Engineering_Change_Proposal.pdf

PDF 11 KB Posted

Attached to
Repair of Shaft Failure Indicator
Solicitation number
FA8119-15-R-0001
Issued by

About this file

Engineering Change Proposal

View the file

Other files

File Type Posted
SFI_J&A_Redacted.pdf PDF
FA811915R0001_amendment_0002.pdf PDF
MEETINGS_AND_CONFERENCES_2.pdf PDF
CONTRACTORS_CORRECTIVE_ACTION_PLAN.pdf PDF
FA811915R0001.pdf PDF
CDRL_Report.pdf PDF
Package_Requirement_Report.pdf PDF
CONFERENCE_MINUTES.pdf PDF
MEETINGS_AND_CONFERENCE_1.pdf PDF
END_ITEM_PROD_AND_COMP_ITEM_CONSUM.pdf PDF
Wage_Determination.pdf PDF
Transport_Data_Report.pdf PDF
Calibration_Certificate.pdf PDF
Counterfiet_Prevention_Plan.pdf PDF
SOW_CAVAF_CFM.pdf PDF
Status_Report.pdf PDF
Depot_Maint_Production_Report_DI-ALSS-80728A.pdf PDF
PWS_29DEC2014.pdf PDF
CAV_AF_DID_81634B 1 .pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: ENGINEERING CHANGE PROPOSAL (ECP)

Number: DI-CMAN-80639C Approval Date: 20000930 AMSC Number: D7388 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: D/DUSD(AT&L)SE Applicable Forms: N/A

Use, Relationships: An Engineering Change Proposal (ECP) provides the documentation in which the engineering change is described. It includes change impacts to systems, configuration items and other associated configuration documentation affected by the proposed change. In addition, it typically describes how the proposed change will be implemented along with providing estimated schedules and associated costs.

This Data Item Description (DID) contains the format, content and preparation instructions for the data product resulting from the work task specified in the contract. This DID is used in conjunction with a Notice of Revision (NOR) (DI-CMAN-80642B). A requirement for NORs should be contractually imposed in conjunction with this DID.

Data Item submittal in Extensible Markup Language (XML) is acceptable. An XML

Document Type Definition (DTD), associated XML document template, and other information is available from http://www.geia.org/836/

This DID supersedes DI-CMAN-80639B.

Requirements:

1. Reference documents. The applicable issue of any documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format and content. The Engineering Change Proposal (ECP) shall be prepared in contractor format. . The ECP content shall include, where applicable, the following information:

a. the change priority, change classification, and change justification

b. a complete description of the change to be made and the need for that change

c. complete listing of other configuration items impacted by the proposed change and a description of the impact on those CIs.

d. proposed changes to documents controlled by the government.

e. proposed serial (or lot) number effectivities of units to be produced in, or retrofitted to, the proposed configuration.

f. recommendation about the way a retrofit should be accomplished.

g. impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by government personnel in support of the product.

h. impacts to the operational use of the product

i. complete estimated life-cycle cost impact of the proposed change

j. milestones relating to the processing and implementation of the engineering change

DI-CMAN-80639C

The following references may be useful in defining content: MIL-HDBK-61, Configuration Management Guidance (paragraph 4.2 and Table 4-6) and ANSI/EIA-649-1998, National Consensus Standard for Configuration Management (paragraph 5.3.1).

END OF DI-CMAN-80639C.

File details come from the government source that posted it. Updated .