Attch 07REVISED Experience Form.docx

DOCX document 30 KB Posted

Attached to
Repair HVAC Harmon Hall Arnold Hall Federal contract opportunity
Solicitation number
FA700020R0004
Issued by
Department of the Air Force Headquarters Air Force Academy

View the file

Other files for this federal contract opportunity

Other files attached to Repair HVAC Harmon Hall Arnold Hall, newest first.
File Type Posted
Attch 1 - SOW Rev 01.pdf PDF
Amendment 0001 SF 30.pdf PDF
Solicitation Conformed Copy FA700020R00040001.pdf PDF
Attch 05 HAZMAT Report.pdf PDF
Attch 6 - WageDet23Jan20.pdf PDF
Attch 1- SOW Rev_1.pdf PDF
Attch 06REVISED WageDet 10Jan20.pdf PDF
Attch 08REVISED Fncl Reference.doc DOC document
Attch 3 - XQPZ160146 Specifications.pdf PDF
Solicitation - FA700020R0004.pdf PDF
Attch 5 - XQPZ160146 HAZMAT Report.pdf PDF
Attch 4 - USAFA Enviro Stnds 2019.pdf PDF
Attch 9 - XQPZ160146 Siemens JA [Redacted].pdf PDF
Attch 8 - Financial Reference.doc DOC document
Attch 1 - XQPZ160146 SOW Rev0.docx DOCX document
Attch 7 - Experience Form.docx DOCX document
Attch 6 - Wage Determination.pdf PDF
Attch 2 - XQPZ160146 Drawings.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA7000-20-R-0004

EXPERIENCE FORM

FA7000-20-R-0004

Repair HVAC – Harmon and Arnold Halls

OFFEROR INFORMATION:

Company Name: Point of Contact Name/Title: Telephone Number: Email:

INSTRUCTIONS:

The prime offeror must submit verifiable information for two (2) recent completed projects (e.g. task orders, purchase orders, contracts, etc.) performed by the offeror as either a prime contractor or subcontractor for similar work. The first two projects on the Experience form will be evaluated. Any additional projects submitted will not be evaluated. Fill in all blanks in the space provided in typewritten text no smaller than 12-point font. Alternate formats will not be considered, including descriptions that extend beyond the space provided. Each submitted project must include:

a. Work must have been completed within five (5) years of this solicitation's closing date;

b. HVAC installation/repair/replacement work in which at least 300 tons of total aggregate chiller capacity were installed;

c. At least one installed chiller had a capacity of at least 100 tons.

For Example - a project in which FOUR 50-ton chillers and ONE 100-ton chillers were installed (50+50+50+50+100=300) would meet the minimum capacity requirements above. Also, a project in which ONE 300-ton chiller was installed would meet the minimum capacity requirements above. However, a project in which EIGHT 75-ton chillers were installed would NOT meet the minimum capacity requirements above (because none of the chillers met the 100-ton requirement of part c, above).

d. Completion of all of the incidental construction work: System Controls Work, Electrical Work, HVAC Demolition, HVAC Test and Balancing, HVAC Ductwork Installation.

e. In at least one of the submitted Experience projects, offeror will demonstrate installation and utilization of a temporary chiller unit.

PROJECT 1:

Project Title:Requiring Organization:
Place of Performance:Contract Number:Contract Value:

Contract Period or Dates of Performance:

This project was performed by the named offeror as (circle one): Prime Contractor -OR- Subcontractor Number of chillers installed: _________________ Aggregate Chiller Capacity: ______________________________ Was at least one temporary chiller utilized? ___________ In the space provided below, briefly describe the work completed. Include any unusual conditions or unique challenges and how your company addressed them:

Client/Customer to Verify Project 1 Information POC Name:

Telephone Number: Email:

PROJECT 2:

Project Title:Requiring Organization:
Place of Performance:Contract Number:Contract Value:Contract Period or Dates of Performance:This project was performed by the named offeror as (circle one): Prime Contractor -OR- Subcontractor Number of chillers installed: _________________ Aggregate Chiller Capacity: ______________________________

Was at least one temporary chiller utilized? ___________ In the space provided below, briefly describe the work completed. Include any unusual conditions or unique challenges and how your company addressed them:

Client/Customer to Verify Project 2 Information POC Name:

Telephone Number: Email:

File details come from the government source that posted it. Updated .