Appendix_A-1(Equipment_List)_Serv_19-008-R-0045_Reverse_Osmosis.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
CSS for Reverse Osmosis System Preventative Maintenance and Remedial Maintenance Federal contract opportunity
Solicitation number
FA813219R1908
Issued by
Department of the Air Force Materiel Command

About this file

Appendix A/Equipment List for Reverse Osmosis PM/RM

View the file

Other files for this federal contract opportunity

Other files attached to CSS for Reverse Osmosis System Preventative Maintenance and Remedial Maintenance, newest first.
File Type Posted
Response_to_Question_2_Combined_Synopsis_Solicitation_FA8132-19-Q-1908_Amdt_01.pdf PDF
FA813219R1908_Amndt_Question.docx DOCX document
FA813219R1908_Amendment_01_CSS.docx DOCX document
FA813219R1908_Amendment_01-_Rev_Appendix_A-1(Equipment_List).xlsx XLSX spreadsheet
PWS_Reverse_Osmosis.pdf PDF
RevOs_FO_Wage_Determination.pdf PDF
CSS_Reverse_Osmosis_PMRM.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

Revised Appendix A1-RO PMXG Maintenance Contract
FA8125-15-M-0045
Tabs
Tab:RO Plating
Tab:Main Line RO
Tab:095 RO

Plating RO

LOCATIONOC-NumberNUMBERNAMEManufacturerModel No./Serial No.MAINTENANCE REQUIRED
Building 3001, Post H-53ALL EQUIPMENT- Check for proper function on all equipment, i.e. check each system for errors. Verify systems are operating to designed set points. Initiate RM as required.
Building 3001, Post H-53OC23392RAW WATER BOOSTER PUMP 1MARLO INCORPORATED OF RACINEBOOSTER PUMP SKID MTD / EP-170287-001-3020- (Standard pump/motor maintenance)
Building 3001, Post H-53RAW WATER BOOSTER PUMP 2- (Standard pump/motor maintenance)
Building 3001, Post H-53OC23390MMF-1MULTIMEDIA FILTRATION SYSTEMMARLO INCORPORATED OF RACINEMZA-63G DUPLEX/PARALLEL MEDI / EP-160275-001-1441- Replace multimedia if required. Expected media life is 10-15 years (expected replacement 2028-2033).
Building 3001, Post H-53OC23387CCF-1CARBON FILTRATION SYSTEMMARLO INCORPORATED OF RACINEACA-48G DUPLEX PARALLEL CARB / EP-160275-002-1442- Replace carbon media if required. Expected carbon life is 2-5 years (expected replacement 2020-2023, based on ORP).
Building 3001, Post H-53OC23391WS-1WATER SOFTENER SYSTEMMARLO INCORPORATED OF RACINEMRG-1200-3 DUPLEX ALT WATER S / EP-160275-003-1443- Replace 2 consumable bottles for hardness monitor as required (expected replacement every ~2 months). Use:

Hach SP 510 Hardness Monitor Buffer Solution for 20 mg/L Hardness, 500 mL container Hach SP 510 Hardness Monitor Indicator Solution for 5 to 100 mg/L Hardness, 500 mL container

- Hardness monitor 2-point standardization whenever reagent is replaced or when optical system component is replaced. Use:

Hach TitraVer (EDTA) Hardness Titrant 0.200N, 0.100M, 29 mL container Hach Magnesium Sulfate Solution 10,000 ±1000 mg/L, 29 mL container

- Replace water softener resin if required. Expected resin life is very long, 15+ years (expected replacement 2033 or later).

- Replace hardness monitor pump tubes every 3 months Building 3001, Post H-53 BRINE TANK - Clean out brine tank to maintain cleanliness. Minimum yearly.

- Check function on automatic water fill equipment for proper function.

- Provide salt (A-A-694, Type II, Form 1, 40 lb bag) in brine tank to support water softener regenerations.

Building 3001, Post H-53 OC23385 RO-1 REVERSE OSMOSIS SYSTEM 1 MARLO INCORPORATED OF RACINE MRO-72K-8H SINGLE PASS RO SKID / EP-160275-004-1113 - Fill antiscallant tank (use PWT SpectraGuard 111, 0.5 gallon container currently authorized)

- Replace 5 micron cartridge filter as required when differential pressure reaches 15 psi.

- Calibrate all gauges and meters based on manufacturer's recommendations. Frequency no less than every 3 months.

- Replace membranes when required

- Grease motor bearings quarterly

- Change metering pump cartridge valves yearly

- (Standard pump/motor maintenance) Building 3001, Post H-53 OC23389 RO-2 REVERSE OSMOSIS SYSTEM 2 MARLO INCORPORATED OF RACINE MRO-72K-8H SINGLE PASS RO SKID / EP-160275-013-1120 - Fill antiscallant tank (use PWT SpectraGuard 111, 0.5 gallon container currently authorized)

- Replace 5 micron cartridge filter as required when differential pressure reaches 15 psi.

- Calibrate all gauges and meters based on manufacturer's recommendations. Frequency no less than every 3 months.

- Replace membranes when required

- Grease motor bearings quarterly

- Change metering pump cartridge valves yearly

- (Standard pump/motor maintenance)

Building 3001, Post H-53RO WATER STORAGE TANK- Inspect level sensor and high-high level sensor
Building 3001, Post H-53OC23386P-101RO SUPPLY PUMP 1MARLO INCORPORATED OF RACINERECIRCULATION PUMP SKID WITH / EP-160275-006-1502- (Standard pump/motor maintenance)
Building 3001, Post H-53P-102RO SUPPLY PUMP 2- (Standard pump/motor maintenance)
Building 3001, Post H-53UV FILTER- Replace UV lamp when required (minimum annually)

- Inspect and clean or replace UV sleeve as required

- Inspect flow meter sensor periodically Building 3001, Post H-53 OC23388 CIP-1 CLEAN IN PLACE SYSTEM MARLO INCORPORATED OF RACINE MEMBRANE CLEAN-IN-PLACE (CIP) / EP-160275-005-1491 - Run clean in place cycle as required to maintain RO membranes. Use PWT Lavasol 1, 5 gallon containers currently authorized

- Replace filter as required

- (Standard pump/motor maintenance)

Main Line RO

LOCATIONNUMBERNAMEManufacturerModel No./Serial No.MAINTENANCE REQUIRED
H101Side A FilterShelco Microguardian12F0S4/112739Ensure filter is not clogged, replace cartridges as needed.
H101Side A PumpGrundfosA91129158-P21008003Standard Pump/Motor Maintenance
H101Side B FilterShelco Microguardian12F0S4/112739Ensure filter is not clogged, replace cartridges as needed.
H101Side B PumpGrundfosA91129158-P21008003Standard Pump/Motor Maintenance
H101Sodium Bisulfite Chem Tanks (2)Fill with Chemical as required. Ensure sensors function properly. Clean out the tank once a year.
H101Pumps Associated with SBS (2)PulsatronLB64SA-VTC1-XX2Standard Pump/Motor Maintenance
H101Antiscalant Chem Tanks (2)Fill with Chemical as required. Ensure sensors function properly. Clean out the tank once a year.
H101Pumps Associated with Anticalant (2)PulsatronLB64SA-VTC1-XX2Standard Pump/Motor Maintenance
H101Cleaner TankAfter use of cleaning out the skid, ensure tank is fully drained. Ensure sensor operates, replace as needed.
H101Cleaner Tank FilterShelco Microguardian7F0S4/112739Ensure filter is not clogged, replace cartridges as needed.
H101Cleaner Tank PumpLeeson Electric CorporationC184T34FK15D/131583.00Standard Pump/Motor Maintenance
H101P-3Re-Pressure Skid Pump 1Leeson Electric CorporationC215T34FK10AAStandard Pump/Motor Maintenance
H101P-4Re-Pressure Skid Pump 2Leeson Electric CorporationC215T34FK10AAStandard Pump/Motor Maintenance
H101P-5Distribution Skid Pump 1Leeson Electric CorporationC215T34FK10AAStandard Pump/Motor Maintenance
H101P-6Distribution Skid Pump 2Leeson Electric CorporationC215T34FK10AAStandard Pump/Motor Maintenance
H101Product Water Holding TanksEnsure level sensor is working properly. Replace as needed.
H101UltraViolet LampAquafineReplace UV lamps as needed, minimum of once a year. Clean quartz sleeves as needed, and replace once a year. Clean sensor probe window and replace probe once a year. Replace ballast as needed, though it should be infrequent.
H101OC20140Main Line Reverse Osmosis SystemHausers Water SystemsEnsure membranes are clear of fouling and there are no leaks on the system as a whole. Clean membranes as needed, minimum once a year. Calibrate, clean, or replace any electrodes/sensors as needed.
H101AC Units for Control Panels (3)Industrial Cooling EquipmentHC12012604XCXClean out filters as needed, minimum of once a year.

O95 RO

LOCATIONNUMBERNAMEManufacturerModel No./Serial No.MAINTENANCE REQUIRED
S91TK-501RO Cleaning TankSnyder Industries, Inc.After use of cleaning out the skid, ensure tank is fully drained. Ensure sensor operates, replace as needed.
S91TK-502Antiscalant Chem TankFill with Chemical as required. Clean out the tank once a year.
S91Antiscalant Tank AgitatorLiquid Metronics10590AStandard Maintenance
S91P-501Antiscalant Metering PumpLMI, Milton RoyP161-468SI/08092663366-2Standard Pump/Motor Maintenance
S91P-502Antiscalant Metering PumpLMI, Milton RoyP161-468SI/08092663366-1Standard Pump/Motor Maintenance
S91Sodium Metabisulfide TankFill with Chemical as required. Clean out the tank once a year.
S91Sodium Metabisulfide AgitatorLMI, Milton Roy6JHX3/71638553Standard Maintenance
S91Sodium Metabisulfide Metering PumpPulsatron, PulsafeederLB03SA-VTC1-XX2/477907Standard Pump/Motor Maintenance
S91Sodium Metabisulfide Metering PumpPulsatron, PulsafeederLB03SA-VTC1-XX2/477905Standard Pump/Motor Maintenance
S91P-201RO A Feed PumpGrundfosA96523644-P10838574Standard Pump/Motor Maintenance
S91P-401RO B Feed PumpGrundfosA96523644-P10838574Standard Pump/Motor Maintenance
S91P-601Product Water Feed PumpGrundfosA96523641-P10838602Standard Pump/Motor Maintenance
S91TK-602Bladder TankWell-X-Trol, AmtrolWX-302Ensure proper operation of level sensor and clean as needed. Clean tank once a year.
S91UV-601UltraViolet LampAtlantic Ultraviolet Corp.S2400CReplace UV lamps as needed, minimum of once a year.
S91CF-601Post-Treatment Cartridge FilterEnsure filter is not clogged, replace cartridges as needed.
S91Pre-Treatment Cartridge Filters (2)Shelco MicroguardianBFS-2SB-2/130857Ensure filter is not clogged, replace cartridges as needed.
S91TK-601Product Water Holding TankClean tank once a year.
S91OC19792Automated Cleaning Line RO SystemLT TechnologiesEnsure membranes are clear of fouling and there are no leaks on the system as a whole. Clean as needed, minimum once a year. Calibrate, clean, or replace any electrodes/sensors as needed.

File details come from the government source that posted it.