Attch 1 - XQPZ160146 SOW Rev0.docx
DOCX document 32 KB Posted
- Attached to
- Repair HVAC Harmon Hall Arnold Hall Federal contract opportunity
- Solicitation number
- FA700020R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001 SF 30.pdf | ||
| Attch 1 - SOW Rev 01.pdf | ||
| Solicitation Conformed Copy FA700020R00040001.pdf | ||
| Attch 05 HAZMAT Report.pdf | ||
| Attch 6 - WageDet23Jan20.pdf | ||
| Attch 1- SOW Rev_1.pdf | ||
| Attch 08REVISED Fncl Reference.doc | DOC document | |
| Attch 07REVISED Experience Form.docx | DOCX document | |
| Attch 06REVISED WageDet 10Jan20.pdf | ||
| Attch 7 - Experience Form.docx | DOCX document | |
| Solicitation - FA700020R0004.pdf | ||
| Attch 5 - XQPZ160146 HAZMAT Report.pdf | ||
| Attch 4 - USAFA Enviro Stnds 2019.pdf | ||
| Attch 9 - XQPZ160146 Siemens JA [Redacted].pdf | ||
| Attch 8 - Financial Reference.doc | DOC document | |
| Attch 3 - XQPZ160146 Specifications.pdf | ||
| Attch 6 - Wage Determination.pdf | ||
| Attch 2 - XQPZ160146 Drawings.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair HVAC – Arnold & Harmon Hall
Revision 0: 09 September 2019, Original Issue
| 10 CES/CECNMP PM: | David Van Dale, CTR | |
| Office Phone: | (719) 333-0897 |
| 10 CES/CENMP CM: | Jeff Young, CTR | |
| Office Phone: | (719) 333-8397 |
1. PROJECT INFORMATION:
A. PROJECT NUMBER: XQPZ160146
B. PROJECT TITLE: Repair HVAC – Arnold & Harmon Hall
C. PROJECT LOCATION: 2302 Arnold & 2304 Harmon Hall, USAF Academy, Colorado
2. DESCRIPTION OF PROJECT:
A. PROJECT BACKGROUND: Chilled water that is generated at Harmon Hall is supplied to Harmon Hall, Arnold Hall and Polaris Hall. Cooling towers are located on Arnold Hall roof which is piped vertically and through tunnels to Harmon Hall. Harmon Hall HVAC system consists of water cooled heat pumps which reject heat to the chilled water system via heat exchangers located in the basement of Harmon Hall. This project will replace the cooling towers located on the roof of Arnold Hall. The cooling heat exchangers at Harmon Hall will be upgraded to flat-plate type and various piping and controls will be upgraded. A temporary air cooled chiller will be utilized during cooling tower demo and replacement. Hazardous material testing was performed and results are included with project documents.
B. CONSTRUCTION SCOPE: The Contractor shall execute the project as shown in this SOW, Project Drawings, and Specifications. In case of conflicts between documents, the order of precedents will be Contract, SOW, Specifications and then Project Drawings.
3. GENERAL PROVISIONS:
A. GENERAL - The Contractor shall supply all labor, materials, transportation, equipment, and supervision to provide a complete, finished, functional product meeting USAFA Specifications.
B. ENVIRONMENTAL - The Contractor must comply with USAFA Environmental Standards 2019, Erosion Control Revegetation and Tree Care Standards, which outlines provisions to help ensure Contractor compliance with environmental law.
C. PERIOD OF PERFORMANCE - Include in the proposal a POP duration including on-site construction time.
D. PRE-CONSTRUCTION SITE SURVEY - Prior to the start of any on-site construction activities, the Contractor shall:
1. Conduct a project site condition survey with the 10 CES Construction Inspector.
2. The Contractor shall note the condition of trees, shrubs, grassed areas, concrete, and any structural damage that may exist immediately within or adjacent to work site.
3. The contractor shall field verify all dimensions and examine system component connections before ordering materials or performing any work.
E. WORK CONFORMANCE - The work area will be confined to the applicable areas as shown in the design drawings and listed in this SOW. All work must conform to the current provisions of the USAFA Architectural and Engineering Services Guide available on CD from the Project Manager.
F. SUBMITTAL REGISTER - A submittal register is provided for this project. Provide submittals and maintain the Submittal Register throughout project construction period of performance. This list of submittals is not all-inclusive; other submittals and forms may be required by the Contract documents. Contractor shall submit the Master Submittal Register to Contracting within fourteen (14) calendar days after the Notice to Proceed (NTP).
