Amendment03_J-4 IAC_BCO_Cost_Price_Model.xlsx
XLSX spreadsheet 270 KB Posted
- Attached to
- DoD Information Analysis Center (DoD IAC) Basic Center of Operations (BCO) Federal contract opportunity
- Solicitation number
- FA8075-20-R-0001
About this file
This request for proposal is for the Department of Defense Information Analysis Center Basic Center of Operations contract. It is a 100% small business set-aside soliciting proposals to provide information analysis services, including collecting and uploading research to a repository, conducting research and analysis, and disseminating technical information products and training. Interested parties must submit any questions by November 26, 2019, and proposals will be evaluated based on technical approach, past performance, and price. The incumbent contractors are to continue work until a new award is made. The total value of the contract is not specified but will include various cost-plus and firm-fixed-price line items over multiple years.
View the file
Other files for this federal contract opportunity
Show all 50
DoD Information Analysis Center (DoD IAC) Basic Center of Operations (BCO) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Directions
| DIRECTIONS FOR | ||
| RFP FA8075-20-R-0001 | ||
| IAC BCO Cost/Pricing Model, Dated: 05 Dec 2019 | ||
| Assumptions: | ||
| 1. | The Fringe Benefit allocation base is total direct labor dollars. | |
| 2. | The Labor Overhead allocation base is total direct labor dollars PLUS associated fringe benefit. | |
| 3. | The G&A allocation base is total cost input. | |
| 4. | Facilities Capital Cost of Money (FCCoM) could be incorporated under Other Loading Factors in TAB Loading Factors. Submit DD 1861. | |
| 5. | Overtime for exempt personnel is based on a total time accounting concept. (Annual salary divided by total hours worked equals the hourly rate.) | |
| 6. | Overtime for labor category rates is 1.5 times the straight time rate. | |
| 7. | The Government will rely on Offerors to tell us in the "Loading Factors" TAB what their annual full time equivalent (FTE) is per year. | |
| 8. | Fixed Fee is not applied to FCCoM, ODCs Travel and Materials/Equipment/Software | |
| 9. | Client site refers to work done at Government facilities. | |
| 10. | All Cost/Price submissions will make the assumption that the contract start date will be 1 July 2020. In order to evaluate all Offerors fairly. | |
| 11. | Projected Full Time Equivalents (FTE) profile for each of the BCOs is estimated to be 12 FTEs per BCO per year; Reminder that is based on your FTE rate supplied on the Loading Factors Tab | |
| Directions for PRIME: | ||
| 1. | Primes should delete TABs SUB Labor Prime Fills in, Prime ODC and Grand Total before sending this Cost Model to their Subcontractors. | |
| 2. | Primes shall manually fill in TAB SUB Labor Prime Fills in, for their Sub(s) labor category, hours and rate and type of contract. (Use dropdown menu) | |
| 3. | Primes shall manually fill in TAB BOE Yr2. The BOE Yr2 TAB is for year 2 of the Base year only and will have both the Prime and any Subs hours. | |
| 4. | Primes must incorporate any Subcontract ODC inputs, TAB SUB ODC, by either inserting their Subcontractor's TAB SUB ODC or by cutting | |
| and pasting each Subcontractor's TAB SUB ODC information into the TAB SUB ODC. If inserting a TAB ensure each one has the Sub's name. | ||
| 5. | Primes must manually input their Subcontractor ODC Travel & Material/Equipment/Software costs if any into the TAB Grand Total. | |
| Directions for both PRIME & SUB(s): | ||
| 1. | If assumptions are valid, fill in only those cells that are highlighted in yellow, beginning with your company name at the top of Loading Factors TAB. | |
| 2. | If assumptions are not valid, modify appropriate loaded rates in the Loading Factors TAB, and if needed through out the TABs, Identify changes by | |
| highlighting (shading) the cells with changed formulas in Green and describe the changes as well as the reasons for those changes in the space | ||
| provided at the bottom of the Loading Factors TAB. | ||
| 3. | Complete Loaded Rates TAB. Once you input the Labor Categories the corresponding number in Column A for Contracctor Site and the corresponding | |
| Alpha character for Client Site will automatically populate in Column A of TAB Labor Hrs & Cost. Once you have filled in your corresponding number | ||
| or alpha character into TAB Labor Hrs & Cost, it will automatically populate the Labor Category and associated rates. | ||
