This document is a 95% design analysis for the repair and renovation of the Air Force Low Observable (LO) Shops Building #1655. The key details are:
The architectural design approach is to accommodate the Phase 1 program of requirements within a revised Phase 1 area as efficiently as possible. This includes demolition of portions of existing masonry walls, gypsum wall board, doors, windows, and roof, as well as new construction such as masonry infill, metal-framed gypsum board partitions, new overhead coiling doors, hollow metal doors and frames, and a new roofing system. The interior design will refresh all finishes and materials. Structural work will support the addition, replacement, or removal of electrical, mechanical, and plumbing systems. Key timeline information is not provided, as this appears to be a design document rather than a solicitation.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
95% Design Analysis DDPM 20-0031: Repair F-35 LO Shops, B1655
2 | August 4, 2023
• 3-410-01 Heating, Ventilating, and Air Conditioning Systems
(2013, w/ Change 8 2021)
• 3-420-01 Plumbing Systems (2021)
• 3-600-01 Fire Protection Engineering for Facilities (2016, w/ Change 6 2021)
• 4-211-01 Aircraft Maintenance Hangars (2017, w/ Change 3 2021)
3 Architectural and Interiors
3.1 Design Approach
The architecture design approach is to accommodate the Phase 1 program of requirements within a revised Phase 1 area as efficiently as possible. The revised area now includes a portion of the original Phase 2 area where the restrooms and shower areas will be placed. A portion of the Phase 2 AMXS program will occupy the area designated for restrooms and showers in the original Phase 1. In addition, considerations will be made to successfully plan for forthcoming phases.
The interior design approach consists of refreshing all interior finishes and materials as described below in section 3.4 New Construction.
3.2 General Design Parameters and Assumptions
General design parameters center on renovation and remodeling areas within the current building envelope. Major masonry walls will be preserved as much as possible, but new openings are anticipated with the updated plan. Relative to the building envelope, the repair of the upper and lower roof areas is necessary due to the existing conditions
(leaks) observed.
Assumptions include that there is enough area delineated within the concept Phase 1 area to accommodate the assigned Phase 1 program of requirements and to allow for elements to be included that will support following phases. Also, the recommended roof system replacement should be accomplished prior to the start of interior work scope. The lower roof will require replacement to the next break in roof plane.
3.3 Demolition
Architectural demolition items will include portions of existing masonry walls, gypsum wall board, hollow metal doors and frames, overhead coiling door and frames, overhead hoist and track, portions of exterior insulated metal panel, and exterior windows. The existing roofing system will require demolition down to the structural deck.
At the interior, demolition will encompass existing porcelain tile flooring, ceramic tiled walls, gypsum board walls and ceilings, carpet and epoxy floors, base, window shades, removal of any existing cabinetry, and acoustical lay-in ceiling panels within the scope area in Phase 1. Demolition of existing ceilings will include areas outside of the Phase 1 area to allow for replacement of existing mechanical pipes and mains above ceiling.
3 Architectural and Interiors
3.1 Design Approach
The architecture design approach is to accommodate the Phase 1 program of requirements within a revised Phase 1 area as efficiently as possible. The revised area now includes a portion of the original Phase 2 area where the restrooms and shower areas will be placed. A portion of the Phase 2 AMXS program will occupy the area designated for restrooms and showers in the original Phase 1. In addition, considerations will be made to successfully plan for forthcoming phases.
The interior design approach consists of refreshing all interior finishes and materials as described below in section 3.4 New Construction.
3.2 General Design Parameters and Assumptions
General design parameters center on renovation and remodeling areas within the current building envelope. Major masonry walls will be preserved as much as possible, but new openings are anticipated with the updated plan. Relative to the building envelope, the repair of the upper and lower roof areas is necessary due to the existing conditions
(leaks) observed.
Assumptions include that there is enough area delineated within the concept Phase 1 area to accommodate the assigned Phase 1 program of requirements and to allow for elements to be included that will support following phases. Also, the recommended roof system replacement should be accomplished prior to the start of interior work scope. The lower roof will require replacement to the next break in roof plane.
3.3 Demolition
Architectural demolition items will include portions of existing masonry walls, gypsum wall board, hollow metal doors and frames, overhead coiling door and frames, overhead hoist and track, portions of exterior insulated metal panel, and exterior windows. The existing roofing system will require demolition down to the structural deck.
