Project Clarifications Continued

View the file

Other files for this federal contract opportunity

Other files attached to Tree Removal (Invasive Species), newest first.
File Type Posted
Amendment 0002.doc DOC document
Amendment 0001.doc DOC document
Post-Site Visit Clarifications.doc DOC document
PWS Revised 08.12.2011.docx DOCX document
MGT_IS_Exhibit 1.jpg JPG image
SiteVisitRegistrationForm.doc DOC document
Notice of Site Visit.doc DOC document
MGT_IS_Exhibit 3 Safety Spec.docx DOCX document
MGT_IS_Exhibit2.jpg JPG image
PWS.docx DOCX document
WD 05-2431.txt TXT text file
Combined Synopsis Solicitation Invasive Species.doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Clarifications, Continued Question 1: Of the approximate 11,000 trees to be removed what is the average DBH and species?

Answer 1: See table in Para 1.8 of PWS for DBH info. As shown in the table, the majority of trees are under 8" DBH. For trees over 8" DBH, the average DBH is about 10". The species are noted in the supplemental table below:

Area
Lacebark Elm
Siberian Elm
Austrian Pine
Callery Pear
Amur Maple
Total Non-native Trees
Individuals over 8” Caliper (%)
Multiflora Rose
Morrow’s Bush Honeysuckle
A (Reserve 1 West)
515
95
0
0
0
610
102 (16.7%)
2
100
B-C (Reserve 1 East)
5830
0
0
0
0
5830
140 (2.4%)
3
600
D-E (north of fence)
275
135
0
1
0
411
20 (4.9%)
4
75
F (south of fence)
1475
0
0
2
0
1477
7 (0.5%)
0
25
G-H (east of Redbud pond)
440
0
0
0
0
440
17 (3.9%)
1
0
I (Section north of Pavilion)
875
0
2
18
2
897
5 (0.6%)
3
0
J (Shoreline)
1230
0
0
1
0
1231
1 (0.008%)
0
0
K (between ponds)
370
0
0
0
0
370
46 (12.4%)
0
0
L (golf course)
0
775
0
2
0
777
TOTAL
11,010
1005
2
24
2
12,043
338 (2.8%)
0
0

Question 2: Of the 800 bushes what is the average size (Ht) and species?

Answer 2: Average height of bushes is 5-6'.

Question 3: Does billing in arrears mean one bill for the entire project or monthly?

Answer 3: If the work is carried over into more than one month, then billing should be per month in arrears of service through WAWF. If the work is completed in one month, one bill will suffice.