Amendment 1 - Attachment 1 - Statement of Work (SOW) - 11 June 2025.pdf
PDF 101 KB Posted
- Attached to
- USAFA - Classroom Grease/White Boards
- Solicitation number
- FA70025Q0097
About this file
This Statement of Work (SOW) details a white board conversion project for 36 classrooms across Fairchild Hall and Gregory Hall at the United States Air Force Academy in Colorado. The project involves replacing existing chalk boards with new white board material using Platinum Visual Systems Marker Wall System, with specific requirements including a porcelain-on-steel magnetic writing surface, low gloss white finish, and aluminum-backed particle boards. The white boards must have a 10-year warranty, minimal seams, and be installed to cover existing substrates with seamless joints and brushed aluminum frames.
The project is divided into three contract line items (CLINs): CLIN 0001 covers 12 classrooms in Fairchild Hall (Rooms 5H14, 5J35, 4H53, etc.), CLIN 0002 covers an additional 13 classrooms in Fairchild Hall (Rooms 4D12, 4F18, 4F20, etc.), and CLIN 0003 involves removing and replacing marker boards in 11 classrooms across Gregory Hall and Fairchild Hall. The delivery schedule is staggered, with performance dates ranging from November 22, 2025, to January 4, 2026. Contractors must coordinate access between 0630-1730 hours, obtain necessary badges, and be responsible for precise measurements, clean-up, and any potential building damage during installation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0001 - Revised 11 June 2025 Statement of Work Bldg 2354 and 2355
Fairchild Hall and Gregory Hall DF classrooms
Prepared by Robin Witek, Col Matthew Ross, and Bradley Beaudry
STATEMENT OF WORK
FOR PURCHASE OF WHITE BOARD CONVERSION, DELIVERY AND INSTALLATION
REVISED: 11 June 2025
Project Title: Purchase and install white board material to cover existing chalk boards, Delivery and Installation
Project Manager: Bradley Beaudry Project Location: Buildings 2354 and 2355 - 34 classrooms
United States Air Force Academy, CO Appendix 1: classroom locations
36 EA @ 13,888.88 EA
1. DESCRIPTION OF PROJECT:
A. PROJECT OVERVIEW FOR INFORMATIONAL PURPOSES: Thirty-six cadet classrooms require chalk board resurfacing to white board conversion. This strategy has been executed this year using Platinum Visual Systems Marker Wall System. To create a standardized classroom template new installation will need to match exactly the Laminated Marker Wall panels, Porcelain-on-steel magnetic writing surface, with 6100L Low gloss white and ½ inch Particle Boards with Aluminum backing prefabricated off site and installed on existing substrate. White Board joints must be covered and appear seamless. Attachment established with adhering boards to substrate with wall mounts at top and bottom of the board to cover non-usable existing areas. The Dean of Faculty needs to replace or add new white boards to adhere to plywood substrates or slate chalkboards, to completely cover the existing substrate and frame the completed boards with approx. 3/4 inch wide brushed aluminum frames, consistent with the previously refurbished room. All chalk/marker trays are intact and usable. The existing metal and porcelain materials that have come off of the substrates or will have to be removed and will need to be discarded off base.
B. SALIENT CHARACTERISTICS
B.1. SUPPLY AND INSTALLATION OF NEW WHITE BOARD MATERIAL OVER THE
EXISTING SLATE OR PLYWOOD SUBSTRATE: NEW MATERIAL WILL BE USED
5 DAYS A WEEK FOR 8-12 HOURS EACH DAY FOR THE ENTIRE ACADEMIC
YEAR AND DURING SUMMER SESSION. MATERIAL IS REQUIRED TO HAVE A
LIFE EXPECTANCY/WARRANTY OF AT LEAST 10 YEARS.
1. Work performed shall be uniformed
2. Continuous writing surface with minimal seams.
Fairchild Hall and Gregory Hall DF classrooms
a. The preference is to minimize seams with no more than 1 seam for every 8 feet of length
3. Trimming cut out should closely match existing standardized work when existing utilities exist within the whiteboard and the size shall be between 1.5”-1.75” from the light cover.
4. Caulking around gaps
5. Trim secured around perimeter
6. Boards in locations that cover existing chalkboards will utilize current marker trays
a. Install classroom marker trays: classroom 1P390 and 2P328.
