RFI_0006AIP_B1344_20150831.pdf

PDF 149 KB Posted

Attached to
B1344 RENOVATIONS Solicitation # FA6675-15-R-0006
Solicitation number
FA6675-15-R-0001
Issued by

About this file

RFI 0006AIP 20150831 response

View the file

Other files

File Type Posted
FA6675-15-R-0006_B1344_Solicitation_Amendment__4.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_4_08312015.pdf PDF
1344_-_301_CATAM_-_HVAC_Installation_Plan.pdf PDF
FA6675-15-R-0006_0003_B1344_Amendment__3.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_3_08252015.pdf PDF
1344_-_301_CATAM_-_Electrical_Power_Plan.pdf PDF
RFI_0002IES_20150822.pdf PDF
RFI_0003IES_20150822.pdf PDF
RFI_0001IES_20150822.pdf PDF
RFI_0001MCI_20150817-signed.pdf PDF
RFI_0003AIP_20150812-signed.pdf PDF
RFI_0005DME_20150818.pdf PDF
RFI_0004AIP_20150812.pdf PDF
RFI_0002AIP_20150812-Signed.pdf PDF
FA6675-15-R-0006_B1344_Solicitation_Amendment_0002.pdf PDF
RFI_0003DME_20150804-signed.pdf PDF
RFI_0004DME_20150811-signed.pdf PDF
RFI_0002DME_20150804.pdf PDF
RFI_0001DME_20150804.pdf PDF
1344_-_301_CATAM_-_Plumbing_Work_Required.pdf PDF
1344_-_301_CATAM_-_Lighting_Installation_Plan.pdf PDF
1344_-_301_CATAM_-_Plumbing_DEMO_Plan.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_2-1_08032015.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev08032015.pdf PDF
B1344_Current_Exterior_Dimensions.pdf PDF
B1344_Interior_Dimensions_Post_Construction.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev06172015.pdf PDF
B1344_Existing_Concrete_Dimensions.pdf PDF
B1344_Electrical_Power_Plan.pdf PDF
B1344_Ceiling_Demo_Plan.pdf PDF
FA6675-15-R-0006_B1344_Solicitation_Amendment_0001.pdf PDF
B1344_Comm_Plan.pdf PDF
WD_TX150322_03062015_TX322.pdf PDF
B1344_HVAC_Demo_Plan_Model_2.pdf PDF
B1344_Concrete_Work_Required.pdf PDF
B1344_Flooring_Install.pdf PDF
B1344_Exterior_Dimensions_Post_Construction.pdf PDF
B1344_Ceiling_Install.pdf PDF
B1344_Lighting_Demo_Plan.pdf PDF
B1344_Rm_102_Millwork.pdf PDF
B1344_Electrical_Demo_Plan.pdf PDF
B1344_HVAC_Installation_Plan.pdf PDF
B1344_Current_Interior_Dimensions.pdf PDF
B1344_Fire_Suppression_Install.pdf PDF
B1344_Current_Fire_Suppression.pdf PDF
FA6675-15-R-0006_B1344_CATM_Solicitation.pdf PDF
RFI_-RFC_FORM_20150420.doc DOC document
B1344_HVAC_Demo_Plan_Model_1.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION / CLARIFICATION FORM

FOR CONTRACTOR USE ONLY

CONTRACT NO:

FA6675-15-R-0001

RFI NO: 6 DATE 2015-08-31

SUBJECT: HVAC DRAWING REFERENCE/ DETAIL:

Section 3.1.2 and Section 3.1.3

ATTACHMENT SENT UNDER SEPARATE

COVER(__)

RESPONSE NEEDED BY:

REQUEST:

The revised SOW section 3.1 appears to contradict the HVAC load requirement.

Can the Contracting Office please clarify the HVAC quantities required?

• 3.1.1 and 3.1.2 call for (2) 7.5 ton outdoor units, each having a minimum cooling capacity of 182,830 BTU/H and a minimum heating capacity of 154,000 BTU/H with a (1) ton split system in the restroom

• 3.1.3 calls for (3) units with a minimum cooling capacity of 72,000 BTU/H and a minimum heating capacity of 84,000 BTU/H and a (3) ton unit for the restroom.

The (2) 7.5 ton units will provide the total minimum cooling and heating capacities as required by the revised SOW, it appears that 3.1.3 quantities are above the performance requirement and confuse the intent. The (1) ton split would appear to be correct for the restroom.

Additionally section 3.1.3 is calling for (3) 6 ton units and(1) 3 ton unit for the restroom.

PROPOSED SOLUTION (If applicable):

Please clarify the HVAC requirements to ensure expectations are clear

TO(Contracting Officer): 301 CONF/LGC Ron Pyles

FROM (Contractor):

AIP Enterprises

DATE (YYYYMMDD)

2015-08-31

TYPE OR PRINT NAME AND TITLE

Aaron Garriott

SIGNATURE:

FOR GOVERNMENT USE ONLY

FROM CONTRACTING TO:

BCE: Charles Tehan (__); Robert Dudley(__; OR OTHER(__)

For Evaluation and Action

DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:

RFI RESPONSE / CLARIFICATION (refer to page 2)

RFI RESPONSE / CLARIFICATION:-

Government to complete following sections:

TO: AF Contractiing Office From Responding Agency

TO:(Contractor from Contracting Officer

1191522202C Typewritten Text X

1191522202C Typewritten Text 20150831

1191522202C Typewritten Text Ron Pyles, Contract Admin

1101986434C Typewritten Text

1101986434C Typewritten Text

1. The two (2) 7.5 ton heat pumps shall be rated at 90,000 BTU/h minimum cooling capacity and minimum heating capacity of 168,000 BTU/h. The two (2) compatible 3,000 CFM air handlers shall be rated the same for cooling and heating capacity in the main 4,800 SF building.

2. Upgrade 1.0 heat pump unit to 1.5 tons. The single 1.5 ton heat pump for the bathroom annex shall be rated at 17,200 BTU/h and a minimum heating capacity of 32,000 BTU/h. The compatible 600 CFM air handler shall be rated the same for cooling and heating capacity in the 300 SF bathroom annex.

The 4th Revision of the Statement of Work will reflect these changes.

1101986434C Typewritten Text 20150831

1101986434C Typewritten Text Charles D. Tehan, GS-11, USAFR Engineering Technician, 301 MSG/BCE

CONTRACTOR REVIEW

After reviewing the Government response, does the contractor anticipate A change order will be required? YES NO There will be an increase in the cost of the project? YES NO

Reviewer:

*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.

1376454971C Typewritten Text 20150901

1376454971C Typewritten Text Yvette Todtenhoefer, Contracting Officer

2015-08-31T13:20:56-0500
PYLES.RONALD.GENE.1191522202
2015-08-31T18:38:42-0500
TEHAN.CHARLES.D.1101986434
2015-09-01T10:49:18-0500
TODTENHOEFER.YVETTE.1376454971