J85_L_PPT_Lite_10_Feb_2016.docx
DOCX document 588 KB Posted
- Attached to
- J85 Management of Items Subject to Repair (MISTR) - PR#FD20301501325 - Previously FA8122-15-R-0023
- Solicitation number
- FA8122-16-R-0001
About this file
Section L
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION L
INSTRUCTIONS TO OFFERORS
1.1 Program Structure and Objective
1.1.1. The Government plans to award a single contract for the J85 MISTR program. J85 MISTR program will primarily include overhaul of J85 components for the U.S. Air Force, U.S. Navy, Foreign Military Sales (FMS), and the National Aeronautics and Space Administration (NASA).
1.1.2. Award will be made on the basis of “best value” utilizing tradeoff procedures in accordance with the Department of Defense (DoD) Source Selection Procedures. If used, the tradeoff will be between past performance and price among those offerors who have been determined technically acceptable. Award will be made to the contractor that provides the “best value” to the Government over the entire period of performance.
1.2. Budget/Funding Information
Funding will be obligated for the Firm-Fixed-Price (FFP) Contract Line Item Numbers (CLINs) for the base period, to include the phase-in period.
2.0 General Instructions
2.1.1. This section of the Instructions to Offerors (ITO) provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The offeror’s proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions. Any offeror who submits an incomplete package may be considered ineligible for award. The offer shall be compliant with the requirements as stated in the Performance Work Statement (PWS) and the repair qualification requirements for the National Stock Numbers (NSN) listed in Section B. Non-conformance with the instructions provided in the ITO may result in an unfavorable proposal evaluation.
2.1.2. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the offeror’s proposal.
2.1.3. Elaborate brochures, documentation, binding, detailed artwork, or other embellishments are unnecessary and are not desired.
2.1.4. The proposal acceptance period is specified in Section A of the model contract/solicitation. The offeror shall make a clear statement in Section A of the proposal documentation volume that the proposal is valid until this date.
2.1.5. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
2.2. General Information
2.2.1. Point of Contact
The Procurement Contracting Officer (PCO), Billie Kindschuh and Contract Negotiator, Joe Castillo, are the sole points of contact for this acquisition. Address any questions or concerns you may have to them. Written requests for clarification may be sent to them at the address located in Section A of the model contract/solicitation.
2.2.2. Debriefings
The PCO will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. Offerors excluded from the competitive range may request a pre-award debriefing or they may choose to wait until after the source selection decision to request a post-award debriefing. However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. The PCO will notify unsuccessful offerors in accordance with FAR 15.503. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
2.2.3. Discrepancies
If an offeror believes the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the PCO in writing with supporting rationale as well as the remedies the offeror is asking the PCO to consider as related to the omission or error. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions. This reservation includes matters of additional or substitute pages of the initial proposal.
2.2.4. Electronic Reference Documents
All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) web site at http://www.fbo.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
2.2.5. Oral Presentation
Oral presentations will not be utilized.
2.2.6. Amendments to Solicitation
If this RFP is amended, all terms and conditions that are not amended remain unchanged and in full force and effect. Offerors shall acknowledge receipt of any amendment and provide confirmation upon submission of the offeror’s proposal. Any unacknowledged amendments in the offeror’s proposal are subject to solicitation provision FAR 52.215-1(b).
2.2.7. Submission, Modification, Revision, and Withdrawal of Proposals Proposals and modifications to proposals shall be submitted in sealed envelopes or packages in paper media and electronic media addressed to the PCO at the address shown in Section A of the model contract/solicitation, and showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Be sure to advise the Administrative Contracting Officer (ACO) and the Defense Contract Audit Agency (DCAA) for prime and subcontractors that the proposal is “For Official Use Only” and “Source Selection Information—See FAR 3.104”.
2.3. Organization/Number of Copies/Page Limits
2.3.1. The Title Page of each volume must show solicitation number, name, address, and telephone and facsimile numbers of the offeror and electronic e-mail address if available.
2.3.2. A Team List of the offeror’s primary Point of Contacts shall be submitted in each volume using the format shown in Attachment 2 of the ITO.
2.3.3. The offeror shall prepare the proposal as set forth in the Proposal Organization Table (Table 2.3 below). The titles and contents of the volumes shall be as defined in this table, all of which shall be within the required page limits and with the number of copies as specified in Table 2.3. The attachments identified in the table shall be separately bound in three-ring, loose-leaf binders, as necessary. The contents of each proposal volume are described in the ITO paragraph as noted in the table below.