| 4. | The total labor rate costs will automatically be adjusted based on inputs in the Loading Factors TAB and the Loaded Rates TAB. | |
| 5. | Offerors who will incur Additional ODCs such as computer usage, reproduction costs, etc. in performance of this contract are required to identify and cost | |
| those Additional ODCs in TAB Prime ODC for the Primes and the TAB SUB ODC for the Subcontractors. Describe basis and costing methodology in | ||
| in the Cost Volume narrative for each such element of Additional ODCs. | ||
| 6. | Complete the BLUE TAB Benefit Summary for the employee compensation plan. Completion of this TAB is mandatory and satisfies the | |
| requirement for the 52.222-46 clause for Employee Compensation Plan. No additional information is required, but supplementary data may be provided. | ||
| 7. | Shall have no more than two rounding places. We understand minor rounding errors. (All amounts in Grand Total TAB shall be to the nearest whole dollar.) | |
| 8. | If applicable provide your proprietary statement in the footer of each TAB. | |
| 9. | Subcontractors must submit a cost proposal if they have a Basis Of Estimate of 10% or more of the Prime contractors total proposed cost. | |
| 10. | ** The Cost Model spreadsheet is a tool provided by the Government to establish uniformity in Offeror's proposals. Offerors are solely responsible for the accuracy of all prices and costs proposed and annotated in the Cost Model spreadsheet.** | |
| Directions for SUBs: | ||
| 1 | Subcontractors must submit to AFICC/KVD DTIC IAC Contracting the following TABs Loading Factors, Loaded Rates, Labor Hrs & Cost, Sub ODC (if any), | |
| Benefit Summary. (Only if Subs have a Basis of Estimate of 10%; or more of the Prime contractors total proposed costs) | ||
| 2 | Subcontractors shall submit to their Primes the TAB Labor Hrs & Cost so the Primes can input the data into the TAB called SUB Labor Prime Fills in | |
| and subcontractors shall submit to Primes the TAB SUB ODC if they have any. |
| Helpful Hints and Reminders: | |||
| 1. | By inserting or deleting new rows or columns in the middle of ranges, the applicable formulas and references for computational cells can be input using the | ||
| "click and drag" technique, and should not affect the totals. Remember to post any changes to the COST/PRICE MODEL in the Loading Factors TAB. | |||
| 2. | Use the checklist provided below to ensure your proposal is complete. | ||
| 3. | NOTE: THAT CLIN 0004 is for STOs and is a set Dollar Amount of $60M. | ||
| ] | |||
| Pricing Model Checklist | √ | Have the following been completed? | |
| Note: that the PWS 1.5.2.4 Extended Technical Inquiry rate is automatically calculated for you on the Grand Total Page based on your average hourly rate with fee. | |||
| Subs were sent the Pricing Model with just these TABs: Directions, Loading Factors, Loaded Rates, Labor Hrs & Cost, Sub ODC, & Benefit Summary | |||
| Prime / Sub company name are entered on the Loading Factors TAB. (Company names automatically populate to the rest of the TABs) | |||
| Input your Indirect rates into the Loading Factors TAB. | |||
| If the pricing model formulas for applying the indirect rates are not consistent with company accounting practices, | |||
| the appropriate formulas have been modified, | |||
| the changed cells are highlighted in Green, and | |||
| the changes are explained at the bottom of the Loading Factors TAB. | |||
| Listed cognizant DCAA and DCMA representative on the Loading Factors TAB. | |||
| If rates/categories differ from the model, the differences are explained at the bottom of the Loading Factors TAB or attach another TAB with explanations. | |||
| Base year direct salary or labor rates are entered on the Loaded Rates TAB. | |||
| Prime has manually filled in the SUB Labor Prime Fills in TAB with each one of the Subcontractor's Labor Categories, Hours & Rate. | |||
| Prime has filled in the Prime ODC TAB with their Travel and Material/Equipment/Software ODCs. | |||
| Subcontractor names are provided on the SUB ODC TAB. | |||
| Prime has manually input Subcontractor names and amounts on the Grand Total TAB for their associated ODC costs. | |||
| If applicable, supporting information for Additional ODCs are provided in the Cost Volume Narrative. | |||
| Supporting information for direct and indirect rates is provided in the Cost Volume narrative. | |||
| Benefits Summary TAB completed. |
&11FA8075-12-R-0004, Section J, Attachment, TAB Directions
Use or disclosure of data contained on this sheet is subject to the restrictions on the title page of this proposal.
