PWS_29DEC2014.pdf
PDF 526 KB Posted
- Attached to
- Repair of Shaft Failure Indicator
- Solicitation number
- FA8119-15-R-0001
About this file
PWS dated 29 Dec 2014
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A
PERFORMANCE WORK STATEMENT
(PWS)
For Repair of Shaft Failure Indicator
PREPARATION DATE: 26 Feb 14
REVISION NUMBER: 3 DATE: 29 Dec 14
FD2030-15-00013
PREPARING ORGANIZATION: AFSC/448 SCMW/848 SCMG/424 SCMS TINKER AFB OK 73145
i
Table of Contents
1. DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.1. Purpose
1.2. General Information
1.3. Work Requirements
1.4. Reporting Requirements
1.5. Quality Program and Inspection System Requirements
1.6. Condemnation Candidates
1.7. Special Tools (ST) and Support Equipment (SE)
1.8. Precious Metals Recovery Program
1.9. Nuclear Hardness Requirement
1.10. Parts Control Program
1.11. Counterfeit Prevention Plan
1.12. Cannibalization of Parts
1.13. Lead (Pb) Free Electronics
1.14. Ozone Depleting Substances (ODS)
1.15. Technical Order Maintenance
1.16 Delivery Schedule
1.17 Customer Service Requirements
1.18 Safety and Health
1.19 Manpower Reporting Language For Contract Performance Work Statements
2 SERVICE SUMMARY
2.1 Service Summary
3 GOVERNMENT PROPERTY
3.1 Government Property
3.2 Disposition of Government Property
3.3 Discrepancies Incident to Shipment:
3.4 Other
ATTACHMENT A – END ITEMS
ATTACHMENT B – DEFINITIONS
ATTACHMENT C – APPLICABLE DOCUMENTS
1. DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.1. Purpose
The purpose of the Performance Work Statement (PWS) is to define the repair requirements for multiple items specified in Attachment A of the PWS. The work encompasses the disassembly, cleaning, inspection, maintenance, reassembly, testing and finishing actions required to return the items to a serviceable condition. The contractor is responsible for having the repair capabilities to include appropriate technical data, repair documents, and license agreements, required to accomplish this repair. The Contractor is responsible for the scheduled delivery of a quality product.
1.2. General Information
Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.3. Work Requirements
1.3.1 Repair
Return unit to a serviceable condition.
1.3.2 No Fault Found (NFF)
Failure cannot be duplicated, unit passes tests.
1.3.3 Over & Above
The Contractor shall execute Over and Above at the request of the Contracting Officer for work within the general scope of the contract; not covered by the line item(s) for the basic work under the contract; and necessary in order to satisfactorily complete the contract.
1.3.4 Repair Management
Repair Management includes: The Infrastructure/Management tasks that are independent to the number of repairs. The tasks include but not limited to:
Obsolescence Management, STE Maintenance and Calibration, and Bondroom Inventory.
1.3.4.1 Material Shortages and Obsolescence Management
The contractor, being the Current Document Control Authority (CDCA) and Original Equipment Manufacturer (OEM) shall establish and maintain an effective obsolescence program. The contractor shall track and resolve obsolescence issues that affect their ability to fulfill repairs required by the contract. At a minimum substitute items, new component vendors, and new/unused government surplus in its original containers, shall be considered on a case by case basis for continued component support. The contractor shall keep the government apprised of all identified impending obsolescence and shall process ECPs when necessary for obsolescence resolutions.
1.3.5 Material Lay-In
Procurement of long lead time piece parts that will be used in the repair of the
SFI.
1.3.6 Data (CDRLs)
Data provided through Contract Data Requirements List (CDRLs)
1.3.7 The Contractor shall repair the items specified in Attachment A of this PWS. The work encompasses the disassembly, cleaning, inspection, maintenance, reassembly, ATP troubleshooting and testing and to finishing actions required to return the items to a serviceable condition. The work shall be accomplished IAW documents as specified in Attachment C. In the event that a situation develops where the instructions conflict with the pertinent manual, this PWS shall take precedence. Additional TOs, directives and other publications listed in Attachment C will be used as guidance to support the repair stipulated in this
PWS.
1.3.8 The Contractor shall replace any component parts that do not meet specified inspection requirements, or if there is any doubt as to its serviceability or longevity at the Contractor’s expense. This includes any part requiring replacement due to catastrophic failure, fatigue failure, or normal deterioration.
The Contractor is advised to include the cost of replacing a percentage of each recoverable part in their repair cost proposal.
1.3.9 If the Contractor is not a Government Engineer approved source of repair for a recoverable part, this part shall be replaced with a new part per paragraph PWS or repaired by a Government Engineer approved source. The Contractor may propose their repair procedure along with substantiating documents for evaluation and possible approval for repair of the recoverable part. The Contractor shall submit the request for evaluation to the cognizant engineering office through the PCO for approval. The Government will not be responsible for any costs associated with development of any repair procedures unless it has been negotiated and approved by the PCO.
1.3.10 End Item Identification and Marking:
1.3.10.1 Permanently and legibly mark each repaired end item with the Contractor's identification. This identification shall include the Contractor's CAGE and the date of repair. The identification shall be permanently affixed to the end item by stamp, stencil, or similar means.
1.3.10.2 Item Unique Identification (IUID) will be added to the end item in accordance with the following:
a. Specification requirements for IUID marking will be contained in the, Specific Work Requirements appendix, approved engineering drawing, or a Government provided Engineering Order (EO) (AF Forms 3925, 3926 and 3927) as applicable.
b. IUID markings are required for the end-item only. IUID for subcomponents is only required if specifically identified in the, Specific Work Requirements appendix, approved engineering drawing, or a Government provided EO.
c. For items that do not have IUID marking specifications as stated in paragraph b., the Contractor shall develop the marking specifications in accordance with the current revision of MIL-STD-
130. Location and marking method shall be approved by 424 SCMS engineering before implementation. If the Contractor cannot meet the terms and conditions in the contract for IUID, the Contractor will contact the PCO/ACO for determination.
d. IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Verify 2-D matrix IUID markings are readable per TO 00-25-260. Should IUID marking be rendered unreadable during repair, the Contractor shall notify 424 SCMS engineering and the PCO/ACO for determination of how to replace the IUID mark.
e. The Contractor shall submit the required and applicable contingent data for Legacy items to the IUID Registry per the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_informatio n.html.
f. The Contractor shall submit IUID data for new manufactured items that require IUID based on the DFARS clause 252.211-7003, Item Identification and Valuation, as prescribed in DFARS Subpart 211.274
1.3.11 Quality Acceptance and Processing:
http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html
1.3.11.1 The Contractor shall support quality acceptance inspections of each end item and shall be performed prior to packaging and transportation. Quality acceptance will be performed by DCMA at the repair site. Quality acceptance documentation for each end-item shall be maintained by the Contractor as part of the item document package.
1.3.11.2 Each end item identified shall be delivered to the Government in serviceable condition.
1.3.11.3 Following quality acceptance by the DCMA, the Contractor shall notify the Production Management Specialist (PMS) via email or fax of the completion of repaired end- items. The PMS will provide ship-to addresses/instructions to the Contractor via email or fax for each item produced. Within one business day of shipment, the Contractor shall provide proof of shipment through delivery of an accepted WAWF Receiving Report to the PMS. The Receiving Report shall include the carrier and tracking number.
1.3.12 Shipping Documentation:
1.3.12.1 The Contractor shall insure that the appropriate tag is attached to each serviceable end-item generated.
a. Serviceable tag is DD Form 1574/1574-1 (Yellow).
b. Unserviceable (repairable) tag is DD Form 1577-2/1577-3 (Green).
c. Unserviceable (condemned) tag is DD Form 1577/1577-1 (Red).
1.3.12.2 Shipments under this contract shall be by Commercial Bill of Lading (CBL) by the fastest traceable means.
1.3.12.2.1 The Contractor shall reimburse the Government for packaging and shipping costs for items returned to the contractor for correction of quality deficiencies.
1.4. Reporting Requirements
1.4.1. Data requirements are specified below and in the Contract Data Requirements
List (CDRL DD Form 1423) found in Part 1, Section B, The Schedule of the Basic contract.
