FA812125R0013_______0001.pdf

PDF 29 KB Posted

Attached to
F100-220, Duct, Turbine, Airfcraft
Solicitation number
FA812125R0013
Issued by

About this file

This document is an Amendment of Solicitation (Standard Form 30) for a Department of the Air Force contract opportunity (Solicitation Number FA812125R0013) for F100-220-PW Duct, Turbine, Aircraft components. The solicitation is a competitive, firm-fixed-price acquisition for a one-time USAF spares buy with a First Article requirement, targeting the procurement of a Turbine Duct for the F100-PW-220 Engine. The quantity ranges from a minimum of 22 to a maximum of 131 units, with additional first article test units, and is designated as a small business set-aside.

Key procurement details include a revised solicitation date of April 11, 2025 (originally July 5, 2025), with price as the only evaluated factor and award to be made to the lowest total evaluated price (TEP) offeror. Qualification requirements mandate that sources must be pre-approved in accordance with FAR 52.209-1, and potential contractors are encouraged to submit Source Approval Requests (SARs) as soon as possible. The solicitation will be electronically available on SAM.gov, with an Ombudsman appointed to address offeror concerns during the proposal development phase. The contract will be administered by the Air Force Sustainment Center at Tinker Air Force Base in Oklahoma.

View the file

Other files

File Type Posted
FA812125R0013.pdf PDF
FA812125R0013_Solicitation.pdf PDF
2970993_EDL_REPORT.pdf PDF
3858684_FA_REPORT.pdf PDF
4059838_TRNSPDATA_REPORT.pdf PDF
4004658_CDRL1_REPORT.pdf PDF
4059534_PKGRQMT_REPORT.pdf PDF
4014951_ATTACH.pdf PDF
4042162_BIDSET_REPORT.pdf PDF
RTD_4014950_ATTACH.pdf PDF
1272204_EI.pdf PDF
DID_4005042_ATTACH.pdf PDF
4006019_CBTMIN.pdf PDF
DID_4005044_ATTACH.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1

2. AMENDMENT/MODIFICATION NO.

FA8121-25-R-0013-0001

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO.

FD20302500249 01

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, AFSC PZAAA

3001 STAFF DR STE 1AF1 98C

TINKER AFB OK 73145-3303

BUYER: Clifford Darrington/AFSC/PZAAA clifford.darrington@us.af.mil Phone: (405) 582- 5207 Fax: (000

7. ADMINISTERED BY (If other than item 6) CODEFA8121

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA812125R0013

9B. DATED (SEE ITEM 11)

12-MAR-2025

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of the amendment is to incorporate sections L and M into the solicitation.

Additionally, the solicitation date is amended to April 11, 2025. This solicitation was inadvertently posted for 120 days. IAW FAR requirements the solicitation will be posted the required thirty (30) days.

FIRST: Sections L and M are incorporated into the solicitation

SECOND: The solicitation date is amended

From: 5 July 2025 3:00pm CST TO: 11 April 2025 3:00pm CST

THIRD: All other terms and conditions are unchanged and remain in full force and effect.

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

Section L – Instructions to Offerors

Program Structure and Objective

1.1. The Government plans to award a single contract for the F100-220-PW Duct, Turbine, Aircra.

This firm-fixed-price type contract will be a one-time USAF spares buy with a First Article requirement.

2.0 General Instructions.

2.1. This competitive acquisition will be conducted utilizing price as the only evaluated factor.

Contract award will be made to the offeror with the lowest total evaluated price (TEP). The offer shall be compliant with the requirements as stated in the contract. Non-conformance with the instructions provided in the Instructions to Offeror (ITO) may result in an offeror being ineligible for award. Offerors shall provide evidence of qualification in accordance with FAR 52.209-1.

2.1.1. Qualification Requirements: Sources must be qualified prior to being considered for award.

To be eligible for contract award, the offeror must be an approved source IAW FAR 52.209-1, Qualification Requirements. The Government is not required to delay contract award to review pending Source Approval Requests (SARs). Therefore, offerors are encouraged to submit SARs as soon as possible. If the Government has not completed review of a SAR when the contract is awarded, the SAR will be retained, and the source will be reviewed as a possible source for future awards.

2.1.2. For Questions regarding the Tinker SAR Process or related issues, these inquiries should be submitted to the AFSC Small Business Office at: AFSC/SB 3001 Staff Drive, Suite 1AG 85A Tinker AFB, OK 73145-3009 Email: afsc.sb.workflow@us.af.mil Website:

https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR Package submission itself shall be submitted electronically through DoD SAFE https://safe.apps.mil/. DoD SAFE is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the POC email addresses below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the POC email addresses below and ask that they "Request a Drop-Off" to your email address via DoD SAFE, which will enable you to be able to Upload the SAR Submission Package documents to DoD SAFE.

29SCMS.SASPO.Workflow@us.af.mil and stacy.cochran@us.af.mi

2.1.3. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims.

2.1.4. The proposal acceptance period is specified in SF 1447 Section A (Block 18) of the contract/solicitation. By signing the Request for Proposal (RFP), the offeror has made a clear statement that the proposal is valid until the date specified.

2.2. General Information

2.2.1. Point of Contact

The Contracting Specialist (CS) and Contracting Officer (CO) are the sole points of contact for this acquisition. Address any questions or concerns you may have to the CS and CO. Written requests for clarification may be sent to the CS and CO at the address located in SF 1447 Section A (Block 7) of the contract/solicitation.

2.2.2. Debriefings

The Government will notify unsuccessful offerors in accordance with FAR 15.503. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.

3.0. Factor 1 - Price

3.1. The offeror shall complete Schedule of Supplies or Services and Prices/Costs of the solicitation to include all unit prices and extended prices for each CLIN and/or SubCLIN. These instructions are to assist you in submitting information required to evaluate the reasonableness of your proposed prices/costs. Compliance with these instructions is mandatory and failure to comply may result in rejection of your proposal.

3.1.1. Price Reasonableness and Balance

Offerors’ proposals will be evaluated for reasonableness and balance. The burden of proof for credibility of proposed prices rests with the offeror. Additionally, unbalanced pricing may pose an unacceptable risk to the Government and may be a reason to reject an offeror’s proposal.

3.2. Pricing Information Requirements

In accordance with FAR 15.403-1(b)(1), prices based on adequate price competition do not require submission of certified cost or pricing data. If, after receipt of proposals, there is insufficient information available to determine price reasonableness and balance, the offeror may be required to submit other than certified cost or pricing data. FAR does not preclude the requirement for obtaining other than certified cost or pricing data under certain circumstances, and the Government reserves the right to obtain data as appropriate. If, after receipt of proposals, the CO determines there is insufficient information available to determine price reasonableness and none of the exceptions in FAR 15.403-1 apply, the offeror shall be required to submit certified cost or pricing data.

4.0. Solicitation Requirements

4.1. Solicitation/Contract Form SF 1447

The offeror shall complete Blocks 13 and 27 of the SF1447. Signature by the offeror on the SF1447 constitutes an offer, which the Government may accept.

4.1.1. Supplies or Services and Prices/Costs

The offeror shall complete pricing information in Supplies or Services and Prices/Costs section of the solicitation.

4.1.2. Contract Clauses

The offeror shall complete provisions/clauses as required.

4.1.3. Representations, Certifications, and other Statements of Offerors The Offeror has completed the annual representations and certifications electronically via the System for Award Management (SAM). After reviewing the SAM database information, the Offeror verifies by submission of this offer that the representations and certifications currently posted electronically at FAR 52.204-8, Annual Representations and Certifications, are correct.

4.2. Ombudsman

An Ombudsman has been appointed to hear concerns from offerors or potential offerors during the proposal development phase of this acquisition. The Ombudsman for this acquisition is OC-ALC/PZC. This does not diminish the authority of the program director or CO, but communicates offeror concerns, issues, disagreements and recommendations to the appropriate Government personnel. When requested, the Ombudsman shall maintain strict confidentiality as to the source of the concern. The Ombudsman does not participate in the evaluation of proposals or in the source selection process; interested parties are invited to call OC-ALC/PZC at 405-736-3273.

4.3 First Article Waivers

If an offeror has substantive recent production history, the offeror may request a first article waiver. IAW 52.209-3(h) First Article Approval-Contractor Testing, The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver. When a waiver request is received, the request will be sent for evaluation by cognizant engineer. Engineering will determine whether a First Article Waiver will be granted. If a First Article Waiver is granted, the Government will notify the offeror.

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION M

EVALUATION FACTORS FOR AWARD

Section M – Instructions to Offerors

Price-Only Competition

Basis for Contract Award This acquisition will utilize price as the only evaluated factor. Award will be made to the offeror with the lowest total evaluated price (TEP) and whose proposal conforms to the solicitation requirements (to include all stated terms, conditions, representations, and certifications). To be eligible for award, the offeror must be an approved source IAW FAR 52.209-1, Qualification Requirements. The Government reserves the right to award without discussions. However, the Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.

Solicitation Requirements (Terms and Conditions) Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and Qualification Requirements in addition to the price factor.

Failure to comply with the terms and conditions of the solicitation may result in the Offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable, and the proposal, therefore, ineligible for award.

1.2 Number of Contracts to Be Awarded

The Government intends to select one contractor for this acquisition. However, the Government reserves the right not to award a contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.

2.0. Evaluation Factor

2.1. Factor 1- Price

Price proposals will be evaluated as follows:

2.1.1. Completeness

Proposals will be reviewed for completeness. Incomplete proposals will be considered ineligible for award.

2.1.2. Price Reasonableness

The proposed prices will be evaluated for reasonableness. Reasonableness must represent a price to the Government a prudent person would pay in the conduct of competitive business.

Normally, price reasonableness is established through adequate price competition but may also be determined through price analysis techniques as described in FAR 15.404-1(b)(2).

2.1.3. Unbalanced pricing

Offerors’ proposals will be reviewed for unbalanced pricing. The Government will evaluate any supporting information provided by the Offeror explaining variances that appear unbalanced.

Evaluated offers that are determined to be unbalanced may be deemed ineligible for award by the Contracting Officer if a determination is made that lack of balance poses an unacceptable risk to the Government. Unbalanced pricing exists when, despite an acceptable total price, the price of one or more-line items (including sub line items) is significantly over or understated as demonstrated by application of price analysis techniques, such that:

There is reasonable doubt the offer would result in the lowest overall cost to the Government, even though it is the lowest priced offer; or

The offer is so grossly unbalanced; its acceptance would be tantamount to allowing an advanced payment.

2.1.5. Total Evaluated Price (TEP):

The TEP will be calculated as the sum of the total proposed prices for all separately priced line items. The total proposed price for each separately priced line item shall be calculated as the proposed unit price multiplied by the corresponding quantity.

If a First Article Waiver is requested by a proposee the Government will submit a Waiver Request to the cognizant engineer. Engineering will approve or deny the request. If the First Article Waiver is denied, the proposee will be required to amend the proposal to include First Article CLINs.

If the First Article Waiver is approved the First Article Waiver CLINS will be removed from the TEP equation. The removed First Article CLIN quantities will be added to the production quantity. The TEP will be based on the proposed production unit price multiplied by the new total production quantities.

File details come from the government source that posted it. Updated .