Attch 5_Appendix C
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 17-Q-S032-0001_Questions_and_Answers_02_August_2017.pdf | ||
| Attch_1_17-Q-S032_Performance_Work_Statement.pdf | ||
| Attch_3_17-Q-S032_Subcontractor_Consent_Form.docx | DOCX document | |
| 17-Q-S032_Att_4_Past_Performance_Questionnaire.pdf | ||
| 17-Q-S032_Combined_Synopsis_Solicitation.pdf | ||
| Attch_2_DD254_(DRAFT).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX “C”
SAFETY, FIRE PROTECTION AND HEALTH SPECIFICATION
INDUSTRIAL SAFETY REQUIREMENTS
FBWOS Sustainment
SECTION I - GENERAL REQUIREMENTS
A. Safety Program Requirements.
The contractor will implement a safety program plan that ensures protection of Government personnel and property. The program will consist of, as a minimum:
1. Mishap reporting, as defined in paragraph B1 below.
2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II –Specific Requirements, and will be used during the performance of the work described in the contract. The Safety Plan will be approved by 75 ABW/SEG (Safety Office) prior to commencement of any work described in this contract.
3. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.
4. Competent personnel to provide surveillance of the Safety Plan.
5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.
6. All contractor personnel shall be trained and qualified to perform their duties safely.
7. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.
B. Mishap Notification
1. The contractor shall notify 75 ABW/SEG (801-777-3333), or the Hill AFB Command Post (777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to 75 ABW/SEG. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.
Page 2 of 5 24 April 2014, Basic CET
Mishap notifications shall contain, as a minimum, the following information:
(a) Contract, Contract Number, Name and Title of Person(s) Reporting
(b) Date, Time and exact location of accident/incident
(c) Brief Narrative of accident/incident (Events leading to accident/incident)
(d) Cause of accident/incident, if known
(e) Estimated cost of accident/incident (material and labor to repair/replace)
(f) Nomenclature of equipment and personnel involved in accident/incident
(g) Corrective actions (taken or proposed)
(h) Other pertinent information
2. The contractor shall cooperate with any and all government mishap investigations. Additionally if requested by government personnel or designated government representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.
3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.
4. The contractor shall support and comply with the safety investigation and reporting requirements of AFI 91-204, Chapters 1 – 5.
C. General Safety Requirements:
If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Contract Administration Office safety representative.
The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees.
The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels.
Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: Air Force Occupational Safety and Health Standards (AFOSH STD) are annotated because many of the Air Force Standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health.
The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
Page 3 of 5 24 April 2014, Basic CET
SECTION II – SPECIFIC REQUIREMENTS
The contractor’s prepared Safety Plan shall:
Demonstrate a management commitment to employee safety and health Identify applicable rules and regulations Identify the roles and responsibilities of Management, Supervisors, Employees and Safety
Coordinator Identify work to be performed and location of expected operations Provide a description of safety program, safety monitoring responsibilities, organizational structure, and contact information for on-site personnel Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures Identify employee safety and health training requirements and the documentation process Include emergency response plans and procedures that relate to protection of government personnel and property Identify procedures for accident reporting and investigation Identify the process for tracking controlled hazards in contractors work area
The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:
PERSONAL PROTECTIVE EQUIPMENT Contractor shall comply with the standards in 29 CFR 1910.132, 134, 136 Subpart I and 29 CFR 1926, 28, 95, 100, 101, 102, & 951. Personnel protective equipment is required to be worn when employees are exposed to a potential hazard, working overhead, falling objects, etc. Contractor’s Safety Plan shall also address:
-Eye and face protection
- Head protection
- Foot Protection
SYSTEM MODIFICATION-WHICH ALTERS FORM, FIT OR FUNCTION: Contractor shall comply with Mil Standard 882D, Standard Practice for System Safety, 10 Feb 00 and AFI 91-202, The US Air Force Mishap Prevention Program, 1 Aug 98, Chap 9 for system modifications, which alter form, fit, or function.
HEARING CONSERVATION PROGRAM ELEMENTS: Contractor shall comply with the standards in 29 CFR 1910.95 and 29 CFR 1926.52. .NOTE: Noise exposures are based on ACGIH guidelines of 85 dB TWA. Contractor’s Safety Plan shall also address:
-Monitoring (survey of noise producing equipment) -Audiometric testing -Hearing Protectors -Training -Recordkeeping/Access to information and training material
MEDICAL AND FIRST AID: Contractor shall comply with the standards in 29 CFR 1910 Subpart K and 29 CFR 1926 Subpart C. Contractor’s Safety Plan shall also address:
-Adequate first aid supplies -Trained employee to render first aid -Recordkeeping
Page 4 of 5 24 April 2014, Basic CET
-Reporting and investigating accidents/incidents -Off-site physician(s) -Maintenance of and employee access to exposure monitoring data and medical records
EXPLOSIVE SAFETY REQUIREMENTS: Contractor shall comply with the standards in DoD Contractors' Safety Requirements for Ammunition and Explosives, 9 Apr 05; DoD 4145.19-R-1, Storage and Materials Handling, 15 Sep 79, Chpts 5/6; AFJMAN 23-210, Joint Service Manual for Storage and Material Handling, Apr 94; TO 11A-1-33, Handling and Maintenance of Explosives-Loaded Aircraft, 20 Nov 08), TO 11A-1-46, Fire Fighting Guidance, Transportation, and Storage, 15 Nov 04 Change 6 (12 Nov 08) for all handling of all explosive devices to be removed, installed, stored or transported, AFMAN 91-201.
FOREIGN OBJECT DAMAGE (FOD) Awareness, Prevention and Responsibilities.
The FOD program must be integrated into the day-to-day operations to reduce/eliminate FOD incidents.
Programs will include covering waste dumpsters, waste hauling trucks, barriers in place to stop migrating FOD from dirt and gravel piles, and end of shift or daily clean-up. The contractor will brief their personnel at least weekly on any FOD requirements. All contractors, subcontractors performing maintenance in a FOD–potential area will receive and have documented initial FOD Awareness and Prevention training. All vehicle operators are responsible for performing a Foreign Object (FO) inspection on their vehicles including all towed equipment, vehicle tires and open cargo areas of vehicles prior to entering the marked runway, taxiway, flight line, and aircraft parking ramps and other areas as directed by the Installation FOD Awareness and Prevention Officer. All “open-air” delivery vehicles must be free of loose items/debris that could potentially fall from the vehicle and cause a FOD hazard. The cargo beds of pickups truck must be clean or covered prior to entering the airfield. Vehicles will be subject to inspection and denied entry if found unacceptable. Contractors and site/operations evaluators will ensure tools; equipment, rags, residue and hardware are properly stored and accounted for. “Clean as you go” methods are desired.
HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in OSHA Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced. Refuse, trash, and debris will be collected daily and not left on site to prevent hazards during high winds and inclement weather.
SOLDERING: Soldering shall be conducted in accordance with the requirements in T.O. 00-25-234, General Shop Practice Requirements for the Repair, Maintenance and Test of Electrical Equipment, 1 Aug 88/Change 36, 13 Aug 07, Chapter 3 and 29 CFR 1910.253.
-Recordkeeping/Access to information and training material
HAND AND PORTABLE POWERED TOOLS AND OTHER HAND-HELD EQUIPMENT:
Contractor shall comply with the standards in 29 CFR 1910 Subpart P and 29 CFR 1926 Subpart I.
Contractor’s Safety Plan shall also address:
-Inspection -Proper use -Guarding -Maintenance -Control of rotating parts, flying chips, and sparks
WELDING, CUTTING AND BRAZING: Contractor shall comply with the standards in: 29 CFR
1910.251 thru 255 and 29 CFR1926.102(b), 153, 453(b), AFOSH STD 91-5, Welding, Cutting and Brazing, Chap 1 thru 3, and NFPA 51B, Fire Prevention During Welding, Cutting, and Other Hot Work, 2003 Edition Contractor’s Safety Plan shall also address:
Page 5 of 5 24 April 2014, Basic CET
-Welding Permit Required from Fire Department -Training/worker knowledge -Equipment inspections, service, and use -Fire protection and prevention -Protective equipment & welding shields -Health protection (PPE) -Ventilation -Cylinders and containers -Cylinder storage