At the interior, demolition will encompass existing porcelain tile flooring, ceramic tiled walls, gypsum board walls and ceilings, carpet and epoxy floors, base, window shades, removal of any existing cabinetry, and acoustical lay-in ceiling panels within the scope area in Phase 1. Demolition of existing ceilings will include areas outside of the Phase 1 area to allow for replacement of existing mechanical pipes and mains above ceiling.
Existing shop equipment will be relocated from other parts of the property to within the main shop area and lean-to area.
95% Design Analysis
DDPM 20-0031: Repair F-35 LO Shops, B1655
August 4, 2023 | 3
Existing shop equipment will be relocated from other parts of the property to within the main shop area and lean-to area.
3.4 New Construction
New architectural items will include new masonry infill, new metal-framed gypsum board partitions (including acoustically enhanced and fire-rated types), new gypsum wall board ceilings and suspended acoustical ceilings, new overhead coiling door and frames, new hollow metal doors and frames, new door hardware, new interior hollow metal window frames, new fixtures and showers at lockers and restrooms, new drinking fountains, and new metal lockers. Additionally, an air shower shall be installed between Decon and
Locker. The building envelope will require a new roofing system over the Phase 1 area and beyond to the next break in the roof plane. Penetrations in exterior wall panels require closure with metal patching and/or silicone sealant depending on the size of the opening. The lean-to area at the north end of the building will require new penetrations to the PEMB envelope to allow for ducting of the new mechanical units. The existing exterior concrete ramp to the egress door at the lean-to area will be replaced with an accessible and compliant concrete ramp, steps and painted metal guardrails.
New interior finish items will include the following:
Floors: Epoxy floor coating, LVT, and porcelain tile.
Base: Epoxy (integral) base, rubber base at LVT, and tile base.
Walls: Painted gypsum board and wall tile.
Ceilings: Acoustical lay-in panels and suspension systems, and gypsum wall board ceilings in wet areas.
Other: New millwork, countertop surfaces, lockers, dressing benches, toilet and shower partitions, stainless steel toilet accessories, window treatments, stainless steel wall protection, windowsills, new paint on door frames and exposed structure elements.
4 Structural
4.1 Design Approach
The structural engineering for this project will be a support role that allows other disciplines to add, replace, or remove electrical or mechanical equipment. New plumbing lines are also anticipated that will require sections of the slab-on-grade to be removed and replaced.
4.2 General Design Parameters and Assumptions
The existing drawings for the building have been provided to the team. The existing drawings are called the Composite Maintenance Facility at Carswell Air Force Base dated August 1989. The roof structure is comprised of open web roof joists supported by interior wide flange girders and exterior concrete masonry unit (CMU) walls. The interior wide flange girders transmit the load to the foundation through wide flange columns. The
