Attch 07REVISED Experience Form.docx
DOCX document 30 KB Posted
- Attached to
- Repair HVAC Harmon Hall Arnold Hall Federal contract opportunity
- Solicitation number
- FA700020R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch 1 - SOW Rev 01.pdf | ||
| Amendment 0001 SF 30.pdf | ||
| Solicitation Conformed Copy FA700020R00040001.pdf | ||
| Attch 05 HAZMAT Report.pdf | ||
| Attch 6 - WageDet23Jan20.pdf | ||
| Attch 1- SOW Rev_1.pdf | ||
| Attch 06REVISED WageDet 10Jan20.pdf | ||
| Attch 08REVISED Fncl Reference.doc | DOC document | |
| Attch 3 - XQPZ160146 Specifications.pdf | ||
| Solicitation - FA700020R0004.pdf | ||
| Attch 5 - XQPZ160146 HAZMAT Report.pdf | ||
| Attch 4 - USAFA Enviro Stnds 2019.pdf | ||
| Attch 9 - XQPZ160146 Siemens JA [Redacted].pdf | ||
| Attch 8 - Financial Reference.doc | DOC document | |
| Attch 1 - XQPZ160146 SOW Rev0.docx | DOCX document | |
| Attch 7 - Experience Form.docx | DOCX document | |
| Attch 6 - Wage Determination.pdf | ||
| Attch 2 - XQPZ160146 Drawings.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA7000-20-R-0004
EXPERIENCE FORM
FA7000-20-R-0004
Repair HVAC – Harmon and Arnold Halls
OFFEROR INFORMATION:
Company Name: Point of Contact Name/Title: Telephone Number: Email:
INSTRUCTIONS:
The prime offeror must submit verifiable information for two (2) recent completed projects (e.g. task orders, purchase orders, contracts, etc.) performed by the offeror as either a prime contractor or subcontractor for similar work. The first two projects on the Experience form will be evaluated. Any additional projects submitted will not be evaluated. Fill in all blanks in the space provided in typewritten text no smaller than 12-point font. Alternate formats will not be considered, including descriptions that extend beyond the space provided. Each submitted project must include:
a. Work must have been completed within five (5) years of this solicitation's closing date;
b. HVAC installation/repair/replacement work in which at least 300 tons of total aggregate chiller capacity were installed;
c. At least one installed chiller had a capacity of at least 100 tons.
For Example - a project in which FOUR 50-ton chillers and ONE 100-ton chillers were installed (50+50+50+50+100=300) would meet the minimum capacity requirements above. Also, a project in which ONE 300-ton chiller was installed would meet the minimum capacity requirements above. However, a project in which EIGHT 75-ton chillers were installed would NOT meet the minimum capacity requirements above (because none of the chillers met the 100-ton requirement of part c, above).
d. Completion of all of the incidental construction work: System Controls Work, Electrical Work, HVAC Demolition, HVAC Test and Balancing, HVAC Ductwork Installation.
e. In at least one of the submitted Experience projects, offeror will demonstrate installation and utilization of a temporary chiller unit.
PROJECT 1:
| Project Title: | Requiring Organization: | ||
| Place of Performance: | Contract Number: | Contract Value: |
Contract Period or Dates of Performance:
This project was performed by the named offeror as (circle one): Prime Contractor -OR- Subcontractor Number of chillers installed: _________________ Aggregate Chiller Capacity: ______________________________ Was at least one temporary chiller utilized? ___________ In the space provided below, briefly describe the work completed. Include any unusual conditions or unique challenges and how your company addressed them:
Client/Customer to Verify Project 1 Information POC Name:
Telephone Number: Email:
PROJECT 2:
| Project Title: | Requiring Organization: | ||||
| Place of Performance: | Contract Number: | Contract Value: | Contract Period or Dates of Performance: | This project was performed by the named offeror as (circle one): Prime Contractor -OR- Subcontractor Number of chillers installed: _________________ Aggregate Chiller Capacity: ______________________________ |
Was at least one temporary chiller utilized? ___________ In the space provided below, briefly describe the work completed. Include any unusual conditions or unique challenges and how your company addressed them:
Client/Customer to Verify Project 2 Information POC Name:
Telephone Number: Email: