01b Answered 01282026 - COR Signed.pdf
PDF 291 KB Posted
- Solicitation number
- FA813726R0006
About this file
This document is a Pre-Bid Request for Information (RFI) Response from the Department of the Air Force, 72 Air Base Wing (AFMC) at Tinker Air Force Base, Oklahoma, dated 08 January 2026. The memorandum addresses contractor inquiries regarding Project WWYK190048 for the repair of restrooms and janitor's closet in Building 1055. The government response clarifies temporary restroom requirements during construction, specifying fixture counts for male and female facilities: Male occupant load of 55 requires 2 water closets, 2 urinal substitutions, and 1 lavatory; Female occupant load of 3 requires 1 water closet and 1 lavatory. Showers are not required in the temporary trailers. The government confirms that the sewer main utility is not available for connection, and contractors must arrange self-contained waste management solutions. Upon project completion, contractors must return the site and sod to its original condition or better.
The project points of contact are identified as: Cory Muir, Project Manager (PH: 582-9043); Anthony DeGreve, Construction Inspector (PH: 582-9052); Joshua Wheeler, CSAG Program Manager (PH: 582-4826); and Randall Floyd, Contracting Officer Representative/Electrical Engineer (PH: 582-1958). The memorandum is signed by Cory Muir, Project Manager, and Randall Floyd, Electrical Engineer/COR, both of the 72d Civil Engineering Directorate.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 72 AIR BASE WING (AFMC)
TINKER AIR FORCE BASE OKLAHOMA
08 Jan 26
MEMORANDUM FOR AFSC/PZIOC (ATTN: Tamara Torres)
THROUGH: 72 ABW/CENM
FROM: 72 ABW/CEED
Tepa Companies
SUBJECT: Pre-Bid RFI Responses Project: WWYK190048 REPAIR RESTROOMS AND JANITOR'S CLOSET, B1055
Reference: Memo, 08 Jan 2026, Pre-Bid RFIs, WWYK190048 REPAIR RESTROOMS AND
JANITOR'S CLOSET, B1055
1. This office reviewed the referenced RFIs received on 08 Jan 2026 for the subject project and provided answers below. Please forward to the contractor(s) for their use in preparing proposals
(1) Request for information, question #-11. Key Note #1 requires Contractor to provide a restroom trailer for duration of the project for . Questions 1. How many fixtures are anticipated to be required? 2. will showers be required to be provided in the trailers?
3. Will the Contractor be able to set the unit locally close enough to provide a temporary waste tie in to existing waste piping underground?
Government Response:
1. AND 2. A fixture count is provided for Men and Women temporary facilities to be provided during construction.
FIXTURE COUNT – TEMPORATY RESTROOMS DURING CONSTRUCTION
2. Showers will not be required.
3. Sewer main utility is not available to tie into. At the completion of the project return the site and sod to its original condition or better.
Male Women
Occupant Load 55 3 Water Closet 2 1 Urinal Substitution 2 Lavatory 1 1 Drinking Fountain Service Sink
2. The points of contact for this project are:
a. Cory Muir, Project Manager. PH: 582-9043
b. Anthony DeGreve, Construction Inspector. PH: 582-9052
c. Joshua Wheeler, CSAG Program Manager. PH: 582-4826
d. Randall Floyd, Contracting Officer Representative (COR). PH: 582-1958
CORY MUIR RANDALL FLOYD
Project Manager Electrical Engineer/COR 72d Civil Engineering Directorate (Tepa) 72d Civil Engineering Directorate
00 Attachment(s):
1. xx cc:
Project folder
| 2026-01-28T14:24:41-0600 | |
| MUIR.CORY.DAVID.1624248763 |
| 2026-01-30T08:08:25-0600 | |
| FLOYD.RANDALL.G.1383281306 |
File details come from the government source that posted it. Updated .