Appendix_A-1(Equipment_List)_Serv_19-008-R-0045_Reverse_Osmosis.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
CSS for Reverse Osmosis System Preventative Maintenance and Remedial Maintenance
Solicitation number
FA813219R1908
Issued by

About this file

Appendix A/Equipment List for Reverse Osmosis PM/RM

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

Revised Appendix A1-RO PMXG Maintenance Contract
FA8125-15-M-0045
Tabs
Tab:RO Plating
Tab:Main Line RO
Tab:095 RO

Plating RO

LOCATIONOC-NumberNUMBERNAMEManufacturerModel No./Serial No.MAINTENANCE REQUIRED
Building 3001, Post H-53ALL EQUIPMENT- Check for proper function on all equipment, i.e. check each system for errors. Verify systems are operating to designed set points. Initiate RM as required.
Building 3001, Post H-53OC23392RAW WATER BOOSTER PUMP 1MARLO INCORPORATED OF RACINEBOOSTER PUMP SKID MTD / EP-170287-001-3020- (Standard pump/motor maintenance)
Building 3001, Post H-53RAW WATER BOOSTER PUMP 2- (Standard pump/motor maintenance)
Building 3001, Post H-53OC23390MMF-1MULTIMEDIA FILTRATION SYSTEMMARLO INCORPORATED OF RACINEMZA-63G DUPLEX/PARALLEL MEDI / EP-160275-001-1441- Replace multimedia if required. Expected media life is 10-15 years (expected replacement 2028-2033).
Building 3001, Post H-53OC23387CCF-1CARBON FILTRATION SYSTEMMARLO INCORPORATED OF RACINEACA-48G DUPLEX PARALLEL CARB / EP-160275-002-1442- Replace carbon media if required. Expected carbon life is 2-5 years (expected replacement 2020-2023, based on ORP).
Building 3001, Post H-53OC23391WS-1WATER SOFTENER SYSTEMMARLO INCORPORATED OF RACINEMRG-1200-3 DUPLEX ALT WATER S / EP-160275-003-1443- Replace 2 consumable bottles for hardness monitor as required (expected replacement every ~2 months). Use:

Hach SP 510 Hardness Monitor Buffer Solution for 20 mg/L Hardness, 500 mL container Hach SP 510 Hardness Monitor Indicator Solution for 5 to 100 mg/L Hardness, 500 mL container

- Hardness monitor 2-point standardization whenever reagent is replaced or when optical system component is replaced. Use:

Hach TitraVer (EDTA) Hardness Titrant 0.200N, 0.100M, 29 mL container Hach Magnesium Sulfate Solution 10,000 ±1000 mg/L, 29 mL container

- Replace water softener resin if required. Expected resin life is very long, 15+ years (expected replacement 2033 or later).

- Replace hardness monitor pump tubes every 3 months Building 3001, Post H-53 BRINE TANK - Clean out brine tank to maintain cleanliness. Minimum yearly.

- Check function on automatic water fill equipment for proper function.

- Provide salt (A-A-694, Type II, Form 1, 40 lb bag) in brine tank to support water softener regenerations.

Building 3001, Post H-53 OC23385 RO-1 REVERSE OSMOSIS SYSTEM 1 MARLO INCORPORATED OF RACINE MRO-72K-8H SINGLE PASS RO SKID / EP-160275-004-1113 - Fill antiscallant tank (use PWT SpectraGuard 111, 0.5 gallon container currently authorized)

- Replace 5 micron cartridge filter as required when differential pressure reaches 15 psi.

- Calibrate all gauges and meters based on manufacturer's recommendations. Frequency no less than every 3 months.

- Replace membranes when required

- Grease motor bearings quarterly

- Change metering pump cartridge valves yearly

- (Standard pump/motor maintenance) Building 3001, Post H-53 OC23389 RO-2 REVERSE OSMOSIS SYSTEM 2 MARLO INCORPORATED OF RACINE MRO-72K-8H SINGLE PASS RO SKID / EP-160275-013-1120 - Fill antiscallant tank (use PWT SpectraGuard 111, 0.5 gallon container currently authorized)

- Replace 5 micron cartridge filter as required when differential pressure reaches 15 psi.

- Calibrate all gauges and meters based on manufacturer's recommendations. Frequency no less than every 3 months.

- Replace membranes when required

- Grease motor bearings quarterly

- Change metering pump cartridge valves yearly

- (Standard pump/motor maintenance)

Building 3001, Post H-53RO WATER STORAGE TANK- Inspect level sensor and high-high level sensor
Building 3001, Post H-53OC23386P-101RO SUPPLY PUMP 1MARLO INCORPORATED OF RACINERECIRCULATION PUMP SKID WITH / EP-160275-006-1502- (Standard pump/motor maintenance)
Building 3001, Post H-53P-102RO SUPPLY PUMP 2- (Standard pump/motor maintenance)
Building 3001, Post H-53UV FILTER- Replace UV lamp when required (minimum annually)

- Inspect and clean or replace UV sleeve as required

- Inspect flow meter sensor periodically Building 3001, Post H-53 OC23388 CIP-1 CLEAN IN PLACE SYSTEM MARLO INCORPORATED OF RACINE MEMBRANE CLEAN-IN-PLACE (CIP) / EP-160275-005-1491 - Run clean in place cycle as required to maintain RO membranes. Use PWT Lavasol 1, 5 gallon containers currently authorized