Paragraph Description CDRL DID Delivery Schedule
Paragraph 1.7.4 Certification Documents
A012 DI-QCIC-80798B Upon ACO Request
Paragraph 1.10.2 and 1.12.1
Engineering Change Proposal
A004 DI-CMAN-80639C 5 Days After Occurrence
Paragraph 1.10.4 DMSMS Plan A005 DI-MISC-80711A 30 Days ARO
Paragraph 1.10.4 DMSMS Report A013 DI-SESS-81656 Quarterly
Paragraph 1.11.1 Counterfeit Prevention Plan
A011 DI-MISC-81832 30 Days ARO
Paragraph 1.3 Status Reports A007 DI-MGMT-80368A 5 Days After Occurrence
Paragraph 1.4.3 End Item Production and Component Item Consumption
A008 DI-ALSS-81220A Quarterly
Paragraph 1.4.4 Contractor’s Corrective Action Plan
A009 DID 80501 Upon ACO Request
Paragraph 1.4.5 Meetings and Conferences
A010 A002 A006
DI-ADMIN-81249
DI-ADMIN-81373
DI-ADMIN-81250
As Requested
Paragraph 1.4.6 Depot Maintenance Production Report
A001 DI-ALSS-80728A Monthly
1.4.2. In addition, the Contractor shall maintain a document package, in the Contractor’s format, containing the following documentation for each item produced for the contract period:
a. Quality Acceptance Documentation
b. Test Data Sheet
c. Quality Acceptance Review Documentation
d. Parts replaced listed by each serial numbered end item repaired
e. Engineering Change Proposals
f. Government Furnished Material Report
1.4.3 The contractor shall develop and deliver the End Item Production and
Component Item Consumption History Data Report for all Contractor Furnished Material (CFM) DI-ALSS-81220A.
1.4.4 The contractor shall develop and provide a corrective action plan DID “DI-
MGMT-80501.”
1.4.5 Meetings and Conferences
The Contractor shall support meetings (e.g., teleconferences, Program Management Reviews (PMR), Technical Interchange Meetings (TIM), etc.) with the Government. The Contractor shall provide meeting facilities. (DI-ADMN- 81249A, CDRL A003, DI-ADMN-81373, CDRL A004 and DI-ADMN-81250A, CDRL A005)
1.4.6 Depot Maintenance Production
The contractor shall develop and deliver the Depot Maintenance Production repot for CFM. (DI-ALSS-80728A)
1.5. Quality Program and Inspection System Requirements
1.5.1. The Contractor shall establish, document and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be in accordance with the contract requirements.
1.5.2. When a Deficiency Report is received for an end item repaired under the terms of this contract, the Contractor shall comply with the Administrative Contracting Officer’s (ACO) directions. Guidance is provided in Technical Order (TO) 00-35D- 54, USAF Deficiency Reporting, Investigation, and Resolution.
1.5.3. The Contractor shall report any Government Furnished Material (GFM), if applicable, for the work accomplished as outlined in this PWS, that is damaged or otherwise unsuitable for use to the ACO using a Supply Discrepancy Report (SDR), SF Form 364 (formerly, Report of Discrepancy (ROD)) within 30 calendar days of discovery.
1.5.4. The Contractor shall support quality audits as required by the ACO. These audits could require that one or more end items be removed from the production line and subjected to any combination of inspection, testing, disassembly, or assembly, to determine that the standards of performance and technical conformance meet the requirements of this PWS. The Contractor shall be required to correct a deficient process to eliminate the cause(s) of any defects as directed by the ACO before production of the next end item.
1.5.5. The Contractor shall allow quality assurance reviews to be conducted at the site of repair at the request of the Defense Contract Management Agency (DCMA) throughout the contract period.
1.5.6. The Contractor shall allow a quality acceptance review by the DCMA representative at the site of repair for each end item generated under the terms of this contract.
1.5.7. The Contractor shall submit requests for deviation / waiver to the Procurement
Contracting Officer (PCO) through the ACO. Work shall not be initiated on assemblies / components affected by deviation / waiver pending approval / disapproval. Requests shall include the contract number, NSN and P/N of end item and lowest part / assembly affected, effect on cost / price and delivery schedule, description of deviation / waiver, justification for deviation / waiver, and proposed corrective action taken.
1.6. Condemnation Candidates
1.6.1. The Contractor shall report end items determined to be Beyond Economical
Repair (BER) in which the repair cost will exceed 75% of the latest cost amount.
The Contractor shall report condemnation candidates to the PCO through the
ACO within 30 calendar days of discovery. The Contractor shall not condemn reparable or recoverable items without prior approval of the PCO through the ACO. The Contractor shall ensure non-repairable items are demilitarized and disposed according to the Contractor-developed, Government-approved property procedures.
1.6.2. Contractor shall not continue repair of item exceeding Beyound Economical
Repair (BER) until written approval is received from ACO/PCO.
1.6.3. As specified in the Contractor-developed, Government-approved property procedures, the disposition of condemned items will be determined on a case-by-case basis by the ACO.