G. BASIS OF DESIGN - Any brand name items listed in this SOW and drawings are intended as a Basis of Design only.
The Contractor may substitute a product, or products, for the brand name items as long as the substituted product(s) meet the minimum performance standards established by the listed salient characteristics. Refer to Specifications. An ‘Or Equal’ product shall be submitted with the initial proposal and will be reviewed for technical acceptability.
The Contractor is responsible for how the substituted product(s) affect the design and schedule of the project. 10 CES will review the substituted products for General Conformance only. All substituted products will be reviewed for compliance with the USAFA Design Standards, any SHPO or historical considerations, Environmental regulation compliance and any other review processes that are applicable to this project.
As a part of the 10 CES review process for substituted products, and prior to the substituted product being used or installed, the Contractor must demonstrate in writing that the substitution will meet all project requirements listed above.
H. HAZARDOUS MATERIALS. Refer to Environmental Standards 2019 for requirements.
I. DD FORM 1354 – For all projects, the Contractor shall prepare and submit a DRAFT DD Form 1354, Transfer and Acceptance of Military Real Property, Current Version. This DRAFT establishes the level of detail and the different components of a project for all work accomplished under the project. This 1354 includes installed property, by building/facility number, and shall be submitted to the Contracting Office (CO). The DRAFT DD Form 1354 shall be submitted no later than thirty (30) calendar days after the Notice to Proceed (NTP). This DRAFT DD Form 1354 will be reviewed by Real Property Office (RPO) to resolve any issues and provide clarity to the Contractor for the inclusion in the INTERIM DD Form 1354. Please request a sample DD Form 1354 document if not provided in the RFP.
J. TRAFFIC CONTROL - Traffic control will be required and must conform to MUTCD. A traffic control plan must be submitted for approval prior to starting any demolition. The roadway and/or parking lot shall be left in a safe and usable condition at the end of each work day. All traffic control plans must be re-submitted by the construction contractor, with a time schedule for placement, at least two weeks prior to the requirement to insure it is clear when and where the traffic control devices will be placed.
K. BUILDER – The request for proposal (RFP) has a blank form and guidance on items to be included in builder. The Contractors shall complete an electronic BUILDER form for all equipment or structure addition, deletion, or replacement components. If there is a component-section (Uniformat II Level IV) listed in the BUILDER catalog that was included in the scope of the project for adding, deleting, or replacing it is to be accounted for on one of the BUILDER forms. In addition to completing the BUILDER forms the Contractor is to attach a photo of the component-section. For structure type components a photo showing the overall item. For equipment type components a photo showing the overall item and a close-up photo of the data plate. Label the photos clearly so they can easily be associated with the BUILDER component-section. At the conclusion of the project, prior to the BOD final inspection, the Contractor shall submit the CD that contains all the BUILDER forms and photos.
4. SPECIFIC REQUIREMENTS:
A. CLIN Schedule: Base Bid (CLIN0001, CLIN0002, CLIN0003, CLIN0004, CLIN0005, & CLIN0006) includes all work for XQPZ160146 Repair HVAC Arnold and Harmon Hall.
1. CLIN0001 (Facility 23020, EEIC 522 Repair, WO#66955): Provide all work for XQPZ160146 Repair HVAC Arnold and Harmon Hall described on sheets: H102 detail 2, S401, S501, MD405 detail 2, M301, M405 detail 2, ED103, and E107. This CLIN includes all work to demo and replace cooling towers on Arnold Hall roof, including roof and structural work, except Siemens DDC.
2. CLIN0002 (Facility 23020, EEIC 522 Repair, WO#66955): Provide Siemens DDC which is required for facilitating work described in CLIN0001.
3. CLIN0003 (Facility 2302, EEIC 522 Repair, WO#69051): Provide all work for XQPZ160146 Repair HVAC Arnold and Harmon Hall described on drawing sheets: H102 detail 1, MD405 detail 1, ED102, E103, E104, E105, and E106. This CLIN includes all work that is located at Arnold Hall and not on the roof, except Siemens DDC.
4. CLIN0004 (Facility 2302, EEIC 522 Repair, WO#69051): Provide Siemens DDC which is required for facilitating work described in CLIN0003.