Table 2.3. Proposal Organization
Volume
ITO
Paragraph Number
Volume Title Hard Copies/ Disk Copies
Page Limit
| I |
| 3.0 |
| Technical |
| 5/1 |
| 65 |
| 2.3.1 |
| Title Page (Not included in 65 page limit) |
| 2.3.2 |
| Team List (see Attach 2.0)(Not included in 65 page limit) |
| 2.3.7 |
| Table of Contents |
Unlimited
| 2.3.8 |
| List of Tables and Figures |
Unlimited
| 2.3.9 |
| Glossary of Abbreviations and Acronyms |
Unlimited
3.2.3 3.2.4 Subfactor 1 Subfactor 2
| II |
| 4.0 |
| Past Performance |
| 4/1 |
| Unlimited |
| 2.3.1 |
| Title Page |
| 2.3.2 |
| Team List (See Attach 2.0) |
| 2.3.7 |
| Table of Contents |
Unlimited
| 4.1.1 |
| Present/Past Performance Information (PPI) Tool (See Attach 1.1) |
See para 4.3.1
| 4.1.2 |
| Consent Letter (See Attach 1.4) |
Unlimited
| 4.1.2 |
| Client Authorization Letters (See Attach 1.5) |
Unlimited
| 4.2.2 |
| Present/Past Performance Questionnaires (See Attach 1.2) |
Tab Only
| 4.3.2 |
| Relevant Contract Narrative |
Request Max 5 pages per contract
| 4.3.4 |
| Organizational Structure Change History |
| III |
| 5.0 |
| Price Volume |
| 2/2 |
| Unlimited |
| 2.3.7 |
| Table of Contents |
Unlimited
| 5.1 |
| General Instructions |
Unlimited
| 5.4 |
| Volume Organization |
Unlimited
| IV |
| 6 |
| Contract Documentation |
| 2/1 |
| Unlimited |
| 2.3.1 |
| Title Page (SF1447) |
| 2.3.2 |
| Team List (see Attach 2.0) |
| 2.3.7 |
| Table of Contents |
Unlimited
| 2.3.8 |
| List of Tables and Figures |
Unlimited
| 2.3.9 |
| Glossary of Abbreviations and Acronyms |
Unlimited
| 6.1 |
| Model Contract (Sections A-J) |
N/A
| 6.1.4 |
| Representations and Certifications (Section K) |
N/A
| 6.3.1-6.3.4 |
| Contact Information |
Unlimited
| 6.3.5 |
| Attachments to the Model Contract |
Unlimited
2.3.4. Page Limitations
Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal and (for paper copies) will be returned to the offeror as soon as practicable. Page limitations may also be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors. Each page shall be counted except the following: blank pages, title pages, tables of contents, tabs, indexes, glossaries, and those noted in the Proposed Organization Chart as unlimited.
2.3.5. Pricing Information
All pricing information shall be addressed ONLY in the Price Proposal volume. Cost tradeoff information, work hour estimates, and material kinds and quantities may be used in other volumes only as appropriate for presenting rationale for alternatives or design and tradeoff decisions.
2.3.6. Cross Referencing
Each volume shall be written on a stand-alone basis so that its contents may be evaluated without cross-referencing to other volumes of the proposal. Information required for proposal evaluation, which is not found in its designated volume, will be assumed to have been omitted from the proposal. Cross-referencing within a proposal volume is permitted when its use would conserve space without impairing clarity.
2.3.7. Indexing
Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections.
2.3.8. Include an indexed list of Tables and Figures.
2.3.9. Glossary of Abbreviations and Acronyms
Each volume shall contain a glossary of all abbreviations and acronyms used, and with an explanation for each. Glossaries do not count against the page limitations for their respective volumes.
2.4. Page Size and Format
2.4.1. A page is defined as each face of a sheet of paper containing information. When both sides of a sheet display printed material, it shall be counted as two pages. Page size shall be 8.5 x 11 inches, not including foldouts. Page line spacing shall be 1.5 lines. Except for the reproduced sections of the solicitation document, the text size shall be no less than Arial 12 points. Tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software. Use at least 1 inch margins on the top and bottom and 3/4 inch side margins. Pages shall be numbered sequentially by volume. These page format restrictions shall apply to responses to Evaluation Notice (ENs). These limitations shall apply to both electronic and hard copy proposals.
2.4.2. Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, and count as a single page. Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics; not for pages of text. The following limitation only applies to the Technical Volume. Text intended for evaluation within all figures, charts, tables, and graphs, to include imbedded images, shall be no less than Arial 8-pt. These limitations shall apply to both electronic and hard copy proposals. Any text within figures, charts, tables, and graphs which do not meet this requirement will not be considered in the evaluation. These limitations shall apply to both electronic and hard copy proposals.
2.5. Binding and Labeling
Each volume of the proposal should be separately bound in a three-ring, loose-leaf binder permitting the volume to lie flat when open. Staples shall not be used. A cover sheet should be bound in each book, clearly marked as to volume number, title, copy number, solicitation identification and the offeror’s name. The same identifying data should be placed on the spine of each binder. All unclassified document binders shall have a color other than red or other applicable security designation colors. Be sure to apply all appropriate markings including those prescribed in accordance with FAR 52.215-1(e), Restriction on Disclosure and Use of Data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.
2.6. Electronic Offers
The content and page size of electronic copies must be identical to the hard copies. When discrepancies exist between the written hard copies and those provided in electronic format, the written hard copies will take precedence in all cases. For electronic copies, indicate on each Compact Disc Read Only Memory (CD-ROM) the volume number and title. Use separate files to permit rapid location of all portions, including subfactors, required plans, exhibits, appendices, and attachments, if any. The offeror shall submit volumes I through V in electronic format. Each volume shall be submitted on a separate CD. If files are compressed, the necessary decompression program must be included. The electronic copies of the proposal shall be submitted in a format readable by Microsoft (MS) Word 2007 or 2010, MS Excel 2007 or 2010, MS-Project 2007 or 2010, and MS-Power Point 2007 or 2010.
2.7. Distribution
The "original" proposal shall be clearly identified. Proposals shall be addressed to the Contracting Officer and mailed to:
DEPARTMENT OF THE AIR FORCE
AFSC/PZAAB: ATTN: Billie Kindschuh
| 3001 Staff Dr, STE 1AG198C |
| Tinker AFB OK 73145-3020 |
| Telephone: 405-734-4615 |
| billie.kindschuh@us.af.mil |
3.0 Factor 1 – Technical
3.1. General
The Technical Volume should be specific and complete. Legibility, clarity and coherence are very important. Your responses will be evaluated against the Technical subfactors defined in Section M, Evaluation Factors for Award. Using the instructions provided below, provide as specifically as possible the actual methodology you would use for accomplishing/satisfying these subfactors. All the requirements specified in the solicitation are mandatory. By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation. It is neither necessary nor desirable for you to tell us so in your proposal. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation.
3.2. Format and Specific Content
3.2.1. Technical
In the Technical Volume, address your proposed approach to meeting the minimum performance or capability requirements of each technical subfactor.
3.2.2. Volume Organization
The Technical Volume shall be organized according to the following general outline:
(1) Title Page
(2) Team List Attach 2.0
(3) Table of Contents
(4) List of Tables and Figures
(5) Glossary
(6) Subfactor 1: Transition/Phase-In
(7) Subfactor 2: Supply Chain Management
3.2.3. Subfactor One: Transition/Phase-In
The offeror shall provide an approach for Transition/Phase-In. As a minimum, the offeror shall provide a milestone schedule, which includes required support equipment, tooling and the capacity to meet full production during transition/phase-in period. Provide a production plan which addresses mission support through contract transition/phase-in period. Provide method to obtain access to required technical orders and gain/maintain access to required data systems in accordance with PWS 1.8.1.
3.2.4. Subfactor Two: Supply Chain Management
The offeror shall provide an approach for Supply Chain Management. As a minimum, the offeror shall provide a Contractor Furnished Material (CFM) management plan to forecast, operate and maintain an adequate inventory and supply ordering system to address supportability of delivery requirements. CFM management plan shall include methods to procure all CFM required to meet repair requirements in accordance with PWS 1.7.3.
4.0. Factor 2 – Past Performance
4.1. General
4.1.1. Each offeror shall submit a past performance volume with its proposal, containing past performance information in accordance with the format contained in Attachment 1.1 of the ITO. The Past Performance volume shall include a team list, which includes the prime contractor, all significant subcontractors, teaming partners, and/or joint venture partners proposed to perform the work outlined in the solicitation. The offeror shall describe the portion of effort each team member is proposed to perform in relation to the Factor 1 Technical subfactors, and Scope, Magnitude and Complexity. The Government Past Performance Evaluation Team (PPET) evaluates each member of the offeror’s team for relevancy and performance, based on their proposed portion of effort. Therefore, it is important for the offeror to provide a detailed portion of effort description, in order for the PPET to conduct an accurate assessment. For the Past Performance evaluation, the Government will use data provided by the offeror in the Past Performance volume, as well as data obtained from other sources.
4.1.2. Along with the information required in this paragraph, the offeror shall submit a consent letter (Attachment 1.4) executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the offeror so the offeror can respond to such information. For each identified effort for a commercial customer, the offeror shall also submit a client authorization letter (Attachment 1.5) authorizing release to the Government of requested information on the offeror’s performance.
4.2. Early Proposal Information
4.2.1 Each offeror is requested to submit Volume II Past Performance for each relevant contract fifteen (15) calendar days prior to the solicitation closing date. Failure to submit early proposal information will not result in offeror disqualification.
4.2.2. As soon as practicable, offerors shall complete Section 1 of the attached Past Performance Questionnaire (Attachment 1.2) and e-mail it and the Performance Questionnaire Letter (Attachment 1.3) to all points of contacts (POCs) the offeror has listed in the Past Performance Information (PPI) Tool (Attachment 1.1). The POCs will complete the questionnaires and forward them by FAX, directly to the Past Performance Evaluation Team (PPET). Fax copies to 405-734-4624 (Attn: Billie Kindschuh) or e-mail billie.kindschuh@us.af.mil. RESPONDENTS TO THE QUESTIONNAIRES SHALL NOT SEND THE COMPLETED INFORMATION SHEETS BACK TO THE OFFEROR. Offerors shall not follow-up with respondents to ensure they have completed the questionnaires. The PPET will conduct such follow-up with any POC as necessary.