1.6.4. On units approved to be condemned by the Government, the Contractor is authorized to retain serviceable parts salvaged from the condemned unit. The salvaged parts shall be retained by the Contractor for further use in repair of the same type end item. These parts will not be replenished when used up. The non-useable, scrapped parts shall be condemned IAW the Contractor-developed, Government-approved property procedures.
1.7. Special Tools (ST) and Support Equipment (SE)
1.7.1. The SE required to accomplish the scope of work to be completed on end-items under this contract is contained in the repair procedures listed in Attachment C of this PWS. If the equipment specified in the repair procedures is not designated as Government furnished in this contract, the Contractor shall furnish identical or substitute SE from commercial sources.
1.7.2. If the Contractor intends to substitute SE the Contractor shall demonstrate that substitute SE can be acquired and meets the standards stipulated in the technical data by the following actions:
1.7.2.1. Displaying drawings, schematics, or specifications which illustrate that the Contractor understands the exact nature of the work to be performed and the SE required to perform the tasks.
1.7.2.2. Explaining the capabilities of substitute SE to ensure that it is adequate to perform the specified testing requirements.
1.7.2.3. Defining how substitute SE will be designed, built, and calibrated without assistance from the Government, by an internal engineering capability, or the services of a recognized outside engineering agency.
1.7.3. The Contractor shall show certification documents of all calibrated SE to the ACO prior to work performed as outlined in the PWS.
1.7.4. Support Equipment Calibration Requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the ACO prior to work performed. The Contractor shall ensure SE calibration is maintained throughout performance of this contract. Upon request, the Contractor shall provide certification documents (DI-QCIC-80798B) to the ACO for each SE item as follows:
a. SE part number and serial number
b. Date calibrated
c. Calibration due date
d. Calibration source
e. Calibration procedure used
f. Before and after calibration data
g. Facsimile of the current stamped calibration sticker affixed to SE item
h. Verification of full performance compliance IAW this PWS for SE items not requiring calibration.
i. Traceability to the National Institute of Standards and Technology
1.8. Precious Metals Recovery Program
The handling and control of precious metals shall be IAW AFMAN23-110, USAF Supply Manual.
1.9. Nuclear Hardness Requirement
The Contractor shall establish, document, and maintain nuclear hardness requirement program for the work associated with this PWS. If nuclear hardness requirement is or will be compromised through the work associated with this PWS, the Contractor shall notify the PCO within 15 business days of discovery, not proceed with any additional work, and wait for written instructions from the
PCO.
1.10. Parts Control Program
1.10.1. The Contractor shall establish, document, and maintain a parts control program for the work associated with this PWS. Parts or material used shall be equal to or exceed the original requirements technical data. The current item configuration, as described in the applicable Approved OEM parts list, shall serve as the baseline and Program Parts Selection List (PPSL) for required parts.
1.10.2. The Contractor shall maintain configuration of items worked under the scope of this contract as identified in the applicable end-item or system parts list. The Contractor shall notify the PCO via fax or e-mail of any configuration discrepancies noted between the parts list, engineering drawings, and the current configuration of the end-item. The Contractor shall obtain written authorization from cognizant engineering activity via the PCO for deviations from the parts list prior to implementation for parts that are not Class II changes. The contractors engineering department shall have the authority to prepare and approve Class II engineering change orders and minor deviations as defined by MIL-HDBK-61 concerning workload. The contractor shall submit all AFTO Class I and Class II ECO major and minor deviations to DCMA for concurrence with classifications. Copies of any approved Class II ECOs or minor deviations, shall be forwarded to the PCO through the ACO using contractors internal form in accordance with the contractors internal procedures (DI-CMAN-80639C).
1.10.3. The Contractor shall keep records to allow traceability of the sourcing of replacement parts for each end item repaired and shall be furnished for inspection upon Government request.
1.10.4. Diminishing Manufacturing Sources/Material Shortage and Obsolescence
The Contractor shall report all diminishing manufacturing sources/material shortages and obsolescence issues to the Government. (DI-SESS-81656)
1.10.5 Government-Industry Data Exchange Program (GIDEP). The contractor shall participate in the GIDEP practices described below in accordance with the DOD-wide practices outlined in Topic 26A of the Defense Acquisition Deskbook (DAD).
