FA8128-24-R-0001 Solicitation ALCM ESS Amendment 0002.pdf

PDF 723 KB Posted

Attached to
Air Launch Cruise Missile Engineering Services - Sole Source to The Boeing Company
Solicitation number
FA8128-24-R-0001
Issued by

About this file

This is a solicitation for recurring and nonrecurring engineering services to support the sustainment of the Air Launched Cruise Missile (ALCM). The Air Force is seeking these services through a 9-year indefinite delivery indefinite quantity contract consisting of four 2-year ordering periods and one 1-year ordering period, with potential for a 6-month option to extend. The planned award date is February 2024.

The solicitation requires the contractor to provide data management, ALCM System Integration Lab support, flight testing, functional ground testing, PreALMAG support, technical inquiries, travel, and materials. It also includes requirements for nonrecurring engineering assignments to be fulfilled using various contract types. The total award amount will be determined at time of award. Certified cost or pricing data is required and the solicitation is set aside solely for The Boeing Company due to the technical complexity and proprietary data involved in sustaining the ALCM system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

FA8128-24-R-0001

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 541330

8(A) SIZE STANDARD: $25.50

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for days.

ORDERING PERIOD DELIVERY SCHEDULE

ORDERING PERIOD DELIVERY SCHEDULE

OP1 / YR1 XX FEB 2024 XX Jan 2026 OP1/ YR2 XX FEB 2024 XX Jan 2026 OP2/ YR1 XX FEB 2026 XX Jan 2028 OP2/ YR2 XX FEB 2026 XX Jan 2028 OP3/ YR1 XX FEB 2028 XX Jan 2030 OP3/ YR2 XX FEB 2028 XX Jan 2030 OP4/ YR1 XX FEB 2030 XX Jan 2032 OP4/ YR2 XX FEB 2030 XX Jan 2032 OP5 XX FEB 2032 XX Jan 2033

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) (1 ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *

RATING

DO: A2

3. AWARD/EFFECTIVE DATE

FA8128

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14

SCD:C

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Engineering Services

9. (Agency Use) LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH

PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE.

SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL

4-DEC-2023 3:00PM

X

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

X

7. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, AFNWC PZN

7330 SENTRY BLVD BLDG 469

TINKER AFB OK 73145-9093

BUYER: Troy Archie/AFNWC troy.archie@us.af.mil Phone: (405) 739- 8833

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

JLSUV

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 4 DEC 2023 3:00 PM

SOLICITATION NUMBER FA812824R0001

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Troy Archie/AFNWC

DEPARTMENT OF THE AIR FORCE, AFNWC PZN

7330 SENTRY BLVD BLDG 469

TINKER AFB OK 73145-9093

FA8128-24-R-0001

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Notice to Offeror: Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Offeror will provide proposal for Recurring Engineering Services CLIN 0001, 0002, 0003, 0004, 0005, 0006, 0007, & 0008 for Ordering Period 1/ Year One. Subsequent Recurring Engineering efforts will be negotiated prior to the start of each sequential ordering period.

A 9YEAR INDEFINITE DELIVERY INDEFINITE QUANTITY TYPE CONTRACT WITH POTENTIAL UP TO 6

MONTHS OPTION TO EXTEND SERVICES

(a) The Contractor shall provide recurring and nonrecurring engineering services as defined in Attachment A Performance Work Statement (PWS) for the Engineering and Analysis Support for Sustainability of the Air Launched Cruise Missile (ALCM). All work shall be completed in accordance with the requirements specified herein (including attachments hereto) and price(s) established at the time of award.

(b) The Government intends to negotiate with only one source, The Boeing Company, Cage 1N929, under the authority of FAR 6.3021. CERTIFIED COST OR PRICING DATA IS REQUIRED in accordance with

FAR 15.4034.

(c) This Solicitation is for a 9year Indefinite Delivery Indefinite Quantity contract consisting of Four 2year ordering periods and One 1year ordering period. (See Clauses at 252.2167006“Ordering”, 52.21618”Ordering”, 52.21619 –“Order Limitations” and 52.21622“Indefinite Quantity”, 52,2178 – “Option to Extend Services”).

(d) FAR 52,2178 – ‘Option to Extend Services” The Contracting Officer may exercise the option by written notice to the Contractor.

(e) FAR 52.21622“Indefinite Quantity” shall be adjusted by the Contracting Officer at the time of award to reflect a date one year after the expiration date of the contract.

(f) FAR 252.2167006“Ordering” shall be adjusted by the Contracting Officer at the time of award to reflect the contract effective date through 9 years.

(g) FAR 52.21619 –“Order Limitations”

The minimum quantity of services will be the negotiated Ordering Period 1 Firm Fixed Price (FFP), Cost Plus Fixed Fee Level of Effort (CPFF LOE), Cost Reimbursable – NO FEE (CR) Recuring Engineering Services.

(h) Ordering Period/Delivery Schedule. This effort is a 9year contract consisting of Four 2year ordering periods and One 1year ordering period, with a potential up to six (6) month option to extend services;

which may be awarded at the Governments discretion. The planned award dated is February 2024. This is a service contract with individual Task Orders placed as required for recurring and nonrecurring engineering efforts.

ORDERING PERIOD DELIVERY SCHEDULE

OP1 / YR1 XX FEB 2024 XX Jan 2026

OP1/ YR2 XX FEB 2024 XX Jan 2026

OP2/ YR1 XX FEB 2026 XX Jan 2028

OP2/ YR2 XX FEB 2026 XX Jan 2028

OP3/ YR1 XX FEB 2028 XX Jan 2030

OP3/ YR2 XX FEB 2028 XX Jan 2030

OP4/ YR1 XX FEB 2030 XX Jan 2032

OP4/ YR2 XX FEB 2030 XX Jan 2032

OP5 XX FEB 2032 XX Jan 2033

FAR 52.2178 Up To 6 Months Extension of Services

(i) Contract Line Item Structure. The Contract Line Item Numbers (CLINs) listed below are intended to show the anticipated CLIN structure for all Delivery Orders and are for reference only. SubContract Line Item Numbers may be established under CLINs to accommodate various ACRNs, Accounting and Appropriation Data, Variations in end items, etc. This will include a mixture of fixed price incentive firm target (FPIF), firm fixed price (FFP), Cost Plus Incentive Fee (CPIF), Cost Plus Fixed Fee (CPFF), Cost Plus Fixed Fee Level of Effort (CPFF LOE), Cost Reimbursement (CR) and not separately priced data CLINs. All references to “X” in the CLIN represent sequential numbering which will correlate to the Ordering Periods.

CLIN # Title Type

X001 Recurring Engineering Data Mgnt – Config/data mgnt, SERP, design tool support, counterfeit parts, GFP, PIWG, PMR, DATA CDRLS, Draft

FFP

X002 Recurring Engineering ALCM System Integration Lab (ASIL) Support FFP

X003 Recurring Engineering Flight Test FFP

X003AA Flight Test – Mission 1 FFP

X003AB Flight Test – Mission 2 FFP

X004 Recurring Engineering Functional Ground Test Support FFP

X004AA Ground Test 1 FFP

X004AB Ground Test 2 FFP

X005 Recurring Engineering PreALMAG Support FFP

X006 Recurring Engineering Technical Inquiries CPFF LOE

X007 Recurring Travel CR – No Fee

X008 Recurring Material (ASIL and TI) CR – No Fee

X009 Nonrecurring Engineering Engineering Assignments FFP

X010 Nonrecurring Engineering Engineering Assignments FPIF

X011 Nonrecurring Engineering Engineering Assignments CPIF

X012 Nonrecurring Engineering Engineering Assignments CPFF

X013 Over & Above FFP

X014 Data NSP

X015 Nonrecurring Travel CR – No Fee

(j) Quality Assurance Provisions: The Government will continue to use Defense Contract Management Agency (DCMA) and Contracting Officer Representatives (COR) for oversight to further enhance the overall quality management process.

(k) ALCM Security Requirements: The AFNWC program will not change existing ALCM security requirements. The contractor will be required to possess the necessary security clearances and identification requirements as indicated in the attached DD254.

(l) Changes in Performance: It is expected that work not yet specified and/or changed work procedures/specifications in Performance Work Statement/Contract Clauses will be incorporated throughout the performance of the contract. All changes will be effected in accordance with the applicable Changes clause, but that the parties’ preference, when consistent with government requirements, mission needs, and other interests, is to effect such changes in conjunction with equitable adjustment in contract price and delivery through supplemental agreement. If such change would result in an increase or decrease of cost under this contract, prior to the Contractor’s commencement of the changed work, an appropriate increase or decrease of the contract price shall be negotiated and evidenced by a supplemental agreement to this contract and are subject to FAR Clauses 52.2431 and Alternate I, ChangesFixed Price, 52.2432 Changes CostReimbursement and 52.2433, ChangesTime & Materials or Labor Hours.

(m) Place of Performance: Services under this contract are required to be performed at the following location(s) unless authorized by the PCO. Location: TBD

(n) Cost Contract – No Fee CLINS: FAR 52.21611 Cost Contract No Fee is applicable to Cost Reimbursement CLINs X007 Recurring Travel & X008 Recurring Material.

(o) Offerors must clearly identify all proposed deviations from the solicitation requirements and/or exceptions to the terms and conditions. Offerors must also provide complete rationale for all proposed deviations and/or exceptions.

(p) Proposal Adequacy Checklist, IAW DFARS 252.2157009 the offeror shall complete the proposal adequacy checklist, and return it with the proposal.

(q) Clauses or provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text. Clauses and provisions in this document will be Numbered in sequence but will not necessarily appear in consecutive order.

(r) Prior Contract Inventory Transfer, IAW DFARS 245.10371, Contract accountability will be transferred to the new ALCM Engineering Service Contract FA812824D0002 (anticipated contract number) when Contracts FA812817C0001, FA812818C0001, and upon award of the new CLS Contract FA812824D0001 (anticipated contract number) are modified using an SF30 with an attached PDF form listing the Government Furnished Property as described in DFARS 245.10372. Equipment identified in Attachment 3 entitled Government Furnished Property List in Part III – Section J, List of Attachments can be used to complete open engineering tasks under Contract FA812817D0001 on a rent free, noninterference basis with PCO approval. Upon completion of the open, FA812817D0001 engineering tasks, contract accountability of the utilized GFP will transfer to Contract FA812824D0002 (anticipated contract number) IAW DFARS 245.10371.

(s) English Language Requirements

(a) All deliverable documents will be in the English language.

(b) An English language speaking person shall be provided during inplant visits, inspections, reviews, audits and other similar activities to facilitate communications and ensure mutual understanding.

RECURRING ENGINEERING DATA MANAGEMENT

ORDERING PERIOD 1 YEAR 1

Item No.

RECURRING ENGINEERING DATA MANAGEMENT

ORDERING PERIOD 1 YEAR 1

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425

RECURRING ENGINEERING SERVICES

Data Management The Contractor shall perform Configuration and Data Management in accordance with the attached Performance Work Statement paragraphs 2.1 Data Mgnt Config/data mgnt, SERP, design tool support, counterfeit parts, GFP, PIWG, PMR, DATA CDRLS, Draft

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING ALCM SYSTEM INTEGRATION LAB (ASIL) SUPPORT

ORDERING PERIOD 1 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425

RECURRING ENGINEERING SERVICES

ALCM System Integration Lab (ASIL) Support The Contractor shall perform in accordance with the attached Performance Work Statement, paragraphs 2.6.3.4, 2.9, & 5.5.3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING FLIGHT TEST

ORDERING PERIOD 1 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

R425

RECURRING ENGINEERING SERVICES

RECURRING ENGINEERING FLIGHT TEST

ORDERING PERIOD 1 YEAR 1

Flight Test The Contractor shall perform In accordance with the attached Performance Work Statement, paragraphs 2.7 & 2.10.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

FLIGHT TEST 1ST MISSION

ORDERING PERIOD 1 YEAR 1

Item No.

0003AA

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Flight Test 1st Mission attached Performance Work Statement, paragraphs 2.7 & 2.10.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

FLIGHT TEST 2ND MISSION

ORDERING PERIOD 1 YEAR 1

Item No.

0003AB

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Flight Test 2nd Mission attached Performance Work Statement, paragraphs 2.7 & 2.10.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING FUNCTIONAL GROUND TEST SUPPORT

ORDERING PERIOD 1 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

R425

RECURRING ENGINEERING SERVICES

Functional Ground Test Support The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.8.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

FUNCTIONAL GROUND TEST SUPPORT GROUND TEST 1

ORDERING PERIOD 1 YEAR 1

Item No.

0004AA

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Functional Ground Test Support Ground Test 1 The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.8.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

FUNCTIONAL GROUND TEST SUPPORT GROUND TEST 2

ORDERING PERIOD 1 YEAR 1

Item No.

0004AB

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Functional Ground Test Support Ground Test 2 The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.8.

Limitations of Liability: Other Than High Value Item

FUNCTIONAL GROUND TEST SUPPORT GROUND TEST 2

ORDERING PERIOD 1 YEAR 1

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERINGPREAIR LAUNCH MUNITIONS ANALYSIS GROUP (ALMAG) SUPPORT

ORDERING PERIOD 1 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

R425

RECURRING ENGINEERING SERVICES

PreAir Launch Munitions Analysis Group (ALMAG) Support The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.9.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING TECHNICAL INQUIRIES

ORDERING PERIOD 1 YEAR 1

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

5,000 HR

R425

RECURRING ENGINEERING SERVICES

Technical Inquiries The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.6.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING TRAVEL

ORDERING PERIOD 1 YEAR 1

Item No.

Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost

RECURRING TRAVEL

ORDERING PERIOD 1 YEAR 1

1 LO

R425

RECURRING ENGINEERING SERVICES

Travel The Contractor shall perform in accordance with the attached Performance Work Statement dated paragraph 1.6.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING MATERIAL (ASIL and TI)

ORDERING PERIOD 1 YEAR 1

Item No.

Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 EA

R425

RECURRING ENGINEERING SERVICES

Material (ASIL and TI) The Contractor shall perform in accordance with the attached Performance Work Statement dated paragraph 3.3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

NONRECURRING ENGINEERING ASSIGNMENTS FFP

ORDERING PERIOD 1 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments FFP The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

NONRECURRING ENGINEERING ASSIGNMENTS FPIF

ORDERING PERIOD 1 YEAR 1

Item No.

Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments FPIF Target The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

ENGINEERING ASSIGNMENTS CPIF

ORDERING PERIOD 1 YEAR 1

Item No.

Cost Plus Incentive Fee Quantity U/I Est Target Cost Target Fee Total Estimated Cost

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments CPIF The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

NONRECURRING ENGINEERING ASSIGNMENTS CPFF

ORDERING PERIOD 1 YEAR 1

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments CPFF The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

NONRECURRING ENGINEERING ASSIGNMENTS CPFF

ORDERING PERIOD 1 YEAR 1

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

OVER & ABOVE

ORDERING PERIOD 1 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Over & Above

Description

“Over and above work” means work discovered during the course of performing overhaul, maintenance, and repair efforts that is –

(i) Within the general scope of the contract;

(ii) Not covered by the line item(s) for the basic work under the contract; and

(iii) Necessary in order to satisfactorily complete the contract.

“Over and above work” shall be performed IAW the Appendix A and DFARS clause

252.2177028. The Government shall be the sole authority to determine whether over and above work is appropriate. When over and above work is required a subCLIN shall be established on the delivery order for authorization and funding. Delivery will be as negotiated between the Contractor and ACO/PCO.

Over and Above Work Categories

Categories for potential over and above work may include, but not limited to:

1. Fixed Priced Items At any time during contract performance, when sufficient data becomes available on a repetitive task being performed, either the Contractor or the Contracting Officer (Administrative or Procuring) may request a negotiation to establish a firmfixedprice for that item for the remaining life of the contract. Fixed priced items shall be defined as they are negotiated via individual delivery orders.

2. Fixed Priced Hourly Rates At any time during contract performance, when sufficient data becomes available on a repetitive task being performed, either the Contractor or the Contracting Officer (Administrative or Procuring) may request a negotiation to establish fixed hourly rates per occurrence for work during the remaining life of the contract. Fixed hourly rates shall be defined as they are negotiated via individual delivery orders.

3. Quality AuditsUnacceptable audits the contractor did not account for in the negotiated contract.

4. New/Revised Technical Order RequirementsUpdates not previously negotiated in the contract.

5. Disposal CostCosts associated with packing and handling incident to removal and return of residual property.

6. Exterior Shipping ContainersRepair, modification, and/or replacement of exterior shipping containers, if not provided by the contractor

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DATA NSP

ORDERING PERIOD 1 YEAR 1

Item No.

Not Separately Priced Quantity U/I Unit Price

EA NSP

DATA

In accordance with the Requirements set forth on the DD Form 1423.

CDRL DID TITLE PWS PARA

A001 DIADMN81249B Conference Agenda 2.12, 2.7.1.3.2, 2.8.2.2 A002 DIADMN81505 Report, Record of Meeting Minutes 1.12, 2.2, 2.7.1.3.2, 2.12,

2.8.3.2 A003 DISESS81000E Product Drawings and Associated Lists 2.6.12.1.1, 3.2.1.1 A004 DIMGMT81861A Integrated Program Management

Report 2.6.12.1.11, 3.2.1.11

A005 DISESS80858C Supplier's Configuration Management Plan

2.1

A006 TM8601N Technical Manuals/Orders/TCTO 2.6.12.1.2, 3.2.1.2 A007 DISESS80639D Engineering Change Proposal 2.6.12.1.3, 3.2.1.3 A008 DIMISC81384 Service Engineering Report 1.2, 1.12, 1.20, 2.4, 2.5, 2.6.1, 2.7.1.1, 2.7.1.2, 2.7.1.3, 2.8.3, 2.9, 2.11.3, 3.1.1

A009 DIQCIC81379 Quality System Plan 1.22.1 A010 DISAFT81626 System Safety Program Plan 1.9 A011 DISAFT80101C System Safety Hazard Analysis Report 2.6.12.1.5, 3.2.1.5 A012 DIATTS80041A Test Requirements Document 2.6.12.1.6, 3.2.1.6 A013 DINDTI80566A Test Plan 2.6.12.1.6, 3.2.1.6 A014 DINDTI80603A Test Procedure 2.6.12.1.6, 3.2.1.6 A015 DINDTI80809B Test/Inspection Report 2.6.12.1.6, 3.2.1.6 A016 DIMISC81454C Automated Computer Program Identification

Number Data and Control

Record

2.6.12.1.7, 3.2.1.7

A017 DISESS81495A Failure Modes, Effects and Criticality Analysis Report

2.6.12.1.8, 3.2.1.8

A018 DIIPSC81488 Computer Software Product 2.6.12.1.7, 2.10, 3.2.1.7 A019 DISDMP81465A Performance Specification Documents 2.6.12.1.10, 3.2.1.10 A020 DIIPSC81433A Software Requirements Specification 2.6.12.1.7, 3.2.1.7 A021 DIIPSC81431A System/Subsystem Specification 2.6.12.1.7, 3.2.1.7 A022 DIIPSC81442A Software Version Description 2.6.12.1.7, 3.2.1.7 A023 DIMGMT81808 Contractor’s Risk Management Plan 1.4.1 A024 DIMGMT81809 Risk Management Status Report 1.4.1 A025 DIPSSS81535A Deficiency Report 2.6.12.1.9, 3.2.1.9 A026 DIQCIC80125B Government Industry Data Exchange

Program Alert/SafeAlert Report 2.5

A027 DIMGMT81324C CEMS Reporting 5.2 A028 DISESS81785A Systems Engineering Management Plan 2.2 A029 DIMGMT80269 Status of Government Furnished Equipment

(GFE) Report 5.5.1

A030 DIMISC81832 Counterfeit Prevention Plan 1.20 A031 DINUOR81888A Nuclear Certification Impact Statement 2.6.12.1.4, 3.2.1.4 A032 DIMGMT81605 Briefing Materials 1.12, 1.13, 2.12 A033 DIMGMT80004A Program Management Plan 1.4.2 A034 DISESS81757A Design Review Information Package 2.6.12.1.12, 3.2.1.12 A035 DISESS81757A Test Readiness Review Information Package 2.6.12.1.13, 3.2.1.13 A036 DIPSSS80727A Government Furnished Material (GFM)

By National Stock Number 5.5.3

A037 DIMGMT81468A Contract Funds Status Report 1.17 A038 DIMGMT81398D Hazardous Materials Management Program

(HMMP) Report 1.21.1

A039 DIPSSS81535B Acquisition and Sustainment Data Package (ASDP) Deficiency Report (DR)

1.22.2, 1.22.3

A040 DIQCIC80736 Quality Deficiency Report 1.22.2, 1.22.3 A041 DIMGMT82001A DoD Risk Management Framework (RMF)

Package Deliverables 1.19.1, 1.19.2, 1.19.3

A042 DIMGMT80259 Physical Inventory Report 5.5.1

NSP = NOT SEPARATELY PRICED

SEE DFARS 252.2047002, Payment for Subline Items Not Separately Priced

The award of any or all reports shall be at the sole discretion of the Government. The Government reserves the right to delete each line item of data and/or reports that the Government does not desire prior to and after final award.

R425

DATA NSP

Data Not Seperately Priced

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

NONRECURRING TRAVEL

ORDERING PERIOD 1 YEAR 1

Item No.

Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

R425

NONRECURRING ENGINEERING SERVICES

Travel The Contractor shall perform in accordance with the attached Performance Work Statement dated paragraph 1.6.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING DATA MANAGEMENT

ORDERING PERIOD 1 YEAR 2

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

RECURRING ENGINEERING SERVICES

Data Management The Contractor shall perform Configuration and Data Management in accordance with the attached Performance Work Statement paragraphs 2.1 Data Mgnt Config/data mgnt, SERP, design tool support, counterfeit parts, GFP, PIWG, PMR, DATA CDRLS, Draft

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING ALCM SYSTEM INTEGRATION LAB (ASIL) SUPPORT

ORDERING PERIOD 1 YEAR 2

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425

RECURRING ENGINEERING SERVICES

ALCM System Integration Lab (ASIL) Support The Contractor shall perform in accordance with the attached Performance Work Statement, paragraphs 2.6.3.4, 2.9, & 5.5.3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING FLIGHT TEST

ORDERING PERIOD 1 YEAR 2

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

R425

RECURRING ENGINEERING SERVICES

Flight Test The Contractor shall perform In accordance with the attached Performance Work Statement, paragraphs 2.7 & 2.10.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

FLIGHT TEST 1ST MISSION

ORDERING PERIOD 1 YEAR 2

Item No.

1003AA

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Flight Test 1st Mission attached Performance Work Statement, paragraphs 2.7 & 2.10.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

FLIGHT TEST 2ND MISSION

ORDERING PERIOD 1 YEAR 2

Item No.

1003AB

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Flight Test 2nd Mission attached Performance Work Statement, paragraphs 2.7 & 2.10.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING FUNCTIONAL GROUND TEST SUPPORT

ORDERING PERIOD 1 YEAR 2

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

R425

RECURRING ENGINEERING SERVICES

Functional Ground Test Support The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.8.

RECURRING ENGINEERING FUNCTIONAL GROUND TEST SUPPORT

ORDERING PERIOD 1 YEAR 2

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

FUNCTIONAL GROUND TEST SUPPORT GROUND TEST 1

ORDERING PERIOD 1 YEAR 2

Item No.

