US_NDC_OSS_II_RFP_Questions_Answers__2.pdf

PDF 64 KB Posted

Attached to
United States National Data Center Operations Support and Studies II (US NDC OSS II) Services
Solicitation number
FA7022-19-R-0001
Issued by

About this file

This document provides details regarding a solicitation for the United States National Data Center Operations Support and Studies II (US NDC OSS II) Services contract opportunity. The Air Force Technical Applications Center seeks to award an indefinite delivery, indefinite quantity contract with a six year ordering period to provide operations and maintenance support, research and development support, and phase-out services to the US National Data Center. Support will include sustainment of software and hardware architecture, integration of third party efforts, integration of new hardware and software, 24/7 operational support, participation in a change management board, and conducting engineering and scientific studies. The solicitation is anticipated to be released on or about November 6, 2018 with contract award expected in September 2019. The North American Industry Classification System code is 541511 and the size standard is $27.5M. The document provides responses to questions on the draft solicitation and details on the pre-solicitation process.

Questions and Answers 02, US NDC OSS II

View the file

Other files

File Type Posted
FA702219R0001_Conformed.pdf PDF
US_NDC_OSS_II_RFP_Questions_Answers__3.pdf PDF
FA702219R0001_Amend_02_Final.pdf PDF
Attachment_1_PWS_(Rev_1,_15_Nov_18)-22_Jun_2018_v5.pdf PDF
FA702219R0001_Amend_01_Final.pdf PDF
Exhibit_B_-_Task_Order_Procedures,_15_Nov_18.pdf PDF
US_NDC_OSS_II_RFP_Questions_Answers.pdf PDF
FA702219R0001_Conformed.pdf PDF
Attachment_7_PWS_TO-01_FY19_O_M,_22_Jun_2018_v2.pdf PDF
Attachment_5_Cost-Price_Matrix_v4.xlsx XLSX spreadsheet
FA702219R0001,_US_NDC_OSS_II_RFP_Final_(25Oct2018).pdf PDF
Attachment_1_PWS_(Basic)-22_Jun_2018_v4.pdf PDF
Attachment_6_CPFF_Labor_Rates_v3.xlsx XLSX spreadsheet
Exhibit_A_CDRLs_signed_-_7_Jun_2018.pdf PDF
Attachment_2_DD254_and_VGSA.pdf PDF
Attachment_4_Past_Performance_Questionnaire-25_Sep_2018.pdf PDF
Attachment_3_Past_Performance_Information-25_Sep_2018.pdf PDF
Attachment_2_DD254,_Supplements_and_Attachments.pdf PDF
Attachment_4_Past_Performance_Questionnaire-25_Sep_2018.pdf PDF
Exhibit_A_CDRLs_signed_-_7_Jun_2018.pdf PDF
FA702219R0001,_US_NDC_OSS_II_RFP_Draft_V1.pdf PDF
Attachment_7_PWS_TO-01_FY19_O_M,_22_Jun_2018_v2.pdf PDF
Attachment_1_PWS_(Basic)-22_Jun_2018_v3.pdf PDF
Attachment_5_Cost-Price_Matrix_v2.xlsx XLSX spreadsheet
Attachment_3_Past_Performance_Information-25_Sep_2018.pdf PDF
Attachment_6_CPFF_Labor_Rates.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No.

RFP

Section

Page

Para Questions

Gov. Response

1 RFP

L.2.2.4, L.2.2.1

38, In section L.4.2.2 the Government has specified that Volume II provides a cross reference matrix and has provided the characteristics of this matrix in L.2.2.4 Table 2.2.4. Section

L.2.2.1 does not exclude this matrix from the page count. This means that the offeror is required to provide less content for each page of cross reference, therefore making it more difficult for the evaluators to fully evaluate the offeror’s proposal.

Would the government exclude the cross reference matrix from the page count allowing the offerors to provide a more detailed cross reference matrix?

Amendment 0002 changes L.2.2.1 by adding Cross

Reference Matrix as being excluded from the proposal page count.

2 RFP L.2.2.1 37 Since the government in section L.2.2.1 excludes the transition plan, subcontracting plan, and small business plans from the page count, should these plans be placed as attachments to the volume to allow easier validation of total counted pages in the volume?

Offerors may attach plans to proposal volumes, however this is not required. Plans will be excluded from the page count as stated in the L.2.2.1, regardless of their location within the proposal volume. It is the responsibility of each offeror to determine the best method to include plans, while ensuring the proposal is legible, clear and coherent per L.4.1.

3 RFP L.2.2, 36‐37 Does the government expect for section SF1 and SF4, summaries of the plans to be included as part of the page count in section

L.2.2.1 or is the expectation that this content will be entirely contained in the plans?

Offerors may include summaries of the plans in proposal volumes, however this is not required.

Summaries of plans located within proposal volumes will not be excluded from the page count. It is the responsibility of each offeror to determine whether or not to include plan summaries, while ensuring the proposal is legible, clear and coherent per L.4.1.

4 L.4.2.3 44 5 SF5 is discussed in both Volume II and Volume V. Does the government expect a discussion of TO 01 approach in Volume II and if so should it be a high level summary of Volume V?

Offerors may include a discussion of TO 01 approach in

Vol II, however this is not required. It is the responsibility of each offeror to determine if elements of their TO 01 approach is relevant to other factors or subfactors, and whether or not to include those elements in other volumes. Furthermore, it is the offerors responsibility to ensure the entire proposal is legible, clear and coherent per L.4.1. As stated in Sec.

L, Par. 4.2.3, the specific information pertaining to

Subfactor 5 is to be included as a separate volume and should serve as a 'stand alone' volume in addressing

Subfactor 5 requirements.

5 L.3.1 40 L.3.1 references the placement of resumes in Volume I as part of the Narrative. However, Volume I is not evaluated. Please clarify if the Government desires resumes to be included as part of Volume II as an appendix, to be evaluated as part of

Subfactor 3, Technical Staffing.

Offerors may include resume's in Volume II, however this is not required. It is the responsibility of each offeror to determine how to incorporate or reference the relative information contained in proposal volumes, while ensuring the proposal is legible, clear and coherent per L.4.1.