The contractor shall review GIDEP ALERTs, Problem Advisories, and other GIDEP Failure Experience Reports (FER) for potential impact to hardware both in repair and delivered items. The contractor shall notify the PCO, via telecon within two
(2) working days of discovery, if a FER will negatively impact system performance. For FERs that identify parts or materials that are noncompliant to hardware specifications or drawings but do not affect performance requirements of production items, the contractor shall dispose of them through its internal quality assurance processes. The contractor shall review GIDEP Diminishing Manufacturing Sources and Material Shortages (DMSMS) notices for applicability to the operational hardware being delivered. The contractor shall identify GIDEP related failures and/or material acquisition problems at each Program Management Review (PMR) and Technical Interchange Meeting (TIM). The contractor shall support GIDEP Urgent Data Request (UDR) efforts and, when applicable, take advantage of the Calibration Procedures, Metrology Documents, and Technical Manuals available at no cost to GIDEP participants to reduce overall contract costs.
1.11. Counterfeit Prevention Plan
1.11.1 Counterfeit Prevention Plan (CPP). Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain.
1.11.2 These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) (DI-MISC-81832 and ) and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.
1.12. Cannibalization of Parts
The Contractor shall request authorization from the PCO to cannibalize subassemblies or parts between inducted unserviceable assets in order to expedite repair when a particular repair is constrained for lack of materials that are not, and will not be immediately available. Cannibalization requests will be subject to the review and approval of the Equipment Specialist. Such cannibalization actions will only be considered upon exhaustion of all other sources of materials. The Contractor shall not initiate any cannibalization action unless such action will satisfy all material requirements for the item in question.
The Contractor shall not remove any piece parts from serviceable units. The Contractor shall replace, at the Contractor’s expense, all cannibalized subassemblies with repaired or new subassemblies and replace all cannibalized parts with new parts. The Contractor shall ensure the contract delivery schedule is not negatively affected by the removal of any subassemblies or parts from any inducted end item.
1.13. Lead (Pb) Free Electronics
1.13.1 The use of lead (Pb) solder and/or components/assemblies in the repair of the subject items is considered a potential safety risk as described by the Reduction of Hazardous Substance (ROHS) requirements. Therefore, if lead (Pb) solder and/or components/assemblies are used in the repair of the subject items, the contractor shall ensure the affected items are marked in accordance with IPC J- STD-609, "Marking, Symbols and Labels of Leaded and Lead-Free Terminal Finish Materials Used in Electronic Assembly.”
1.13.2 Mixing of incompatible metals can reduce the reliability and can possibly lead to the formation of Tin-Whiskers in electronic assemblies. Therefore, all touch-up, rework, or repair of printed circuit assemblies shall be performed with the solder and component finish composition used to manufacture the original assembly .
The vendor shall refer to the fabrication drawings to determine the material alloy and rosin type to be used in the repair process. Any deviation requests must be approved by the PCO. The use of Lead Free in lieu of Tin Lead solder is prohibited in the repair process. Use TO 00-25-259 as a guide.
1.14. Ozone Depleting Substances (ODS)
This PWS is not requiring the use of a Class 1 ozone depleting substance (ODS) in the performance of the contract. The Contractor is authorized to use a suitable substitute for any Class 1 ODS which may be required by the specifications or Technical Data of this PWS. The Contractor shall immediately identify the substitute by written notification to the PCO.
1.15. Technical Order Maintenance
1.15.1. The Contractor shall maintain all TOs and other technical directives applicable to the work requirements in an updated and current status according to TO 00-5-1, Technical Order System, and TO 00-5-3, Technical Order Life Cycle Management.
The Contractor shall evaluate the impact of a TO change on costs, schedules, and any other pertinent factors. A written evaluation, along with specific backup data for those changes which impact the Contractor’s performance, shall be provided to the PCO within 10 business days after receipt of updated TO and directives. The Contractor shall not incorporate these TO changes until approved by the PCO.
1.15.2. Commercial repair manuals to be maintained via contractors internal quality system.
1.16 Delivery Schedule
The Contractor shall meet the contractual delivery schedule.
1.17 Customer Service Requirements
1.17.1 Information Requests: The Contractor shall ensure responses to requests for information and data are only provided to customers authorized by the PCO in the performance of official duties. All requests between the Government and the Contractor shall go through the Procuring Contracting Officer (PCO).
1.17.1.1 Information requests shall contain a subject line, nature of the request and an expected/requested response date and time. The request must be identified as “EMERGENCY”, “URGENT” or “ROUTINE” so that a response is provided within the specified timeframes. A log will be maintained by the PCO or an appointed Government Representative.
The log will be used to track all requests and evaluate response times.
1.17.1.2 Contractor requests for engineering and/or technical related problems or issues shall be submitted on an AFMC Form 202, Nonconforming Technical Assistance Request and Reply. All AFMC Form 202s shall be sent directly to 424 SCMS Cognizant Engineer with an information copy to the ACO and PCO.
1.17.2 Response Times for Information Requests: All requests for information initiated by the Government or Contractor shall be in writing and submitted electronically via e-mail or fax. Requests for information shall be answered within the following timeframes:
a. Emergency Respond within two (2) business days.
b. Urgent- Respond within five (5) business days.
c. Routine- Respond within ten (10) business days.
1.18 Safety and Health
1.18.1 While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Contracting Officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two business days, for any damage to government property less than $500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.
1.19 Manpower Reporting Language For Contract Performance Work Statements
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the United States Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.
http://www.ecmra.mil/
*Reporting Period: Contractors are required to input data by 31 October of each year.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
http://www.ecmra.mil/
2 SERVICE SUMMARY
2.1 Service Summary
2.1.1 Contractor performance shall be measured and assessed, using the Performance Requirements listed in Table 2-1. The Contractor service requirements are summarized into performance requirements that relate directly to the mission essential items. The performance threshold requirements describe the minimum acceptable levels of service for each requirement. In the event the performance requirement is not met, the Contractor shall be given time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action in accordance with the performance threshold(s). In cases where the Contractor fails to implement corrective action, the PCO will take appropriate measures.
2.1.2 Service Summary (SS) Requirements: The Contractor shall ensure the performance and threshold requirements are achieved as identified in Table 2-1.
2.1.3 Surveillance Methods: The PMS, DCMA Quality Assurance Representatives (QAR) and PCO will exercise surveillance over the performance requirements. The absence of any contract requirement from the SS shall not detract from this enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall support the PMS, DCMA QAR, and PCO surveillance methods as identified below:
a. Periodic Inspection of Process or Output
b. Random Sampling of Recurring Service Output
c. 100 Percent Inspection of Output
d. Customer Observation or Complaint.
2.1.3.1 The Government will use the methods contained in the Quality
Assurance Surveillance Plan (QASP) to evaluate the Contractor’s performance for the listed program objectives. The PMS, DCMA QAR, and/or PCO will monitor Contractor performance to determine if it meets the contract thresholds as set forth in the performance measures and this PWS.
2.1 SERVICE SUMMARY TABLE
Performance Requirements
PWS
Para
Performance Threshold Requirements
SS-1. All requests for information initiated by the Government or Contractor shall be in writing and submitted electronically via e-mail or fax.
1.17.2 Emergency and– respond within 2 business days
Urgent Requests – respond within 5 business days
Routine Requests – respond within 10 business days
SS-2. Each end-item identified shall be delivered to the Government in serviceable condition.
1.3.11.2
100% of all end items shall be delivered in serviceable condition.
SS-3. Furnish Data requirements that are specified in the Contract Data Requirements List (CDRL DD Form 1423)
1.4.1 100% inspection of data input in CAV AF (Commercial Asset Visibility Air Force) and review of furnished reports.
SS-4. The Contractor shall meet the contractual delivery schedule.
1.16 100% of all end items are returned to the Government IAW the delivery schedule.
SS-5. The Contractor shall report discrepancies incident to shipment.
3.3 100% inspection of GFP
2.1.4 Contractor Performance Evaluation: The Contractor shall understand that the evaluation of performance will occur when the PMS evaluates the service of the Contractor to determine whether or not it meets the performance measures of the contract.
a. SS-1through SS-5: The Contractor's failure to meet the requirement for this item shall result in the possibility of an unsatisfactory or marginal under the Contractor Performance Assessment Review (CPAR).
3 GOVERNMENT PROPERTY
3.1 Government Property
3.1.1 The Contractor shall furnish all material, support equipment, tools, test equipment, and services except as listed below. No Government Furnished Property will be provided other than the units to be repaired. Government Furnished Material will not be provided.
3.2 Disposition of Government Property
3.2.1 These instructions apply to all Government owned property. Within 90 calendar days prior to contract expiration, the Contractor shall submit a letter to the PCO requesting disposition instructions in the transfer of Government furnished property (GFP). A listing identifying GFP shall include the NSN, part number/CAGE, noun, quantity, condition code, and dollar value, and the list shall be submitted through the PCO to the PMS for disposition instructions.