1004AA

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Functional Ground Test Support Ground Test 1 The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.8.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

FUNCTIONAL GROUND TEST SUPPORT GROUND TEST 2

ORDERING PERIOD 1 YEAR 2

Item No.

1004AB

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Functional Ground Test Support Ground Test 2 The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.8.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERINGPREAIR LAUNCH MUNITIONS ANALYSIS GROUP (ALMAG) SUPPORT

ORDERING PERIOD 1 YEAR 2

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

RECURRING ENGINEERINGPREAIR LAUNCH MUNITIONS ANALYSIS GROUP (ALMAG) SUPPORT

ORDERING PERIOD 1 YEAR 2

1 EA

R425

RECURRING ENGINEERING SERVICES

PreAir Launch Munitions Analysis Group (ALMAG) Support The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.9.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING TECHNICAL INQUIRIES

ORDERING PERIOD 1 YEAR 2

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

5,000 HR

R425

RECURRING ENGINEERING SERVICES

Technical Inquiries The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.6.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING TRAVEL

ORDERING PERIOD 1 YEAR 2

Item No.

Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

R425

RECURRING ENGINEERING SERVICES

Travel The Contractor shall perform in accordance with the attached Performance Work Statement dated paragraph 1.6.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

RECURRING MATERIAL (ASIL and TI)

ORDERING PERIOD 1 YEAR 2

Item No.

Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 EA

R425

RECURRING ENGINEERING SERVICES

Material (ASIL and TI) The Contractor shall perform in accordance with the attached Performance Work Statement dated paragraph 3.3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

NONRECURRING ENGINEERING ASSIGNMENTS FFP

ORDERING PERIOD 1 YEAR 2

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments FFP The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

NONRECURRING ENGINEERING ASSIGNMENTS FPIF

ORDERING PERIOD 1 YEAR 2

Item No.

Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments FPIF Target The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

NONRECURRING ENGINEERING ASSIGNMENTS FPIF

ORDERING PERIOD 1 YEAR 2

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

ENGINEERING ASSIGNMENTS CPIF

ORDERING PERIOD 1 YEAR 2

Item No.

Cost Plus Incentive Fee Quantity U/I Est Target Cost Target Fee Total Estimated Cost

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments CPIF The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

NONRECURRING ENGINEERING ASSIGNMENTS CPFF

ORDERING PERIOD 1 YEAR 2

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments CPFF The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

OVER & ABOVE

ORDERING PERIOD 1 YEAR 2

Item No.

OVER & ABOVE

ORDERING PERIOD 1 YEAR 2

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Over & Above

Description

“Over and above work” means work discovered during the course of performing overhaul, maintenance, and repair efforts that is –

(i) Within the general scope of the contract;

(ii) Not covered by the line item(s) for the basic work under the contract; and

(iii) Necessary in order to satisfactorily complete the contract.

“Over and above work” shall be performed IAW the Appendix A and DFARS clause

252.2177028. The Government shall be the sole authority to determine whether over and above work is appropriate. When over and above work is required a subCLIN shall be established on the delivery order for authorization and funding. Delivery will be as negotiated between the Contractor and ACO/PCO.

Over and Above Work Categories

Categories for potential over and above work may include, but not limited to:

1. Fixed Priced Items At any time during contract performance, when sufficient data becomes available on a repetitive task being performed, either the Contractor or the Contracting Officer (Administrative or Procuring) may request a negotiation to establish a firmfixedprice for that item for the remaining life of the contract. Fixed priced items shall be defined as they are negotiated via individual delivery orders.

2. Fixed Priced Hourly Rates At any time during contract performance, when sufficient data becomes available on a repetitive task being performed, either the Contractor or the Contracting Officer (Administrative or Procuring) may request a negotiation to establish fixed hourly rates per occurrence for work during the remaining life of the contract. Fixed hourly rates shall be defined as they are negotiated via individual delivery orders.

3. Quality AuditsUnacceptable audits the contractor did not account for in the negotiated contract.

4. New/Revised Technical Order RequirementsUpdates not previously negotiated in the contract.

5. Disposal CostCosts associated with packing and handling incident to removal and return of residual property.

6. Exterior Shipping ContainersRepair, modification, and/or replacement of exterior shipping containers, if not provided by the contractor

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DATA NSP

ORDERING PERIOD 1 YEAR 2

Item No.

Not Separately Priced Quantity U/I Unit Price

EA NSP

DATA

In accordance with the Requirements set forth on the DD Form 1423.