20018
20019
TEM
P
DEICING
PAD
Van C om ple x
ASSAULT RUNWAY
Fresnel Lens
NORTH APRON 160
16391632
33573358
3359 3361
41414145
41074106
O V
E R
R U
N
T A
X
IW
A Y
A
TA
X
IW
A Y A
TAXIW
AY 185
AIRCRAFT PARKING 166
SO
UTH A
PRO
N
TAXIW
AY 1
TAXIWAY 181
T A
X
IW
A Y
C
T A
X
IW
A Y
C
T A
X
IW
A Y
D
T A
X
IW
A Y
E
O V
E R
R U
N
NORTH−SOUTH PRIMARY/ INSTRUMENT
RUNWAY 130
74259
11941195
00 1
1519 1517
MK8
E28
6 6
1 99
65206513
65046500
TAXIW
AY 170
T A
X
IW
A Y
B
T A
X
IW
A Y
B
H A
IL
E
R D
PARALLEL TAXIWAY 197
W A
R M
U P
P A
D
W A
R M
U P
P A
D
APRO
N 8
(5
P
AR
KIN
G
STUBS)
WARM UP PAD
APRO
N 7
(1
PARKIN
G
STUBS)
ELECT
SUB
STATION
3321 3325
N
EW
ADD
ITIO
N
NEWADDITION
NEW
ADD
N
EW
ADDIT
IO
N
F arm ers B ranch
Trin ity
Rive r
Lake Worth
S ta te H ig h w a y 1
N
IM
IT
Z
D R
IV
E
H E
R C
U L
E S
R D
B O
Y
IN
G
TO
N
D R
DESERT STORM
ROAD D
A
V
IS
O N
D R
A R
N O
L D
A V
E
S U
P P
L Y
A V
E
LOGISTICS AVE
WAREHOUSE AVED
E
P O
T A
V E
N U
E
HALSEY ST
BU
RKE A
VEN
UE
D O O
LI
TTLE
A
VENUE
VANDENBURG
AVE
EIS
ENHO
W
ER A
VE
CARSW
ELL AVENUE
H E N
S
LE
Y D
R
IV
E
M
EA
N D
I N G
ER
R
OA
D
HULK AVE
H O
R N
E T
C T
T O
M C
A T
A V E
F A
L C
O N
A V
E
R A
N G
E R
D
SAM GARR DR
MILITARY
PKWY
DESERT STORM RD
MILITARY
PKWY
CI RCL E
P
HI
L LI PS
PUMPHREY DRIVE
ETT
H O
R N
E T
C T
Paine Lane
T H
U N
D E R
C H
IE
F
LN
G C
H O
W E
L L
W A
Y
CUTTS WAY
C H
E N
N A
U L T
HEADQUARTERS AVE
D O
O L
IT
L E
A V
E
Mr.G’s
Mr.G’s
NEXTEL
TOW
ER
& BLDG
INDEX OF DRAWINGS
NUMBERING SYSTEM:
XX-100
DISCIPLINE:
A - ARCHITECTURE
C - CIVIL
I - INTERIOR
F - FIRE PROTECTION
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
T - TELECOMMUNICATIONS
DISCIPLINE MODIFIER
REFER TO A/E/C CAD STANDARD FOR
SHEET NUMBERINGSTANDARDS
SHEET NUMBER WITHIN SERIES
HAUL ROUTE IN
HAUL ROUTE OUT
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
C O
N T
R A
C T
N O
A N
S I
D
F A
F
A F
R C
C o n tr a c ti n g
L y o n s D r.
N
A S
J R
B
F o rt W o rt h T
X
B L
O S
H O
P
E
S
IG
N
SHEET
NUMBER
H D
R E
N G
IN
E
E R
IN
G
IN
C
N
W L
O O
P
S
U
IT
E
S A
N A
N T
O N
IO
T E
X A
S
T e x a s P
.E
F ir m R e g is tr a ti o n
N o
F -7
H D
R
A S
N O
T E
D
F A
D
F A
C
E
A W
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
/2
/2
T
R
C O
V E
R S
H E
E T
G-001
/2
/2
C Z
C Z
A M
AFRC 301 Contracting, 1660 Lyons Drive, NAS JRB Fort Worth, Texas 76127
B1655 LO SHOP DESIGN
SOLICITATION NUMBER: FA667523F0003
CONTRACT NUMBER: FA664318D0009
FILE NUMBER: F5A6CE2292AW02
PROJECT NUMBER: 10362240
ISSUED FOR CONSTRUCTION
09/28/2023
SITE LOCATION
VICINITY MAP & HAUL ROUTE NOT TO SCALE
N
SHEET INDEX
SHEET
NUMBER SHEET NAME IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
GENERAL
G-001 COVER SHEET X
G-002 PROJECT INFORMATION, ABBREVIATIONS X
G-100 CODE ANALYSIS X
G-101 LIFE SAFETY PLAN X
CIVIL
C-001 CIVIL TEMPORARY SECURITY FENCE AND
CONTRACTOR LAYDOWN AREA
X
ARCHITECTURAL
AD-101 FLOOR PLAN - DEMOLITION X
AD-102 REFLECTED CEILING PLAN - DEMOLITION X
AD-201 ELEVATIONS - DEMOLITION X
A-101 FLOOR PLAN X
A-102 REFLECTED CEILING PLAN X
A-103 ROOF PLAN X
A-201 EXTERIOR ELEVATIONS X
A-202 INTERIOR ELEVATIONS X
A-301 WALL SECTIONS X
A-401 ENLARGED RESTROOM PLAN X
A-530 WALL DETAILS X
A-531 WALL DETAILS X
A-535 SHOWER DETAILS X
A-601 DOOR SCHEDULE AND DETAILS X
A-720 STD PARTITION TYPES X
A-722 PARTITION FRAMING DETAILS X
A-730 TOILET MOUNTING DIAGRAM X
A-731 INTERIOR CASEWORK STANDARDS X
A-732 INTERIOR CASEWORK STANDARDS X
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES X
S-101 FIRST FLOOR SLAB PLAN X
S-102 INTERMEDIATE LEVEL FRAMING PLAN X
S-301 STRUCTURAL DETAILS X
S-302 STRUCTURAL DETAILS X
INTERIORS
I-001 INTERIOR FINISH LEGEND AND ROOM FINISH
SCHEDULE
X
I-101 INTERIOR FINISH PLAN X
I-201 INTERIORS FURNITURE PLAN X
FIRE PROTECTION
F-001 FIRE PROTECTION GENERAL NOTES X
FD-101 FIRE ALARM PLAN - DEMOLITION X
FD-102 FIRE PROTECTION PLAN - DEMOLITION X
FA-101 FIRE ALARM AND MASS NOTIFICATION PLAN -
NEW WORK
X
FA-501 FIRE ALARM AND MASS NOTIFICATION DETAILS X
FP-101 FIRE PROTECTION PLAN - NEW WORK X
FP-501 FIRE PROTECTION DETAILS X
SHEET INDEX
SHEET
NUMBER SHEET NAME IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
PLUMBING
P-001 PLUMBING LEGEND X
PD-102 PLUMBING DEMOLITION ABOVE FLOOR PLAN X
PD-101 PLUMBING DEMOLITION UNDERFLOOR PLAN X
P-101 PLUMBING PLAN X
P-102 PLUMBING ENLARGED PLAN X
P-103 PLUMBING ENLARGED PLAN X
P-104 PLUMBING COMPRESSED AIR AND VACUUM PLAN X
P-401 PLUMBING RISERS X
P-501 PLUMBING DETAILS X
P-502 PLUMBING DETAILS X
P-601 PLUMBING SCHEDULES X
P-602 PLUMBING SCHEDULES X
MECHANICAL
M-001 MECHANICAL GENERAL NOTES, ABBREVIATIONS X
MD-101 HVAC DEMOLITION PLAN X
MD-102 HVAC ROOF PLAN - DEMOLITION X
MPD-101 MECHANICAL PIPING PLAN - DEMOLITION X
M-101 HVAC PLAN - NEW WORK X
M-102 HVAC ROOF PLAN - NEW WORK X
MP-101 MECHANICAL PIPING PLAN - NEW WORK X
MP-201 MECHANICAL PIPING ENLARGED PLAN X
M-501 HVAC DETAILS X
M-502 HVAC DETAILS X
M-601 HVAC SCHEDULES X
M-602 HVAC SCHEDULES X
M-603 HVAC SCHEDULES X
M-604 HVAC SCHEDULES X
M-701 FLOW DIAGRAM X
M-702 FLOW DIAGRAM X
M-800 CONTROLS GENERAL NOTES, ABBREVIATIONS X
M-801 CONTROL DIAGRAMS X
M-802 CONTROL DIAGRAMS X
M-803 CONTROL DIAGRAMS X
M-804 CONTROLS DIAGRAMS X
M-805 CONTROL POINTS X
M-806 CONTROL POINTS X
ELECTRICAL
E-001 ELECTRICAL SYMBOLS AND ABBREVIATIONS X
ED-101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN X
E-101 LIGHTING PLAN X
E-110 POWER PLAN X
E-111 POWER PLAN - EXISTING ELEC ROOM X
E-112 POWER PLAN - ROOF PLAN X
E-113 POWER PLAN - MECHANICAL EQUIPMENT X
E-501 ELECTRICAL DETAILS X
E-601 ONE-LINE DIAGRAM X
E-701 ELECTRICAL PANELBOARD SCHEDULES X
E-801 ELECTRICAL SCHEDULES X
TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS NOTES & LEGEND X
T-101 TELECOMMUNICATION PLAN X
T-401 TELECOMMUNICATION ENLARGED - TR X
T-402 TELECOMMUNICATION TR ELEVATIONS X
T-501 TELECOMMUNICATION DETAILS X
YOU ZHOU
2 7 6 7 3
09/28/2023
INTERIOR FINISH GENERAL
NOTES
1. REFER TO ASSOCIATED SPECIFICATION SECTION FOR
DETAILED INFORMATION.