7. Projectable surface; low reflectivity
8. White boards to accept magnetic accessories
9. Porcelain enamel steel material
B.1.1. CLIN 0001 Contractor shall replace marker board material on top of existing plywood substrate or slate substrate in the following classrooms:
a. Fairchild Hall Bld 2354 - Room 5H14:
1. North wall: 329 inches wide with 60-inch height.
2. East wall: 195 inches wide with 60-inch height.
3. West wall: 191 inches wide with 60-inch height.
b. Fairchild Hall Bld 2354 - Room 5J35:
1. North wall: 337 inches wide with 60-inch height.
2. South wall: 241 inches wide with 60-inch height.
3. West wall: 240 inches wide with 60-inch height.
c. Fairchild Hall Bld 2354 - Room 4H53:
1. East wall: 197 inches wide with 60-inch height.
2. South wall: 328 inches wide with 60-inch height.
3. West wall: 232 inches wide with 60-inch height.
Fairchild Hall and Gregory Hall DF classrooms
d. Fairchild Hall Bld 2354 - Room 4H31:
Fairchild Hall and Gregory Hall DF classrooms
1. North wall: 329 inches wide with 60-inch height.
2. East wall: 191 inches wide with 60-inch height.
3. West wall: 197 inches wide with 60-inch height.
e. Fairchild Hall Bld 2354 - Room 4F25:
1. North wall: 196 inches wide with 60-inch height.
2. South wall: 234 inches wide with 60-inch height.
3. West wall: 239 inches wide with 60-inch height.
f. Fairchild Hall Bld 2354 - Room 4F21:
1. North wall: 235 inches wide with 60-inch height.
2. East wall: 329 inches wide with 60-inch height.
3. South wall: 230 inches wide with 60-inch height.
g. Fairchild Hall Bld 2354 - Room 4F19:
1. North wall: 233 inches wide with 60-inch height.
2. East wall: 329 inches wide with 60-inch height.
3. South wall: 240 inches wide with 60-inch height.
h. Fairchild Hall Bld 2354 - Room 4F11:
1. North wall: 196 inches wide with 60-inch height.
2. South wall: 190 inches wide with 60-inch height.
3. West wall: 340 inches wide with 60-inch height.
i. Fairchild Hall Bld 2354 - Room 5H31:
1. North wall: 328 inches wide with 60-inch height.
2. East wall: 191 inches wide with 60-inch height.
3. West wall: 196 inches wide with 60-inch height.
j. Fairchild Hall Bld 2354 - Room 5H41:
Fairchild Hall and Gregory Hall DF classrooms
1. North wall: 196 inches wide with 60-inch height.
2. South wall: 190 inches wide with 60-inch height.
3. West wall: 328 inches wide with 60-inch height.
k. Fairchild Hall Bld 2354 - Room 5D60:
1. East wall: 506 inches wide with 60-inch height.
l. Fairchild Hall Bld 2354 - Room 5D47:
1. West wall: 506 inches wide with 60-inch height.
B.1.2. CLIN 0002 Contractor shall replace marker board material on top of existing plywood substrate or slate substrate in the following classrooms:
a. Fairchild Hall Bld 2354 - Room 4D12:
1. North wall: 196 inches wide with 60-inch height.
2. East wall: 329 inches wide with 60-inch height.
3. South wall: 232 inches wide with 60-inch height.
b. Fairchild Hall Bld 2354 - Room 4F18:
1. North wall: 234 inches wide with 60-inch height.
2. South wall: 242 inches wide with 60-inch height.
3. West wall: 329 inches wide with 60-inch height.
c. Fairchild Hall Bld 2354 - Room 4F20:
1. North wall: 236 inches wide with 60-inch height.
2. South wall: 230 inches wide with 60-inch height.
3. West wall: 329 inches wide with 60-inch height.
d. Fairchild Hall Bld 2354 - Room 4H8:
1. North wall: 242 inches wide with 60-inch height.
2. South wall: 234 inches wide with 60-inch height.
Fairchild Hall and Gregory Hall DF classrooms
3. West wall: 328 inches wide with 60-inch height.
e. Fairchild Hall Bld 2354 - Room 4H58:
1. North wall: 328 inches wide with 60-inch height.
2. East wall: 231 inches wide with 60-inch height.
3. West wall: 236 inches wide with 60-inch height.
f. Fairchild Hall Bld 2354 - Room 4H54:
1. East wall: 233 inches wide with 60-inch height.
2. South wall: 329 inches wide with 60-inch height.
3. West wall: 197 inches wide with 60-inch height.
g. Fairchild Hall Bld 2354 - Room 4H49:
1. East wall: 497 inches wide with 60-inch height.
h. Fairchild Hall Bld 2354 - Room 4H47:
1. West wall: 509 inches wide with 60-inch height.
i. Fairchild Hall Bld 2354 - Room 4F23:
1. North wall: 241 inches wide with 60-inch height.
2. East wall: 329 inches wide with 60-inch height.
3. South wall: 233 inches wide with 60-inch height.
j. Fairchild Hall Bld 2354 - Room 4D35:
1. North wall: 190 inches wide with 60-inch height.
2. South wall: 196 inches wide with 60-inch height.
3. West wall: 329 inches wide with 60-inch height.
k. Fairchild Hall Bld 2354 - Room 4H51:
1. North wall: 329 inches wide with 60-inch height.
2. East wall: 242 inches wide with 60-inch height.
Fairchild Hall and Gregory Hall DF classrooms
3. West wall: 234 inches wide with 60-inch height.
B.1.3. CLIN 0003 Contractor shall remove current markerboards and replace marker board material in the following classrooms:
a. Gregory Hall Bld 2355 - Room 1P390M:
1. North wall: 204 inches wide with 48-inch height.
b. Fairchild Hall Bld 2354 - Room 4J17:
1. East wall: 164 inches wide with 48-inch height and 240 inches wide with 48-inch height.
2. South wall: 264 inches wide with 48-inch height.
3. West wall: 80 inches wide with 48-inch height and 150 inches wide with 48-inch height.
c. Fairchild Hall Bld 2354 - Room 2B17:
1. North wall: 260 inches wide with 48-inch height and 106 inches wide with 48-inch height.
2. South wall: 106 inches wide with 48-inch height and 264 inches wide with 48-inch height.
3. West wall: 300 inches wide with 48-inch height.
d. Gregory Hall Bld 2355 - Room 2P521Z:
1. West wall: 270 inches wide with 48-inch height.
e. Gregory Hall Bld 2355 - Room 2P328F:
1. North wall: 426 inches wide with 48-inch height.
f. Gregory Hall Bld 2355 - Room 2P425S:
1. North wall: 240 inches wide with 48-inch height.
g. Gregory Hall Bld 2355 - Room 2N198C:
1. East wall: 204 inches wide with 48-inch height.
h. Gregory Hall Bld 2355 - Room 2M171Q:
Fairchild Hall and Gregory Hall DF classrooms
1. North wall: 360 inches wide with 48-inch height.
i. Gregory Hall Bld 2355 - Room 2N185Q:
1. North wall: 288 inches wide with 48-inch height.
j. Gregory Hall Bld 2355 - Room 2M167Q:
1. North wall: 180 inches wide with 48-inch height.
k. Gregory Hall Bld 2355 - Room 2M154E:
1. North wall: 180 inches wide with 48-inch height.
D.1. SETUP and CLEANUP:
D.1.1. The contractor shall be responsible for any clean-up associated with the delivery and installation. The cleanup shall include the removal of all packing, boxes, wrapping, nails, adhesives and leftover materials. All dust and debris is swept and all surfaces are vacuumed to remove fine particles. Wipe down walls and other surfaces with a damp cloth to remove any remaining dust and debris.
Tackle stains and spots such as paint and caulking splashes and adhesive residue. Remove any stickers from the product. The installation shall provide a clean and ready to use appearance.
E.1. DELIVERY SCHEDULE:
Room #
Condition Height
N-wall*
E-wall*
S-wall*
W-wall*
Department
Notes
Groups Estimated Days
Delivery/ Performance
Dates Gregory Hall Bld
2M154E 1 48 180 DFCH 2355 2-3 days Nov 28-30 Gregory Hall Bld
2M167Q 1 48 180 DFCH 2355
Gregory Hall Bld
2M171Q 1 48 360 DFCH 2355
Gregory Hall Bld
2N185Q 1 48 288 DFCH 2355
Gregory Hall Bld
2N198C 1 48 204 DFCH 2355
Gregory Hall Bld
1P390M 1 48 204 DFBI 2355 2-3 days Dec 21 - 23 Gregory Hall Bld
2P328F 1 48 426 DFVR 2355
Gregory Hall Bld
2P425S 1 48 240 DFBI 2355
Gregory Hall Bld
2P521Z 1 48 270 DFBI 2355
Fairchild Hall and Gregory Hall DF classrooms
260,106
164,240
106,264
80,150
Fairchild Hall Bld 5 days
3-4 days
9 days
Nov 22 - 27
Dec 8 - 12
Dec 26 - 30
Dec 15 - 19
Jan 2 - 4
Dec 13 - 23
4F11 0 60 DFCS 2354
Fairchild Hall Bld
4F19 0 60 DFCS 2354
4F21 0 60 DFCS 2354
4F23
DFCS
4F25
DFCS
4H8
DFCL
4H54 1 60 DFCL 2354
Fairchild Hall Bld
4H58 1 60 DFCL 2354
Fairchild Hall Bld
4F18 1 60 DFCL 2354
4F20 1 60 DFCL 2354
4H31
4H47
DFVR
Fairchild Hall Bld
4H49 1 60 DFVR 2354
4H51 1 60 DFCL 2354
4H53
4J17
DFEG
5D47
DFEN
5H31 1 60 DFVR 2354
5H41 1 60 DFVR 2354
5J35
DFMA
5H14 0 60 DFVR 2354
5D60
DFVR
2B17
DFPM
4D12 1 60 DFCL 2354
4D35
DFPY
All highlighted are high priority and need to be executed first
* Measurements are provided in inches
Fairchild Hall and Gregory Hall DF classrooms
F.1. ACCESS TO BUILDINGS:
F.1.1. Access to the buildings is between the hours of 0630 and 1730.
Please coordinate access to the buildings and classrooms with the
PM.
G.1. BADGING:
G.1.1. On-site contractor personnel shall have passes/badges obtained in accordance with USAFA procedures, not later than one
(1) day prior to start of on-site work. Please contact the program manager for access and procedures to obtain passes/badges as necessary.
H.1. ADDITIONAL CONSIDERATIONS:
H.1.1. The contractor shall be responsible for all measurements of the site necessary to complete the installation of whiteboard surfaces, and before ordering materials.
H.1.2. The contractor shall be responsible for any damage to the building, its floors, its walls, ceilings, and any wiring or other components behind the surfaces contained within.
| STATEMENT OF WORK |
| a. Fairchild Hall Bld 2354 - Room 5H14: |
| b. Fairchild Hall Bld 2354 - Room 5J35: |
| c. Fairchild Hall Bld 2354 - Room 4H53: |
| d. Fairchild Hall Bld 2354 - Room 4H31: |
| e. Fairchild Hall Bld 2354 - Room 4F25: |
| f. Fairchild Hall Bld 2354 - Room 4F21: |
| g. Fairchild Hall Bld 2354 - Room 4F19: |
| h. Fairchild Hall Bld 2354 - Room 4F11: |
| i. Fairchild Hall Bld 2354 - Room 5H31: |
| j. Fairchild Hall Bld 2354 - Room 5H41: |
| k. Fairchild Hall Bld 2354 - Room 5D60: |
| l. Fairchild Hall Bld 2354 - Room 5D47: |
| a. Fairchild Hall Bld 2354 - Room 4D12: |
| b. Fairchild Hall Bld 2354 - Room 4F18: |
| c. Fairchild Hall Bld 2354 - Room 4F20: |
| d. Fairchild Hall Bld 2354 - Room 4H8: |
| e. Fairchild Hall Bld 2354 - Room 4H58: |
| f. Fairchild Hall Bld 2354 - Room 4H54: |
| g. Fairchild Hall Bld 2354 - Room 4H49: |
| h. Fairchild Hall Bld 2354 - Room 4H47: |
| i. Fairchild Hall Bld 2354 - Room 4F23: |
| j. Fairchild Hall Bld 2354 - Room 4D35: |
| k. Fairchild Hall Bld 2354 - Room 4H51: |
| a. Gregory Hall Bld 2355 - Room 1P390M: |
| b. Fairchild Hall Bld 2354 - Room 4J17: |
| c. Fairchild Hall Bld 2354 - Room 2B17: |
| d. Gregory Hall Bld 2355 - Room 2P521Z: |
| e. Gregory Hall Bld 2355 - Room 2P328F: |
| f. Gregory Hall Bld 2355 - Room 2P425S: |
| g. Gregory Hall Bld 2355 - Room 2N198C: |
| h. Gregory Hall Bld 2355 - Room 2M171Q: |
| i. Gregory Hall Bld 2355 - Room 2N185Q: |
| j. Gregory Hall Bld 2355 - Room 2M167Q: |
| k. Gregory Hall Bld 2355 - Room 2M154E: |
File details come from the government source that posted it. Updated .