CDRL DID TITLE PWS PARA

A001 DIADMN81249B Conference Agenda 2.12, 2.7.1.3.2, 2.8.2.2 A002 DIADMN81505 Report, Record of Meeting Minutes 1.12, 2.2, 2.7.1.3.2, 2.12,

2.8.3.2 A003 DISESS81000E Product Drawings and Associated Lists 2.6.12.1.1, 3.2.1.1 A004 DIMGMT81861A Integrated Program Management

Report 2.6.12.1.11, 3.2.1.11

A005 DISESS80858C Supplier's Configuration Management Plan

2.1

A006 TM8601N Technical Manuals/Orders/TCTO 2.6.12.1.2, 3.2.1.2 A007 DISESS80639D Engineering Change Proposal 2.6.12.1.3, 3.2.1.3 A008 DIMISC81384 Service Engineering Report 1.2, 1.12, 1.20, 2.4, 2.5, 2.6.1, 2.7.1.1, 2.7.1.2, 2.7.1.3, 2.8.3, 2.9, 2.11.3, 3.1.1

A009 DIQCIC81379 Quality System Plan 1.22.1 A010 DISAFT81626 System Safety Program Plan 1.9 A011 DISAFT80101C System Safety Hazard Analysis Report 2.6.12.1.5, 3.2.1.5 A012 DIATTS80041A Test Requirements Document 2.6.12.1.6, 3.2.1.6 A013 DINDTI80566A Test Plan 2.6.12.1.6, 3.2.1.6 A014 DINDTI80603A Test Procedure 2.6.12.1.6, 3.2.1.6 A015 DINDTI80809B Test/Inspection Report 2.6.12.1.6, 3.2.1.6 A016 DIMISC81454C Automated Computer Program Identification

Number Data and Control

Record

2.6.12.1.7, 3.2.1.7

A017 DISESS81495A Failure Modes, Effects and Criticality Analysis Report

2.6.12.1.8, 3.2.1.8

A018 DIIPSC81488 Computer Software Product 2.6.12.1.7, 2.10, 3.2.1.7 A019 DISDMP81465A Performance Specification Documents 2.6.12.1.10, 3.2.1.10 A020 DIIPSC81433A Software Requirements Specification 2.6.12.1.7, 3.2.1.7

A021 DIIPSC81431A System/Subsystem Specification 2.6.12.1.7, 3.2.1.7 A022 DIIPSC81442A Software Version Description 2.6.12.1.7, 3.2.1.7 A023 DIMGMT81808 Contractor’s Risk Management Plan 1.4.1 A024 DIMGMT81809 Risk Management Status Report 1.4.1 A025 DIPSSS81535A Deficiency Report 2.6.12.1.9, 3.2.1.9 A026 DIQCIC80125B Government Industry Data Exchange

Program Alert/SafeAlert Report 2.5

A027 DIMGMT81324C CEMS Reporting 5.2 A028 DISESS81785A Systems Engineering Management Plan 2.2 A029 DIMGMT80269 Status of Government Furnished Equipment

(GFE) Report 5.5.1

A030 DIMISC81832 Counterfeit Prevention Plan 1.20 A031 DINUOR81888A Nuclear Certification Impact Statement 2.6.12.1.4, 3.2.1.4 A032 DIMGMT81605 Briefing Materials 1.12, 1.13, 2.12 A033 DIMGMT80004A Program Management Plan 1.4.2 A034 DISESS81757A Design Review Information Package 2.6.12.1.12, 3.2.1.12 A035 DISESS81757A Test Readiness Review Information Package 2.6.12.1.13, 3.2.1.13 A036 DIPSSS80727A Government Furnished Material (GFM)

By National Stock Number 5.5.3

A037 DIMGMT81468A Contract Funds Status Report 1.17 A038 DIMGMT81398D Hazardous Materials Management Program

(HMMP) Report 1.21.1

A039 DIPSSS81535B Acquisition and Sustainment Data Package (ASDP) Deficiency Report (DR)

1.22.2, 1.22.3

A040 DIQCIC80736 Quality Deficiency Report 1.22.2, 1.22.3 A041 DIMGMT82001A DoD Risk Management Framework (RMF)

Package Deliverables 1.19.1, 1.19.2, 1.19.3

A042 DIMGMT80259 Physical Inventory Report 5.5.1

NSP = NOT SEPARATELY PRICED

SEE DFARS 252.2047002, Payment for Subline Items Not Separately Priced

The award of any or all reports shall be at the sole discretion of the Government. The Government reserves the right to delete each line item of data and/or reports that the Government does not desire prior to and after final award.

R425

DATA NSP

Data Not Seperately Priced

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

NONRECURRING TRAVEL

ORDERING PERIOD 1 YEAR 2

NONRECURRING TRAVEL

ORDERING PERIOD 1 YEAR 2

Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

R425

NONRECURRING ENGINEERING SERVICES

Travel The Contractor shall perform in accordance with the attached Performance Work Statement dated paragraph 1.6.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING DATA MANAGEMENT

ORDERING PERIOD 2 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R425

RECURRING ENGINEERING SERVICES

Data Management The Contractor shall perform Configuration and Data Management in accordance with the attached Performance Work Statement paragraphs 2.1 Data Mgnt Config/data mgnt, SERP, design tool support, counterfeit parts, GFP, PIWG, PMR, DATA CDRLS, Draft

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING ALCM SYSTEM INTEGRATION LAB (ASIL) SUPPORT

ORDERING PERIOD 2 YEAR 1

Item No.

Firm Fixed Price

RECURRING ENGINEERING ALCM SYSTEM INTEGRATION LAB (ASIL) SUPPORT

ORDERING PERIOD 2 YEAR 1

R425

RECURRING ENGINEERING SERVICES

ALCM System Integration Lab (ASIL) Support The Contractor shall perform in accordance with the attached Performance Work Statement, paragraphs 2.6.3.4, 2.9, & 5.5.3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING FLIGHT TEST

ORDERING PERIOD 2 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

R425

RECURRING ENGINEERING SERVICES

Flight Test The Contractor shall perform In accordance with the attached Performance Work Statement, paragraphs 2.7 & 2.10.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

FLIGHT TEST 1ST MISSION

ORDERING PERIOD 2 YEAR 1

Item No.

2003AA

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Flight Test 1st Mission attached Performance Work Statement, paragraphs 2.7 & 2.10.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

FLIGHT TEST 2ND MISSION

ORDERING PERIOD 1 YEAR 1

Item No.

2003AB

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Flight Test 2nd Mission attached Performance Work Statement, paragraphs 2.7 & 2.10.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING FUNCTIONAL GROUND TEST SUPPORT

ORDERING PERIOD 1 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

R425

RECURRING ENGINEERING SERVICES

Functional Ground Test Support The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.8.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

FUNCTIONAL GROUND TEST SUPPORT GROUND TEST 1

ORDERING PERIOD 1 YEAR 1

Item No.

2004AA

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Functional Ground Test Support Ground Test 1 The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.8.

FUNCTIONAL GROUND TEST SUPPORT GROUND TEST 1

ORDERING PERIOD 1 YEAR 1

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

FUNCTIONAL GROUND TEST SUPPORT GROUND TEST 2

ORDERING PERIOD 2 YEAR 1

Item No.

2004AB

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

R425

RECURRING ENGINEERING SERVICES

Functional Ground Test Support Ground Test 2 The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.8.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERINGPREAIR LAUNCH MUNITIONS ANALYSIS GROUP (ALMAG) SUPPORT

ORDERING PERIOD 2 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

R425

RECURRING ENGINEERING SERVICES

PreAir Launch Munitions Analysis Group (ALMAG) Support The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.9.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING ENGINEERING TECHNICAL INQUIRIES

ORDERING PERIOD 2 YEAR 1

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

RECURRING ENGINEERING TECHNICAL INQUIRIES

ORDERING PERIOD 2 YEAR 1

5,000 HR

R425

RECURRING ENGINEERING SERVICES

Technical Inquiries The Contractor shall perform in accordance with the attached Performance Work Statement paragraph 2.6.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING TRAVEL

ORDERING PERIOD 2 YEAR 1

Item No.

Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

R425

RECURRING ENGINEERING SERVICES

Travel The Contractor shall perform in accordance with the attached Performance Work Statement dated paragraph 1.6.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

RECURRING MATERIAL (ASIL and TI)

ORDERING PERIOD 2 YEAR 1

Item No.

Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 EA

R425

RECURRING ENGINEERING SERVICES

Material (ASIL and TI) The Contractor shall perform in accordance with the attached Performance Work Statement dated paragraph 3.3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

NONRECURRING ENGINEERING ASSIGNMENTS FFP

ORDERING PERIOD 2 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments FFP The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

NONRECURRING ENGINEERING ASSIGNMENTS FPIF

ORDERING PERIOD 2 YEAR 1

Item No.

Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments FPIF Target The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

ENGINEERING ASSIGNMENTS CPIF

ORDERING PERIOD 2 YEAR 1

Item No.

Cost Plus Incentive Fee Quantity U/I Est Target Cost Target Fee Total Estimated Cost

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments CPIF The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

ENGINEERING ASSIGNMENTS CPIF

ORDERING PERIOD 2 YEAR 1

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

NONRECURRING ENGINEERING ASSIGNMENTS CPFF

ORDERING PERIOD 2 YEAR 1

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Engineering Assignments CPFF The Contractor shall perform in accordance with the attached Performance Work Statement, Paragraph 3.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

OVER & ABOVE

ORDERING PERIOD 2 YEAR 1

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

R425

NONRECURRING ENGINEERING SERVICES

Over & Above

Description

“Over and above work” means work…

This is the start of the file's text. The full file is on GovTribe.