5. CLIN0005 (Facility 2304, EEIC 522 Repair, WO#66722): Provide all work for XQPZ160146 Repair HVAC Arnold and Harmon Hall described in this SOW and on the plans and specifications on drawing sheets: H101, MD101, MD102, M302, M401, M402, M403, M404, ED101, E101, and E102. This CLIN includes all work that is located at Harmon Hall, including temporary air cooled chiller, except Siemens DDC.
6. CLIN0006 (Facility 2304, EEIC 522 Repair, WO#66722): Provide Siemens DDC which is required for facilitating work described in CLIN0005.
B. Work Sequencing:
1. All work shall be completed so that chilled water supply and Harmon Hall heat pump loops are not offline for more than 24 hours during demolition and 24 hours during construction. Downtime for chilled water and heat pump loops shall be between 6pm and 6am, or on weekends.
2. A temporary 200-ton air cooled chiller shall be provided during all times when the cooling towers are offline. Therefore, piping connections and electrical connections for the temporary chiller shall be installed before demolition of the cooling towers can begin.
3. Non-standard working hours may be required in order to perform some of this work according to the specifications and drawings.
C. Construction Staging:
1. 8 parking spaces for Contractor vehicles will be reserved within 225 feet of Arnold Hall.
2. A staging area 25 feet by 50 feet will be reserved within 125 feet of Arnold Hall. This space may be on a grassy area and the Contractor will need to repair to the original condition upon completion. Other temporary accommodations may be possible with a minimum of one week’s notice.
3. An additional staging area of 25 feet by 75 feet will be made available within 5 miles of Arnold Hall.
D. Temporary chiller piping connection location:
1. Piping penetrations to exterior from Mechanical room B002 shall be located below grade in mechanical area well, in lieu of as shown on sheet M403. (Approximately 33 feet south of location on drawing sheet M403) USAFA prefers that the piping does not penetrate the exterior granite panels.
E. UTILITY COORDINATION AND CSU INSPECTOR NOTIFICATION – The Construction Contractor shall provide utility coordination and notify the CSU. Inspectors prior to starting excavation work or related utilities work associated with this project, per the following:
1. Academy Dig Permits and UNCC - The Contractor shall submit the standard USAFA Form 144 Dig Permit required prior to starting excavation work or related utilities work for the project (Dig Permits, Bldg 8116, 7:30-8:30am and 3:00-4:00pm Monday-Friday). The Academy will provide utility locates for water and sanitary sewer. The UNCC will provide utility locates for gas and electric, but does not notify CSU regarding planned work in the vicinity of CSU utility infrastructure.
2. CSU Inspector Notification – The Contractor shall provide a minimum of 24-hour notice to CSU Inspectors prior to starting work in the vicinity of CSU gas and electric infrastructure. The current CSU POCs (subject to change) are: (a) GAS – Wayne Simshauser, Office 719-668-3667, Cell 719-491-8142, and (b) ELECTRIC – Daniel Gonzales, Office 719-668-5638, Cell 719-491-6886.
3. HTHW Infrastructure – Where the project includes work directly involving HTHW infrastructure or adjacent to HTHW lines, Contractor shall ensure adequate distance separation between the HTHW infrastructure and any nearby gas and electric infrastructure, such that the heat from the HTHW does not damage the PVC gas mains or PVC electric lines and create a safety risk.
4. Utility Outages – For the duration of the project, Contractor shall provide information to the CE Inspector for coordination of outages thirty-five (35) calendar days in advance.
F. POST CONSTRUCTION STORM WATER MANAGEMENT - Refer to Environmental Standards 2019 for requirements.
G. Coordinate work schedules with the 10 CES CM at least fourteen (14) calendar days in advance.
H. Any exceptions to this statement of work must be detailed in the contractor proposal.
I. An acceptable period of performance (POP) for this project shall be between 180 - 240 calendar days.
5. PROJECT MEETINGS:
A. PRE-CONSTRUCTION MEETING - A pre-construction meeting will be held at the Contracting conference rooms within two (2) weeks after the contract award.
B. WEEKLY MEETINGS - Weekly planning meetings will be held at the contractor’s jobsite trailer. The date and time will be the same each week, and will be set by the construction manager at the pre-construction meeting.
6. SUBMITTALS:
A. Provide submittals for all equipment and material as outlined in the project submittal register.
B. 10 CES CM must review all submittals before commencement of relevant work.
C. Contractor shall submit monthly waste report for each project that will outline total tonnage/cubic yards of solid waste removed, total tonnage/cubic yards of recyclable waste removed, and total tonnage/cubic yards of recyclable waste used on the project (crushed concrete, asphalt, etc.), if applicable.
7. PROJECT CLOSEOUT:
A. AS-BUILT DRAWINGS - Supply as-built CADD drawings at the conclusion of the project on CD, three (3) copies and two (2) hard copies. The CAD drawings must be in the format in adherence to USAFA CADD standards. All CADD Standards requirements and associated files, templates, blocks, border sheets, etc. are available upon request from 10 CES.
B. O&M MANUALS - Supply three (3) hardcopies of Operation and Maintenance (O&M) manuals, and two (2) on CD.
C. PROJECT CLOSEOUT DELIVERABLES – At 80% of project completion or no later than sixty (60) days prior to total asset placed-in-service date or partial asset placed-in service date, submit an INTERIM DD Form 1354 (per project number) to the CO for Real Property review. At Total or Partial Placed-In-Service-Date (PISD, a.k.a BOD), the closeout package must include INTERIM DD Form 1354 with list of all Real Property Installed Equipment (RPIE). Any deficiencies and/or punch list items identified during the pre-final/final inspection must be included in Box # 27 or attached to the INTERIM DD Form 1354. At project completion, the following items shall be delivered to the Contracting office: final INTERIM DD Form 1354, BUILDER Report, As-Built Drawings, and O&M manuals in both hardcopy and electronic format.
D. Before project closeout, ensure that all Environmental reports have been submitted and approved by the 10 CES Environmental group (CEIAM) in USAFA Civil Engineering.
8. TYPICAL USAFA YEARLY CALENDAR EVENTS: These USAFA events are typical each year. The Contractor is required to include all events within the overall project construction schedule. (Note: events may occur more than once in a given project schedule).
| A. CORONA* | 27 Oct – 2 Nov 2019 | ||
| B. Winter Break | 16 Dec 2019 – 1 Jan 2020 | ||
| C. Founder’s Day | 4 April 2020 | ||
| D. Spring Break | 20 Mar – 29 Mar 2020 | ||
| E. Graduation* | 28 May 2020 | ||
| F. Internal Processing | 25 Jun 2020 | ||
| G. BCT | 26 Jun – 31 Jul 2020 | ||
| H. Parent’s Weekend* | 27 Aug – 31 Aug 2020 |
* Indicates USAFA Institutional Events. Three (3) days prior to each of these Institutional dates, the Contractor shall remove all barriers around newly poured concrete that has cured a minimum of seven (7) days. The barriers may also be removed a minimum of two (2) days after new concrete sealer has been applied. The barriers shall be moved to a location approved by the 10 CES Construction Inspector. The Contractor shall coordinate these dates in their proposed construction schedule.
9. BIDDING RFI QUESTIONS AND RESPONSES: (not used)
10. ABBREVIATIONS:
| 10 CES | 10th Civil Engineering Squadron | |||
| 10 CONS | 10th Contracting Squadron | |||
| AF | Air Force | |||
| AFI | Air Force Instruction | |||
| BCT | Basic Cadet Training | |||
| BOD | Basis of Design | |||
| CADD | Computer Automated | Drafting & Design | ||
| CD | Compact Disk | |||
| CLIN | Contract Line Item | |||
| CO | Contracting Officer | |||
| conc. | Concrete | |||
| CSU | Colorado Springs Utilities | |||
| EESOH | Environmental Safety | Occupational Health | ||
| EISA | Energy Independence Act | |||
| HAZMAT | Hazardous Materials | |||
| HMMP | Hazardous Materials Management Program | |||
| HTA | HAZMAT Tracking Activity | |||
| HTHW | High Temperature Hot Water | |||
| MTP(s) | Marble Tile Paver(s) | |||
| NTP | Notice to Proceed | |||
| O&M | Operation and Maintenance | |||
| POC(s) | Point of Contact(s) | |||
| POP | Period of Performance | |||
| PM | Project Manager | |||
| PVC | Polyvinyl Chloride | |||
| RFI | Request for Information | |||
| SHPO | State Historic Preservation Office | |||
| SOG | Slab on Grade | |||
| SOW | Statement of Work | |||
| Typ. | Typical | |||
| UNCC | Utility Notification Center of Colorado |
STATEMENT OF WORK
FOR CONSTRUCTION
USAFA United States Air Force Academy
CONSTRUCTION SOW
Last Updated 22 July 2019
END OF STATEMENT OF WORK