- Replace filter as required

- (Standard pump/motor maintenance)

Main Line RO

LOCATIONNUMBERNAMEManufacturerModel No./Serial No.MAINTENANCE REQUIRED
H101Side A FilterShelco Microguardian12F0S4/112739Ensure filter is not clogged, replace cartridges as needed.
H101Side A PumpGrundfosA91129158-P21008003Standard Pump/Motor Maintenance
H101Side B FilterShelco Microguardian12F0S4/112739Ensure filter is not clogged, replace cartridges as needed.
H101Side B PumpGrundfosA91129158-P21008003Standard Pump/Motor Maintenance
H101Sodium Bisulfite Chem Tanks (2)Fill with Chemical as required. Ensure sensors function properly. Clean out the tank once a year.
H101Pumps Associated with SBS (2)PulsatronLB64SA-VTC1-XX2Standard Pump/Motor Maintenance
H101Antiscalant Chem Tanks (2)Fill with Chemical as required. Ensure sensors function properly. Clean out the tank once a year.
H101Pumps Associated with Anticalant (2)PulsatronLB64SA-VTC1-XX2Standard Pump/Motor Maintenance
H101Cleaner TankAfter use of cleaning out the skid, ensure tank is fully drained. Ensure sensor operates, replace as needed.
H101Cleaner Tank FilterShelco Microguardian7F0S4/112739Ensure filter is not clogged, replace cartridges as needed.
H101Cleaner Tank PumpLeeson Electric CorporationC184T34FK15D/131583.00Standard Pump/Motor Maintenance
H101P-3Re-Pressure Skid Pump 1Leeson Electric CorporationC215T34FK10AAStandard Pump/Motor Maintenance
H101P-4Re-Pressure Skid Pump 2Leeson Electric CorporationC215T34FK10AAStandard Pump/Motor Maintenance
H101P-5Distribution Skid Pump 1Leeson Electric CorporationC215T34FK10AAStandard Pump/Motor Maintenance
H101P-6Distribution Skid Pump 2Leeson Electric CorporationC215T34FK10AAStandard Pump/Motor Maintenance
H101Product Water Holding TanksEnsure level sensor is working properly. Replace as needed.
H101UltraViolet LampAquafineReplace UV lamps as needed, minimum of once a year. Clean quartz sleeves as needed, and replace once a year. Clean sensor probe window and replace probe once a year. Replace ballast as needed, though it should be infrequent.
H101OC20140Main Line Reverse Osmosis SystemHausers Water SystemsEnsure membranes are clear of fouling and there are no leaks on the system as a whole. Clean membranes as needed, minimum once a year. Calibrate, clean, or replace any electrodes/sensors as needed.
H101AC Units for Control Panels (3)Industrial Cooling EquipmentHC12012604XCXClean out filters as needed, minimum of once a year.

O95 RO

LOCATIONNUMBERNAMEManufacturerModel No./Serial No.MAINTENANCE REQUIRED
S91TK-501RO Cleaning TankSnyder Industries, Inc.After use of cleaning out the skid, ensure tank is fully drained. Ensure sensor operates, replace as needed.
S91TK-502Antiscalant Chem TankFill with Chemical as required. Clean out the tank once a year.
S91Antiscalant Tank AgitatorLiquid Metronics10590AStandard Maintenance
S91P-501Antiscalant Metering PumpLMI, Milton RoyP161-468SI/08092663366-2Standard Pump/Motor Maintenance
S91P-502Antiscalant Metering PumpLMI, Milton RoyP161-468SI/08092663366-1Standard Pump/Motor Maintenance
S91Sodium Metabisulfide TankFill with Chemical as required. Clean out the tank once a year.
S91Sodium Metabisulfide AgitatorLMI, Milton Roy6JHX3/71638553Standard Maintenance
S91Sodium Metabisulfide Metering PumpPulsatron, PulsafeederLB03SA-VTC1-XX2/477907Standard Pump/Motor Maintenance
S91Sodium Metabisulfide Metering PumpPulsatron, PulsafeederLB03SA-VTC1-XX2/477905Standard Pump/Motor Maintenance
S91P-201RO A Feed PumpGrundfosA96523644-P10838574Standard Pump/Motor Maintenance
S91P-401RO B Feed PumpGrundfosA96523644-P10838574Standard Pump/Motor Maintenance
S91P-601Product Water Feed PumpGrundfosA96523641-P10838602Standard Pump/Motor Maintenance
S91TK-602Bladder TankWell-X-Trol, AmtrolWX-302Ensure proper operation of level sensor and clean as needed. Clean tank once a year.
S91UV-601UltraViolet LampAtlantic Ultraviolet Corp.S2400CReplace UV lamps as needed, minimum of once a year.
S91CF-601Post-Treatment Cartridge FilterEnsure filter is not clogged, replace cartridges as needed.
S91Pre-Treatment Cartridge Filters (2)Shelco MicroguardianBFS-2SB-2/130857Ensure filter is not clogged, replace cartridges as needed.
S91TK-601Product Water Holding TankClean tank once a year.
S91OC19792Automated Cleaning Line RO SystemLT TechnologiesEnsure membranes are clear of fouling and there are no leaks on the system as a whole. Clean as needed, minimum once a year. Calibrate, clean, or replace any electrodes/sensors as needed.

File details come from the government source that posted it.