Loading Factors
| Prime Name: | Prime | ||||||
| Subcontractor Name: | Subcontractor | ||||||
| HDIAC BCO | BASE | BASE | Option 1 | Option 1 | Option 2 | Option 2 | 6 Month |
| LOADING FACTORS: | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Extension |
| Labor Escalation | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Fringe | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Overhead-Contractor Site | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Overhead-Client (Government) Site | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| G&A Rate | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Other Loading Factors (Like FCCOM, etc) | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Material & Handeling (Burden on ODC &/or Subs) | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Fee on Sub Labor (Prime Only) | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Fixed Fee | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Annual salary is divided by 2080* | 2080 | 2080 | 2080 | 2080 | 2080 | 2080 | 2080 |
| Wrap Rate W/O fee Contractor Site (Auto calculated) | - | - | - | - | - | - | - |
| Wrap Rate W/O fee Client Site (Auto calculated) | - | - | - | - | - | - | - |
| *All offerors will use 2080 unless they have identified Uncompensated Overtime. (See FAR 52.237-10) | |||||||
| YES | NO | ||||||
| Do you have a Forward Pricing Rate Agreement? | |||||||
| Do you have a DCAA deemed adequate accting system for Cost contracts? | |||||||
| Identify your Full Time Equivalent (FTE) hours. | |||||||
| Subcontractor identify the type of contract you have with the Prime? | Drop Down Menu |
| List your Cognizant DCAA and DCMA Representative or Branch: |
| The DCAA office listed below will be the same office the offeror sent their cost proposal to |
| Helpful note: Utilize the DCAA website to locate your audit branch number at http://www.dcaa.mil/ |
| The DCAA branch listed below will be the same office the offeror sent their cost proposal to |
| Name & or Branch (If Branch, include Branch #): |
| Address: |
| Phone Number & Fax Number: | Phone: | Fax: |
| e-mail *: | ||
| * Most email for DCAA is first name, a period, Last Name, @dcaa.mil OR dcaa-fao, Last 4 of the branch number, @dcaa.mil | ||
| example: stanley.stearns@dcaa.mil OR dcaa-fao1621@dcaa.mil | ||
| Defense Contract Management Agency (DCMA) Cognizant office: | ||
| Name & or Location: | ||
| Address: |
| Phone Number & Fax Number | Phone: | Fax: |
| e-mail *: |
CONTRACTOR CHANGES TO COST/PRICE MODEL:
&11FA8075-12-R-0004, Section J, Attachment, TAB Loading Factors
Use or disclosure of data contained on this sheet is subject to the restrictions on the title page of this proposal.
mailto:Connie.Christ@dcaa.milmailto:Gayle.Whittington@dcma.mil Loaded Rates
| Prime Name: | Prime | |||||||||||||||||||||||||||||||||||||||||||
| Subcontractor Name: | Subcontractor | |||||||||||||||||||||||||||||||||||||||||||
| LOADED RATES | ||||||||||||||||||||||||||||||||||||||||||||
| BASE YEAR (2 YEARS) | BASE YEAR (2YEARS) | OPTION 1 (2 YEARS) | OPTION 1 (2 YEARS) | OPTION 2 (2 YEARS) | OPTION 2 (2 YEARS) | 6 MONTH EXTENSION | ||||||||||||||||||||||||||||||||||||||
| Overhead-Contractor Site | Base Year 1 Rates (Assumed Start 1 July 2020) | Base Year Year 2 | Option 1 Year 3 | Option 1 Year 4 | Option 2 Year 5 | Option 2 Year 6 | 6 Month Extension | |||||||||||||||||||||||||||||||||||||
| Direct | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | |||
| # | Labor Category | Salary of Labor Cat |
Stanley.Stearns: Stanley.Stearns:
| If you you don't have the annual salary but want to propose a Direct Labor Rate with no Salary, this worksheet allows for that. | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | |||||||
| 1 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 2 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 3 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 4 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 5 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 6 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 7 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 8 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 9 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 10 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 11 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 12 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 13 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 14 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 15 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 16 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 17 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 18 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 19 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 20 | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Overhead-Client (Government) Site | Base Year 1 Rates (Assumed Start 1 July 2020) | Base Year Year 2 | Option 1 Year 3 | Option 1 Year 4 | Option 2 Year 5 | Option 2 Year 6 | 6 Month Extension | ||||||||||||||||||||||||||||||||||||
| Direct | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | Labor | Fringe | OH | G&A | Other | Total | ||
| Labor Category | Salary of Labor Cat |
Stanley.Stearns: Stanley.Stearns:
If you you don't have the annual salary but want to propose a Direct Labor Rate with no Salary, this worksheet allows for that.
Stanley.Stearns: Stanley.Stearns:
| If you you don't have the annual salary but want to propose a Direct Labor Rate with no Salary, this worksheet allows for that. | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | Rate | Cost | Cost | Cost | Cost | Cost | |||||||
| A | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| B | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| C | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| D | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| E | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| F | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| G | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| H | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| I | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| J | $ - 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
&12FA8075-12-R-0004, Section J, Attachment, TAB Loaded Rates
&"Times New Roman,Regular"
Use or disclosure of data contained on this sheet is subject to the restrictions on the title page of this proposal.
&"Times New Roman,Regular"&P / &N
Labor Hrs & Cost
| Prime Name: | Prime | |||||
| CLIN: 0001/0002/0003 | Sub Name: | Subcontractor | ||||
| Phase-In Transition(s) 90 Days | CLIN 0001, 0002, 0003, X004, & 6001-6006 LABOR HOUR & COST BREAKDOWN | |||||
| Note: You have to ensure that in Column A of this TAB matches the corresponding number or alpha character you want that is associated with the Labor Category you input in the "Loaded Rates" TAB. | ||||||
| CLIN 0001 Phase-In Transition | CLIN 0002 (HD) Phase-In Transition | CLIN 0003 (CS) Phase-In Transition |
Stanley.Stearns: Stanley.Stearns:
| Input the corresponding number or alpha charater that matches the labor category that was input in TAB "Loaded Rates By Labor Cat" that you want for this CLIN or TASK | Labor Category Contractor Site | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | ||||||||||||
| 1 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 2 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 3 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 4 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 5 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 6 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 7 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 8 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 9 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 10 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 11 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 12 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 13 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 14 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| 15 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| Labor Category IAC Site or Govt Site | ||||||||||||||||||||||
| A | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| B | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| C | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| D | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| E | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| F | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| G | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| H | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| I | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| J | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||
| CLIN Subtotal | 0 | ERROR:#DIV/0! | 0.00 | 0 | ERROR:#DIV/0! | 0.00 | 0 | ERROR:#DIV/0! | 0.00 | |||||||||||||
| CLIN 0001 TOTAL | CLIN 0002 TOTAL | CLIN 0003 TOTAL | ||||||||||||||||||||
| HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | |||||
| CUMULATIVE CLIN Totals | 0 | ERROR:#DIV/0! | 0.00 | 0 | ERROR:#DIV/0! | $0 | 0 | ERROR:#DIV/0! | $0 | 0 | ERROR:#DIV/0! | $0 | 0 | ERROR:#DIV/0! | $0 | 0 | ERROR:#DIV/0! | $0 |
| CLIN: X004 & 6001-6006 | ||||||||||||||||||||||
| Basic Center Operations | ||||||||||||||||||||||
| Task 1.5.1 | CLIN 0004 BCO - BASE PERIOD | CLIN 0004 BCO - BASE PERIOD | CLIN 1004 BCO - OPTION 1 | CLIN 1004 BCO - OPTION 1 | CLIN 2004 BCO - OPTION 2 | CLIN 2004 BCO - OPTION 2 | CLIN 6001-6006 6 MONTHs | |||||||||||||||
| Collection and Upload to R&E Gateway | Base Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | 6 Month Extension | |||||||||||||||
| Labor Category Contractor Site | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | |
| 1 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 2 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 3 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 4 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 5 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 6 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 7 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 8 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 9 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 10 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 11 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 12 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 13 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 14 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 15 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| Labor Category IAC Site or Govt Site | ||||||||||||||||||||||
| A | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| B | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| C | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| D | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| E | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| F | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| G | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| H | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| I | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| J | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| Subtotal Task 1.5.1 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | ||||||||
| Subtotal by Base & Options | 0 | BASE | $ - 0 | 0 | BASE | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | 6Mths | $ - 0 |
| Task 1.5.2 | CLIN 0004 BCO - BASE PERIOD | CLIN 0004 BCO - BASE PERIOD | CLIN 1004 BCO - OPTION 1 | CLIN 1004 BCO - OPTION 1 | CLIN 2004 BCO - OPTION 2 | CLIN 2004 BCO - OPTION 2 | CLIN 6001-6006 6 MONTHs | |||||||||||||||
| Research, Analysis, and Synthesis | Base Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | 6 Month Extension | |||||||||||||||
| Labor Category Contractor Site | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | |
| 1 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 2 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 3 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 4 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 5 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 6 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 7 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 8 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 9 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 10 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 11 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 12 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 13 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 14 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 15 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| Labor Category IAC Site or Govt Site | ||||||||||||||||||||||
| A | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| B | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| C | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| D | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| E | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| F | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| G | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| H | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| I | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| J | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| Subtotal Task 1.5.2 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | ||||||||
| Subtotal by Base & Options | 0 | BASE | $ - 0 | 0 | BASE | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | 6Mths | $ - 0 |
| Task 1.5.3 | CLIN 0004 BCO - BASE PERIOD | CLIN 0004 BCO - BASE PERIOD | CLIN 1004 BCO - OPTION 1 | CLIN 1004 BCO - OPTION 1 | CLIN 2004 BCO - OPTION 2 | CLIN 2004 BCO - OPTION 2 | CLIN 6001-6006 6 MONTHs | |||||||||||||||
| Dissemination (STI, Technical Information Products, Training, and Awareness) | Base Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | 6 Month Extension | |||||||||||||||
| Labor Category Contractor Site | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | |
| 1 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 2 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 3 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 4 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 5 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 6 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 7 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 8 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 9 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 10 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 11 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 12 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 13 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 14 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 15 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| Labor Category IAC Site or Govt Site | ||||||||||||||||||||||
| A | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| B | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| C | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| D | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| E | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| F | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| G | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| H | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| I | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| J | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| Subtotal Task 1.5.3 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | ||||||||
| Subtotal by Base & Options | 0 | BASE | $ - 0 | 0 | BASE | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | 6Mths | $ - 0 |
| Task 1.5.4 | CLIN 0004 BCO - BASE PERIOD | CLIN 0004 BCO - BASE PERIOD | CLIN 1004 BCO - OPTION 1 | CLIN 1004 BCO - OPTION 1 | CLIN 2004 BCO - OPTION 2 | CLIN 2004 BCO - OPTION 2 | CLIN 6001-6006 6 MONTHs | |||||||||||||||
| Program Management, Administration, and Compliance | Base Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | 6 Month Extension | |||||||||||||||
| Labor Category Contractor Site | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | |
| 1 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 2 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 3 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 4 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 5 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 6 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 7 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 8 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 9 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 10 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 11 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 12 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 13 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 14 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 15 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| Labor Category IAC Site or Govt Site | ||||||||||||||||||||||
| A | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| B | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| C | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| D | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| E | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| F | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| G | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| H | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| I | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| J | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| Subtotal Task 1.5.4 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | ||||||||
| Subtotal by Base & Options | 0 | BASE | $ - 0 | 0 | BASE | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | 6Mths | $ - 0 | |
| CLIN 0004 TOTAL | CLIN 0004 TOTAL | CLIN 1004 TOTAL | CLIN 1004 TOTAL | CLIN 2004 TOTAL | CLIN 2004 TOTAL | CLINs 6001-6006 TOTAL | ||||||||||||||||
| HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | ||
| CLIN X0004/6001-6006 Subtotal by Year | 0 | ERROR:#DIV/0! | $0 | 0 | ERROR:#DIV/0! | $0 | 0 | ERROR:#DIV/0! | $0 | 0 | ERROR:#DIV/0! | $0 | 0 | ERROR:#DIV/0! | $0 | 0 | ERROR:#DIV/0! | $0 | 0 | ERROR:#DIV/0! | $0 | |
| CLIN Total: Base & Opts | 0 | ERROR:#DIV/0! | $0 |
CLIN Cumulative Totals 0 ERROR:#DIV/0! $0 0 ERROR:#DIV/0! $0 0 ERROR:#DIV/0! $0 0 ERROR:#DIV/0! $0 0 ERROR:#DIV/0! $0 0 ERROR:#DIV/0! $0 0 ERROR:#DIV/0! $0
&"Times New Roman,Bold"&12FA8075-12-R-0004, Section J, Attachment, TAB Labor Hrs & Cost
&"Times New Roman,Bold"&14&A
Use or disclosure of data contained on this sheet is subject to the restrictions on the title page of this proposal.