3.2.2 If a follow-on contract is being awarded or, is in the negotiation or solicitation stage, the existing GFP may be retained to the extent required to phase support on the current contract and/or the follow-on contract.
3.2.3 The Contractor shall comply with preservation, packaging, and packing instruction as specified in the basic contract and/or on the AFMC Form 158 (Packaging Requirements).
3.2.4 The Contractor shall comply with the Transportation Data on the DD Form 1653 and Transportation Appropriations Form when returning government property.
3.3 Discrepancies Incident to Shipment:
3.3.1 The Contractor shall report discrepancies incident to shipment which include misidentified items, variations in quantity, non-requisitioned items, lost or damaged parcel post, and items in dubious condition within 5 business days of discovery. The Contractor shall report and resolve the discrepancies using the DoD web-based application WebSDR link located within the CAV AF system described in the CAV AF SOW. This system of reporting a Supply Discrepancy Report (SDR), formerly called a Report of Discrepancy (ROD), has been developed in compliance with DoD regulations 4140.1-R and 4000.25-M Volume 2, which requires automated SDR processing. In those situations where the SDR initiator is unable to gain access to the AF WebSDR, continued use of manual forms (SF Form 364) is permitted. A copy of the form shall be forwarded through the PCO and DCMA QAR activity for corrective action.
3.3.2 Transportation discrepancies and item transaction discrepancies shall be coordinated with the DCMA Property Administrator and ACO within 2 business days upon discovery for corrective action utilizing the AF WebSDR submittal.
3.3.3 The Contractor shall process a SDR (SF Form 364) for contract line items received with missing components (Missing On Induction, (MOI)) within 2 business days upon discovery in accordance with AFJMAN 23-215. An electronic copy of MOI SDR form shall be submitted to the ACO and PCO within 2 business days of discovery.
3.4 Other
3.4.1 The Contractor shall not obtain GFP through the utilization of requisition codes assigned exclusively to this contract for any other contracts.
3.4.2 The Contractor shall not transfer or use GFP charged to this contract to any other contract, Contractor, or activity without the advance approval of the PMS through the PCO.
3.4.3 The Contractor shall replace GFP that has been removed by the USAF to fulfill other more urgent requirements. If any item so removed by the government is still required to complete the contract, the Contractor shall take appropriate action to replace the removed item.
ATTACHMENT A – END ITEMS
END ITEM
RECEIVED AS
END ITEM
TO BE DELIVERED AS
END
ITEM
NO
NATIONAL
STOCK NO(S) PART NO(S)
NATIONAL
STOCK NO(S) PARTS NO(S)
1 6625-01-305-8713 DAA3116P419-305 6625-01-305-8713 DAA3116P419-305
ATTACHMENT B – DEFINITIONS
The following definitions are applicable to this PWS:
a) End Item: An end item is a complete piece of Government equipment as listed in Government supply catalogs and suitable for government storage and issue.
b) Initial Production Evaluation (IPE): An IPE is a planned Government review of early production items and processes to evaluate a Contractor’s capability to complete the work stipulated in the contract and in accordance with (IAW) the technical order (TO), and other guidance stipulated in this PWS.
c) Cannibalization: Authorized removals of a specific assembly, subassembly, or part from one weapon system, system, support system, or equipment end-item for installation on another end-item to meet priority mission requirements with an obligation to replace the removed item.
d) Administrative Contracting Officer (ACO): A contracting officer assigned the responsibility for the post award functions related to the administration of a government contract in the field. The ACO is normally located in the Defense Contract Management Agency (DCMA) office. The ACO is responsible for ensuring the Contractor performs in accordance with the terms of the contract.
e) Procurement Contracting Officer (PCO): The individual authorized to enter into contracts for supplies and services on behalf of the Government by formal advertising or negotiation and who is responsible for overall procurement of the contract.
f) Technical Order (TO): An Air Force publication or Contractors Commercial manual that gives specific technical directives and information with respect to the inspection, storage, operation, modification, and maintenance of given items and equipment or publication prescribing Technical Order maintenance.
g) Support Equipment (SE): All equipment called out in applicable repair instructions required for end item and component test, repair, and / or modification.
h) Serviceable: Capable of meeting the requirements and performing the function for which designed or modified, and meets all test requirements established by the technical order and PWS.
i) Repair: An end item repair is the action taken to return the end item to a serviceable condition by replacing all specific listed or non-performing consumable items and only the damaged recoverable parts that do not meet the TO inspection criteria. Repair consists of end item testing to determine deficiencies, disassembly as required to support maintenance actions required, thorough cleaning, refurbishment or replacement of all disturbed components not meeting inspection criteria, replacement of all soft parts (seal, gaskets, etc.) exposed during repair, re-assembly of assemblies and subassemblies, performance of all adjustments and alignments, test and calibration of subassemblies and end-items and final inspection (e.g., safety wiring, painting, affixing of decals) IAW the applicable TOs and approved test documents to restore the end item to a serviceable condition.
j) Defect: Any nonconformance of a characteristic with specified requirements.
k) Product Quality Deficiency: A defect or nonconforming condition. Included are deficiencies in design, specification, material, manufacturing, and workmanship.
l) Product Quality Deficiency Report: The SF 368 form or format used to record and transmit product quality deficiency data.
m) Consumable Part: Detail item that in itsef is not repairable .
n) Recoverable Part: Parts that are not replaced at every repair event.
ATTACHMENT C – APPLICABLE DOCUMENTS
USAF Technical Orders
TO NUMBER DATE TITLE
00-5-1, Chapters 1-3
On- line version is considered most up-to-date
AF Technical Order System http://www.tinker.af.mil/technicalorders/index.asp
00-5-3 Chapters 1-4
On- line version is considered most up-to-date
Technical Order Life Cycle Management http://www.tinker.af.mil/technicalorders/index.asp
00-35D-54 Chapters 1-4
On- line version is considered most up-to-date
USAF Material Deficiency Reporting and Investigating System http://www.tinker.af.mil/technicalorders/index.asp
00-25-260 On- line version is considered most up-to-date
Asset Marking and Tracking Item Unique Identification (IUID) Marking Procedures http://www.robins.af.mil/library/technicalorders.asp
16G2-3-10-3 On- line version is considered most up-to-date
305-8713OVERHAUL INSTRUCTIONS WITH
ILLUSTRATED PARTS BREAKDOWN
Military Specifications, Standards, Handbooks, and Government Standards
NUMBER DATE TITLE
MIL-STD-130N 16 Nov 2012 Identification Marking of U.S. Military Property
MIL-HDBK-61 7 Feb 2001 Configuration Management Guidance
AS5553 16 Nov 2012 Overarching DOD Counterfeit Prevention Guidance
Industry Publications
NUMBER DATE TITLE
Forms
FORM NUMBER DATE FORM TITLE
SF 364 Feb 1980 Report of Discrepancy (ROD)
SF 368 Jun 2007 Product Quality Deficiency Report (PQDR)
AFMC 158 Apr 2003 Packaging Requirements
AF 3925 Jan 2004 Engineering Order http://www.e-publishing.af.mil/shared/media/epubs/AF3925.XFD
AF 3926 Jan 2004 Engineering Order (Continuation Sheet) http://www.e-publishing.af.mil/shared/media/epubs/AF3926.XFD
AF 3927 Jan 2004 Engineering Order, Parts List Changes http://www.e-publishing.af.mil/shared/media/epubs/AF3927.XFD
AFMC 202 Mar 2006 Non Conforming Technical Assistance Request and Reply
AFMC 807 Apr 2008 Recommended Quality Assurance Provisions and Special Inspection Requirements
DD1574 Oct 1988 Serviceable Tag - Material
DD1574-1 Oct 1966 Serviceable Label - Material
DD1577 Oct 1966 Unserviceable (Condemned) Tag - Materiel
DD1577-1 Oct 1966 Unserviceable (Condemned) Label - Materiel
DD1577-2 Oct 1966 Unserviceable (Repairable) Tag - Materiel
DD1577-3 Oct 1966 Unserviceable (Repairable) Label - Materiel
DD1653 Apr 1999 Transportation Data for Solicitations
Other Publications for Information Purposes Only Note: These publications are for information purposes only.
Air Force Manuals
NUMBERS DATE TITLE
AFMAN 23-101
On- line version is considered most up-to-date
Air Force Material Management http://www.e-publishing.af.mil/shared/media/epubs/afman23- 101.pdf
AFJMAN 23-215 On- line version is considered most up-to-date
Reporting of Supply Discrepancies http://www.e-publishing.af.mil/shared/media/epubs/AFJMAN23- 215.pdf
File details come from the government source that posted it. Updated .