4.3. Relevant Contracts
4.3.1. The offeror shall provide Past Performance Information (PPI) on current or previous contracts The PPI forms shall be completed in accordance with Section L, Attachment 1, Past Performance Information Instructions. The offeror shall submit contracts which include all or some performance within the past three years, as defined in Section M, para 2.3.2.1 Recency Assessment. Request each offeror submit up to four (4) PPI forms for the prime contractor, and up to four (4) PPI forms for each significant subcontractor/teaming partner. Significant subcontractor is defined as a contractor who is proposed to perform over 10% of the total effort, or a contractor who is proposed to perform less than 10% of the total effort, but is determined to be performing a critical function. NOTE: The requested number of PPI forms for the prime and subcontractors are preferences, and not requirements. Offerors may submit more than the preferred number, if the offeror believes the extra contracts are needed to fully describe their relevancy. Offerors who submit less than the preferred number of PPI forms are not automatically assigned an “Unknown Confidence” rating. Fewer numbers may be acceptable, if the Government determines there is sufficient information to determine a confidence rating. Request each PPI form not exceed a target of 8 pages, although more or less may be submitted, if necessary and relevant to the XXX program.
4.3.2. PPI Relevant Contract Narrative
For each PPI form, the offeror shall provide a narrative explaining what aspects of the contract is deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate. Specifically, the narrative should focus on similarities to the Factor 1 Technical subfactors, Factor 3 Price, and Scope, Magnitude, and Complexity, as defined in Section M, paragraph 2.3.2.2, and should be tailored to the proposed portion of effort. Categorize the relevant information into the specific technical subfactors and price assessment used to evaluate the proposal. The narrative may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a Limited or No confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror shall clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a higher confidence candidate. For example, submittal of quality performance indicators or other management indicators that clearly support that an offeror has overcome past problems is required. The offeror is requested to limit the narrative to a maximum of 5 pages. However, the offeror may exceed the requested page limit, if determined necessary to fully describe relevancy.
4.3.3. Organizational Structure Change History
Many companies have acquired, been acquired by, or otherwise merged with other companies and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant past efforts or between the conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, offeror’s shall include a "roadmap" describing all such changes in the organization of the offeror’s company. A pamphlet or other commercial document describing such reorganizations may suffice. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider past performance information provided by other sources as well as that provided by the offeror(s), the "roadmap" should be both specifically applicable to the efforts identified, yet general enough to apply to efforts on which the Government receives information from other sources.
5.0. Factor 3 – Price
In the Price Volume, the offeror shall provide the following information in addition to the pricing in Supplies or Services and Prices/Cost Section (Part B) of the solicitation. These instructions are to assist you in submitting information required to evaluate the reasonableness of your proposed price. Compliance with these instructions is mandatory and failure to comply may result in rejection of your proposal.
5.1. Volume Organization.
The Price Volume shall consist of the following sections:
SECTION 1 – Include your rationale in response to the following paragraphs in Section 1, along with a Table of Contents.
| 5.2.1 - Price Reasonableness |
| 5.2.2 - Balanced Pricing |
| 5.2.3 - Price Realism |
| 5.4.1 - Estimating System |
| 5.4.2 - Purchasing System |
| 5.4.3 - Accounting System |
SECTION 2 Include your response to the following paragraphs in Section 2.
| 5.4.4 - Over & Above (O&A) Overhead Rate Support |
| 5.4.5 - Explanation of Specific Estimating Techniques and Methods |
| 5.4.6 - Past Experience Basis of Estimates |
5.4.7 - Proposed Price Reduction per Corporate/Management Decision
5.4.8 - Subcontractor and Vendor Pricing
SECTION 3 Include your response to the following paragraphs in Section 3.
5.4.9 - Rounding
5.4.10 - Annual Price Changes
5.4.11 - Price Assumptions Used in Development of Proposed Pricing
5.4.12 - Government Furnished Property (GFP)
5.4.13 - Services Contract Labor Standards (SCLS)
5.4.14 - Government Field Support Agencies
5.4.15 - Other Documentation
SECTION 4 – Include your response to the following paragraphs in Section 4.
5.4.16 - Submission of Price/Cost Models – Pricing Matrix
5.4.17 - Supplies or Services and Prices/Costs (Section B)
5.2. General Instructions
Information beyond that required by this instruction shall not be submitted, unless you consider it essential to document or support your price position. All information relating to the proposed price including all required supporting documentation must be included in the section of the proposal designated as the Price Volume. Under no circumstances shall this information and documentation be included elsewhere in the proposal.
5.2.1. Price Reasonableness
Offeror’s proposal will be evaluated for reasonableness. Unreasonable proposed prices, initially or subsequently, may be grounds for eliminating a proposal from competition.
Price reasonableness is based on total evaluated proposed price and must represent a price to the Government a prudent person would pay in the conduct of competitive business. Normally, price reasonableness is established through adequate price competition, but may also be determined through proposal analysis techniques. To assist in the price reasonableness assessment, you are required to provide supporting explanation/rationale as outlined in the Pricing Volume. Your offer shall be sufficiently detailed to demonstrate price reasonableness. The burden of proof for credibility of proposed pricing rests with the offeror. It shall be noted that completeness is one aspect of price reasonableness – all required pricing shall be provided as complete pricing.
5.2.2. Balanced Pricing
The offeror is cautioned against submitting an offer that exhibits unbalanced pricing. Unbalanced pricing may increase performance risk. Unbalanced pricing exists when, despite an acceptable total evaluated price (TEP), the price of one or more contract line items (CLINs) is significantly over or understated as indicated by application of price analysis techniques such that there is reasonable doubt the offer would result in the lowest overall cost to the Government, even though it is the lowest TEP. Also, an offer could be so grossly unbalanced that an acceptance of the offer would be tantamount to allowing an advanced payment. Balanced pricing is determined with respect to separately priced CLINs or significant unexplained variance within one CLIN’s pricing from year to year. If what appears to be unbalanced pricing is due to sound rationale associated with, for example, the proposal’s technical approach, offerors shall provide an explanation to account for any pricing that appears unbalanced.
5.2.3. Price Realism
Proposed pricing will be evaluated for price realism. Proposed pricing must demonstrate an adequate understanding of the requirement and does not pose a risk to performance.
5.3. Pricing Information Requirements
This is not a commercial effort; FAR part 15 applies. In accordance with FAR 15.403-3-1(b), prices based on adequate price competition do not require submission of cost or pricing data. In accordance with FAR 15.403-3(a), however, information other than cost or pricing data may be required to support price reasonableness. FAR 15.403-3(a)(1) provides for obtaining information other than cost or pricing data if needed to determine price reasonableness. Therefore, the FAR does not preclude the requirement for obtaining other than cost or pricing data under certain circumstances and the Government reserves the right to obtain data as appropriate. Should the PCO determine proposed prices to appear unreasonable or the possibility that an offeror does not fully understand the requirement, the offerors may be required to support price reasonableness via other than cost or pricing data. If, after receipt of proposals, the PCO determines that there is insufficient information available to determine price reasonableness and none of the exceptions in FAR 15.403-1 apply, the offeror shall be required to submit cost or pricing data.
5.3.1. Total Evaluated Price (TEP)
Pricing will be evaluated using the Pricing Matrix (electronic cost model). The TEP Is calculated as the sum of the Base Period (3 years), two (2) one-year Option Periods and six (6) month Extension Period. The offeror shall propose unit pricing per CLIN as requested in the RFP model contract and Pricing Matrix (electronic cost model).
5.4. Pricing Support Information
5.4.1. Estimating System
Provide a summary description of your standard estimating system or methods. Also, identify any deviations from your standard estimating procedures in preparing this proposal volume. If no deviations are applicable then state accordingly in the pricing volume. Indicate whether you have Government (DCMA) approval of your system and if so, provide evidence of such approval.
5.4.2. Purchasing System
Provide a summary description of your purchasing system or methods (e.g., how material requirements are determined, how sources are selected, when firm quotes are obtained, what provision is made to ensure quantity and other discounts). Also, identify any deviations from your standard procedures in preparing this proposal. If no deviations are applicable then state accordingly in the pricing volume. Indicate whether you have Government (DCMA) approval of your system and if so, provide evidence of such approval.
5.4.3. Accounting System
Provide a summary of your accounting system or methods. Indicate whether you have Government (DCMA) approval of your accounting system and if so, provide evidence of such approval. Also, identify any deviations from your standard procedures in preparing this proposal. If no deviations are applicable then state accordingly in the pricing volume.
5.4.4. Over & Above (O&A) Overhead Rate Support
Contract Line Items X001 and X002 include an O&A rate for labor. This O&A should be fully burdened and include direct labor, overhead, G&A, & profit as applicable. Contract Line Items X003 and X004 include an O&A rate for material handling. This material cost markup factor shall represent all indirect costs plus profit associated with obtaining direct material. All rates shall be proposed as Firm Fixed Priced (FFP) ceiling rates. Ceiling rates are those rates proposed for all performance periods and are considered fixed at the proposed amount.
5.4.5. Explanation of Specific Estimating Techniques and Methods Explain the methodology used to estimate prices in the development of your proposed pricing. A variety of estimating techniques and methods are acceptable as a basis of estimate in proposed pricing. When responding to the Price Volume requirements in the solicitation, the offeror and associated subcontractors may use any generally accepted estimating techniques consistent with the offeror’s Disclosure Statement as appropriate. The Government reserves the right to obtain information from the Contract Business Analysis Repository (CBAR) as considered necessary.
5.4.6. Past Experience Basis of Estimates
Where price estimates are based on past experience, identify the past experience, explain how the past experience relates to the current effort including similarities and differences and how price data available from the past experiences was adapted to the current effort pricing.
5.4.7. Proposed Price Reduction per Corporate/Management Decision If proposed prices to perform the required effort have been decreased due to a management decision, provide a summary of the reduction by major cost element (e.g., material, labor, overhead, profit, etc.). Also, provide complete rationale for the reduction. Provide the estimated dollar and percentage of the reduction, explaining how such reductions are ensured not to increase performance risk to the Government.
5.4.8. Subcontractor and Vendor Pricing
Submit a list of the proposed probable subcontractors and inter-divisional transfers showing (a) the supplier, (b) description of effort, and (c) type of contract. As prime contractor, documentation is required to demonstrate subcontractor/vendor quotes are considered fair and reasonable. Include a detailed description of your process for evaluating subcontractor/vendor pricing and how you determined fair and reasonable pricing of subcontractors/vendors.
5.4.9. Rounding
All proposed dollar amounts shall be rounded to two (2) decimal places to the right of the decimal point. Proposed Material Handling Rates shall be rounded to four (4) decimal places to the right of the decimal point. The electronic cost model format provides for decimal places that must be in accordance with this required decimal format. If any pricing proposal deviates from this format, the Government will apply the specified format to determine the extended pricing and TEP.
5.4.10. Annual Price Changes
Proposed price increases greater than 5% per year shall be verified and addressed for reasonableness and balanced pricing in this section. Unexplained unit price variances between sequential performance period years could suggest unbalanced pricing. It is in the offeror’s best interest to provide an explanation of any significant annual CLIN price variances.
5.4.11. Price Assumptions Used in Development of Proposed Pricing Information to support reasonableness of proposed pricing is required, including supporting data and estimating methodology to support price reasonableness. All cost assumptions (including indirect rates for the offeror’s appropriate accounting period, volume or location discounts), scope limitations and/or qualifications of the pricing proposal shall be addressed and explained.
5.4.12. Government Furnished Property (GFP)
Provide assumptions regarding usage of all GFP as reflected in your pricing proposal. Appendix B of the RFP contains items to be provided as GFP.
5.4.13. Services Contract Labor Standards (SCLS), formerly known as Service Contract Act (SCA)/Collective Bargaining Agreement (CBA) It is the responsibility of the offeror and the subsequent contract awardee to comply with the SCLS. In this section of the Price Volume, demonstrate compliance with SCLS requirements per Department of Labor. Contact Government Point of Contact (POC) for any questions regarding the use of SCLS. As applicable for SCLS-covered positions, demonstrate your understanding that all such direct labor rates shall be equal to or exceed the appropriate corresponding job category/skill level in accordance with the specific regional Wage Determination (WD) rates as required by SCLS-covered job categories and skill levels. Provide general information regarding any CBAs applicable to this acquisition.
5.4.14. Government Field Support Agencies
Identify the cognizant Defense Contract Audit Agency (DCAA) and Defense Contract Management Agency (DCMA) office responsible for administration of the offeror’s Government contracts.
5.4.15. Other Documentation
Other documentation considered by offeror’s to be essential for support of proposed prices shall be presented in this section.
5.4.16. Submission of Price/Cost Models
Submit the electronically encoded Pricing Matrix in support of the proposed total evaluated price (TEP). The Pricing Matrix proposed pricing submitted must be consistent with your approved estimating system and must duplicate the logic and mathematical formulas reflected in the paper copy of your proposal. The Pricing Matrix submitted must comply with the following format requirements:
(a) Data file should be submitted on a CD.
(b) Data file should be .XLS file format (MS-Excel 2007 or earlier) compatible format.
5.4.17. Supplies or Services and Prices/Costs (Section B)
Provide a copy of the Supplies or Services and Prices/Costs (Section B) of the model contract. This should reflect pricing proposed in the Price Volume (including pricing proposed in the Pricing Matrix) used to develop the TEP.
6.0. Contract Documentation
6.1. Model Contract/Representations and Certifications
The purpose of this volume is for the offeror to provide information that will assist the Government in preparing the contract document and supporting file. The offeror's proposal shall include a signed copy of the Model Contract, and Sections A through K.
6.1.1. Solicitation/Contract Form (Section A)
The offeror shall complete blocks 13, 15 and signature and date for block 27 of the SF1447. Signature by the offeror on the SF1447 constitutes an offer, which the Government may accept. The "original" copy should be clearly marked under separate cover and should be provided without any punched holes.
6.1.2. Supplies or Services and Costs/Prices (Section B)
The offeror shall complete pricing information in Section B of the model contract.
6.1.3. Contract Clauses (Section I)
The offeror shall provide required information to complete clauses as required.
6.1.4. Representations, Certifications, and other Statements of Offerors (Section K) In accordance with FAR 52.204-8(d), the offeror shall ensure that it has completed the annual representations and certification electronically via the System for Award Management (SAM) website at https://www.sam.gov. After reviewing the SAM database information, the offeror verifies by submission of this offer that the representation and certifications currently posted electronically at FAR 52.204-8, Annual Representations and Certifications, are correct.
6.2. Exceptions to Solicitation Requirements
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. This information shall be provided in the format and content of Table 6.2. Offerors are cautioned the Government could determine any identified exceptions to be unacceptable, which would make the proposal ineligible for award.
Table 6.2 - Solicitation Exceptions Solicitation Document Page/ Paragraph Requirement/ Portion Rationale
| SOO, SOW, SPEC, Model Contract, ITO, etc. |
| Applicable |
Page and Paragraph Numbers
| Identify the requirement or portion to which exception is taken |
| Describe |
why the requirement can/will not be met
6.3. Other Information Required
6.3.1. Ombudsman
An Ombudsman has been appointed to hear concerns from offerors or potential offerors during the proposal development phase of this acquisition. The Ombudsman for this acquisition is AFSC/PZC. This does not diminish the authority of the program director or PCO, but communicates offeror concerns, issues, disagreements and recommendations to the appropriate Government personnel. When requested, the Ombudsman shall maintain strict confidentiality as to the source of the concern. The Ombudsman does not participate in the evaluation of proposals or in the source selection process; interested parties are invited to call AFSC/PZC at 405-736-3273.
6.3.2. Authorized Offeror Personnel
Provide the name, title, and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.
6.3.3. Government Offices
Provide the mailing address, telephone and fax numbers and facility codes for the cognizant Contract Administration Office, DCAA, and Government Paying Office. Also, provide the name and telephone and fax number for the Administrative Contracting Officer (ACO).
6.3.4. Company/Division Address, Identifying Codes, and Applicable Designations Provide company/division's street address, county and facility code; CAGE code; DUNS code; TIN; size of business (large or small); and labor surplus area designation. This same information must be provided if the work for this contract will be performed at any other location(s). List all locations where work is to be performed and indicate whether such facility is a division, affiliate, or subcontractor, and the percentage of work to be performed at each location.
ITO ATTACHMENTS
PAST PERFORMANCE PACKAGE ATTACHMENT
| ITO Attachment – 1.1 | PAST PERFORMANCE INFORMATION (PPI) TOOL FOR OFFERORS |
| ITO Attachment – 1.2 | PAST AND PRESENT PERFORMANCE QUESTIONNAIRE |
| ITO Attachment – 1.3 | SAMPLE QUESTIONNAIRE COVER LETTER |
| ITO Attachment – 1.4 | SAMPLE CONSENT LETTER |
| ITO Attachment – 1.5 | SAMPLE CLIENT AUTHORIZATION LETTER |
PROPOSED TEAM LIST
ITO Attachment – 2.0 PROPOSED TEAM LIST
ITO ATTACHMENT 1.1
Past Performance Information (PPI) for Offerors
Offerors must use the PPI Tool (Use latest version from FBO.gov) in order to electronically submit the PPI portion of the Past Performance Volume in accordance with the RFP.
Downloading the PPI Tool The PPI Tool can be downloaded by performing the following steps (if you are unable to download the Tool, contact the contracting officer for assistance):
1. Access the FedBizOpps (https://www.fbo.gov/) website.
2. Find the solicitation posting.
3. Locate the “ppi tool” link from the “All Files” column on the solicitation’s “Notice Details” tab .
4. Select the link and save the “ppi tool” to your computer. Name the file as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA861710R6158.accdb).
Note: PPI Tools saved in Microsoft Office versions 2007 and greater will be saved with “.accdb” file extension.
Entering information in the PPI Tool After selecting and saving the tool, enter information by performing the following steps:
1. Open the saved PPI Tool.
2. Select the “Options” button from the “Security Warning” banner, if applicable.
3. The “Security Alert” pop-up screen displays.
Figure 1: Security Alert Pop-up Note:
· Files saved using Microsoft Office 2010 will have the “Enable Content” button on the “Security Warning” banner and therefore will not get a Security Alert pop-up.
· If a "read only" file is opened, in order to populate data in the file, click "Save As" in the "Read-Only" message bar. Enter the filename as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA861710R6158.accdb).
4. Select the radio button “Enable this content” and then click “OK.” A setup pop-up screen displays.
Figure 2: Setup Pop-Up
5. Select the “Start” button. The “Application Setup” screen displays.
Figure 3: Application Setup Screen
Note: Once the offeror’s Name and RFP Number have been entered they can be edited by selecting the “Edit offeror And RFP Number” button from the “Contractor’s Menu”
6. Enter the offeror’s Name and RFP Number and then click the “Next” button. The application setup continues.
Figure 4: Continue the Application Setup
7. Choose the appropriate option by selecting the corresponding radio button and then click the “Next” button. The “Contractor’s Menu” displays.
Figure 5: Contractor’s Menu
8. Click the “Step 1: Set up Business Relationships” button to create a business relationship, if applicable, for each business entity before proceeding throughout the PPI Tool (refer to Section L of the RFP for detailed instructions). Identify all prime and sub-prime organizations and categorize them according to the appropriate role in the proposed acquisition. The “Business Relationships” screen displays.