&"Times New Roman,Regular"&P / &N
SUB Labor Prime Fills in
| PRIME NAME: | Prime | ||||||||||||||||||||||
| THIS TAB IS FILLED IN BY PRIME | LABOR HOUR & COST BREAKDOWN BY SUB | ||||||||||||||||||||||
| CLINs: 0001/0002/0003 | NOTE: Primes will fill this Tab out. You can add rows to the spreadsheet or delete them. However, Don't delete any Sub Totals or total rows. The Primes and Subs will fill out the TAB called "Labor Hrs & Cost". The subs will send this TAB to the Primes and the Primes will | ||||||||||||||||||||||
| Phase-In Transition | use that TAB to fill in this TAB. Primes fill in the Labor Categories, hours, and rates. Primes start with the 1st Labor Category for the 1st Sub you have in cell A6 and so on. The TAB "Grand Total" will include the burdens that you listed in the "Loading Factors" TAB. | ||||||||||||||||||||||
| CLIN 0001 (DS) Phase-In Transition | CLIN 0002 (HD) Phase-In Transition | CLIN 0003 (CS) Phase-In Transition | IDENTIFY THE TYPE OF CONTRACT THE PRIME | ||||||||||||||||||||
| Labor Category | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | HAS WITH EACH SUBCONTRACTOR: | |||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | Type of Contract | ||||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | Subcontractor Name | with Prime | |||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | SUBCONTRACTOR NAME | Drop Down Menu | |||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | SUBCONTRACTOR NAME | Drop Down Menu | |||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | SUBCONTRACTOR NAME | Drop Down Menu | |||||||||||||
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | SUBCONTRACTOR NAME | Drop Down Menu | |||||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | Drop Down Menu | ||||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | Drop Down Menu | ||||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||||
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |||||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | TOTAL BY SUB CLIN 0001 | ||||||||||||||
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | Hours | Cost | |||||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 1st Sub | 0.00 | 0.00 | ||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 2nd Sub | 0.00 | 0.00 | ||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 3rd Sub | 0.00 | 0.00 | ||||||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 4th Sub | 0.00 | 0.00 | ||||||||||||
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 5th Sub | 0.00 | 0.00 | ||||||||||||||
| CLIN Subtotal | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||
| CLIN 0001 TOTAL | CLIN 0002 TOTAL | CLIN 0003 TOTAL | |||||||||||||||||||||
| HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | ||||||
| CUMULATIVE CLIN Totals | 0 | ERROR:#DIV/0! | 0.00 | 0 | ERROR:#DIV/0! | 0 | 0 | ERROR:#DIV/0! | 0 | 0 | ERROR:#DIV/0! | 0 | 0 | ERROR:#DIV/0! | 0 | 0 | ERROR:#DIV/0! | 0 |
| CLIN: X004 & 6001-6006 | |||||||||||||||||||||
| Basic Center Operations | |||||||||||||||||||||
| Task 1.5.1 | CLIN 0004 BCO - BASE PERIOD | CLIN 0004 BCO - BASE PERIOD | CLIN 1004 BCO - OPTION 1 | CLIN 1004 BCO - OPTION 1 | CLIN 2004 BCO - OPTION 4 | CLIN 2004 BCO - OPTION 4 | CLIN 6001-6006 6 MONTHs | ||||||||||||||
| Collection and Upload to R&E Gateway | Base Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | 6 Month Extension | ||||||||||||||
| Labor Category | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Subtotal Task 1.5.1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Subtotal by Base & Options | 0 | BASE | $ - 0 | 0 | BASE | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | 6Mths | $ - 0 |
| Task 1.5.2 | CLIN 0004 BCO - BASE PERIOD | CLIN 0004 BCO - BASE PERIOD | CLIN 1004 BCO - OPTION 1 | CLIN 1004 BCO - OPTION 1 | CLIN 2004 BCO - OPTION 4 | CLIN 2004 BCO - OPTION 4 | CLIN 6001-6006 6 MONTHs | ||||||||||||||
| Research, Analysis, and Synthesis | Base Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | 6 Month Extension | ||||||||||||||
| Labor Category | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Subtotal Task 1.5.2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Subtotal by Base & Options | 0 | BASE | $ - 0 | 0 | BASE | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | 6Mths | $ - 0 |
| Task 1.5.3 | CLIN 0004 BCO - BASE PERIOD | CLIN 0004 BCO - BASE PERIOD | CLIN 1004 BCO - OPTION 1 | CLIN 1004 BCO - OPTION 1 | CLIN 2004 BCO - OPTION 4 | CLIN 2004 BCO - OPTION 4 | CLIN 6001-6006 6 MONTHs | |||||||||||||||
| Dissemination (STI, Technical Information Products, Training, and Awareness) | Base Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | 6 Month Extension | |||||||||||||||
| Labor Category | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | ||
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||
| Subtotal Task 1.5.3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||
| Subtotal by Base & Options | 0 | BASE | $ - 0 | 0 | BASE | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | 6Mths | $ - 0 |
| Task 1.5.4 | CLIN 0004 BCO - BASE PERIOD | CLIN 0004 BCO - BASE PERIOD | CLIN 1004 BCO - OPTION 1 | CLIN 1004 BCO - OPTION 1 | CLIN 2004 BCO - OPTION 4 | CLIN 2004 BCO - OPTION 4 | CLIN 6001-6006 6 MONTHs | ||||||||||||||
| Program Management, Administration, and Compliance | Base Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | 6 Month Extension | ||||||||||||||
| Labor Category | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | |
| SUBCONTRACTOR NAME | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Subtotal Task 1.5.4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Subtotal by Base & Options | 0 | BASE | $ - 0 | 0 | BASE | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 1 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | Opt 2 | $ - 0 | 0 | 6Mths | $ - 0 |
| CLIN 0004 TOTAL | CLIN 0004 TOTAL | CLIN 1004 TOTAL | CLIN 1004 TOTAL | CLIN 2004 TOTAL | CLIN 2004 TOTAL | CLIN 6001-6005 TOTAL | |||||||||||||||
| HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | HOURS | FTE | COST | |
| CLIN X0004/6001-6006 Subtotal by Year | 0 | ERROR:#DIV/0! | 0 | 0 | ERROR:#DIV/0! | 0 | 0 | ERROR:#DIV/0! | 0 | 0 | ERROR:#DIV/0! | 0 | 0 | ERROR:#DIV/0! | 0 | 0 | ERROR:#DIV/0! | 0 | 0 | ERROR:#DIV/0! | 0 |
| CLIN Total: Base & Opts | 0 | ERROR:#DIV/0! | 0 |
CLIN Cumulative Totals 0 ERROR:#DIV/0! 0 0 ERROR:#DIV/0! 0 0 ERROR:#DIV/0! 0 0 ERROR:#DIV/0! 0 0 ERROR:#DIV/0! 0 0 ERROR:#DIV/0! 0 0 ERROR:#DIV/0! 0
&"Times New Roman,Bold"&12FA8075-12-R-0004, Section J, Attachment, Sub Labor Prime Fills in
Use or disclosure of data contained on this sheet is subject to the restrictions on the title page of this proposal. &"Times New Roman,Regular"&P / &N
BOE Option 01
| Prime Name: | Prime | ||||||||||||||||
| Sub Name: | Subcontractor | ||||||||||||||||
| CLIN 1004 IAC BCO BASIS OF ESTIMATE WORK BREAKDOWN | |||||||||||||||||
| CLIN 1004 for OPTION 01 (Reminder Per the RFP the Government Estimate is 12 FTEs a Year) | |||||||||||||||||
| (See PWS for References) | 1.5.1 R&E Gateway | 1.5.2 Research, Analysis, and Synthesis | 1.5.3 Dissemination | 1.5.4 Program Management | |||||||||||||
| PRIME & SUBs | 1.5.1.1 STI Collection | 1.5.2.1 Subject Matter Expert (SME) Network | 1.5.2.2 Domain Knowledge Assessment | 1.5.2.3 Technical Inquiries (TI) | 1.5.2.4 Extended Technical Inquiries (ETI) | 1.5.2.5 BCO Specialized Task Orders (STO) | 1.5.3.1 Dissemination of STI | 1.5.3.2 Technical Information Products | 1.5.3.3 Models and Technology Databases | 1.5.3.4 Training | 1.5.3.5 Awareness | 1.5.3.6 Community of Practice (CoP) | 1.5.3.7 Service Promotion | 1.5.3.8 Conferences, Symposia, Workshops, and other Meetings | 1.5.3.9 IAC Websites | 1.5.4.1 Information Support System (ISS) | 1.5.4.2 ISS Database Details |
| Labor Category | |||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .