site and would caution that there may be unknown conditions in existence which differ seriously from those encountered by the test borings. Such conditions, if indeed they exist at all, cannot be, and have not been, accounted for in this report. Therefore, the descriptions, recommendations, and conclusions contained herein should be considered as generalized, applying only to the immediate vicinity of the borings.
5.2 Limitations
Since this report is being prepared in advance of much of the detailed design, the finalized soil and structure parameters (i.e., floor elevation, structural system and loading, vertical movement tolerance, etc.) may differ from the ones considered during the preparation of this report. If such a design variance is substantial, Standard Testing would request the opportunity to review the plans and specifications of the proposed facility for applicability to the soil conditions in this report, and assurance of consistency with its intent.
It is recommended that Standard Testing be retained for testing and observation during earthwork and foundation construction phases, to help determine that the design requirements are fulfilled.
This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical practice.
APPENDIX A
Vicinity Map
Site and Boring Location Plan
Vicinity Map
B2280 Chilled Water System & Cooling Towers
Tinker Air Force Base, Oklahoma
2230-0534
Project Name:
Project Location:
Project No.:
Approximate Site Location
Site and Boring Location Plan
B2280 Chilled Water System & Cooling Towers
Tinker Air Force Base, Oklahoma
2230-0534
Project Name:
Project Location:
Project No.:
LEGEND:
Approximate Boring Location
TBM
(ELEV=100 ft.)
B-1
B-2
TBM
APPENDIX B
Boring Logs
Soil Profile Definition of Descriptive Terms
CL
CL
CL
CL
4" (ASPHALT)
6" (AGGREGATE)
Reddish Brn. SANDY CLAY (W/ ASPHALT
DEBRIS)
Reddish Brn. LEAN CLAY (W/ ASPHALT
DEBRIS)
Moist, Moderate Plasticity, V. Stiff
(W/O ASPHALT DEBRIS)
Sl. Moist, Low Plasticity
Reddish Brn. WEATHERED SHALE V. Soft Rock
Sl. Moist, Moderate Plasticity
(ROCK) Reddish Brn. SHALE Med. Hard Rock
Sl. Moist, Moderate Plasticity
Reddish Brn. LOOSELY CEMENTED
SANDSTONE
Soft Rock
A
B
C
D
E
F
G
H
I
J
K
7-8-10 (18)
6-12-13 (25)
4-16-31 (47)
8-17-20 (37)
8-40-50/1.00"
19-45-50/2.00"
50/3.00"
50/4.00"
50/3.50"
12.8
11.7
9.7
12.3
11.0
124 7475
91.9
86.8
95.9
85.4
38-14-24
28-14-14
34-15-19
32-13-19
BORING LOG B-1
PROJECT NAME: B2280 Chilled Water System & Cooling
PROJECT NUMBER: 2230-0534
PROJECT LOCATION: Tinker Air Force Base
CLIENT: HDR Engineering, Inc.
www.stantest.com
WATER LEVELS ELEVATIONS / LOCATIONS DRILLING
WD - GROUND ELEVATION: 100 DRILL START: 10/12/2022 LOGGER: J.B.
AD - TBM: N.W. Corner of Building DRILLED END: 10/13/2022 DRILLER: G.D.
24 Hrs - GPS: 35 24.793'N, 97 22.564'W DRILL RIG: CME-55 HOLE SIZE: 7.25"
> 24 Hrs - STA: OFFSET: DRILL METHOD: HSA
D E
P T
H
F T
E L
E V
A T
IO
N
F
T
G R
A P
H
IC
L O
G
U S
C
S MATERIAL DESCRIPTION
SAMPLER SYMBOLS
S A
M P
L E
T Y
P E
S A
M P
L E
N U
M B
E R
B L
O W
C O
U N
T S
N
P O
C K
E T
P E
N T
R O
M E
T E
R ts f)
R E
C O
V E
R Y
R
Q D
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T p c f)
U C
S p s f)
S
IE
V
E
LL-PL-PI
A T
T E
R B
E R
G L
IM
IT
S
Oklahoma City (405) 528-0541 Tulsa (918) 289-0005 Lawton (580) 353-0872 Enid (580) 237-3130
Grab
SS
ST RC
TC HA
(1 of 2)
SP
Med. Hard Rock
V. Moist, Nonplastic, Soft Rock
Reddish Brn. SHALE W/ SANDSTONE
SEAMS
Soft Rock
Bottom of borehole at 51.8 feet
L
M
N
50/2.50"
50/5.00"
40-50/5.50"
11.0 2.9 NP-NP-NP
BORING LOG B-1
PROJECT NAME: B2280 Chilled Water System & Cooling
PROJECT NUMBER: 2230-0534
PROJECT LOCATION: Tinker Air Force Base
CLIENT: HDR Engineering, Inc.
www.stantest.com
WATER LEVELS ELEVATIONS / LOCATIONS DRILLING
WD - GROUND ELEVATION: 100 DRILL START: 10/12/2022 LOGGER: J.B.
AD - TBM: N.W. Corner of Building DRILLED END: 10/13/2022 DRILLER: G.D.
24 Hrs - GPS: 35 24.793'N, 97 22.564'W DRILL RIG: CME-55 HOLE SIZE: 7.25"
> 24 Hrs - STA: OFFSET: DRILL METHOD: HSA
D E
P T
H
F T
E L
E V
A T
IO
N
F
T
G R
A P
H
IC
L O
G
U S
C
S MATERIAL DESCRIPTION
SAMPLER SYMBOLS
S A
M P
L E
T Y
P E
S A
M P
L E
N U
M B
E R
B L
O W
C O
U N
T S
N
P O
C K
E T
P E
N T
R O
M E
T E
R ts f)
R E
C O
V E
R Y
R
Q D
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T p c f)
U C
S p s f)
S
IE
V
E
LL-PL-PI
A T
T E
R B
E R
G L
IM
IT
S
Oklahoma City (405) 528-0541 Tulsa (918) 289-0005 Lawton (580) 353-0872 Enid (580) 237-3130
Grab
SS
ST RC
(2 of 2)
CL
SM
SM
CL
4" (ASPHALT)
6" (AGGREGATE)
Reddish Brn. SANDY LEAN CLAY (W/
ASPHALT DEBRIS)
Moist, Moderate Plasticity, Stiff Reddish Brn. SILTY SAND (W/ ASPHALT
DEBRIS)
V. Moist, Nonplastic
(W/O ASPHALT DEBRIS)
Med. Dense, Low Plasticity
Reddish Brn. WEATHERED SANDY
SHALE
V. Moist, Moderate Plasticity, V. Soft Rock
(ROCK) Reddish Brn. SHALE Soft Rock
Med. Hard Rock
Reddish Brn. LOOSELY CEMENTED
SANDSTONE
Soft Rock
A
B
C
D
E
F
G
H
I
J
K
10-7-8 (15)
10-7-8 (15)
4-8-13 (21)
2-5-10 (15)
5-10-24 (34)
50/6.00"
31-50/4.00"
50/3.00"
50/4.50"
50/4.50"
15.6
14.7
15.5
17.9
53.4
28.1
24.3
52.6
31-15-16
NP-NP-NP
16-13-3
26-11-15
BORING LOG B-2
PROJECT NAME: B2280 Chilled Water System & Cooling
PROJECT NUMBER: 2230-0534
PROJECT LOCATION: Tinker Air Force Base
CLIENT: HDR Engineering, Inc.
www.stantest.com
WATER LEVELS ELEVATIONS / LOCATIONS DRILLING
WD - GROUND ELEVATION: 99 DRILL START: 10/11/2022 LOGGER: T.L.
AD - TBM: N.W. Corner of Building DRILLED END: 10/14/2022 DRILLER: G.D.
24 Hrs - GPS: 35 24.808'N, 97 22.565'W DRILL RIG: CME-55 HOLE SIZE: 7.25"
> 24 Hrs - STA: OFFSET: DRILL METHOD: HSA
D E
P T
H
F T
E L
E V
A T
IO
N
F
T
G R
A P
H
IC
L O
G
U S
C
S MATERIAL DESCRIPTION
SAMPLER SYMBOLS
S A
M P
L E
T Y
P E
S A
M P
L E
N U
M B
E R
B L
O W
C O
U N
T S
N
P O
C K
E T
P E
N T
R O
M E
T E
R ts f)
R E
C O
V E
R Y
R
Q D
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T p c f)
U C
S p s f)
S
IE
V
E
LL-PL-PI
A T
T E
R B
E R
G L
IM
IT
S
Oklahoma City (405) 528-0541 Tulsa (918) 289-0005 Lawton (580) 353-0872 Enid (580) 237-3130
Grab
SS
ST RC
(1 of 2)
CL Reddish Brn. SHALE Moist, Moderate Plasticity, Soft Rock
Bottom of borehole at 51.7 feet
L
M
N
50/4.00"
50/3.00"
40-50/4.50"
100 15.1 72.1 38-16-22
BORING LOG B-2
PROJECT NAME: B2280 Chilled Water System & Cooling
PROJECT NUMBER: 2230-0534
PROJECT LOCATION: Tinker Air Force Base
CLIENT: HDR Engineering, Inc.
www.stantest.com
WATER LEVELS ELEVATIONS / LOCATIONS DRILLING
WD - GROUND ELEVATION: 99 DRILL START: 10/11/2022 LOGGER: T.L.
AD - TBM: N.W. Corner of Building DRILLED END: 10/14/2022 DRILLER: G.D.