Figure 6: Business Relationships
9. Click the “New” button to create a business relationship for the proposed acquisition. An additional “Business Relationships” screen displays.
Figure 7: Enter New Business Relationship
10. Complete the fields as follows (fields marked on the screen with an asterisk ‘*’ are required):
· Contractor’s Name: Self-explanatory
· Role in Proposed Acquisition: Choose one of the four options – Prime, Sub, Joint Venture, or Other (Explain). An explanation comment box will display when you select “Other.”
· Place of Work: Location where contractor will perform work.
· Percentage of Work: Identify percentage of work contributed by specified business entity
· Responsibilities: Detail proposed responsibilities of specified business entity.
11. Select one of the buttons at the bottom of the screen.
· Add – Saves the current business relationship and allows for the addition of a new one.
· Close – Cancels the current business relationship without saving.
Note: In order to edit or delete an existing business relationship in the list, double-click on it.
12. Select the “Close” button on the “Business Relationships” screen after all of the business relationships has been added.
13. Click the “Step 2: Enter Past Performance Information (PPI)” buttonto enter the Past Performance Information. The “Past Performance” screen displays.
Figure 8: Past Performance
14. Click the “New” button to enter Past Performance Information for the proposed acquisition. An additional “Past Performance” screen displays.
Figure 9: Enter Past Performance Information
15. Complete the fields on each of the tabs as follows (fields on the screen marked with an asterisk ‘*’ are required):
· Contract Information Tab
· Contractor: Select from the dropdown the appropriate business entity.
· Cage Code: Self-explanatory.
· Contract Number: If you don’t have a contract number, enter “N/A.”
· Program Title: Enter full name of program.
· Contr Agency/Customer: Enter servicing contracting agency and customer (office symbols suffice).
· DUNS Number: Self-explanatory
· Delivery Task/Order: If the order is provided as a stand-alone reference, enter the task/call/delivery/purchase order number.
· Contract Type: Enter Firm-Fixed-Price (FFP), Cost Plus Fixed-Fee (CPFF), Indefinite Delivery/Indefinite Quantity (ID/IQ), LH, Blanket Purchase Agreement (BPA), Cost Plus Incentive-Fee (CPIF), Cost Plus Award Fee (CPAF), etc. For additional clarification, click the question mark button.
· Short Program Title (i.e. Acronym): Enter abbreviated title for the program or enter “N/A.”
· Contract Dollar Value:
· Original: Input total contract dollar value, with all options if applicable, in the amount originally awarded on the referenced contract.
· If ID/IQ or BPA, provide total ceiling.
· If stand-alone task/call/delivery/purchase, provide amount of the individual contract.
· Current: Input total contract dollar value, with all options if applicable, as the contract stands at time of PPI submission.
· If ID/IQ or BPA, provide total ceiling.
· If stand-alone task/call/delivery/purchase, provide amount of the individual contract.
· Explain the differences in Contract Value, if applicable: Enter an explanation of the difference between the original contract dollar value and the revised value as of the time of PPI submission.
· Period of Performance (mm/dd/yy)
· Start Date: Input start date of contract.
· Original End Date: Input original end date based on award.
· Current End Date: Input end date, as the contract stands at time of PPI submission.
· Explain the differences in Period of Performance, if applicable: Enter an explanation of the difference between “Original End Date” and “Current End Date.”
· Program Details Tab
· Brief Description of Effort as:
· Select Prime, Sub, Joint Venture, or Other (Explain). An explanation comment box will display when you select “Other.”
· Provide a brief description of the service provided and actual work performed under this contract reference.
· ****If applicable: Provide information on performance problems encountered on the identified contracts. At a minimum, briefly describe the problem experienced, actions taken to alleviate the problem, and whether or not the problem was satisfactorily overcome.****
· Explain how your performance on this contract is relevant for each applicable factor or subfactor, as instructed under Past Performance in Section M of the RFP. Include any unique aspects that demonstrate relevancy in this effort. Provide evidence to support such relevance to the requirements as described in the RFP.
· Describe the nature or portion of the work on the proposed effort to be performed by the business entity being reported here. Also estimate the percentage of the total proposed effort to be performed by this entity, and whether this entity will be performing as the prime, subcontractor or a corporate division related to the prime (define relationship).
Percentage of Work to be Performed Subfactor 1 – Transition/Phase-In Subfactor 2 – Supply Chain Management
· Compliance with FAR 52.219-8, Utilization of Small Business Concerns. Leave this section blank.
· Subcontracting Plan. Leave this section blank.
· POC & Key Individuals Tab
· Key Individuals: Click the “New” button to specify any key individual or individuals who participated in this program or who may support the proposed acquisition. Also indicate their roles for both acquisitions, previous and current. To edit or delete an existing key individual, double-click an item from the list.
Note: In accordance with FAR 15.305(a)(2)(iii), relevant contract efforts performed by from key personnel may be evaluated. If you wish to include the past performance of individual key personnel, select the “New” button for each individual and fill out the necessary…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .