This First Article Requirements (FAR) document details specifications for a critical aerospace component for the F100-PW-220 Engine. The document covers a Duct, Turbine, Aircraft (NSN: 2840015042791NZ, Part Number: 4086297) with specific first article testing requirements. The procurement involves a total quantity range of 22-131 units, with three first article units to be tested: two parts as part of production quantity and one additional part.

Key procurement details include a solicitation issued by the Department of the Air Force Materiel Command Air Force Sustainment Center, with an estimated solicitation issue date of 7 March 2025 and a response/closing date of 5 July 2025. The procurement is a small business set-aside, targeting a one-time spares buy for new manufacture. The duct's function is to hold the outer air seal in place on the High-pressure Turbine Rotor Assembly, and it is comprised of nickel alloy with dimensions of 28.0" L x 28.0" W x 3.0" H, weighing approximately 12 lbs. First article testing is mandatory, with strict inspection requirements outlined in document LPF-QAR-003, emphasizing the critical nature of this component for mission capability and system safety.

View the file

Other files

File Type Posted
FA812125R0013.pdf PDF
FA812125R0013_______0001.pdf PDF
FA812125R0013_Solicitation.pdf PDF
2970993_EDL_REPORT.pdf PDF
4059838_TRNSPDATA_REPORT.pdf PDF
4004658_CDRL1_REPORT.pdf PDF
4059534_PKGRQMT_REPORT.pdf PDF
4014951_ATTACH.pdf PDF
4042162_BIDSET_REPORT.pdf PDF
RTD_4014950_ATTACH.pdf PDF
1272204_EI.pdf PDF
DID_4005042_ATTACH.pdf PDF
4006019_CBTMIN.pdf PDF
DID_4005044_ATTACH.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

06 FEB 2024(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

77445 / 4086297

4. NSN

2840015042791NZ

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 3 UNIT(S) OF LOT / ITEM 1

AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

X REQUIRED NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Identified in drawing 4086297, sub-tier drawings, and specifications identified therein.

B. The detailed technical requirements for First Article approval tests are contained in block 12 of this form and LPF-QAR-003.

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and

PCO

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

AFLCMC/LPZED

FA MONITOR DODAAC FA8111

3001 STAFF DRIVE, STE 1AB85A

TINKER AFB, OKLAHOMA, 73145

(4) Government written notice of approval / disapproval due

(2) Due

(1) DD Form 1423 ELIN days after receipt of contractor's report.60 calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 6Generated by PRPS using Jasper Reports on 21 Nov 2024

PREVIOUS EDITION IS OBSOLETE

Prescribed by: AFMCI23-110

F. FIRST ARTICLE DELIVERY

(1) Due within 0 calendar days from date contract.

(2) Notify 0 calendar days prior to shipment.

(3) Delivered to government at n/a

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 0 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$2,500.0000

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

Disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

X Other Disposition:

see block 12 of this form.

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, X DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

AFMC IMT 260, 20230316, V-5,

Version 6Generated by PRPS using Jasper Reports on 21 Nov 2024

12. REMARKS

Ashford, Holden ANAME: 06 FEB 2024DATE:

Block 3: Part Number: 4086297 Block 9: additional information for part C&E:

C. 1) DD Form 1423 ELIN:

2) Deliver due _____ calendar days from date of contract

E. 1) DD Form 1423 ELIN:

2) Due ______ calendar days from date of contract

Block 5. First Article Quantity is 3 parts:

-2 parts will be part of production quantity -1 part will be in addition to production quantity

Block 9.B First article test requirements shall be per LPF-QAR-003 and the following:

-a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003.

-b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003 prior to assembly.

-c. After completion of inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPF-QAR-003.

-NOTE: Deliveries (FAT test plan and Reports) are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Block 10. Disposition of First Articles:

-1 First Article part will be destructively tested. This item will be condemned and disposed of at vendor's facility.

Block 11. The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver identified in 11.a and/or 11.c.

First article testing is waived if the offeror is the prime contractor, Pratt & Whitney.

This is a critical part used in the F100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article Testing is required to insure first time manufacturers or manufacturers that have not produced the item within three years manufacture parts in accordance with the drawing and specification requirements.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Ashford, Holden A

AFLCMC / LP S B E

405-734-8773

884-8773

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Ashford, Holden A

AFLCMC / LP S B E

405-734-8773

884-8773

AFMC IMT 260, 20230316, V-5,

Version 6Generated by PRPS using Jasper Reports on 21 Nov 2024

File details come from the government source that posted it. Updated .