2. IF FINISH CODE IS NOT SPECIFIED (--), NO FIELD FINISH IS
APPLIED. REFER TO CORRESPONDING SPECIFICATION
SECTION. IF MANUFACTURER FINISH IS SPECIFIED (MFR),
REFER TO CORRESPONDING SPECIFICATION SECTION
3. ANY COLOR SUBSTITUTE SHALL BE REQUESTED TO THE
ARCHITECT. REFER TO DIVISION 1 REQUIREMENTS.
4. CONSISTENT MATERIAL COLORS AND PATTERN SHALL BE
PROVIDED. PROVIDE MATERIALS FROM SAME PRODUCT RUN.
5. WHERE ITEMS OR SURFACES ARE NOT SPECIFICALLY
MENTIONED, PAINT THE SAME AS SIMILAR ADJACENT
MATERIALS OR AREA. IF COLOR OF FINISH IS NOT
DESIGNATED, ARCHITECT WILL SELECT FROM STANDARD
COLORS OR FINISHES AVAILABLE.
6. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-
FINISHED OR INSTALLER-FINISHED ITEMS.
7. GRILL, DIFFUSERS, ELECTRICAL PANELS, ACCESS PANELS,
ETC. WICH ARE EXPOSED IN FINISHED SPACES SHALL BE
PAINTED TO MATCH THE SURFACE ON WHICH THEY OCCUR.
8. PAINT INTERIOR SURFACES OF DUCTS LOW VOC BLACK
WHERE SURFACES ARE VISIBLE THROUGH GRILLES AND
DIFFUSERS.
9. ALL INTERIOR FINISHES SHALL BE INSTALLED PER
MANUFACTURER'S RECOMMENDATION. INSTALLER SHALL BE
QUALIFIED TO INSTALL SPECIFIC FINISH MATERIAL AND HAVE
EXPERIENCE WITH PROJECTS OF SIMILAR SIZE AND
COMPLEXITY.
10. ALL FLOORING TYPE TRANSITIONS AT DOORS SHALL OCCUR
ON THE CENTERLINE OF THE DOOR LEAF. TRANSITION TO BE
SMOOTH AND EVEN. MAXIMUM VERTICAL CHANGE IN
ELEVATION SHALL BE 1/4 IN. REFER TO SPECIFICATIONS FOR
REQUIRED FLOOR TRANSITION TRIMS.
11. EXTEND FLOORING UNDER LAV/SINK BASE CABINETS AND
OPEN KNEE SPACE.
12. CASEWORK TOE-KICK HEIGHT TO MATCH BASE HEIGHT IN
ROOM.
13. ALL WOOD-LOOK PLASTIC LAMINATE CASEWORK SHALL RUN
VERTICALLY.
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
C O
N T
R A
C T
N O
A N
S I
D
F A
F
A F
R C
C o n tr a c ti n g
L y o n s D r.
N
A S
J rt W o rt h T
X
B L
O S
H
S
IG
N
SHEET
NUMBER
H D
R E
N G
IN
E
E R
IN
G
IN
C
N
W L
O O
P
S
U
IT
E
S A
N A
N T
O N
IO
T E
X A
S
T e x a s P
.E
F ir m R e g is tr a ti o n
N o
F -7
H D
R
A S
N O
T E
D
F A
D
F A
C
E
A W
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
/2
/2
T
R
IN
T
E R
IO
R
F
IN
IS
H
L E
G E
N D
A N
D R
O O
M F
IN
IS
H S
C H
E D
U L
E
I-001
/2
/2
P C
P C
A M
I-001s - INTERIOR FINISH LEGEND
CODE MANUFACTURER SERIES/STYLE COLOR SIZE COMMENTS
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
CFSHD SEE SPECIFICATION -- -- -- --
06 41 16.00 10 PLASTIC-CLAD ARCHITECTURAL CABINETS
PL1 WILSONART 12 SOFT GRAIN FAWN CYPRESS -- --
PL2 FORMICA MATTE FINISH 2770-58 SARUM GREY
06 61 16 SOLID FABRICATIONS
SSF1 CORIAN SOLID SURFACE ARTISTA DUST -- RESTROOM COUNTERTOP
SSF2 CORIAN SOLID SURFACE DEEP CLOUD -- THRESHOLD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
T1 DALTILE FLAT IRON 12" X 24" FLOOR TILE. MAPEI KERAPOXY
GROUT IN COLOR 107 IRON
T2 DALTILE VERTUO MAESTRO VR10 12" X 24" WALL TILE. MAPEI KERAPOXY
GROUT IN COLOR 93 WARM
GRAY
T2b DALTILE VERTUO MAESTRO VR10 6" X 12" WALL TILE BASE. MAPEI
KERAPOXY GROUT IN COLOR
93 WARM GRAY
T3 DALTILE STAGECRAFT KALEIDOSCOPE MOSAIC ARCTIC WHITE 6" X 6" MOSAIC ACCENT TILE. MAPEI
KERAPOXY GROUT IN COLOR
00 WHITE
TT1 SCHLUTER QUADEC-K CLEAR ANODIZED -- OUTSIDE CORNERS METAL
TRIM AT T2 WALL TILE
TT2 SCHLUTER DILEX-AHK CLEAR ANODIZED -- COVE SHAPED METAL TRIM IN
RESTROOMS
09 51 00 ACOUSTICAL CEILINGS
ACT1 ARMSTRONG CALLA HIGH NRC #2844 WHITE 2'X2' SQUARE LAY-IN 15/16" GRID
09 65 00 RESILIENT FLOORING
RB1 ROPPE PINNACLE CHARCOAL 4" --
RFT1 NORA NORAPLAN ENVIRONCARE 7042 STAR GAZING 24,015" X
24.015"
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
RF1 STONHARD STONCHEM 400 STONCHEM GRAY -- --
09 90 00 PAINTS AND COATINGS
PT1 SHERWIN WILLIAMS LATEX / EGGSHELL 7035 AESTHETIC WHITE -- --
PTD1 SHERWIN WILLIAMS DRYFALL PAINT 7035 AESTHETIC WHITE -- EXPOSED STRUCTURE IN MAIN
SHOP
PTE1 SHERWIN WILLIAMS EPOXY / EGGSHELL 7035 AESTHETIC WHITE -- --
PTE2 SHERWIN WILLIAMS EPOXY / FLAT 7005 PURE WHITE -- GWB CEILINGS
PTM1 SHERWIN WILLIAMS PAINT TO METAL / SEMI-GLOSS 7515 HOMESTEAD BROWN -- HOLLOW METAL DOOR &
WINDOW FRAMES
09 96 00 HIGH PERFORMANCE COATINGS
HPC1 STONHARD STONGLAZE VSD BLUE MIST -- AIR SHOWER AND DECON
WALLS
10 26 00 WALL AND DOOR PROTECTION
CG1 CS GROUP HEAVY DUTY RUBBER CORNER GUARD, HC100C BLACK EPDM 3 15/16" LEGS --
10 28 13 TOILET ACCESSORIES
SC1 CS GROUP MYSTERY WHITE -- --
ROOM FINISH SCHEDULE
NUMBER ROOM NAME FLOOR FINISH BASE FINISH WALL FINISH
CEILING
FINISH Area
100 MAIN SHOP RF1 RF1 PTE1 PTD1 3862 SF
101 TRAINING RFT1 RB1 PT1 ACT1 673 SF
102 OFFICE RFT1 RB1 PT1 ACT1 210 SF
103 TOOL CRIB CFSHD RB1 PT1 -- 887 SF
104 PARTS CAGE CFSHD RB1 PT1 -- 511 SF
105 WOMEN'S LOCKER RFT1 RB1 PT1 PTE2 115 SF
106 MEN'S LOCKER RFT1 RB1 PT1 PTE2 298 SF
107 WOMEN T1 T2b T2,T3,PTE1 PTE2 217 SF
107-1 WOMEN T1 T2b T2, PTE1 PTE2 52 SF
108 MEN T1 T2b T2,T3,PTE1 PTE2 449 SF
108-2 MEN T1 T2b T2, PTE1 PTE2 150 SF
109 JAN CFSHD RB1 T2, PTE1 PTE2 27 SF
110 COMM CFSHD RB1 PT1 PTE2 111 SF
111 TLT T1 T2 T2,PTE1 PTE2 58 SF
112 LOCKER RFT1 RB1 PTE1 PTE2 140 SF
113 VEST RFT1 RB1 PTE1 PTE2 62 SF
114 AIR SHWR RF1 RF1 HPC1 PTE2 27 SF
115 DECON RF1 RF1 HPC1 PTE2 112 SF
116 CLEAN ROOM RF1 RF1 PTE1 PTE2 605 SF
117 LOASM CFSHD RB1 PT1 -- 301 SF
118 CNC CFSHD RB1 PT1 -- 302 SF
119 MT/A RF1 RF1 PTE1 -- 943 SF
120 SHOP WORK AREA -- -- PTE1 -- 2289 SF
121 CORR. RF1 RB1 PT1 79 SF
132 MECHANICAL ROOM -- RB1 PTE1 -- 501 SF
138 EXISTING CORRIDOR -- -- PT1 -- 811 SF
E103 EXIST COMM -- -- -- -- 282 SF
E104 EXIST ELEC -- -- -- -- 233 SF
YOU ZHOU
DN
INTERIOR FINISH
PLAN LEGEND
SHEET KEYNOTES
I1
ROOM
NAME
FLOOR
BASE
WALL
NOTE:
REFER TO INTERIOR FINISH LEGEND
SHEET
I-001 FOR FINISH CODES AND
DESCRIPTION OF MATERIALS.
ROOM NUMBER
FLOOR FINISH
BASE FINISH
NOT IN CONTRACT
XXXX
WALL FINISH
WALL ACCENT
FINISH ABBREVIATIONS:
CFSHD MISCELLANEOUS CAST-IN-PLACE
CONCRETE
CG CORNER GUARD
HPC HIGH PERFORMANCE COATING
PL PLASTIC LAMINATE
PT PAINT, LATEX
PTE PAINT, EPOXY
PTM PAINT, METAL DOORS AND
FRAMES
RB RUBBER BASE
RF FULE RESISTIVE RESINOUS
FLOORING
RT RESILIENT TILE FLOORING
SSF SOLID SURFACE FABRICATIONS
T TILE
EXISTING CORRIDOR TO RECEIVE NEW PAINT
ON WALLS. ALL OTHER FINISHES REMAIN
EXISTING.
IX
I1
1 3 4 5 6 7
B
D
A
C
E
8 9
10 11
CNC
CFSHD
RB1
PT1
SHOP
WORK
AREA
PTE1
LOASM
CFSHD
RB1
PT1
MT/A
RF1
RF1
PTE1
MAIN
SHOP
RF1
RF1
PTE1
TRAINING
RFT1
RB1
PT1
OFFICE
RFT1
RB1
PT1
TOOL
CRIB
CFSHD
RB1
PT1
CLEAN
ROOM
RF1
RF1
PTE1
DECON
RF1
RF1
HPC1
MEN'S
LOCKER
RFT1
RB1
PT1
PARTS
CAGE
CFSHD
RB1
PT1
MECHANICAL
ROOM
RB1
PTE1
JAN
CFSHD
RB1
T2, PTE1
MEN
T1
T2b
T2,T3,PTE1
WOMEN
T1
T2b
T2,T3,PTE1
EXISTING
CORRIDOR
PT1
WOMEN'S
LOCKER
RFT1
RB1
PT1
COMM
CFSHD
RB1
PT1
LOCKER
RFT1
RB1
PTE1
VEST
RFT1
RB1
PTE1
AIR
SHWR
RF1
RF1
HPC1
I1
TLT
T1 T2
T2,PTE1
T
T
T
CG1
CG1
CG1CG1 CG1CG1 CG1
CG1 CG1
CG1
E X
IS
T
T
T
E X
IS
T
EXIST
T1
MEN
108-2 T1 T2b
T2, PTE1
WOMEN
107-1 T1 T2b
T2, PTE1
CORR.
RF1
RB1
PT1
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
C O
N T
R A
C T
N O
A N
S I
D
F A
F
A F
R C
C o n tr a c ti n g
L y o n s D r.
N
A S
J rt W o rt h T
X
B L
O S
H
S
IG
N
SHEET
NUMBER
H D
R E
N G
IN
E
E R
IN
G
IN
C
N
W L
O O
P
S
U
IT
E
S A
N A
N T
O N
IO
T E
X A
S
T e x a s P
.E
F ir m R e g is tr a ti o n
N o
F -7
H D
R
A S
N O
T E
D
F A
D
F A
C
E
A W
KEYPLAN
PLAN NORTH
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
/2
/2
T
R
IN
T
E R
IO
R
F
IN
IS
H
P L
A N
I-101
/2
/2
P C
P C
A M
3/32" = 1'-0"1
FIRST FLOOR PLAN
YOU ZHOU
MRP1
07 41 13
MANUFACTURER: BERRIDGE
SERIES/STYLE: KAYNAR 500 OR HYLAR 5000
COLOR: MEDIUM BRONZE
FWP1
07 42 63
MANUFACTURER: CENTRIA
SERIES/STYLE: VERSA WALL V
COLOR: 992 LEE IVORY
PL1
06 41 16.00 10
MANUFACTURER: WILSONART
SERIES/STYLE: 12 SOFT GRAIN
COLOR: FAWN CYPRESS
PL2
06 41 16.00 10
MANUFACTURER: FORMICA
SERIES/STYLE: MATTE FINISH
COLOR: 2770-58 SARUM GREY
SSF1
06 61 16
MANUFACTURER: CORIAN
SERIES/STYLE: SOLID SURFACE
COLOR: ARTISTA DUST
SSF2
06 61 16
MANUFACTURER: CORIAN
SERIES/STYLE: SOLID SURFACE
COLOR: DEEP CLOUD
T1 09 30 10
MANUFACTURER: DALTILE
SERIES/STYLE: FLAT
COLOR: IRON
SIZE: 12” X 12”
T2, T2b
MANUFACTURER: DALTILE
SERIES/STYLE: VERTUO
COLOR: MAESTRO VR10
SIZE: 12” X 24”
T3
MANUFACTURER: DALTILE
SERIES/STYLE: STAGECRAFT KALEIDOSCOPE
COLOR: ARCTIC WHITE
SIZE: 6” X 6”
TT1
MANUFACTURER: SCHLUTER
SERIES/STYLE: QUADEC-K
COLOR: CLEAR ANODIZED
TT2
MANUFACTURER: SCHLUTER
SERIES/STYLE: DILEX-AHK
COLOR: CLEAR ANODIZED
ACT1
09 51 00
MANUFACTURER: ARMSTRONG CEILINGS
SERIES/STYLE: CALLA HIGH NRC, #2844;
SQUARE LAY-IN 15/16” GRID
COLOR: WHITE
RB1
09 65 00
MANUFACTURER: ROPPE
SERIES/STYLE: PINNACLE
COLOR: CHARCOAL
RFT1
09 65 00
MANUFACTURER: NORA
SERIES/STYLE: NORAPLAN ENVIRONCARE 7042
COLOR: STAR GAZING
SIZE: 49.21’ x 48”
RF1
09 67 23.15
MANUFACTURER: STONHARD
SERIES/STYLE: STONCHEM 400
COLOR: STONCHEM GRAY
PT1, PTE1, PTD1
09 90 00
MANUFACTURER: SHERWIN WILLIAMS
SERIES/STYLE: LATEX, EPOXY / EGGSHELL
COLOR: 7036 AESTHETIC WHITE
PTE2
MANUFACTURER: SHERWIN WILLIAMS
SERIES/STYLE: EPOXY / FLAT
COLOR: 7005 PURE WHITE
PTM1
MANUFACTURER: SHERWIN WILLIAMS
SERIES/STYLE: PAINT TO METAL/SEMI-GLOSS
COLOR: 7515 HOMESTEAD BROWN
HPC1
09 96 00
MANUFACTURER: STONHARD
SERIES/STYLE: STONGLAZE VSD
COLOR: BLUE MIST
CG1
10 26 00
MANUFACTURER: CS GROUP
SERIES/STYLE: HEAVY DUTY CORNER GUARD,
HC100C
COLOR: BLACK EPDM
SC1
10 28 13
MANUFACTURER: CS GROUP
SERIES/STYLE: MYSTERY
COLOR: WHITE