24 Hrs - GPS: 35 24.808'N, 97 22.565'W DRILL RIG: CME-55 HOLE SIZE: 7.25"
> 24 Hrs - STA: OFFSET: DRILL METHOD: HSA
D E
P T
H
F T
E L
E V
A T
IO
N
F
T
G R
A P
H
IC
L O
G
U S
C
S MATERIAL DESCRIPTION
SAMPLER SYMBOLS
S A
M P
L E
T Y
P E
S A
M P
L E
N U
M B
E R
B L
O W
C O
U N
T S
N
P O
C K
E T
P E
N T
R O
M E
T E
R ts f)
R E
C O
V E
R Y
R
Q D
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T p c f)
U C
S p s f)
S
IE
V
E
LL-PL-PI
A T
T E
R B
E R
G L
IM
IT
S
Oklahoma City (405) 528-0541 Tulsa (918) 289-0005 Lawton (580) 353-0872 Enid (580) 237-3130
Grab
SS
ST RC
(2 of 2)
B-1
7-8-10 (18)
6-12-13 (25)
4-16-31 (47)
8-17-20 (37)
8-40-50 (90)
19-45-50 (95)
50/3"
50/4"
50/3.5"
50/2.5"
50/5.0"
40-50/5.5"
B-2
10-7-8 (15)
10-7-8 (15)
4-8-13 (21)
2-5-10 (15)
5-10-24 (34)
50/6"
31-50/4"
50/3"
50/4.5"
50/4.5"
50/4"
50/3"
40-50/4.5"
E L E
V A
T
IO
N I
N F
E E
T
E L E
V A
T
IO
N
IN
F E
E T
Asphalt
Gravel
Sandy Lean Clay
Lean Clay
Weathered Shale
Shale
Sandstone
Sandy Shale
Sandy Silt
Weathered Sandy Shale
SOIL PROFILE
B2280 Chilled Water System & Cooling Towers
PROJECT NO. 2230-0534
HORIZONTAL VERTICAL
SCALE: SCALE: 1"=12'
DEFINITION OF DESCRIPTIVE TERMS
Consistency of Cohesive Soils (at moisture content near plastic limit):
Very Soft - Easily penetrated 4" to 6" by fist; tall core will sag under its own weight.
Soft - Easily molded by fingers.
Firm - Can be penetrated 2" to 3" by thumb with moderate effort, imprinted with fingers.
Stiff - Readily indented by thumb but penetrated only with great effort.
Very Stiff - Readily indented by thumbnail, imprinted very slightly with pressure from fingers.
Hard - Indented with difficulty by thumbnail, cannot be imprinted with fingers.
Density of Cohesionless Soils:
Very Loose - less than 4 SPT "N" value corrected for overburden.
Loose - 5 to 10 SPT "N" value corrected for overburden.
Medium Dense - 11 to 30 SPT "N" value corrected for overburden.
Dense - 31 to 50 SPT "N" value corrected for overburden.
Very Dense - 51 to 50/6" SPT "N" value corrected for overburden.
Hard - less than 6" penetration in 50 SPT "N" blows corrected for overburden (cemented).
Hardness of Rock:
Very Soft - can be scratched readily by fingernail Soft - can be grooved readily by knife or pick Medium - can be grooved 0.05" deep by firm pressure of knife Moderately Hard - can be scratched by knife Hard - can be scratched by knife or pick only with difficulty Very Hard - cannot be scratched by knife or sharp pick
Other Terms Descriptive of Consistency:
Brittle - Ruptures with little deformation Friable - Crumbles or pulverizes easily.
Elastic - Returns to original length after small deformation.
Spongy - Is very porous, loose and elastic.
Sticky - Adheres or sticks to tools or hands.
In-Situ Moisture Descriptions:
Dry - powdery Slightly Moist - water not readily absorbed by paper Moist - water readily absorbed by paper Very Moist - water condenses on sample tray Wet - water drips from sample
Degree of Plasticity When Moist to Very Moist:
Nonplastic - cannot be rolled into a ball Trace of Plasticity - can be rolled into a ball but not into a 1/8" thread Low Plasticity - barely holds its shape when rolled into a 1/8" thread Fairly Low Plasticity - 1/8" thread quickly ruptures when bent Medium Plasticity - 1/8" thread withstands considerable deformation without rupture.
Fairly High Plasticity - difficult to rupture a 1/8" thread by bending.
High Plasticity - can be kneaded without rupture; greasy texture.
Abbreviations:
V. - Very Dk. - Dark Blk. - Black Tr. - Trace Lt. - Light Brn. - Brown Fl. - Fairly Med. - Medium Sl. - Slightly
APPENDIX C
AASHTO Soil Classification System
Unified Soil Classification System
APPENDIX D
Summary of Laboratory Test Results
B-1
B 2.3-3.8 12.8 38 14 24 100 99 97 95 91.9 CL A-6(22)
C 3.8-5.8 11.7 124 7475 3.1
D 5.8-7.3 9.7 28 14 14 97 95 93 92 86.8 CL A-6(10)
F 10.8-12.3 12.3 34 15 19 100 99 98 97 95.9 CL A-6(18)
H 20.8-22.0 11.0 32 13 19 99 98 95 91 85.4 CL A-6(14)
M 45.8-46.3 11.0 NP NP NP 100 98 87 33 2.9 SP A-3
B-2
A 0.8-2.3 15.6 31 15 16 92 84 71 58 53.4 CL A-6(5)
C 3.8-5.8 14.7 NP NP NP 100 100 90 47 28.1 SM A-2-4(0)
D 5.8-7.3 15.5 16 13 3 100 100 88 38 24.3 SM A-2-4(0)
F 10.8-12.3 17.9 26 11 15 100 100 91 62 52.6 CL A-6(4)
N 50.8-51.7 15.1 38 16 22 97 94 91 81 72.1 CL A-6(14)
SUMMARY OF LABORATORY TEST RESULTS
Client: HDR Engineering, Inc. Date: 10/26/2022
Project: B2280 Chilled Water System & Cooling Towers Project No.: 2230-0534
Boring No.
Sample
No.
Depth
(ft)
Moisture Content
Dry Density
(pcf) LL
Atterberg Limits (% Moisture)
PL PI #4
Sieve Analysis (% Passing)
#10 #40 #100 #200 USCS
Soil Classification
AASHTO
Stress (psf)
UCT
Strain
UNCONFINED COMPRESSION TEST
Project No.: 2230-0534
Date Sampled:
Remarks:
Figure
Client: HDR Engineering, Inc.
Project: B2280 Chilled Water System & Cooling Towers
Source of Sample: B-1 Depth: 3.83
Sample Number: C
Description:
LL = PI = PL = Assumed GS= 2.65 Type: Shelby Tube
Stage
Unconfined strength, psf
Undrained shear strength, psf
Failure strain, %
Strain rate, in./min.
Water content, %
Wet density, pcf
Dry density, pcf
Saturation, %
Void ratio
Specimen diameter, in.
Specimen height, in.
Height/diameter ratio
3.1
0.052
9.5
135.5
123.7
74.6
0.3372
2.87
5.76
2.01
C o m p re s s iv e S tr e s s p s f
10000
Axial Strain, %
0 1 2 3 4
5HSRUW�2Q� 'HWHUPLQLQJ�6ROXEOH�&KORULGH�&RQWHQW�LQ�6RLO
)LOH�,'�
+'5�(QJLQHHULQJ��,QF�
0U��6FRWW�*RHKUL��3�(�
�����0DLQ�6WUHHW��6XLWH�����
.DQVDV�&LW\���02�������
&OLHQW��
/RFDWLRQ� %�������
5HSRUW�'DWH��
6DPSOHG�%\��
)LHOG�,'��� %��
%�����&KLOOHG�:DWHU�6\VWHP� �:DWHU�
&RROLQJ�7RZHUV�
2.&�2.
3URMHFW��
6DPSOH�'DWH��
/DE�1R��
5HSRUW�1R��
��������� $FFW�,'�����+'5��
$UHD�2IILFHV
����7UDLOV�:HVW�/RRS�
����6(��-��$YH�
�����(����WK�3ODFH
(QLG��2.������
/DZWRQ��2.������
7XOVD��2.������
�����1��/,1&2/1��2./$+20$�&,7<��2.���������������������
&25325$7(�2)),&(�DQG�&(175$/�/$%25$725<
3DJH���RI��
7HV W�0 HWKRG�� &RORULP HWULF
0 DWHULDO�5HSUHVHQWHG� % �������
% ODQN �$GMXV WP HQW��5
��� ���� SSP
0DVV �RI�$ LU�'ULHG�6 DP SOH�3 XOYHUL]HG�WR������6 LHYH��0 � �� ����� J
0DVV �RI�6 DP SOH�SOXV �'HLRQL] HG�: DWHU��0 � �� ������ J
$ YHUDJH�&RORULP HWHU�5HDGLQJ�RQ�2 ULJLQDO�6 OXUU\ ��5�� ���� SSP
&RQFHQWUDW LRQ� LQ�2 ULJLQDO�6 ROLG�6 DPSOH��& � � �0 � � � �0 � �
� �5���5
�� SSP
'LOXW LRQ�� LI�QHFHVVDU\
0 DVV �RI�2 ULJLQDO�6 OXUU\ �8VHG��0 � �� 1 �$ J
0 DVV �RI�2 ULJLQDO�6 OXUU\ �8VHG�SOXV �$ GGLW LRQDO�'HLRQL] HG�: DWHU��0 � �� 1 �$ J
&RORULP HWHU�5HDGLQJ�RQ�'LOXWHG�6 OXUU\ ��5 � �� 1 �$ SSP
'LOXW LRQ�)DF WRU��' � � �0 � � � �0 � �� 1R�'LOXW LRQ
&RQFHQWUDW LRQ� LQ�2 ULJLQDO�6 ROLG�6 DPSOH��& � � �' � �
�0 � � � �0 � � � >5���5
@�� SSP
&KOR ULGH �& RQFHQ WUDWLRQ �LQ �$LU�' U\ �6R LO���& V �� �� SSP
7HVW�0HWKRGV� &RORULPHWULF
2ULJ��+'5�(QJLQHHULQJ��,QF���.DQVDV�&LW\��02�
$WWQ��0U��6FRWW�*RHKUL��3�(������FF�FRS\�
��FF�/DERUDWRU\
5HVSHFWIXOO\�6XEPLWWHG�
6WDQGDUG�7HVWLQJ� �(QJLQHHULQJ�&RPSDQ\
5(3257�&5($7('�%<�(OP7UHH�6<67(0
127('��7+(6(�5(32576�$5(�)25�7+(�(;&/86,9(�86(�2)�7+(�$''5(66('�&/,(17�$1'�$5(�127�72�%(�5(352'8&('�:,7+287�:5,77(1�3(50,66,21� 7+(�48$/,7,(6�2)�$33$5(17/<�,'(17,&$/�25�6,0,/$5�352'8&76�25�352&('85(6��125�'2�7+(<�5(35(6(17�$1�21*2,1*�48$/,7<�$6685$1&(�352*5$0�81/(66�62 7+,6�5(3257�$33/,(6�21/<�72�7+(�67$1'$5'6�25�352&('85(6�,1',&$7('�$1'�72�7+(�6$03/(�6��7(67('�$1'�25�2%6(59('�$1'�$5(�127�1(&(66$5,/<�,1',&$7,9(�2)
+'5�(QJLQHHULQJ��,QF�
0U��6FRWW�*RHKUL��3�(�
�����0DLQ�6WUHHW��6XLWH�����
.DQVDV�&LW\���02�������
&OLHQW��
/RFDWLRQ� %�������
5HSRUW�'DWH��
6DPSOHG�%\��
)LHOG�,'��� %��
%�����&KLOOHG�:DWHU�6\VWHP� �:DWHU�
&RROLQJ�7RZHUV�
2.&�2.
3URMHFW��
6DPSOH�'DWH��
/DE�1R��
5HSRUW�1R��
��������� $FFW�,'�����+'5��
$UHD�2IILFHV
����7UDLOV�:HVW�/RRS�
����6(��-��$YH�
�����(����WK�3ODFH
(QLG��2.������
/DZWRQ��2.������
7XOVD��2.������
�����1��/,1&2/1��2./$+20$�&,7<��2.���������������������
&25325$7(�2)),&(�DQG�&(175$/�/$%25$725<
3DJH���RI��
7HV W�0 HWKRG�� &RORULP HWULF
0 DWHULDO�5HSUHVHQWHG� % �������
% ODQN �$GMXV WP HQW��5
��� ���� SSP
0DVV �RI�$ LU�'ULHG�6 DP SOH�3 XOYHUL]HG�WR������6 LHYH��0 � �� ����� J
0DVV �RI�6 DP SOH�SOXV �'HLRQL] HG�: DWHU��0 � �� ������ J
$ YHUDJH�&RORULP HWHU�5HDGLQJ�RQ�2 ULJLQDO�6 OXUU\ ��5�� ��� SSP
&RQFHQWUDW LRQ� LQ�2 ULJLQDO�6 ROLG�6 DPSOH��& � � �0 � � � �0 � �
� �5���5
�� SSP
'LOXW LRQ�� LI�QHFHVVDU\
0 DVV �RI�2 ULJLQDO�6 OXUU\ �8VHG��0 � �� 1 �$ J
0 DVV �RI�2 ULJLQDO�6 OXUU\ �8VHG�SOXV �$ GGLW LRQDO�'HLRQL] HG�: DWHU��0 � �� 1 �$ J
&RORULP HWHU�5HDGLQJ�RQ�'LOXWHG�6 OXUU\ ��5 � �� 1 �$ SSP
'LOXW LRQ�)DF WRU��' � � �0 � � � �0 � �� 1R�'LOXW LRQ
&RQFHQWUDW LRQ� LQ�2 ULJLQDO�6 ROLG�6 DPSOH��& � � �' � �
�0 � � � �0 � � � >5���5
@�� SSP
&KOR ULGH �& RQFHQ WUDWLRQ �LQ �$LU�' U\ �6R LO���& V �� �� SSP
7HVW�0HWKRGV� &RORULPHWULF
2ULJ��+'5�(QJLQHHULQJ��,QF���.DQVDV�&LW\��02�
$WWQ��0U��6FRWW�*RHKUL��3�(������FF�FRS\�
��FF�/DERUDWRU\
5HVSHFWIXOO\�6XEPLWWHG�
6WDQGDUG�7HVWLQJ� �(QJLQHHULQJ�&RPSDQ\
5(3257�&5($7('�%<�(OP7UHH�6<67(0
127('��7+(6(�5(32576�$5(�)25�7+(�(;&/86,9(�86(�2)�7+(�$''5(66('�&/,(17�$1'�$5(�127�72�%(�5(352'8&('�:,7+287�:5,77(1�3(50,66,21� 7+(�48$/,7,(6�2)�$33$5(17/<�,'(17,&$/�25�6,0,/$5�352'8&76�25�352&('85(6��125�'2�7+(<�5(35(6(17�$1�21*2,1*�48$/,7<�$6685$1&(�352*5$0�81/(66�62 7+,6�5(3257�$33/,(6�21/<�72�7+(�67$1'$5'6�25�352&('85(6�,1',&$7('�$1'�72�7+(�6$03/(�6��7(67('�$1'�25�2%6(59('�$1'�$5(�127�1(&(66$5,/<�,1',&$7,9(�2)
+'5�(QJLQHHULQJ��,QF�
0U��6FRWW�*RHKUL��3�(�
�����0DLQ�6WUHHW��6XLWH�����
.DQVDV�&LW\���02�������
&OLHQW��
/RFDWLRQ� %�������
5HSRUW�'DWH��
6DPSOHG�%\��
)LHOG�,'��� %��
%�����&KLOOHG�:DWHU�6\VWHP� �:DWHU�
&RROLQJ�7RZHUV�
2.&�2.
3URMHFW��
6DPSOH�'DWH��
/DE�1R��
5HSRUW�1R��
��������� $FFW�,'�����+'5��
$UHD�2IILFHV
����7UDLOV�:HVW�/RRS�
����6(��-��$YH�
�����(����WK�3ODFH
(QLG��2.������
/DZWRQ��2.������
7XOVD��2.������
�����1��/,1&2/1��2./$+20$�&,7<��2.���������������������
&25325$7(�2)),&(�DQG�&(175$/�/$%25$725<
3DJH���RI��
7HV W�0 HWKRG�� &RORULP HWULF
0 DWHULDO�5HSUHVHQWHG� % �������
% ODQN �$GMXV WP HQW��5
��� ���� SSP
0DVV �RI�$ LU�'ULHG�6 DP SOH�3 XOYHUL]HG�WR������6 LHYH��0 � �� ����� J
0DVV �RI�6 DP SOH�SOXV �'HLRQL] HG�: DWHU��0 � �� ������ J
$ YHUDJH�&RORULP HWHU�5HDGLQJ�RQ�2 ULJLQDO�6 OXUU\ ��5�� ���� SSP
&RQFHQWUDW LRQ� LQ�2 ULJLQDO�6 ROLG�6 DPSOH��& � � �0 � � � �0 � �
� �5���5
�� SSP
'LOXW LRQ�� LI�QHFHVVDU\
0 DVV �RI�2 ULJLQDO�6 OXUU\ �8VHG��0 � �� 1 �$ J
0 DVV �RI�2 ULJLQDO�6 OXUU\ �8VHG�SOXV �$ GGLW LRQDO�'HLRQL] HG�: DWHU��0 � �� 1 �$ J
&RORULP HWHU�5HDGLQJ�RQ�'LOXWHG�6 OXUU\ ��5 � �� 1 �$ SSP
'LOXW LRQ�)DF WRU��' � � �0 � � � �0 � �� 1R�'LOXW LRQ
&RQFHQWUDW LRQ� LQ�2 ULJLQDO�6 ROLG�6 DPSOH��& � � �' � �
�0 � � � �0 � � � >5���5
@�� SSP
&KOR ULGH �& RQFHQ WUDWLRQ �LQ �$LU�' U\ �6R LO���& V �� �� SSP
7HVW�0HWKRGV� &RORULPHWULF
2ULJ��+'5�(QJLQHHULQJ��,QF���.DQVDV�&LW\��02�
$WWQ��0U��6FRWW�*RHKUL��3�(������FF�FRS\�
��FF�/DERUDWRU\
5HVSHFWIXOO\�6XEPLWWHG�
6WDQGDUG�7HVWLQJ� �(QJLQHHULQJ�&RPSDQ\
5(3257�&5($7('�%<�(OP7UHH�6<67(0
127('��7+(6(�5(32576�$5(�)25�7+(�(;&/86,9(�86(�2)�7+(�$''5(66('�&/,(17�$1'�$5(�127�72�%(�5(352'8&('�:,7+287�:5,77(1�3(50,66,21� 7+(�48$/,7,(6�2)�$33$5(17/<�,'(17,&$/�25�6,0,/$5�352'8&76�25�352&('85(6��125�'2�7+(<�5(35(6(17�$1�21*2,1*�48$/,7<�$6685$1&(�352*5$0�81/(66�62 7+,6�5(3257�$33/,(6�21/<�72�7+(�67$1'$5'6�25�352&('85(6�,1',&$7('�$1'�72�7+(�6$03/(�6��7(67('�$1'�25�2%6(59('�$1'�$5(�127�1(&(66$5,/<�,1',&$7,9(�2)
5HSRUW�2Q� S+�DQG�5HVLVWLYLW\�RI�6RLO
+'5�(QJLQHHULQJ��,QF�
0U��6FRWW�*RHKUL��3�(�
�����0DLQ�6WUHHW��6XLWH�����
.DQVDV�&LW\���02�������
&OLHQW��
/RFDWLRQ� %�������
5HSRUW�'DWH��
6DPSOHG�%\��
)LHOG�,'��� %��
%�����&KLOOHG�:DWHU�6\VWHP� �:DWHU�
&RROLQJ�7RZHUV�
2.&�2.
3URMHFW��
6DPSOH�'DWH��
/DE�1R��
5HSRUW�1R��
��������� $FFW�,'�����+'5��
$UHD�2IILFHV
����7UDLOV�:HVW�/RRS�
����6(��-��$YH�
�����(����WK�3ODFH
(QLG��2.������
/DZWRQ��2.������
7XOVD��2.������
�����1��/,1&2/1��2./$+20$�&,7<��2.���������������������
&25325$7(�2)),&(�DQG�&(175$/�/$%25$725<
3DJH���RI��
0DWHULDO��
S+�7HVW���$$6+72�7�����
5HVLVWLYLW\ �7HVW���$670�*���
,QWHUSUHWHG�&RUURVLYLW\ �
0RGHUDWHO\ �&RUURVLYH
�������FP
S+�UHDGLQJ�RI�VDPSOH�LQ�ZDWHU
5HVLVWDQFH�RI�6RLO�LQ�6RLO�%R[��2KPV
6RLO�%R[�*HRPHWULF�)DFWRU
5HVLVWLYLW\ �RI�6RLO��2KPV�
�FP
7HVW�0HWKRGV� $$6+72�7����� �$670�*��
2ULJ��+'5�(QJLQHHULQJ��,QF���.DQVDV�&LW\��02�
$WWQ��0U��6FRWW�*RHKUL��3�(������FF�FRS\�
��FF�/DERUDWRU\
5HVSHFWIXOO\�6XEPLWWHG�
6WDQGDUG�7HVWLQJ� �(QJLQHHULQJ�&RPSDQ\
5(3257�&5($7('�%<�(OP7UHH�6<67(0
127('��7+(6(�5(32576�$5(�)25�7+(�(;&/86,9(�86(�2)�7+(�$''5(66('�&/,(17�$1'�$5(�127�72�%(�5(352'8&('�:,7+287�:5,77(1�3(50,66,21� 7+(�48$/,7,(6�2)�$33$5(17/<�,'(17,&$/�25�6,0,/$5�352'8&76�25�352&('85(6��125�'2�7+(<�5(35(6(17�$1�21*2,1*�48$/,7<�$6685$1&(�352*5$0�81/(66�62 7+,6�5(3257�$33/,(6�21/<�72�7+(�67$1'$5'6�25�352&('85(6�,1',&$7('�$1'�72�7+(�6$03/(�6��7(67('�$1'�25�2%6(59('�$1'�$5(�127�1(&(66$5,/<�,1',&$7,9(�2)
+'5�(QJLQHHULQJ��,QF�
0U��6FRWW�*RHKUL��3�(�
�����0DLQ�6WUHHW��6XLWH�����
.DQVDV�&LW\���02�������
&OLHQW��
/RFDWLRQ� %�������
5HSRUW�'DWH��
6DPSOHG�%\��
)LHOG�,'��� %��
%�����&KLOOHG�:DWHU�6\VWHP� �:DWHU�
&RROLQJ�7RZHUV�
2.&�2.
3URMHFW��
6DPSOH�'DWH��
/DE�1R��
5HSRUW�1R��
��������� $FFW�,'�����+'5��
$UHD�2IILFHV
����7UDLOV�:HVW�/RRS�
����6(��-��$YH�
�����(����WK�3ODFH
(QLG��2.������
/DZWRQ��2.������
7XOVD��2.������
�����1��/,1&2/1��2./$+20$�&,7<��2.���������������������
&25325$7(�2)),&(�DQG�&(175$/�/$%25$725<
3DJH���RI��
0DWHULDO��
S+�7HVW���$$6+72�7�����
5HVLVWLYLW\ �7HVW���$670�*���
,QWHUSUHWHG�&RUURVLYLW\ �
6 OLJKWO\ �&RUURVLYH
�������FP
S+�UHDGLQJ�RI�VDPSOH�LQ�ZDWHU
5HVLVWDQFH�RI�6RLO�LQ�6RLO�%R[��2KPV
6RLO�%R[�*HRPHWULF�)DFWRU
5HVLVWLYLW\ �RI�6RLO��2KPV�
�FP
7HVW�0HWKRGV� $$6+72�7����� �$670�*��
2ULJ��+'5�(QJLQHHULQJ��,QF���.DQVDV�&LW\��02�
$WWQ��0U��6FRWW�*RHKUL��3�(������FF�FRS\�
��FF�/DERUDWRU\
5HVSHFWIXOO\�6XEPLWWHG�
6WDQGDUG�7HVWLQJ� �(QJLQHHULQJ�&RPSDQ\
5(3257�&5($7('�%<�(OP7UHH�6<67(0
127('��7+(6(�5(32576�$5(�)25�7+(�(;&/86,9(�86(�2)�7+(�$''5(66('�&/,(17�$1'�$5(�127�72�%(�5(352'8&('�:,7+287�:5,77(1�3(50,66,21� 7+(�48$/,7,(6�2)�$33$5(17/<�,'(17,&$/�25�6,0,/$5�352'8&76�25�352&('85(6��125�'2�7+(<�5(35(6(17�$1�21*2,1*�48$/,7<�$6685$1&(�352*5$0�81/(66�62 7+,6�5(3257�$33/,(6�21/<�72�7+(�67$1'$5'6�25�352&('85(6�,1',&$7('�$1'�72�7+(�6$03/(�6��7(67('�$1'�25�2%6(59('�$1'�$5(�127�1(&(66$5,/<�,1',&$7,9(�2)
+'5�(QJLQHHULQJ��,QF�
0U��6FRWW�*RHKUL��3�(�
�����0DLQ�6WUHHW��6XLWH�����
.DQVDV�&LW\���02�������
&OLHQW��
/RFDWLRQ� %�������
5HSRUW�'DWH��
6DPSOHG�%\��
)LHOG�,'��� %��
%�����&KLOOHG�:DWHU�6\VWHP� �:DWHU�
&RROLQJ�7RZHUV�
2.&�2.
3URMHFW��
6DPSOH�'DWH��
/DE�1R��
5HSRUW�1R��
��������� $FFW�,'�����+'5��
$UHD�2IILFHV
����7UDLOV�:HVW�/RRS�
����6(��-��$YH�
�����(����WK�3ODFH
(QLG��2.������
/DZWRQ��2.������
7XOVD��2.������
�����1��/,1&2/1��2./$+20$�&,7<��2.���������������������
&25325$7(�2)),&(�DQG�&(175$/�/$%25$725<
3DJH���RI��
0DWHULDO��
S+�7HVW���$$6+72�7�����
5HVLVWLYLW\ �7HVW���$670�*���
,QWHUSUHWHG�&RUURVLYLW\ �
6 OLJKWO\ �&RUURVLYH
�������FP
S+�UHDGLQJ�RI�VDPSOH�LQ�ZDWHU
5HVLVWDQFH�RI�6RLO�LQ�6RLO�%R[��2KPV
6RLO�%R[�*HRPHWULF�)DFWRU
5HVLVWLYLW\ �RI�6RLO��2KPV�
�FP
7HVW�0HWKRGV� $$6+72�7����� �$670�*��
2ULJ��+'5�(QJLQHHULQJ��,QF���.DQVDV�&LW\��02�
$WWQ��0U��6FRWW�*RHKUL��3�(������FF�FRS\�
��FF�/DERUDWRU\
5HVSHFWIXOO\�6XEPLWWHG�
6WDQGDUG�7HVWLQJ� �(QJLQHHULQJ�&RPSDQ\
5(3257�&5($7('�%<�(OP7UHH�6<67(0
127('��7+(6(�5(32576�$5(�)25�7+(�(;&/86,9(�86(�2)�7+(�$''5(66('�&/,(17�$1'�$5(�127�72�%(�5(352'8&('�:,7+287�:5,77(1�3(50,66,21� 7+(�48$/,7,(6�2)�$33$5(17/<�,'(17,&$/�25�6,0,/$5�352'8&76�25�352&('85(6��125�'2�7+(<�5(35(6(17�$1�21*2,1*�48$/,7<�$6685$1&(�352*5$0�81/(66�62 7+,6�5(3257�$33/,(6�21/<�72�7+(�67$1'$5'6�25�352&('85(6�,1',&$7('�$1'�72�7+(�6$03/(�6��7(67('�$1'�25�2%6(59('�$1'�$5(�127�1(&(66$5,/<�,1',&$7,9(�2)
5HSRUW�2Q� 'HWHUPLQLQJ�6ROXEOH�6XOIDWH�&RQWHQW�LQ�6RLO
+'5�(QJLQHHULQJ��,QF�
0U��6FRWW�*RHKUL��3�(�
�����0DLQ�6WUHHW��6XLWH�����
.DQVDV�&LW\���02�������
&OLHQW��
/RFDWLRQ� %�������
5HSRUW�'DWH��
6DPSOHG�%\��
)LHOG�,'��� %��
%�����&KLOOHG�:DWHU�6\VWHP� �:DWHU�
&RROLQJ�7RZHUV�
2.&�2.
3URMHFW��
6DPSOH�'DWH��
/DE�1R��
5HSRUW�1R��
��������� $FFW�,'�����+'5��
$UHD�2IILFHV
����7UDLOV�:HVW�/RRS�
����6(��-��$YH�
�����(����WK�3ODFH
(QLG��2.������
/DZWRQ��2.������
7XOVD��2.������
�����1��/,1&2/1��2./$+20$�&,7<��2.���������������������
&25325$7(�2)),&(�DQG�&(175$/�/$%25$725<
3DJH���RI��
7HVW�0HWKRG�� 2+'�/���
0DWHULDO�5HSUHVHQWHG�
0DVV�RI�$LU�'ULHG�6DPSOH�3DVVLQJ�����6LHYH��:V�� ���� J
0DVV�RI�'HLRQL]HG�:DWHU�8VHG�LQ�6OXUU\��:Z�� ������ J
$YHUDJH�&RORULPHWHU�5HDGLQJ��5�� ���� SSP
9ROXPH�RI�2ULJLQDO�)LOWUDWH�8VHG��9I �� 1�$ PO
9ROXPH�RI�'HLRQL]HG�:DWHU�$GGHG�WR�)LOWUDWH��9Z�� 1�$ PO
&RORULPHWHU�5HDGLQJ�RQ�'LOXWHG�)LOWUDWH��5G�� 1�$ SSP
&� �>5�
��:Z���:V�@��RU��>5G�
��:Z���:V�� ��9I ���9Z����9I @
6XOIDWH�&RQFHQWUDWLRQ�LQ�$LU�'U\�6RLO���&�� ��� SSP
7HVW�0HWKRGV� 2+'�/��
2ULJ��+'5�(QJLQHHULQJ��,QF���.DQVDV�&LW\��02�
$WWQ��0U��6FRWW�*RHKUL��3�(������FF�FRS\�
��FF�/DERUDWRU\
5HVSHFWIXOO\�6XEPLWW…